Designation: D5745 − 23

Standard Guide for


Developing and Implementing Interim and Early Actions for
Waste Contamination Site Remediation1
This standard is issued under the fixed designation D5745; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (´) indicates an editorial change since the last revision or reapproval.

1. Scope* 1.5 This standard does not purport to address all of the
1.1 The purpose of this guide is to assist practitioners in the safety concerns, if any, associated with its use. It is the
development, selection, design, and implementation of interim, responsibility of the user of this standard to establish appro-
short-term, or early action remedies undertaken at sites of priate safety, health, and environmental practices and deter-
waste contamination for the purpose of managing, controlling, mine the applicability of regulatory limitations prior to use.
or reducing risk posed by environmental site contamination. 1.6 This international standard was developed in accor-
Early action remedies and strategies are applicable to the dance with internationally recognized principles on standard-
management of other regulatory processes (for example, state ization established in the Decision on Principles for the
underground storage tank (UST) programs are equally appli- Development of International Standards, Guides and Recom-
cable) in addition to the Comprehensive Environmental mendations issued by the World Trade Organization Technical
Response, Compensation and Liability Act (CERCLA)/ Barriers to Trade (TBT) Committee.
National Oil and Hazardous Substances Pollution Contigency
Plan (NCP) process. This guide identifies and describes a 2. Referenced Documents
standard process, technical requirements, information needs, 2.1 ASTM Standards:2
benefits, and strategy for early actions. D653 Terminology Relating to Soil, Rock, and Contained
1.2 This guide is applicable to both nonhazardous and Fluids
hazardous sites of contamination as defined by CERCLA as D3740 Practice for Minimum Requirements for Agencies
amended by the Superfund Amendments and Reauthorization Engaged in Testing and/or Inspection of Soil and Rock as
Act of 1986 (SARA) and the Resource Conservation and Used in Engineering Design and Construction
Recovery Act (RCRA) as amended by the Hazardous and Solid D6235 Practice for Expedited Site Characterization of Va-
Waste Amendments (HSWA) of 1986. dose Zone and Groundwater Contamination at Hazardous
Waste Contaminated Sites
1.3 To the extent that this guide may be used for hazardous E1689 Guide for Developing Conceptual Site Models for
materials operations, it does not address the applicability of Contaminated Sites
regulatory limitations and local requirements. E1739 Guide for Risk-Based Corrective Action Applied at
1.4 This guide offers an organized collection of information Petroleum Release Sites
or a series of options and does not recommend a specific E2081 Guide for Risk-Based Corrective Action
course of action. This document cannot replace education or E2616 Guide for Remedy Selection Integrating Risk-Based
experience and should be used in conjunction with professional Corrective Action and Non-Risk Considerations
judgment. Not all aspects of this guide may be applicable in all 2.2 USEPA DocumentsAvailable from United States Envi-
circumstances. This ASTM standard is not intended to repre- ronmental Protection Agency (EPA), William Jefferson Clinton
sent or replace the standard of care by which the adequacy of Bldg., 1200 Pennsylvania Ave., NW, Washington, DC 20460,
a given professional service must be judged, nor should this http://www.epa.gov.
document be applied without consideration of a project’s many Guidance for Performing Preliminary Assessments under
unique aspects. The word “Standard” in the title of this CERCLA, September 1991, EPA/9345.0-01A
document means only that the document has been approved Guidance for Performing Site Inspections under CERCLA,
through the ASTM consensus process. September 1992, EPA/9345.1-05

1
This guide is under the jurisdiction of ASTM Committee D18 on Soil and Rock
2
and is the direct responsibility of Subcommittee D18.21 on Groundwater and For referenced ASTM standards, visit the ASTM website, www.astm.org, or
Vadose Zone Investigations. contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
Current edition approved July 1, 2023. Published July 2023. Originally approved Standards volume information, refer to the standard’s Document Summary page on
in 1995. Last previous approved in 2015 as D5745 – 15. DOI: 10.1520/D5745-23. the ASTM website.

