Sl. Item Description


No.

1 2
1 Schedule-I : Engineering Services
2

Survey Work, Hydraulic Design and As-Built Drawing: Conducting route survey of the Rangia
Town as per drawings/ maps attached in the Bid Documents. The survey includes along the road, fixing
up alignment, taking levels at every 50 m intervals , and at each crossing & junction of road, change of
alignment by qualified surveyors and with modern equipment viz. GPS, Total Station / DGPS and
preparation of drawing in Auto CAD and GIS format as per instruction of Engineer - in - Charge,
showing the alignment of road, route of pipeline, location of Head Works & existing Intake/ Deep tube
well, important land marks in both side of the roads, habitation by hatch mark and submission of 3 (Six)
copies of drawing (Hard Copy) as well as soft copy in (CD or DVD) with geo reference of all
landmarks, important road crossings, head Works, As built drawing & other related sites of proposed
areas in GIS Layer, .shp file layers, in projection (Latitude & Longitude). The location of completed
works and alignment shall be marked in the drawing and it shall represent true locations at site as
directed. Survey Work also Includes Household survey for finalizing house survey connections- Entire
water supply scheme under AMRUT 2.0 avoiding duplicity of Household Connection of Water Supply
already provided by schemes other than AMRUT 2.0 & Hydraulic Design, Detailed Engineering and
Drawings with technical specifications and modelling of proposed water supply main lines, distribution
system, and structural Design, Detailed Engineering and Drawings with technical specifications of
components (if any) included in proposed water supply system completely in all respect. Any changes as
required after re-Design, Detailed Engineering and Drawings with technical specifications (if needed)
the system shall be informed to the Engineer-in-Charge and any other works as directed by Engineer in
charge/ employer and after approval shall be executed for entire project area.

3 Schedule II : Intake floating Barge


4
A) Design, installation, development, testing and commissioning of Steel Floating Barge of size
10 m x 5 m. Providing & supplying A.C. Building board in Ceiling with necessary nails, Wood Board
Screws including Ist class Local wood 50mmx 12mm beading, Providing Repainted Galvanised Iron
Sheet Roofing (RPGI), Providing Repainted G.I. Sheet accessories (Ridges/valley, Gutter/flashing),
Providing wood work in frame for false ceiling, Partitions, Painting in three coats on new steel & other
metal surface with ready mixed bituminous paint including cleaning the surface, Providing deck fitting
of approved specification on board the barges. Providing mooring materials, Life saving & Fire fighting
equipmentson board the barges as directed & Specified. Providing & Supplying electrical arrangements
for light/fan/call bell point with all materials, including Transportation of equipment, erection at site,
setting the work etc. all complete as required and as directed. Fabrication and supplying, Getting
Permission from naval officer before descending the Barge in the river water , payment to All
Permission to Concerned Authority, etc complete and any other works as directed by Engineer in
charge/ employer.
5
B) MECHANICAL WORKS FOR BARAGE RAW WATER PUMPING:- Design, supply, erection,
testing and commissioning of New Proposed Raw Water Pumping machinery (Centrifugal Pumps) on
Barage of 15 HP, 60 LPS, 13 Mtr Head, 3 nos. (2 working + 1 standby) including all necessary
electrical and other installation works : Pump MOC - CI Casing, CI Impeller, SS Shaft, Mechanical
Seal, Pump set with base frame, IE3 Motor (CC/ABB/Matharon/ Equivalent as per relevant BIS
specification), Pump, Coupling, Pressure Guage, Coupling Guard, Foundation Bolts, M.S.
Dismantelling Joint, DI suction & delivery piping with flanges, foot valve, DI sluice valve, DI non
return valve etc., All piping works like Cutting, welding, Fabrication, Hydor Testing, Painting &
Coating as per technical specificaiton. Supplying and Erection of Lifting equipment chain block pulley
with travelling trolley with 6 mtr lift for clear water pump and blower. All the Mechanical works Should
Comply the Technical Specification and Clients Requirement.

C) ELECTRICAL WORKS FOR BARAGE RAW WATER PUMPING:- Design, Administrative


cost and charges, Supply & erection of LT panel with suitable size Incomer MCCB from transformers &
DG Set. Pumps feeders supplied with MCB/MCCB & DOL/Star Delta/Soft starter with EMPR for
motor protection. (DOL upto 7.5HP and Star Delta upto 35 HP and Soft starter above 50 HP). Also have
Spare MCB of 16 amp (4 Nos) and 32 amp (2 Nos). The panel should be SCADA Compatable with
power analyser and can be operated remotely from SCADA System. APFC Panel : Suitable Rating of
KVAR capacity 440 V, 3 phase, 50 Hz., Contactor Logic & Intelligent Relay micro APFC passive filter
panel, consisting of suitable steps of APP/MPP type capacitor units with Detuned (harmonic filter)
reactors of suitable rating and compliance to IEC 61439 and power quality IEC 61921 standard.
Providing and extending earthing to all electrical & Mechanical equipments from transfromer thru 25x3
GI Strip. Supplying, lying & terminating XLPE armoured cable 3/3½/4 core aluminium conductor with
continuous 12 SWG G.I. earth wire complete erected with glands & lugs, on wall/ trusses/pole or laid in
provided trench/ pipe for all equipments as per std and IE Rules. Providing & erecting hot dipped
galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 150 mm width
& 75 mm height complete with necessary coupler plates & hardware. Providing internal and External
Lighting with PVC pipe (20mm), flexible single core copper wire along with Switch boards, normal
sockets, power sockets, LED lighting, Street lighting, Fans, Exhaust fans for Barage. All the Electrical
works Should Comply the Technical Specification and Clients Requirement

