Procedure: -
Heat the bitumen at 160 ℃ for 15-20 min or until melting point of bitumen.
Note:- 170 ℃ for Polymer Modified Bitumen (PMB)
Pre weight the sampler and pour about 4.0 to 4.5 gm of bitumen in that or we can directly
pour in the bottom plate of the poker chip.
Note:- Pre heat the top , bottom plate and spacer dowels at 165 ℃ for 45 min than pour
the bitumen directly at bottom plate.
Now place the whole assembly in oven for another 15 min at 165 ℃.
Remove the bottom plate and place the 3 spacer dowels at 120°, and again place it in over
for 5 min at 165 ℃
Now, after 5 min. place the alignment pin & top plate over bottom plate and place it in
for 15 min at 165 ℃
Now, cool the whole assembly at normal temperature for 24 hours.
Testing: -
Place the whole assembly at poker chip instrument, fix it at proper aligned.
Now remove the alignment pin for assembly.
Start the test at a rpm of 5mm/min.