Introduction
• Who am I ?
• Where am I from ?
• Who are all involved in the Management systems ISO 9001 & TS
16949 and in what capacity?
• What’s my position in my plant ?
• Expectations of this week ?
3
What is Environment?
ENVIRONMENT
Surroundings in which an organization operates, including air, water, land, natural
resources, flora, fauna, humans, and their interrelation.
4
Environment Pollution
Pollution is the introduction of contaminants into the natural environment that
cause adverse change
Types of Pollution
Water Pollution
from chemical/ oil spillages
Air Pollution
From boilers etc.
Vehicle emissions
Soil Pollution
From chemical/ oil spillages
Incorrect disposal of waste
5
Sources of Pollution
Sources of Waste
Industries
Commercial Establishments
Domestic (Municipal)
6
Why does the Environment Need Protecting?
Pollution,
The generation of wastes and
The depletion of natural resources leads to
7
Environmental Aspect Impact Identification (Cont...)
8
Examples of Aspects & Impacts
9
Environment Aspect
ISO14001 defines an environmental aspect as :
“An element of an organization’s activities, products or services that can interact with the
environment”
Aspects can be
Regulated or non-regulated
Natural or man-made
Positive or negative
Controlled or influenced by the organization
10
Environment Impact
11
Establishing Significant Aspects
START
YES
NO
Significant Aspects
International Issues
YES
Business concern
NO YES
Severity of Impact
Non-significant aspects
12
ISO 14001:2004 4.3.1 REQUIREMENTS
13
Input Output Analysis /Turtle Diagram
Responsibility
Utilities Production Manager ,
Water Supervisors , Setters, Operators
Compressed air
Energy
INPUTS OUTPUTS
Raw Materials Product,
Fuel By product
PROCESS NAME:
Wastes
PRODUCTION Air Emission
Effluent
Noise
etc
• Control Actions: measures taken to control, eliminate, minimize or mitigate the identified
impacts. Examples of control actions: monitoring, facilities, treatment systems,
standardization.
• Significant Environmental Aspect: an aspect which has (actual) or may have (potential)
an important impact on the environment, determined according to the ENV 5x5 Matrix
attached.
• Significant Environmental Aspects Conformance Rate (S-ECR): defines the
percentage of significant environmental aspects that has effective control measures in
place.
• Emergency: abnormal situation that causes (actual) or may cause (potential) accidents or
significant negative impacts on the environment. For example: explosions, fires, major
leakages.
16
Pre-requisite before Starting Aspect Impact Identification
17
Process of Identifying Aspects & Impacts
18
Building Aspect Register
19
General identification of the spreadsheet
20
Task Identification
21
Task Identification (Cont…)
Aspects related to:
products (including raw materials and intermediate products) and
co-products;
support services and activities,
such as internal / external transportation,
construction,
expansion,
demolition,
cafeteria,
separation of trash,
maintenance,
lubrication,
cleaning services,
sanitation, and
gardening; and
new projects (e.g. expansion, modernization, new facilities or technologies, launching new products,
among others).
22
Concepts
PROCESS = CASTING
Process
Steps Tasks Activities
Pan receive H2 Measurement Set up measurement
Casting
Preparation for the machine mechanism
Mold powder addition
start Fold mechanism in a way that
Discard long tube
the wire is perpendicular to the
Cast
Liquid pool measurement liquid bath
Cut
Flux powder high Position the mechanism
Dispatch measurement between the valve and the
Distributor fluxing mold
Wait 10 seconds
Identification of Aspects and Impacts
Environmental Aspects:
List the possible causes of changes in the environment, actual or
potential, associated with the activities identified by grouping similar
causes in order to simplify the analysis.
Examples of aspects:
air emissions,
wastewater generation,
solid waste generation, including industrial and ordinary or non-industrial waste,
noise emissions,
odors,
radioactivity,
vibration,
visual impact,
use of raw materials,
use of non-renewable natural resources such as raw or processed coal, diesel oil, etc.
25
Classifying Aspects According to their Nature
Actual Aspect:
an aspect that normally occurs and may take place under normal
circumstances (e.g. production and preventive maintenance) or
unusual circumstances (e.g. corrective maintenance).
Potential Aspect:
an aspect that may occur, such as in emergency situations.
26
Classifying An Aspect By Its Operating Condition
OPERATING TASK
CONDITION
“Normal” environmental aspects are those arising from routine
NORMAL (N)
activities. Example: preventive maintenance tasks, furnace
operation, etc.
“Abnormal” environmental aspects are those arising from non-
ABNORMAL (A)
routine activities. Plant start-ups and shutdowns, equipment
undergoing corrective maintenance, etc.
“Emergency” environmental aspects are those arising from
EMERGENCY (E)
unplanned or unintentional potential situations: leakage, fire,
explosion, equipment failure, tank ruptures, etc.
Impacts identified in the present but arising from activity
PAST (L) undertaken in the past that has generated some liability. Examples:
Improper disposal of waste, underground structures and tanks,
retired equipment.
27
Evaluation Criteria (frequency/probability and severity)
The basic criteria for evaluation are: frequency/probability and severity, with
progressive levels, according to the ENV 5x5 Matrix
28
Env 5 X 5 Matrix
1 2 3 4 5
FREQUENCY OF ENVIRONMENTAL ASPECT GENERATION
Low, occurs once or Eventual, occurs 3 Low, occurs once or
Frequent, occurs Continuous, occurs
twice in a to 4 times twice in a
weekly. daily.
year. per year. month.