7
D) INSTRUMENTATION WORKS FOR BARGE RAW WATER PUMPING :- Design, manufacture,
supply, installation, testing and commissioning Electromagnetic Flow Meter as per ISO 4064,
with accuracy as per specification, with in- built wireless communication along with one
number of battery operated Pressure Transmitter (ratio metric type) as per given
specifications for following sizes including sensor, transmitter surge arrestor, cables, pipe
cutting, levelling and installation of flow meter in Electrical panels with locking arrangement,
commissioning and erection all complete and pressure transmitter in the pipelines with
necessary tool tackles etc complete for Raw water Rising main outlet of proper sizing. All the
Instrumentation works Should Comply the Technical Specification and any other works as
directed by Engineer in charge/ employer

8 Schedule III : Raw Water Transmission main :


9

DI - K9 Pipes for Raw water Pipes and Specials: - Design, supply, laying, hydro-testing, disinfection
and commissioning of raw water transmission main of Supply, delivery & Stacking of Ductile Iron (DI)
Pipes of Class K9, and P 1.0 rating, IS marked conforming to IS 8329:2000 Centrifugally Cast (SPUN)
Pressure Pipes for water with Socket, Spigot ends and tyton joints in standard working lengths of 5.5 &
6m for classification K-9 suitable for Push- on Joint (Rubber Gasket Jointing) with cement mortar
lining inside the pipes as per of IS 8329:2000 and Zinc Coating with a finishing layer of Epoxy Resin
(Blue Epoxy) on external surfaces as per IS 8329:2000. including third party inspection (Pre and Post)
including DI Specials and fittings of class K12, with plain, double socket, Socketed and flanged DI
specials conforming to IS: 9523 including various types of bends, tees, reducers, socket and flanged tail
pieces, duck foot bends, collars, mechanical joints, dead end caps, blank flanges etc. as per requirement
including EPDM rubber gaskets suitable for tyton joints and ‘O” rings required for the jointing of
specials with the pipes, nuts and bolts with packing gaskets, including required valves, appurtenances
and chamber (air valves, sluice valves and non-return valves, pressure gauges) including excavation in
trenches, dismantling of all type of pavements, sand bedding as required, backfilling of trenches and
foundations with approved grade excavated materials and approved graded river sand as required
including loading and unloading , reinstating of road, Shuttering and shoring the earth at different levels
in foundations where necessary with required prop, struts, planks, timbers, nails etc. including
dewatering if necessary, thrust blocks, nalla/Stream/ culvert crossing, construction of pedestals
including all up to commissioning, Third party inspection (Pre & Post), Road restoration as per existing
condition with proper safety arrangements, hydro-testing complete for Rising main as per Technical
Specifications and any other works as directed by Engineer in charge/ employer.

10 250 mm to 300 mm dia Ductile Iron Class K-9 pipe (inclusive of all fittings and other relevant
accessories)
11 Schedule IV : Proposed Water Treatment Plant (3.4 MLD)
12

A) Civil works for Proposed WTP: Design, supply, construction, installation, testing and
commissioning of Complete Water Treatment Plant of capacity 3.40 MLD (in 16 hours of operation and
with raw water from underground source) with suitable design in conformity with the CPHEEO Manual
and all relevant BIS Code of practices with latest amendment, current at the time of design & execution,
having provision for Aeration, Rapid mixing flash mixer (MSEP), Clariflocculation & Filtration
followed by disinfection Auto Chlorination system (Pre & Post) fixing and installation up to
commissioning with construction of RCC Chlorine Room of minimum 14 Sqm.as per instruction
of the Engineer - in -Charge at the WTP Location, including all necessary Mechanical Work suitable
for smooth & trouble free operation of the plant, Provision for Back Washing, Chemical house with
Laboratory Facility including laboratory equipment and having provision for one Water Works Office
and Storage accommodation, filter back wash water tank, sludge disposal system, recycling of back
wash water, all internal connection & by-pass piping system including all internal and external
electrification work for compound lighting etc., back wash water pump with necessary piping work etc.,
and including Internal electrification work (with concealed copper wiring of required C/S. area) with all
necessary electrical fittings & fixtures viz., light / fan / power socket etc., all complete, as directed and
specified and any other works as directed by Engineer in charge/ employer. Design and Construction
of pure water sump of required capacity & pump house having all appurtenances & provision for
all inlet, outlet & overflow arrangement; calibrated water level indicator; Air Vent Pipe; Men Hole
with Cover; CI Lugs inside the sump etc., and complete finishing of the pump room having steel
casement window / ventilator, MS Rolling Shutter, C.C. flooring with metallic concrete hardener,
internal electrification (with concealed copper wiring of required C/S. area) with all necessary electrical
fittings & fixtures viz., light / fan / power socket etc., all complete, and any other works as directed by
Engineer in charge/ employer.
13