*A Summary of Changes section appears at the end of this standard


Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States

&RS\ULJKWE\$670,QW O DOOULJKWVUHVHUYHG 7KX0DU87&


1
'RZQORDGHGSULQWHGE\
3RQWLILFLD8QLYHUVLGDG&DWROLFDGHO3HUXSXUVXDQWWR/LFHQVH$JUHHPHQW1RIXUWKHUUHSURGXFWLRQVDXWKRUL]HG
D5745 − 23
Data Quality Objectives for Remedial Response Activities: 3.2.12 size characterization, n—the process by which infor-
Development Process, EPA/540/G-87/003 mation relating to the nature, extent, potential migration
RCRA Corrective Action Interim Measures Guidance, In- pathways, and receptors of environmental contaminants is
terim Final, June 1988, EPA/9902.4 gathered, interpreted, and documented.
RCRA Corrective Action Plan (Final), May 1994, EPA/ 3.2.12.1 Discussion—Site characterization efforts to provide
9902.3-2A a basis for the following: (1) the development of a conceptual
site model (CSM), (2) the selection and design of a site
3. Terminology remediation plan, or (3) the measuring point against which the
3.1 Definitions—For definitions of common technical terms effectiveness of a remedy can be evaluated, or some combina-
in this standard, refer to Terminology D653. tion thereof (see Practice D6235).
3.2 Definitions of Terms Specific to This Standard: 3.2.13 site remediation, n—those actions taken in the event
3.2.1 applicable or relevant and appropriate requirements of a release or threatened release of a hazardous substance into
(ARAR)—those requirements, cleanup standards, standards of the environment, to prevent or minimize the impact of the
control, and other substantive environmental protection release, or to mitigate a substantial hazard to present or future
requirements, criteria, or limitations promulgated under federal environmental conditions.
or state law that show either a direct correspondence or address 3.2.13.1 Discussion—This early action may or may not lead
problems or situations sufficiently similar at a site to show that to ultimate restoration of the site.
they are well suited for application. 3.2.14 source, n—the location at which contamination has
3.2.2 conceptual site model (CSM), n—a written or pictorial entered the natural environment.
representation of the physical system and the iterative charac-
terization of the physical and chemical processes and condi- 4. Summary of Guide
tions that affect the transport of contaminants from sources 4.1 The basic activities associated with implementing an
through environmental media to receptors or potential recep- interim or early action are as follows: (1) construction of a
tors (see Guide E1689). CSM and estimation of risk(s); (2) identification of exposure
3.2.3 contaminant, n—any substance potentially hazardous control pathways amenable to engineered control; (3) devel-
to human health or the environment present in the environmen- opment of partial solutions, estimation of engineered risk, and
tal media of concern, and for which there exist regulatory identification and negotiation of required action levels; (4)
limits. selection of the desired solution(s); (5) attainment of legal
