13 SEP2019
CoxHewlett& BaileyWoodland RCA PROJECT OFR- - OMAA
Signature:.................
POBox7013CloistersSquareWA6850
360MurrayStreetPerthWA6000Australia
T + 61893223&M F + 61893221664 wwwcosw au
Job 614020
number
Sheet 1 Of Date-29/09/2019
The Contractor shall comply with directions described withoutvariation to the Contract sum and without
adjustment to the time for Substantial Completion. Should the Contractor consider that compliance
with these directions involves a variation to the Contract Sum or an adjustmentto the time ofSubstantial
Completion of the works, he/she shall inform the Resident Engineer(RCA) and obtain written approval
before executing the work
SUBJECT MEP3-MS-GE-0004 Rev. O Method Statement for Installation of Fire Sealants on MEP Services
^^^^(. /^C^.
Copies to - RCA, MIL
Page 1 f 1
T2)^K)^
^
PRASANTH
29/09/2019
DOCUMENT REVIEW SHEET
Project Name: Oman Museum Across Ages, Nizwa, Sultanate of Oman Project Number 1661
Doc Ref: 1661-TEN-OAAM-MST-007 Issue Date 28.09.2019
Category Method Statement for the Installation of Fire sealants on MEP services
Review Findings
Tenable Fire Engineering had reviewed the MST (refer category) and our observations are as follows:
Required Action
Review Status
☐ Approved ☒ Approved with Comments ☐ Not Approved
☐ Attachments
Issued by:
Yuvaraj M
Sr. Fire Engineer
P.O Box 250, PC 118, Muscat, Sultanate of Oman; T: +968 24693056, F: +968 24693057, E: info@tenablefec.com, www.tenablefec.com
CONTRACTOR DOCUMENT REVIEW
(B) NO EXCEPTION TAKEN.
(A) NO EXCEPTION TAKEN. COMPLY WITH COMMENTS.
WORK MAY PROCEED.
(C) NO EXCEPTION TAKEN
EXCEPT CLOUDED AREAS. (D) REVISE AND RESUBMIT.
RESUBMIT CLOUDED AREAS. WORK NOT TO PROCEED.