B) MECHANICAL WORKS FOR PROPOSED WTP:- Design, supply, erection, testing and commissioning
of New Proposed Treated Water Pumping machinery (Centrifugal Pumps) of 25 HP, 31.4 LPS, 32 Mtr
Head, 5 nos. (4 working + 1 standby) including all necessary electrical and other installation works :
Pump MOC - CI Casing, CI Impeller, SS Shaft, Mechanical Seal, Pump set with base frame, IE3 Motor
(CC/ABB/ Matharon/Equivalent as per relevant BIS specification), Pump, Coupling, Pressure Gauge,
Coupling Guard, Foundation Bolts, M.S. Dismantling Joint, DI suction & delivery piping with flanges,
foot valve, DI sluice valve, DI non return valve etc., WTP Components like Clariflocculator Bridge, MOC:
MSEP Drive: Max. 1 HP / 1 Nos each Flocculator: 1-2 HP / 10 RPM / 2/4 Nos each, Flash Mixer 1.5m Dia
x 1.8m Deep (or size as per drawing), MOC: MSEP, Lime & Alum dosing agitator, MOC: MSEP, Filter
underdrain System with a. Concrete Tee @ 300 C/C b. PVC Laterals with end cap c. Air Header d.
Rubber seal e. Header clamps. Chlorination System (1 working +1 Standby) Vacuum Based of Capacity
0-5 Kg/Hr. along with Accessories like Yoke Assembly, Auxiliary Container Valve/Manifold
Valve/Isolation Valve, Vacuum Regulator, Remote Ejector, Booster Pump , Vacuum Tubing, Valves and
Piping, PVC Piping, Chloro Filtra Systems Etc. Supply & Erection of spirally welded M.S./GI Pipes &
Specials as per IS - 3589 and IS-5504 with DI Valves as per IS 4985 / 1988, for WTP & for Filter Bed,
Clear water Sump, Backwash piping, Air Blower, Settling Tank, ESR etc. All piping works like Cutting,
welding, Fabrication, Hydro Testing, Painting & Coating as per technical specification. Air Blower with
motor( Twin lobe type). Capacity -1200 M3/hr. Pressure- 0.4 Kg/cm2 & 30-40 HP/1500RPM IE-2
Electric Motor. Supplying and Erection of Lifting equipment chain block pulley with travelling trolley
with 6 mtr lift for clear water pump and blower. All the Mechanical works Should Comply the Technical
Specification and any other works as directed by Engineer in charge/ employer.
14

C) ELECTRICAL WORKS FOR PROPOSED WTP :- Design, Administrative cost and charges, supply,
erection, testing and commissioning of 250 KVA Transformer with DP Structure (Two Nos 1 working +
1 standby) 3 phase, 11/0.433 kV, 50 Hz., Mineral oil immersed and naturally cooled outdoor type,
copper wound delta/star type as per IS:1180 (part 1) : 2014. D. P. Structure includes R.S.J. Pole 2 Nos.
of size 100 x 116 mm x 11 Mtr., Distribution Box of C.R.C.A. Sheet 16 SWG with 4 Pole MCCB 400 Amps
as incomer & 6 Nos. 200 Amps MCCB for out going circuits, A. B. Switch 200 Amps, D.O. fuse Set & L.A.
Set, A.B. Switch handle etc. D.P. Structure in c.c. foundation, Copper coated GI Pipe/Plate Earthing at
least 8 Nos (40 mm dia, 3 Mtr). Supply & erection of LT panel with suitable size Incomer MCCB from
transformers, DG Set & Bus coupler. Pumps feeders supplied with MCB/MCCB & DOL/Star Delta/Soft
starter with EMPR for motor protection. (DOL up to 7.5HP and Star Delta up to 35 HP and Soft starter
above 50 HP). Also have Spare MCB of 16 amp (4 Nos) and 32 amp (2 Nos). The panel should be SCADA
Compatible with power analyser and can be operated remotely from SCADA System. APFC Panel :
Suitable Rating of KVAR capacity 440 V, 3 phase, 50 Hz., Contactor Logic & Intelligent Relay micro APFC
passive filter panel, consisting of suitable steps of APP/MPP type capacitor units with Detuned
(harmonic filter) reactors of suitable rating and compliance to IEC 61439 and power quality IEC 61921
standard. Providing and extending earthing to all electrical & Mechanical equipment from transformer
thru 25x3 GI Strip. Supplying, lying & terminating XLPE armoured cable 3/3½/4 core aluminium
conductor with continuous 12 SWG G.I. earth wire complete erected with glands & lugs, on wall/
trusses/pole or laid in provided trench/ pipe for all equipment as per std and IE Rules. Providing and
erecting Heat shrinkable indoor/outdoor termination kit for 11 kV ( E ) XLPE HT cable. Providing &
erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI
sheet of 150 mm width & 75 mm height complete with necessary coupler plates & hardware. Supply
erection testing and commissioning of Diesel generating set & suitable AMF Panel with alternator of
200 kVA output continuous rating, 3 Phase, 415 V, 50c/s 0.8 p. f. A.C supply, a totally enclosed air
cooled / liquid cooled multi-cylinder diesel engine developing suitable BHP at 1500 rpm with 10%
overload for 1 hour in 12 hours. Providing internal and External Lighting with concealed PVC pipe
(20mm), flexible single core copper wire along with Switch boards, normal sockets, power sockets, LED
lighting, Street lighting, Fans, Exhaust fans for WTP Building and premises. All the Electrical works
Should Comply the Technical Specification and any other works as directed by Engineer in charge/
employer.