3.2.4 early action, n—a remedial plan initiated in advance authority for implementation of the planned solution(s); (6)
of a complete or final characterization of a contaminated site. design and execution of the selected solution(s); and (7)
post-implementation monitoring of the conceptual site model.
3.2.5 final remedy, n—complete site restoration.
4.2 Five common objectives for an early action are to
3.2.6 interim action, n—a remedial action that implements a
achieve the following: (1) minimize the human or environmen-
partial solution prior to the selection of a final remedy.
tal risk exposure, or both; (2) minimize the time required to
3.2.7 migration, n—the movement of contaminant(s) away implement a final remedy; (3) protect resources (for example,
from a source through permeable subsurface media (such as the financial, mineral, and ecological); (4) minimize the complex-
movement of a groundwater plume of contamination) or the ity of a final remedy; or (5) provide a solution-oriented project
movement of contaminant(s) by a combination of surficial and focus, or combination thereof.
subsurface processes.
4.3 There are three basic types of interim or early action
3.2.8 potential migration pathway, n—the route that may be remedies: (1) source control remedies, (2) pathway control
taken by contaminants in the environment as they move or are remedies, and (3) receptor control remedies. Early actions are
transported from the source(s), usually in a downgradient commonly categorized as source or receptor control since
direction. pathway controls usually require a sophisticated understanding
3.2.9 receptor, n—humans or other species potentially at of the conceptual site model dynamics.
risk from exposure to contaminant(s) at the point(s) of expo-
NOTE 1—Some examples of interim and early action remedies include:
sure. fences; site access controls; warning signs; physical security; covers;
3.2.10 release, n—any spilling, leaking, pumping, emitting, barriers; underground barrier walls; drainage controls; runoff diversion
emptying, discharging, injecting, escaping, leaching, dumping, barriers; berms; dikes; impoundment areas; capping; neutralizing chemi-
cals; removal of debris; removal of drums, tanks, containers; removal of
and disposing into the environment (including the abandon- soil or solid materials; removal of liquids; in-situ treatments; bioremedia-
ment or discarding of barrels, containers, and other closed tion; alternate water treatment process; provision of alternate potable
receptacles) of any hazardous substance. water sources or supplies; and provision of alternate habitat.
3.2.11 removal, n—immediate, short-term measures in- 4.4 The development of a final remedy is often an iterative
tended to protect people from immediate threats posed by process that evolves frequently with the compilation of new
contaminants. data in the CSM. Prompt development and implementation of
3.2.11.1 Discussion—Examples are handling, transport, and early actions increases attainment of a project’s remediation
off-site disposal of sources or potential sources. objectives.

