Modern Diamond Drop and Gulachi LLC
Oman India Fertilizer Company
Sur, Oman
Final Report
(22-02-2023 to 02-03-2023)
2
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
CONTACT
a. Registered Name Modern Diamond Drop and Gulachi LLC
3
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
PREFACE
Modern Diamond Drop and Gulachi LLC is a Muscat based NDT Inspection,
Testing and Industrial Solution Service providing company. We are an
Omani company incorporated in 2018.
Modern Diamond Drop and Gulachi LLC expressed their sincere thanks to
Oman India Fertilizer Company, for the support, guidance and cooperation
extended by them for successful completion of this Eddy Current Tube
Inspection Job.
4
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
TABLE OF CONTENT
1. Introduction…………………………….….………………………………………………………….………………………Page No. 07
5
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
Executive Summary
Eddy current testing of LP Decomposer 11-E-103 currently operational in Urea -I unit was
conducted in the month of February 2023.
Total of 844 Straight Tubes are installed out of which87 Straight tubes wereexamined as per the
instructions of OMIFCO E.I.C.
During visual inspection of tube-sheet face, tubes were found dry condition but the tubes had
some amount of scaling present which led to using a smaller diameter probe.
One important aspect to be kept into mind that while looking in to ID & OD wall thickness
signals, ID wall thinning is represented between 00 to 400 and OD wall thinning is represented
above 400. So, measurement accuracy on ID side is less and OD side is more. Since through hole
signal is set at 400, a minor variation in phase angle may represent ID signal as OD signal and
vice versa.
Observation Summary
6
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
Data Acquisition and Analysis: Dedicated software is used for data acquisition, data analysis
and display. The data acquisition module collects the tube data at a given sample rate. The
menu driven, user-oriented program provides for real-time display of phase, amplitude and
probe position in the tube. The data analysis and display module contain the calibration curves
for wall thinning, volume losses, pits, vibration / fretwear and correlates the calibration
standard in formation with the actual plant data for flaw sizing and evaluation.
Capabilities and Limitations: The technique is effective for detecting pitting, surface erosion,
erosion damage, localized wall loss and other small defects on the free portion of tube and
7
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
under tube support plate. The technique is less effective for thin defects in circumferential
orientation. Any defect causing thickness reduction more than 20% of wall thickness can be
easily detected. Test System is also calibrated with 1.3 mm diameter through hole and any
opening of such order can be easily detected however, minute pin holes may go unnoticed.
4. REFERENCE DOCUMENT:
ASME Boiler and Pressure Vessel Code Section-V, Article-8 UREA STRIPPER Drawing
ECT Equipment Operating Manual
5. ECT PERSONNEL:
d. Manually driven Differential probe operating in both Differential and Absolute mode
suiting the ID of the Tube.
e. Laptop computer loaded with software for data acquisitions, signal processing and analysis.
8
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
8. ECT PROCEDURE:
Test Parameters: Test frequency is selected as per tube material and tube wall thickness.
Gain and phase is adjusted to obtain signals of required amplitude and separation between
Id and OD signals as shown in below figure. Calibration tube with reference flaws is used to
establish sensitivity and amplification required. Testing of Tube: The probe is inserted into
the tube till it reaches bottom side tube sheet. The probe is then gradually withdrawn from
the tube at a steady speed and the data is collected on a hard disk. The processing of the
data occurs in real-time. Impedance plane signal and corresponding x-y plot is stored. The
Data is further analyzed using Data Analysis Software and Calibration Curve obtained from
Calibration tubes.
9
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023
9. EXTENT OF TESTING: only 93 Tubes colored in purple have been scanned and analyzed.
10. ECT CALIBRATION RECORD: ECT calibration parameter and calibration record are described below:
ECTPROBE
Probe Style Number Shaft Length Extension Cable
Differential/Absolute:18mm 15M NA
ECTEQUIPMENT
Make & Model Serial No. Calibration Date
OLYMPUS, MS5800 1131736 01/08/2022
10
Modern Diamond Drop and Gulachi LLC
Modern Diamond Drop and Gulachi LLC Report No: OMIFCO/MDD&G/10266
Address: 500 City Season Building, Al Khuwair Duration of Test: 28/02/2023
PO Box 404, PC 112, Muscat Date of Report: 02-03-2023