15
D) INSTRUMENTATION WORKS FOR PROPOSED WTP :- Design, manufacture, supply, installation,
testing and commissioning of PH+Turbidity Meter for WTP inlet and PH+Turbidity+Resedual Chlorine
Analyser for WTP outlet water parameter measurement. Supply and installation of Ultrasonic Level
meter for Pure water Tank and ESR Tank. Supply and Erection of Electromagnetic Flow Meter for ESR
outlet of proper sizing. Supply and Erection of signal Cables for Technical Specification wherever
required. All the Instrumentation works Should Comply the Technical Specification and any other
works as directed by Engineer in charge/ employer.

16 Schedule-V: Retrofitting / Rehabilitation works of Existing U/c WTP (3.5 MLD)


17
A) BALANCE CIVIL WORKS OF EXISTING WTP:- Installation, testing and commissioning of
incomplete Water Treatment Plant of capacity 3.5MLD (in 16 hours of operation and with raw water
from underground source) with suitable design in conformity with the CPHEEO Manual and all relevant
BIS Code of practices with latest amendment, current at the time of design & execution, having
provision for Cascade type aeration, rapid mixing, clarifloculator & Filtration followed by disinfection,
including all necessary Mechanical Work suitable for smooth & trouble free operation of the plant,
Provision for Back Washing, Chemical house with Laboratory Facility including laboratory equipment
and having provision for one Water Works Office and Storage accommodation, filter back wash water
tank, sludge disposal system, recycling of back wash water, all internal connection & by-pass piping
system including all internal and external electrification work for compound lighting etc., back wash
water pump with necessary piping work etc., and including Internal electrification work (with concealed
copper wiring of required C/S. area) with all necessary electrical fittings & fixtures viz., light / fan /
power socket etc., all complete, as directed and any other works as directed by Engineer in charge/
employer.

18

B) MECHANICAL WORKS FOR EXISTING U/c WTP:- Design, supply, erection, testing and
commissioning of Existing Treated Water Pumping machinery (Centrifugal Pumps) of 25 HP, 32 LPS, 32
Mtr Head (2 Nos) at existing WTP including all necessary electrical and other installation works. Pump
MOC - CI Casing, CI Impeller, SS Shaft, Mechanical Seal, Pump set with base frame, IE3 Motor
(CC/ABB/Matharon/Equivalent as per relevant BIS specification), Pump, Coupling, Pressure Gauge,
Coupling Guard, Foundation Bolts, M.S. Dismantling Joint, DI suction & delivery piping with foot valve,
DI sluice valve, DI non return valve etc. Supplying and Erection of other WTP Components like
Clariflocculator Bridge, MOC: MSEP Drive: Max. 1 HP / 1 Nos each Flocculator: 1-2 HP / 10 RPM / 2/4
Nos each, Lime & Alum dosing agitator, MOC: MSEP, Chlorination System (1 Working + 1 Standby)
Vacuum Based of Capacity 0-5 Kg/Hr. along with Accessories like Yoke Assembly, Auxiliary Container
Valve/Manifold Valve/Isolation Valve, Vacuum Regulator, Remote Ejector, Booster Pump , Vacuum
Tubing, Valves and Piping, Chloro Filtra Systems Etc. Supply & Erection of spirally welded M.S./GI Pipes
& Specials as per IS - 3589 and IS-5504 with DI Valves as per IS 4985 / 1988, for WTP & for Filter Bed,
Clear water Sump, Backwash piping, Air Blower, Settling Tank, ESR etc. All piping works like Cutting,
welding, Fabrication, Hydro Testing, Painting & Coating as per technical specification. Air Blower with
motor( Twin lobe type). Capacity -1200 M3/hr. Pressure- 0.4 Kg/cm2 & 30-40 HP/1500RPM IE-2
Electric Motor. Supplying and Erection of Lifting equipment chain block pulley with travelling trolley
with 6 mtr lift for clear water pump and blower. All the Mechanical works Should Comply the Technical
Specification and any other works as directed by Engineer in charge/ employer.
19