&RS\ULJKWE\$670,QW O DOOULJKWVUHVHUYHG 7KX0DU87&


2
'RZQORDGHGSULQWHGE\
3RQWLILFLD8QLYHUVLGDG&DWROLFDGHO3HUXSXUVXDQWWR/LFHQVH$JUHHPHQW1RIXUWKHUUHSURGXFWLRQVDXWKRUL]HG
D5745 − 23
4.5 Early actions or interim remedial measures are effective contamination; and lenders, sureties, and persons of general
risk management tools when designed and executed properly. interest within an affected community.
Some common benefits derived from early actions include: (1) 5.3 This guide is not intended to replace legal requirements
human, ecological, and financial resources are protected; (2) for remediating sites of environmental contamination. This
the time required to remediate an unacceptable environmental guide should be used to supplement existing regulatory guid-
condition is minimized or reduced; (3) decreased geometric ance and to focus remedial efforts toward final remedy solu-
magnitude or scale of an unacceptable environmental condi- tions.
tion; (4) minimized complexity and scope of a final remedial NOTE 2—The quality of the result produced by this standard is
solution; and (5) environmental projects become “solution” dependent on the competence of the personnel performing it, and the
oriented. suitability of the equipment and facilities used. Agencies that meet the
criteria of Practice D3740 are generally considered capable of competent
4.6 A successful strategy for the application of early actions and objective testing/sampling/inspection/etc. Users of this standard are
has been developed. The strategy consists of phases or steps cautioned that compliance with Practice D3740 does not in itself assure
that include: reliable results. Reliable results depend on many factors; Practice D3740
4.6.1 Development of a potential proactive early action provides a means of evaluating some of those factors.
remedies list.
4.6.2 Identification of early action candidate sites. 6. Procedure
4.6.3 Selection of site-specific and easily definable CSM 6.1 Assembling Required Information—Assemble all avail-
component(s). able information, including the following: historical records,
4.6.3.1 Establishment and prioritization of early action ob- interviews, previous studies, environmental analytical data,
jectives for each CSM component. permits, regulatory guidance and requirements, maps, geologic
4.6.3.2 Identification of early action alternatives to address- cross sections, engineering infrastructure as-built plans, and
ing each objective, anticipated or expected results and their drawings (see Practice D6235). At least one site visit by
impact on final regulations and remedy. technical personnel tasked with the responsibility of designing
4.6.3.3 Selection of regulatory and public comment, as and implementing an early action is required prior to the
appropriate. development of a remedial plan.
4.6.4 Establishment of funding for early actions.
NOTE 3—For sites subject to USEPA CERCLA additional guidance is
4.6.5 Prioritization of early action solutions consistent with available by reviewing “Guidance for Performing Preliminary Assess-
the objectives, public response, expected results, and funding ments under CERCLA” and “Guidance for Performing Site Inspections
availability. under CERCLA.”
4.6.6 Selection and integration of early action solutions. 6.2 Development of the Conceptual Site Model—An initial
4.6.6.1 Determination of appropriate criteria for manage- concept of the site(s) CSM should be developed using all
ment of early action progress and results. assembled information (see Guide E1689). The quality and
4.6.6.2 Establishment of documentation and record proce- accuracy of all information should be assessed both quantita-
dures for early action and effective final remedy implementa- tively and qualitatively, and the use of the information should
tion. be focused on the following:
4.6.6.3 Analysis of the validation approach prior to the 6.2.1 Identification of Contaminants—Identify the environ-
implementation of early action. mental contaminants for all pathways of a CSM. Particular
4.6.7 Preparation and finalization of the early action reme- emphasis should be placed on identifying the contaminants for
dial plan. any suspected exposure pathways of concern.
4.6.8 Implementation and documentation of early action 6.2.2 Characterization of Background Conditions—The
activities. natural and secondary (modified) background concentration of
4.6.8.1 Frequent and periodic validation of early action contaminants in all CSM pathways must be characterized or
results in comparison to the early action plan and the final estimated in order to design a useful early action. This
remedial action frequently and periodically. information is necessary in order to develop appropriate action
4.6.8.2 Frequent and periodic review of early action activi- levels, identify possible synergism, estimate environmental
ties. risk, and identify and design remedial solutions.
5. Significance and Use 6.2.3 Contaminant Source Characterization—An under-
standing of contaminant source characteristics is essential in
5.1 This guide is intended to provide a systematic approach developing a successful early action remedy. At a minimum,
for the application and execution of early actions for purposes the following source characteristics should be measured or
of remediating both hazardous and non-hazardous contamina- estimated for a site:
tion. Iterative development of a CSM is fundamental to the use 6.2.3.1 Source location, boundaries, volume, and mass;
of this guide. 6.2.3.2 Hazardous constituents and their concentration at a
5.2 Anticipated users of this guide are owners or operators source;
at sites of environmental contamination; technical profession- 6.2.3.3 Time, duration, rate of contaminant release (both
als involved in the field of environmental site characterization volume and mass) from a source; and
and remediation; environmental regulators, property owners, 6.2.3.4 Suspected areas (three dimensional) of contaminant
employees, and residents adjacent to sites of environmental migration within a pathway from a point or source release.

