Professional Documents
Culture Documents
Modifications:
A A
No. Modification No. Date Name Type/ Designation of modification/ Completement
1
22/02/2019
B B
3
Printing date:
C 5 C
Compactmix 1.0-A-R/R
Type
6
D
LTH AUTOMATIC CONTROL SYSTEM GENERATION III D
Batching system
8
Reproduction or distribution permitted only with our written permission
9
GA433081
E 10 E
11
F F
Authorization Date Name Project Description Version =1_COVER SHEET
COVER SHEET Compactmix 1.0 00 +S1
Construction 11/12/2018
Job Number Drawing Number Page 1
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A area code DESCRIPTION COMMENT / CHANGE area code DESCRIPTION COMMENT / CHANGE A
+S0 RESERVE (not be used at the moment) +S45 HIGH-PRESSURE CLEANING SYSTEM
+S1 CONTROL CONTAINER MIXING PLANT +S46 HIGH-PRESSURE CLEANING SYSTEM sensors / actuators
22/02/2019
+S2 CONTROL TABLE / CONTROL DESK +S50...+S59 RESERVE (not be used at the moment)
B B
+S3 / +S33 power unit mixing plant / FREQUENCY CONVERTER-SWITCH CABINET +S60 SWITCH CABINET LOADER / STEEP CONVEYOR BELT
Printing date:
+S4 power unit loading +S61 LOADER / STEEP CONVEYOR BELT RANGE ABOVE
+S5 MIXER PLATFORM MIXING PLANT +S62 LOADER / STEEP CONVEYOR BELT RANGE BOTTOM
+S6 WEIGHING PLATFORM MIXING PLANT +S71 MIXER COVER / MIXER GATE
C +S7 RESERVE (not be used at the moment) +S73 TRAFFIC LIGHT SYSTEM C
+S8 LOADING PROTECTIVE CABIN UPPER TOWER +S76...+S79 DISCHARGE HOPPER / PIVOTING FUNNEL / GATE SEGMENT
+S9 RESERVE (not be used at the moment) +S81 MIXER COVER / MIXER GATE MIXER 2
+S10 RESERVE (not be used at the moment) +S90...+S99 RESERVE (not be used at the moment)
D
+S11 INLINE SILO +COM COMPRESSOR / compressor room D
+S12 INLINE SILO / SPLITTING POINT +ZS1...+ZS6 CEMENT SCREW 1 - CEMENT SCREW 6
+S21...+S26 CEMENT SILO 1 - CEMENT SILO 6 +CEM CEMENT SILO 1 - CEMENT SILO 6
+MS MICROSILLICA
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LEGEND AREA CODE 1/2 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 1
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
area code DESCRIPTION COMMENT / CHANGE area code DESCRIPTION COMMENT / CHANGE
A A
+AGG AGGREGATES
22/02/2019
B
+CEM CEMENT B
+WAT WATER
Printing date:
+ADD ADMIXTURES
+MS MICROSILLICA
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LEGEND AREA CODE 2/2 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 2
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FUNCTION GROUP
A IDENT. LETT. (= IDENTIFICATION LETTER) IDENT. LETT. (= IDENTIFICATION LETTER) A
COUNTER NUMBER
A ASSEMBLIES, PARTIAL ASSEMBLIES P measuring instruments, testing facilities
G Power supply sources, generators Y VALVE - COIL / ELECTRICAL CYLINDER PREFIX FUNCTION GROUP DESCRIPTION
40 admixture batching
L
50
E M MOTOR E
60 LOADER / STEEP CONVEYOR BELT
N
70 MIXER (1) - CONTROL SYSTEM
90
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
DESCRIPTION MATERIAL IDENTIFICATION Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 3
Production 10/102018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
SWITCH CABINET power unit mixing plant
Printing date:
+S3
C C
WAGO-STATION NUMBER 3
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OVERVIEW Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 4
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11
/31.A1
L21
/31.A1
A L31 A
/31.A1
L1 L2 L3
3.13 3.33
-0Q1
400A
22/02/2019
/19.A2
/5.C5
B /19.E2 B
52
Printing date:
13
-00K2
/19.E5
14 -P1
V
3 1
4 2
0-300V
-0F1 13
-00K3
6A /19.E6
C 14 C
D1
-0Q1 U <
/5.B1
D2
D D
L1
/6.A1
Reproduction or distribution permitted only with our written permission
L2
/6.A1
L3
/6.A1
PE
/6.D1
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
POWER FEEDING Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 5
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
/5.D8
L2
/5.E8
L3
/5.E8
A A
22/02/2019
1 3 5
-0F2
63A
B 2 4 6 B
Printing date:
C C
L13
/7.A1
L23
/7.A1
L33
/7.A1
PE PE
/5.E8 /7.D1
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