C) ELECTRICAL WORKS FOR EXISTING U/c WTP:- Supply, Administrative cost and charges & erection of
LT panel with Suitable capacity of incomer MCCB from transformer. Pumps feeders with MCB/MCCB &
DOL/Star Delta/Soft starter with EMPR for motor protection. (DOL up to 7.5HP and Star Delta up to 35
HP and Soft starter above 50 HP). Panel should include the Spare MCB feeder 16 amp (2 Nos) and 32
amp (2 Nos). The panel should be SCADA Compatible with power analyser and can be operated
remotely from SCADA System. APFC Panel : Suitable Rating of KVAR capacity 440 V, 3 phase, 50 Hz.,
Contactor Logic & Intelligent Relay micro APFC passive filter panel, consisting of suitable steps of
APP/MPP type capacitor units with Detuned (harmonic filter) reactors of suitable rating compliance to
IEC 61439 and power quality IEC 61921 standard. Providing earthing to all electrical & Mechanical
equipment thru 25x3 GI Strip. HT/ L.T Cable & Termination :- Supplying, erecting & terminating XLPE
armoured cable 3/3½/4 core aluminium conductor with continuous 12 SWG G.I. earth wire complete
erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe against replacement
of damaged and old cables and additional requirement wherever required. Providing & erecting hot
dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 150
mm width & 75 mm height complete with necessary coupler plates & hardware wherever required.
Replacement and repair work of lighting and wiring works in existing WTP building. All the Electrical
works Should Comply the Technical Specification and any other works as directed by Engineer in
charge/ employer.

20
D) INSTRUMENTATION WORKS FOR EXISTING WTP :- Design, manufacture, supply, installation,
testing and commissioning of PH+Turbidity Meter for WTP inlet and PH+Turbidity+Residual Chlorine
Analyser for WTP outlet water parameter measurement. Supply and installation of Ultrasonic Level
meter for Pure water Tank and ESR Tank. Supply and Erection of Electromagnetic Flow Meter for ESR
outlet of proper sizing. Supply and Erection of signal Cables for Technical Specification wherever
required. All the Instrumentation works Should Comply the Technical Specification and any other
works as directed by Engineer in charge/ employer.

21 Schedule VI : Clear Water Transmission main


22

DI - K9 Pipes for Clear water Pipes and Specials: - :- Design, supply, laying, hydro-testing,
disinfection and commissioning of raw water transmission main of Supply, delivery & Stacking of
Ductile Iron (DI) Pipes of Class K9, and P 1.0 rating, IS marked conforming to IS 8329:2000
Centrifugally Cast (SPUN) Pressure Pipes for water with Socket, Spigot ends and tyton joints in
standard working lengths of 5.5 & 6m for classification K-9 suitable for Push- on Joint (Rubber Gasket
Jointing) with cement mortar lining inside the pipes as per of IS 8329:2000 and Zinc Coating with a
finishing layer of Epoxy Resin (Blue Epoxy) on external surfaces as per IS 8329:2000. including third
party inspection (Pre and Post) including DI Specials and fittings of class K12, with plain, double
socket, Socketed and flanged DI specials conforming to IS: 9523 including various types of bends, tees,
reducers, socket and flanged tail pieces, duck foot bends, collars, mechanical joints, dead end caps,
blank flanges etc. as per requirement including EPDM rubber gaskets suitable for tyton joints and ‘O”
rings required for the jointing of specials with the pipes, nuts and bolts with packing gaskets, including
required valves, appurtenances and chamber (air valves, sluice valves and non-return valves, pressure
gauges) including excavation in trenches, dismantling of all type of pavements, sand bedding as
required, backfilling of trenches and foundations with approved grade excavated materials and approved
graded river sand as required including loading and unloading , Shuttering and shoring the earth at
different levels in foundations where necessary with required prop, struts, planks, timbers, nails etc.
including dewatering if necessary, thrust blocks, nalla/Stream/ culvert crossing, construction of
pedestals including all up to commissioning, Third party inspection (Pre & Post), Road restoration as per
existing condition with proper safety arrangements, hydro-testing complete for distribution system as
per Technical Specifications and any other works as directed by Engineer in charge/ employer.

23 200 mm to 250 mm dia Ductile Iron Class K-9 pipe (inclusive of all fittings and other relevant
accessories)
24 Schedule VII : Elevated Service Reservoirs (Proposed 1000 Cum Capacity ) 18 m staging Ht.

25
Elevated Service Reservoir :-Design, construction, supply, erection, testing and commissioning of
1(One) Zonal Over head service reservoirs of Circular shape, RCC framed staging and 1000 cum
capacity and minimum 18.00 m staging height at locations under the command areas to be served.
Reservoirs have RCC pile Foundation including all necessary inlet/ outlet/ overflow/ draining etc.
piping arrangement with control valves, RCC spiral case from GL to top of roof, M.S. ladder with guard
ring, RCC ventilator, Manhole with frame & cover at roof, float operated inlet valve, calibrated water
level indicator, lightening arrestor with earthing system, providing CC topping on bottom dome &
conical dome inside the reservoir & CC Skirting on inner faces of reservoir wall, providing cement
mortar plaster to all other exposed surfaces of the structure and painting of the RCC structure with
weather resistant cement paint over priming coat & anti corrosive paint over a coat of lead primer to
M.S. work, etc., all complete (as per all relevant BIS or ISO specification), as directed and specified
including construction of operator room and compound wall in the premises and any other works as
directed by Engineer in charge/ employer.