&RS\ULJKWE\$670,QW O DOOULJKWVUHVHUYHG 7KX0DU87&


3
'RZQORDGHGSULQWHGE\
3RQWLILFLD8QLYHUVLGDG&DWROLFDGHO3HUXSXUVXDQWWR/LFHQVH$JUHHPHQW1RIXUWKHUUHSURGXFWLRQVDXWKRUL]HG
D5745 − 23
6.2.4 Potential Migration Pathway Characterization— 6.3.3.1 Each site of environmental contamination has a
Potential migration pathways through the soil, surface water, CSM component appropriate to manage for the control of
air, and ground water must be identified and characterized human or ecological risk. Example of these components
primarily for each source of contamination at a site. The include: (1) surface water diversion and runoff control from a
minimum information or characterization requirements for contaminated release area may be a useful CSM component in
developing an early action for each migration pathway type is pathway control; (2) source control or removal of a contami-
as follows: (1) an evaluation and estimate of the contaminant nant release to the environment may prevent migration of
mass released and its release mechanism to a pathway, (2) contaminant mass through a pathway to a receptor; and (3)
identification of the transport mechanism and an estimate of fencing or warning signs of hazardous contaminants. Identifi-
contaminant transport rate or dispersion within a pathway, or cation of the CSM components appropriate for engineered risk
both; and (3) identification of the human and ecological management is often the most critical element for developing
receptors at potential points of exposure above levels of a successful early action. Regulatory agency involvement is
acceptable risk on a contaminant migration pathway. recommended to communicate the evaluation of the CSM
6.2.5 Contaminant Mass Estimate—An estimate of con- components. Early agreement to the strategy by the regulatory
taminant mass and contaminant distribution is required for agencies is essential.
developing successfully focused early action remedies. NOTE 5—For sites subject to USEPA RCRA additional guidance is
6.2.6 Receptor Exposure Characterization—Estimates of available by reviewing “RCRA Corrective Action Interim Measures
the concentration and duration of both human and ecological Guidance, Interim Final.”
contaminant exposure should be developed for each exposure 6.3.3.2 Each CSM component identified should have well-
point within a migration pathway. defined risk management and mitigation objectives, each with
6.2.7 Estimation of Human and Ecological and Other associated desired and anticipated results from the potential
Risk—Early actions are engineered risk management solutions. early action solutions. These CSM components and objectives
An estimate or perception of unacceptable risk should exist should be prioritized as the primary basis for evaluating
before an early action is considered and developed. There are alternatives and desired results. To the extent practical at this
many categories of environmental risks; some examples are stage in the strategy, the possible impact on projected final
human and ecological risk, financial risk, community relations, remedies should be considered while the CSM components,
etc. objectives, and expected results are being identified and
prioritized.
NOTE 4—For site subject to USEPA RCRA additional guidance is
available by reviewing “RCRA Corrective Action Plan (Final).” 6.3.3.3 Public participation should be solicited and evalu-
ated whether or not legally required. Early public/citizen
6.3 Identification of Early Action Strategy—Most successful participation may reveal objectives and concerns in addition to
early actions or interim remedial measures incorporate a technical and site issues that could jeopardize the future
strategy that emphasize a technical approach that expediously success of the early action unless considered in all phases of
balances and expedites the technical requirements and needs of the strategy.
a project risk and available resources (see Guides E1739 and 6.3.3.4 At many sites where early actions have been
E2081). The elements of a proven strategy for developing and implemented, often only one potential technical remedy was
implementing early actions, as summarized in 4.6, are dis- considered. The identification of multiple potential technical
cussed as follows. solutions targeted at the most appropriate CSM components is
6.3.1 Proactive Development of Early Action Remedies—It essential if the most flexible, timely, and technically responsive
is important for all affected parties to provide input within the remedy(ies) is to be developed for that site (see Guide E2616).
framework of a “positive” forum to identify their concerns, 6.3.4 Funding of Early Actions—Few sites have been reme-
risks, resources, and objectives for an early action. The diated successfully using early actions alone and seldom are all
development and implementation of an optimum early action contaminant migration pathways and risks understood at the
will be delayed unless a proactive and technically focused early stages of a remedial project, the time when many early
environment of cooperation is developed among the parties actions are performed. For these reasons, it is advisable to
affected by environmental contamination concerns. It is espe- identify and allocate (budget) only a reasonable portion of the
cially important for time and resource critical projects to foster available funding for early action, which is balanced between
proactive interaction on technical issues. ASTM advocates the cost and risk management benefits. The available funding
early solicitation and consideration of community concerns. levels should be used to guide and focus the following steps
6.3.2 Identification of Early Action Candidate Sites—Not all toward a realistic early action solution. If the human or
sites of environmental contamination are appropriate candi- ecological risks identified in the CSM component(s) cannot be
dates for early action. Sites that are dynamic and contain addressed adequately by available funding, other or additional
complex migration pathways commonly require sophisticated funding alternatives should be considered.
and detailed site characterization before sufficient technical 6.3.5 Prioritization of Early Action Solutions—The alterna-
information is available to design an appropriate interim tive elements, including desired results and technical
remedy. components, of a proposed early action should be prioritized
6.3.3 Identification of Manageable CSM Components and by the affected parties. It is important that the prioritization be
Early Action Solution Alternatives: performed in a proactive fashion to ensure that most critical

