2 Kickoff Meeting For Reference 07 - PRV RDD e 019 - Tenant Testing & Commissioning List
2 Kickoff Meeting For Reference 07 - PRV RDD e 019 - Tenant Testing & Commissioning List
: PRV-RDD-E-019
The below testing and commissioning reports are to be submitted by the Tenants Fit-out Contractor.
2 All HVAC equipment installed, commissioned, tested and balanced Complete Not Required
4 Chilled water pipe pressure test and flushing report Complete Not Required
7 Water supply chlorination certificate and pipe pressure test Complete Not Required
11 Kitchen extract hood/ fan/ ecology unit commissioning (F&B) Complete Not Required
13 Smoke extract alarm & fan startup simulation (anchor) Complete Not Required
14 S/NG system third party inspection & ADNOC NOC Complete Not Required
16.1 LPG panel is interfaced with fire alarm/suppression system Complete Not Required
16.2 Electrical equipment below hood interfaced is interfaced with FACP Complete Not Required
16.5 Pa/audio system mutes in the event of alarm Complete Not Required
16.6 Fire protection supervisory valve is interfaced with FACP Complete Not Required
16.7 Kitchen hood fire suppression system is interfaced with FACP & commissioning Complete Not Required
16.8 Tenant FACP interacting report with mall main fire alarm system Complete Not Required
17 Annual Maintenance Contract for firefighting fire alarm and LPG if available Complete Not Required
Note: The tenant’s main contractor is to ensure the correct certification is attached.
Signature:
ACKNOWLEDGMENT