26 Schedule VIII : Elevated Service Reservoirs (Balance Work of 650 Cum Capacity ) 18 mt Staging
Ht.
27
Elevated Service Reservoir :-Design, construction, supply, erection, testing and commissioning of
Balance work of 1(One) Zonal Over head service reservoirs of Circular shape, RCC framed staging
and 650 cum capacity and minimum 18.00 m staging height at locations under the command areas to
be served. Reservoirs have RCC pile Foundation including all necessary inlet/ outlet/ overflow/
draining etc. piping arrangement with control valves, RCC spiral case from GL to top of roof, M.S.
ladder with guard ring, RCC ventilator, Manhole with frame & cover at roof, float operated inlet valve,
calibrated water level indicator, lightening arrestor with earthing system, providing CC topping on
bottom dome & conical dome inside the reservoir & CC Skirting on inner faces of reservoir wall,
providing cement mortar plaster to all other exposed surfaces of the structure and painting of the RCC
structure with weather resistant cement paint over priming coat & anti corrosive paint over a coat of lead
primer to M.S. work, etc., all complete (as per all relevant BIS or ISO specification), as directed and
specified including construction of operator room and compound wall in the premises and any other
works as directed by Engineer in charge/ employer.

28 Schedule IX : Distribution Network


29

A) DI - K7 Pipes for Distribution network:- Design, Detailed Engineering and Drawings with
technical specifications, Supply, delivery, Stacking, laying, Trail run, Flushing Disinfection and
Commissioning of pipelines by flushing with water containing bleaching powder at 0.5 gms per litre of
water and cleaning the same with fresh water, operation to be repeated three times including getting the
sample of water from the disinfected main tested in the laboratory for the entire implemented network
system. Road cut / railway crossing/ nalla/ drain/ culvert crossing, jointing and hydro-testing for
distribution pipe network of Ductile Iron (DI) Pipes of Class K7, and P 1.6 rating, IS marked
conforming to IS 8329:2000 Centrifugally Cast (SPUN) Pressure Pipes for water with Socket, Spigot
ends and tyton joints in standard working lengths of 5.5 & 6m for classification K-7 as per details given
below suitable for Push- on Joint (EPDM Rubber Gasket Jointing) with cement mortar lining inside the
pipes as per Annexure-“B” of IS 8329:2000 and Zinc Coating with a finishing layer of Epoxy Resin
(Blue Epoxy) on external surfaces as per Annexure-“A” of IS 8329:2000, Third Party Inspection (Pre &
Post) as per Technical Specifications and direction of Engineer including all labour, material, equipment
all lead and lift all work complete including earth work, back filling & thrust blocks, including providing
and erecting steel bridges for 350mm and 400mm dia DI pipe on nalla/Stream/ culvert crossing,
construction of pedestals including all up to commissioning, Third party inspection (Pre & Post), Road
restoration as per existing condition with proper safety arrangements including GSB, WBM/WMM,
ICBP/BM/BT/Premix Carpet/CC and the RCC/PCC Thrust blocks wherever necessary, and any other
works as directed by Engineer in charge/ employer.

30 DI K-7 (m) 250 mm Dia To 400 mm Dia (inclusive of all fittings and other relevant accessories)
31

B) HDPE Pipes for Distribution System confirming to IS 4984 / 14151 / 12786 / 13488:- Design,
Detailed Engineering and Drawings with technical specifications, Supplying, transportation, stacking,
laying using Trenchless Technology / Conventional Trenching method, electrofusion jointing for fittings
, nalla/ drain/ culvert crossing and hydraulic testing of HDPE (PE100 PN 10) pipe including all pipe,
specials, fittings and all relevant accessories (using electrofusion) confirming to IS 4984 and the
specifications, including third party inspection (Pre and Post), all taxes and duties, transportation, freight
charges, loading and unloading, construction of Thrust Block where necessary, conveyance to the
project site and stacking with cost of all labour and material for following pipe diameters. including all
labour, material, equipment all work complete as per specification and as directed by the Engineer In
Charge with all lead and lift-including earth work, back filling &thrust blocks, nalla/Stream/ culvert
crossing, construction of pedestals including all up to commissioning, Third party inspection (Pre &
Post), Road restoration as per existing condition with proper safety arrangements including GSB,
WBM/WMM, ICBP/BM/BT/Premix Carpet/CC and the RCC/PCC. Trail run, Flushing Disinfection and
Commissioning of pipelines by flushing with water containing bleaching powder at 0.5 gms per litre of
water and cleaning the same with fresh water, operation to be repeated three times including getting the
sample of water from the disinfected main tested in the laboratory for the entire implemented network
system. This item includes Oxidation Induction Time Test confronting to IS 4894 : 2016 at both ends by
two different agencies through Perkin Elmar Instrument and any other works as directed by Engineer in
charge/ employer.