&RS\ULJKWE\$670,QW O DOOULJKWVUHVHUYHG 7KX0DU87&


4
'RZQORDGHGSULQWHGE\
3RQWLILFLD8QLYHUVLGDG&DWROLFDGHO3HUXSXUVXDQWWR/LFHQVH$JUHHPHQW1RIXUWKHUUHSURGXFWLRQVDXWKRUL]HG
D5745 − 23
and beneficial elements of an early action are implemented. Often, although not always required, written documents de-
The resulting priority should be consistent with the technical scribing the following topics are developed and submitted to
and risk management objectives, public response, expected legal entities for approval.
results, and available funding. 6.4.1 Legal Authority—Early actions must meet those
6.3.6 Selection and Integration of Early Actions—Based on cleanup standards, standards of control, ARARs, and other
the priority of alternative solutions, selection of the most substantive requirements, criteria, or limitations promulgated
beneficial solution should be conducted before formulating a under federal environment or state environmental or facility
remedial implementation plan. Performance criteria should be citing laws that specifically address a hazardous substance,
selected to document and measure progress toward the ex- pollutant, contaminant, remedial action, location, or other
pected results in order to integrate the selected early action circumstances found at a hazardous waste, RCRA, or CER-
with follow-on remedial activities and a final remedy. These CLA site. Only those state standards that are identified by a
criteria should be incorporated into the remedial plan and state in a timely manner and that are more stringent than
include, as a minimum, recording and reporting procedures by federal requirements may be applicable. Many different legal
the responsible party, interim technical objectives and requirements may impact the design and implementation of an
schedule, budgetary objectives and constraints, reporting for- early action. Early actions are commonly authorized by the
mat for public participation, and documentation of early action following: (1) letters of agreement, (2) interim records of
activities useful for final remedy preparation and implementa- decision, (3) engineering estimates and cost analysis (EECAs),
tion. The criteria resulting from the selection process should and (4) permit amendments. There are many other types of
also include an analysis to validate that the selected early legal mechanisms that may also be used to authorize or
action approach does, in fact, satisfy the risk management approve early actions.
objectives and the CSM components. 6.4.2 Health and Safety Plan—The operational health and
6.3.7 Preparation and Finalization of Remedial Plan— safety aspects of implementing an early action must be
Regulatory agencies often have format and content require- considered. Typically, emergency response plans, site evacua-
ments for remedial plans; however, the regulatory agency tion plans, worker safety, and alternate pathway contaminant
requirements may be minimal for many early actions. The transport (for example, soils contamination transported in the
preparation of early action remedial plans must meet these air pathway during waste excavation) control are topics that are
regulatory requirements to receive approval. The remedial plan considered and discussed by a health and safety plan.
should be sufficiently detailed to provide guidance for imple-
6.4.3 Sampling and Analysis Plan—Most early actions in-
mentation but simple enough to allow flexibility to respond to
changing technical and site conditions. Specifically, it should corporate some sampling and analytical testing; however, it is
be noted that site characterization activities may be ongoing not always required. Samples are frequently collected to
during early action activities on complicated contaminated monitor treatment efficiency, characterize wastes for disposal,
sites with complex CSMs. This ongoing site characterization and characterize a site further as components of an early action.
will contribute developments and refinements to the CSM that All sampling and analysis plans (SAPs) should identify the
may require changes to the early action remedial plan. following: sampling procedures; sampling frequency;
preservation, transport, and handing techniques; decontamina-
6.3.8 Implementation and Documentation of Early Action
tion procedures; analytical methods; and quality assurance/
Activities—During implementation of the plan, the results must
quality control (QA/QC) systems that are associated with the
be documented faithfully and compared to the original objec-
environmental data generation process.
tives frequently. Actual results and progress during the early
action must be validated as achieving the targeted objectives. NOTE 6—For sites subject to USEPA CERCLA additional guidance is
Consistency with a projected final remedy must be validated available by reviewing “Data Quality Objectives for Remedial Response
frequently during implementation of the early action. Activities: Development Process.”
6.3.9 At some sites where early actions have been 6.4.4 Early Action Plan—All early actions must have a
implemented, valuable technical information has been lost or remedial plan. The remedial plan describes how an early action
not properly documented, recorded, and reported by the will be implemented. Operational items that should be ad-
responsible party. For example, early and undocumented re- dressed by the remedial plan are discussed as follows:
moval and disposal of contaminated soil resulted in lack of (1) Security,
contaminant characterization chemical data and knowledge (2) Mobilization/demobilization,
concerning the volume of the removed soil. This lack of (3) Unit/system operation,
information made it difficult and more costly to plan and (4) Unit/system test/performance monitoring,
implement a final remedy. Extreme care and extra expense may (5) Community relations,
be needed to ensure proper documentation. There must be (6) Site analysis,
proper documentation and record-keeping in order for the early (7) Contaminant mass balance,
action strategy to benefit the final remedy. (8) Waste characterization/management plan, and
6.4 Identification of Requirements for Early Actions—Some (9) Permits.
requirements for developing early actions are site specific. The Early action plans address complex technical issues affecting
following sections discuss those requirements that must be operation and execution of the remedy, but they are often
considered for any interim remedial measure or early action. relatively short and simple documents.