PROBABILITY
Very unlikely, almost Possible. It has
Unlikely, very low. It
null. There are no Rare. It has happened more
has happened at Likely. It has
records of similar happened last year than once in the last
least once in the happened less than
Historical cases in the past 10 at Gerdau OR in the year at Gerdau OR
past 10 years in this a year ago on this
events/Possibility years in this kind of past 5 years on this more than once in
kind of process/ Site.
process/ Site. the past 5 years on
equipment.
equipment. this Site.
Possesses effective
Controls controls
Possesses controls
(engineering +
(engineering +
administrative +
administrative + Only administrative
monitoring) that Only administrative Week or absent
monitoring) that and monitoring
totally eliminate the controls are in place. controls.
partially eliminate controls are in place.
possibility of
the possibility of
occurrence or there
occurrence.
is no need
of controls.
ENVIRONMENT
5 a) Demands more than 10 years or more than US$ 50 million or
more than monthly planned EBITDA to mitigate.
b) Mill down for more than 30 days.
c) The community needs to be evacuated or near roads need to
be disrupted or public services have to be interrupted for longer 5 10 15 20 25
than 3 days. d) Might cause a public demonstration or expose the
company to international media.
e) Supply of natural resources can be depleted at a regional level.
f) Visible continuous atmospheric emissions or continuous
effluent emissions affecting neighboring community. 29
Env 5 X 5 Matrix (Cont...)
ENVIRONMENT
4 a) Demands up to 10 years or more than US$ 5 million or more than 50% of the monthly planned EBITDA to
mitigate.
b) Mill/ Department down for up to 30 days.
c) Residences nearby need to be evacuated or the public services have to be interrupted for up to 3 days.
4 8 12 16 20
d) Might cause a public demonstration or expose the company in the national media.
e) Supply of natural resources can be depleted at a local level. f) Visible intermittent atmospheric or
effluent emissions affecting neighboring community.
ENVIRONMENT
3 a) Demands up to 5 years or more than US$ 1 million or more than 25% of the monthly planned EBITDA to
mitigate.
b) Department/ Cell down for up to 24h.
SEVERITY
c) The community needs to be warned or the residences near have to be inspected. Evacuation is not
required and public services can operate normally.
d) Might cause a public demonstration or expose the company in state media. 3 6 9 12 15
e) Supply of natural resource might be compromised for the Mill.
f) Atmospheric emissions are visible from outside the Mill, but do not
affect the community.
ENVIRONMENT
2 a) Demands up to 1 year or up to US$ 1 million or up to 25% of the monthly planned EBITDA to mitigate.
b) Department/ Cell down for ≤ 4h. c) Limited to the Mill.
d) Might expose the company in the local media.
2 4 6 8 10
e) Does not compromise natural resource availability.
f) There are diffuse atmospheric emissions, which are not easily seen from outside the Mill.
ENVIRONMENT
a) It can be mitigated by immediate action or simply by regeneration of the environment itself.
b) There is no down.
c) Damage is limited to the area of occurrence. d) There is no exposion to external public.
1 e) Does not compromise resource availability. 1 2 3 4 5
f) Atmospheric emissions are not visible from outside the Mill.
Result (R)
Once the scores are identified, calculate the result using the equation below:
31
Significance of Environmental Aspects
A result of more than 12 is considered Significant (S) and a result of less than
12 is considered Non-significant (N), as follows: That is:
32
Legal Requirements and Permits
Permit restrictions;
33
Control Action
Identify the existing control action(s) for all aspects evaluated as significant (R> =
12).
34
Environmental Compliance Evaluation
In cases where the impact is known to be significant, but there is no governing local
legislation, consideration should be given to following internationally- recognized
environmental legislation.
35
S-ECR measurement frequency
The S-ECR should be measured, with the result the last position at the end
of the quarter.
36
Proposed Action
For aspects that are rated as “S” and have an Environmental Compliance of “NC”
(non-compliant), actions for improvement to become compliant should be defined,
and where applicable, approval should be obtained from the environmental control
agency to continue operating while the control measure is being implemented.
This action should be included in the proposed action for the field. Considering:
RESULT ACTION
Between 20 & 25
Requires robust engineering measures for control
(Significant)
Should prioritize the goals and objectives for
Between 12 & 16 improvement (projects), preferably, physical
(Significant) systems, measurements and routine
standardization.
Between 8 and 10
Maintain operational standard as minimum control,
(borderline and non-
if necessary.
significant)
Question the need to maintain existing operational
Below 8 (non significant) standards, eliminating/ simplifying whenever
possible.
37
Table Top Exercise F-4 Conveyor RM-1 Conveyor
RM-2 Conveyor
IRON ORE
F-3 Conveyor
FINES
m
ixing dru
Primary m
M-4 Conveyor
r
ey o F-2 Conveyor
onv
Secondary Mixing Drum
2 C
M- Ignition furnace
veyor
Single roller crusher FS-3 Con
or
ey
nv
Co
-2
Product Bin
FS
r
yo
M-3 Conveyor nve
o
- 1C
Sinter Machine FS
r
onveyo
FS-4 C