32 HDPE PE 100, PN 10, 90mm to 225mm dia (inclusive of all fittings and other relevant accessories)

33
C) For Control with Sluice Valve / Wash-Out with Sluice Valve : Providing, supply and installation
manually operated Ductile Iron of DIN 1693 Garde - GGG 40/ GGG 50/ SG Iron of IS 1865 Grade -
400/12/500/7. Double Flanged Non-Rising Type Sluice Valve as per IS 14846/2000 (PD Type) PN 1.0
having seat of body/wedge face ring Gunmetal to IS 318 LTB 2, Stem SS AISI 410 with manual
handwheel operation. Flange Drilled as per IS 1538 Table IV & VI Flat Face (INCLUSIVE OF
FITTINGS AND PUDDLE PIPE) and any other works as directed by Engineer in charge/ employer

34 100 NB to 400NB (INCLUSIVE OF FITTINGS AND PUDDLE PIPE)


35

D) Valve Chamber: Design, Detailed Engineering and Drawings with technical specifications,
Drawing, detail engineering , Construction of RCC and Brick masonry chambers for Sluice valve, Wash
Out Valve, Air valves, Fire hydrants etc. including cost of PCC and RCC work, cost of supply and
bending and binding of steel with required shuttering, cost of brick work with plaster from inside
and outside, precast slabs, including all the miscellaneous items of work, restoration of the periphery,
but excluding the supply and installation of pipes and specials, valves etc. including all labour material
all lead and lift all work complete and any other works as directed by Engineer in charge/ employer
36

E) Flow Control Valve for Flow Measurement at the DMAs: Supply, installation and commissioning
in all respect as per Design, Detailed Engineering and Drawings with technical specifications, including
calibration in third party laboratory, Electromagnetic Flow Meter (EMF) as per ISO 4064, for potable
water with accuracy as per specification, with in- built wireless communication along with one number
of battery operated Pressure Transmitter (ratio metric type) and integration of pressure signal with DMA
flow meter wireless communication modem, including software for datalogging with workstation, as per
given specifications for required sizes including sensor, transmitter surge arrestor, cables, pipe cutting,
levelling and installation of flow meter in Electrical panels with locking arrangement, commissioning
and erection all complete and pressure transmitter in the pipelines with necessary tool tackles etc
complete, as may be required at site & based on technical specifications as directed by Engineer In
Charge. Providing manually operated Ductile Iron of DIN 1693 Garde - GGG 40/ GGG 50/ SG Iron of
IS 1865 Grade - 400/12/500/7. Double Flanged Non Rising Type Sluice Valve for Electromagnetic Flow
Meter as per Design, Detailed Engineering and Drawings with technical specifications & as per IS
14846/2000 (PD Type) PN 1.6 having seat of body/wedge face ring Gunmetal to IS 318 LTB 2, Stem SS
AISI 410 with manual handwheel operation. Flange Drilled as per IS 1538 Table IV & VI Flat Face. as
per Technical Specifications and as per direction of Engineer. Design, Detailed Engineering and
Drawings with technical specifications, and Construction of RCC chambers for Flow Control Valve
including PCC and RCC work, cost of supply and bending and binding of steel with required shuttering,
cost of brick work with plaster from inside and outside, precast slabs, including all the miscellaneous
items of work, restoration of the periphery, including the supply and installation of pipes and specials,
valves etc. The item shall be as per specification, drawing and any other works as directed by Engineer
in charge/ employer

37
F) Fire Hydrant: Providing, Fixing, testing &Commissioning of Single Headed Gun Metal ISI Marked
oblique pattern Hydrant Landing Valve with 80 mm dia, flanged inlet & 63 mm dia instantaneous type
female outlet complete with cap and chain, twist release lug and all accessories as per IS:5290-
1993(third revision) (Type-'A') and specifications complete as required including Providing, Erection,
Testing & Commissioning of Cast Iron Sluice Valve/ Gate Valve confirming to IS:14846/2000 complete
with matching flanges, rubber insertion, nuts, bolts and washer etc. of following size complete as
required including Valve Chamber (FRP slab with universal key lock system) and any other works as
directed by Engineer in charge/ employer

38 Schedule-X House Service Connections


39
A) House Service Connection: Providing House Service connection from the distribution network pipe
lines comprising of PVC Shade Piece, Brass Ferrule Cock and average 10.0 m. long reputed Brand 3
layer (Outer green coloured UV Stabilised, middle black coloured UV Stabilised and innermost layer
white coloured with antimicrobial property) Fusion welded PP-R (Poly propylene- random copolymer)
Pipes, SDR 7.4 having thermal stability for hot and cold water supply including all plain PP-R fittings
and brass threaded PP-R fitting and clamping, cutting etc. including all necessary earth work, restoration
of road as per existing condition including GSB, WBM/WMM, ICBP/BM/BT/Premix Carpet/CC
and the RCC/PCC (repairing charges payable to PWD / local bodies, if any), hooking up of the service
connection with the nearby distribution pipe network including payment of all taxes & duties, forest
royalty, octroi, all complete and any other works as directed by Engineer in charge/ employer
40
B) Domestic Water Meter and Meter Box : Providing, installing and giving satisfactory field testing
of water meter (domestic type) with ISI mark as per IS 779/1994, horizontal inferential MultiJet type
with magnetic drive and dry dial suitable for ambient 50° C |Temperature duly sealed against tampering,
complete with couplings at both ends and conforming to class A as per IS 779/1994 (VI Revision) Third
party inspection. Water Meter Conforming to IS: 4064 along with manufacturer's test certificate and
guarantee certificate, with 5 years warranty, including cost of all materials, reducer, meter box as per
specification (15mm dia/20mm dia/25mm dia) and any other works as directed by Engineer in charge/
employer