&RS\ULJKWE\$670,QW O DOOULJKWVUHVHUYHG 7KX0DU87&


5
'RZQORDGHGSULQWHGE\
3RQWLILFLD8QLYHUVLGDG&DWROLFDGHO3HUXSXUVXDQWWR/LFHQVH$JUHHPHQW1RIXUWKHUUHSURGXFWLRQVDXWKRUL]HG
D5745 − 23
6.4.5 Execution and Implementation of Early Action (solid, sludge, liquids, etc.); documentation of all post remedial
Plan—It is usually not possible to deviate from an approved site restoration activities; copies/records of all written and
early action plan. Operations should conform to the plan unless verbal correspondence with property owners, public media,
circumstances require change and written authorization for and regulatory agencies; recommendations/lessons learned for
plan modification is obtained. Documentation of all operations final remedy.
and activities must be maintained to verify that the early action 6.4.6 Documentation Retention—Responsibility for record
plan was implemented correctly and fully and to demonstrate keeping rests with the property owner. Documentation for early
what was accomplished at a future date. Documentation is actions taken under CERCLA should be maintained in the
necessary so that the final remedy can be selected and administrative record. This documentation should be main-
implemented without delay and question: tained for other sites as part of the legal records for the site.
6.4.5.1 Records of Public Participation—Notes of all public 6.4.7 Post Remedy Monitoring Plan—Many early actions
meetings; records of responses to public comments and meet- will require that the success of the remedy be monitored during
ings. their implementation. It is advisable to develop an operation
6.4.5.2 Field Logs—Daily records of activities, site man- and monitoring plan prior to, or in conjunction with, develop-
ager; health and safety meeting notes; transportation, disposal, ment of the remedial plan.
treatment records; field sampling records and sample identifi- 6.4.8 Early Action Performance Assessment—The success
cation; site entry logs; all other records to document field of an early action should be assessed by comparing its actual
activities. result to the predicted goal or desired objective.
6.4.5.3 Analytical Data Records—Chain of custody records 6.5 Other Considerations—In addition to the previously
to document field sampling; purchase orders for laboratory data discussed requirements, other factors must often be considered
and expense; tracking, analytical data results and QC data/ when developing a remedial plan for an early action. Some of
records. the more common factors of this type are as follows: (1)
6.4.5.4 Early Action Results—Chronological comparison of funding limitations, (2) time constraints, (3) community
remedial plan with actual activities; soil excavation history and acceptance, and (4) technology availability.
verification sampling results to verify that post excavation
remedial goals were met; volume and disposition (location) of 7. Keywords
contaminated material removed from site; analytical data 7.1 conceptual site model; early action; environmental risk
associated with disposal and waste management activities; all management; hazardous waste; interim-remedial measure;
waste management and disposal manifests and bill of latent nonhazardous waste; site characterization; site remediation

SUMMARY OF CHANGES

Committee D18 has identified the location of selected changes to this standard since the last issue (D5745–15)
that may impact the use of this standard. (July 1, 2023)

(1) In Section 1, added professional judgement caveat. (4) Moved Appendix X1 to Section 4 Note.
(2) Revised Section 2 to include new ASTM standards and (5) In Section 5, added Note on Practice D3740
update USEPA documents. Notes also added to body of (6) In Section 7, edited Keywords
standard to cite USEPA References.
(3) In Section 3, added D653, deleted definition contained
therein D653, corrected typo and moved standard-specific
definitions from 3.1 to 3.2

ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentioned
in this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the risk
of infringement of such rights, are entirely their own responsibility.

This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and
if not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standards
and should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of the
responsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you should
make your views known to the ASTM Committee on Standards, at the address shown below.

This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,
United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the above
address or at 610-832-9585 (phone), 610-832-9555 (fax), or service@astm.org (e-mail); or through the ASTM website
(www.astm.org). Permission rights to photocopy the standard may also be secured from the Copyright Clearance Center, 222
Rosewood Drive, Danvers, MA 01923, Tel: (978) 646-2600; http://www.copyright.com/