41 Schedule XI : Other works


42
A) RCC Protection Wall:- Design & Construction of Protection Wall of 17 m long & 6m meter
height (above GL) Wall with RCC M30 Concrete adjacent to WTP Premises along Bank of River
Including Providing Weep holes ,Including Providing & Supplying Material required Material of 13
mm to 20mm grade aggregate, course sand, Cement , Reinforcement of Various Dia . wall finished
with weather coat cement paint & gate finished with non glossy synthetic enamel paint over a coat of red
lead primer), all complete, and any other works as directed by Engineer in charge/ employer

43 B) Site development, and landscaping all complete, with plantation of trees , flower plants, grass with
excavation, earth filling watering & maintaining the developemet.as directed all complete, and any other
works as directed by Engineer in charge/ employer
44 Schedule XII : Cost of various Permissions & Express Feeder
45 A) NH Road Crossing permission charges, includes necessary permission charges, documentation,
work execution with HDD technology with cost of materials, labour,with cost of casing and carrier
pipe all taxes including GST, clearing the site after work done with.as per specification and any other
works as directed by Engineer in charge/ employer
46
B) Rail Way Crossing through Jack Pushing as per attached network system in the bid document
including all administrative cost and right of Way. The scope includes Fabrication thick with Casing
Pipe- Pipe jack for crossing with Jacking and Pushing method. The item include pushing jointing of
required diameter MS pipe of required length, construction of Receiving and Jacking pit with suitable
shoring and strutting (if required), including installation of jacking platform, thrust resistant arrangement
of required capacity including , hydraulic jacking with required accessories, required excavation inside
the jacking pipe and disposal the same, shoring, shuttering, MS Testing - thick Casing Pipe- Flushing,
Hydrotesting, Trial Run & Commissioning: Hydraulic testing of the distribution system piping of the
following diameters in segments at the required test pressures. This item includes the costs of water,
labour, pumping, etc. all complete, as per the approved drawings (including diameter & location) of the
Railways and any other works as directed by Engineer in charge/ employer

47 C) 11 Kv Express Feeder for new WTP with all materials and equipment as per APDCL specifications
and any other works as directed by Engineer in charge/ employer
48 Schedule-XIII : Operation and Maintenance
49

Operation and Maintenance ( after completion of Capex work and trial & satisfactory
commissioning of complete project):- Operation, maintenance, excluding APDCL charges for Power
Consumption, but including required Manpower, chemicals and material, repairing of all components as
required, repair to pipeline leakages, road restoration for the repairing works, painting of civil or non
civil structures (if any), retrofitting works of the civil structure wherever necessary and management of
Water Treatment plants ( Existing & proposed)pumps and motors, pumping stations, deep tube wells
including, mechanical, electrical panels, necessary accessories and SCADA systems, it also includes
activities for maintenance of campus development, administrative building, laboratory, horticulture, etc.
and all works related to plant operation as per scope of work and specification and performance indicator
and other relevant works . and all works related to plant operation as per scope of work and specification
and performance indicator and other relevant works (if any)meter reading, billing of water supply
system through regular water supply in DMAs/Zones from service reservoirs to consumer water meter
points as per specifications & employer's requirement including consumables, disposables, collecting
bills, supply of chemicals, repairing of leakages in pipes, road restoration, periodical water testing cost,
from date of commissioning up to completion of Design, Detailed Engineering and Drawings with
technical specifications build period as directed by Engineer In Charge. for Five years as per
specifications attached and any other works as directed by Engineer in charge/ employer (APDCL
Energy Charges will be borne by the ULB)

50 1st year of Operation and Maintenance


51 2nd year of Operation and Maintenance
52 3rd year of Operation and Maintenance
53 4th year of Operation and Maintenance
54 5th year of Operation and Maintenance
Total in Figures
Quoted Rate in Figures
Quoted Rate in Words
NUMBER # TEXT # BASIC RATE In NUMBER #
Figures To be
entered by the
Bidder in
Rs. P

Quantity Units TOTAL


AMOUNT With
13 Taxes
4 5 54

5970000 5970000.00

1.00 Job

0.00
3000000.00 3000000.00

1.00 Job
263400.00 263400.00

1.00 Job

0.00

1.00 Job

0.00

1.00 Job

0.00
0.00

53.00 RMT 0.00

0.00
0.00

1.00 Job
0.00

1.00 Job
0.00

1.00 Job

0.00

1.00 Job

0.00
0.00

1.00 Job

0.00

1.00 Job
0.00

1.00 Job

0.00

1.00 Job

0.00
0.00

105.00 Rmt 0.00

0.00

0.00

1.00 Job

0.00
0.00

1.00 Job

0.00
0.00

10208.00 Rmt 0.00


0.00

53389.00 Rmt 0.00

0.00

31.00 Nos 0.00


0.00

38.00 Nos
0.00

13.00 Nos

0.00

6.00 Nos

0.00
0.00

8923.00 Nos
0.00

8923.00 Nos

0.00
0.00

17.00 Rmt

0.00
1.00 Job

0.00
0.00
3.00 Job

0.00

2.00 Job

1.00 Job 0.00

0.00
0.00

1.00 year 0.00


1.00 year 0.00
1.00 year 0.00
1.00 year 0.00
1.00 year 0.00
9233400.00 9233400.00
Select 0.0000 0.0000