POWER FEEDING BEFORE MAIN SWITCHES Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 6
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L13 L13
/6.D8 /9.A1
L23 L23
/6.D8 /9.A1
L33 L33
/6.D8 /9.A1
A A
1 3 5 1 3 5 1 3 5 1 3 1 3 1 3 1 3
-0F3 -0F4 -0F5 -0F6 -0F7 -0F8 -0F9
32A 32A 32A 25A 25A 25A 25A
22/02/2019
2 4 6 2 4 6 2 4 6 2 4 2 4 2 4 2 4
B B
Printing date:
C C
D PE PE
D
/6.D8 /9.D1
CONTROL CONTAINER PLUG SOCKET BOOSTER STATION MIXER & WEIGHING PLATFORM PASSAGE INLINE SILO -0X5 1 2 PE
32A 32A 32A 25A 25A 25A
L-22
/16.A1
L-23
/16.A1
PE-2
/16.A1
E E
CONNECTION
CONTROL DESK (+S2)
25A
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LIGHTING + PLUG SOCKET - CONNECTION Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 7
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 8
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L13 L13
/7.A8 /15.A1
L23 L23
/7.A8 /15.A1
L33 L33
/7.A8 /15.A1
A A
3/L2
5/L3
1/L1
-0Q7
6...10 A
I> I> I>
2/T1
4/T2
6/T3
22/02/2019
B B
+5%
-5%
Printing date:
220V
-1T1
2000VA
220V
C C
D D
REMOVE BRIDGE FOR UNEARTHED
OPERATED CONTROL CIRCUIT AND PROVIDE
INSULATION MONITORING
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CONTROL VOLTAGE 230V AC Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 9
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
220V-AC 220V-AC
/9.D8 /11.A1
A 0V-AC 0V-AC A
/9.D8 /11.A1
1 3
-1F14
6A
2 4
22/02/2019
B L N B
-0T1
24V DC
Printing date:
5A
DC + DC-
C C
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CONTROL VOLTAGE 24V DC Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 10
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
220V-AC 220V-AC
/10.A8 /25.A3
0V-AC 0V-AC
/10.A8 /25.D3
24V-DC 24V-DC
/10.D8
A 0V-DC 0V-DC A
/10.D8
1 -F3 1 1 1 1
-F1 -F4 -F5 -F6
6A 6A 6A 6A 6A
2 2 2 2 2
22/02/2019
0
/13.A1
B
-00K1 61 -00K1 71 -00K1 81 B
/19.E2 /19.E2 /19.E2
62 72 82
Printing date:
C C
-0X00 4 4 4 4 7 -0X00 7 7 7 7
/12.A1 /12.A1
Reproduction or distribution permitted only with our written permission
E 0=0V/AC E
1=230V AC / CONTROL VOLTAGE
3=24V DC / VALVE
4=24V DC / CONTROL VOLTAGE
5=24V DC / EXTERNAL
6=0V DC
7=24V DC / before emergency stop
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CURR PTH MARK. Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 11
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4 4
/11.D5 /13.A1
5 5
/11.D5 /13.A1
6 6
/11.D6 /13.A1
7 7
/11.D7 /13.A1
A A
22/02/2019
B -1X3 4 5 6 7 B
POWER UNIT MIXING PLANT (+S3)
Printing date:
+S2
CONTROL DESK (+S2) -1X4 4 5 6 7
C C
4-2
/20.A1
5-2
6-2
/20.D1
7-2
D D
+S2 +S2
-0X7 4 4 4 -0X7 6 6 6
Reproduction or distribution permitted only with our written permission
E 0=0V/AC E
1=230V AC / CONTROL VOLTAGE
3=24V DC / VALVE
4=24V DC / CONTROL VOLTAGE
5=24V DC / EXTERNAL
6=0V DC
7=24V DC / before emergency stop
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
SUPPLY TERMINAL BOX Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 12
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
0 0
/11.B2 /32.D1
1 1
/11.D3 /32.A1
3 3
/11.D4 /28.A1
A 4 4 A
/12.A8 /25.A3
5 5
/12.A8 /55.A1
6 6
/12.A8 /19.D1
7 7
/12.A8 /18.A1
PE PE
/10.D8 /15.D1
22/02/2019
B B
Printing date:
5-71
/66.A1
6-71
/66.E1
SUPPLY
MIXER PLATFORM
5-6
/40.A1
6-6
D /40.E1 D
SUPPLY
WEIGHING PLATFORM
Reproduction or distribution permitted only with our written permission
5-61
/60.A1
6-61
/62.A1
SUPPLY
LOADER
E 0=0V/AC E
1=230V AC / CONTROL VOLTAGE
3=24V DC / VALVE 5-11
/29.A1
4=24V DC / CONTROL VOLTAGE 6-11
/28.E1
5=24V DC / EXTERNAL
6=0V DC SUPPLY
7=24V DC / before emergency stop INLINE SILO
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
SUPPLY TERMINAL BOXES Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 13
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 14
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L13 L13
/9.A8 /25.A1
L23 L23
/9.A8 /25.A1
L33 L33
/9.A8 /25.A1
A A
1 3 -0B2
-0F33
6A
250V(L2*)
48/60V
(L1*)
115V
24V
2 4
N N L N N
1 2 3 4 5 6 7
22/02/2019
B B
Printing date:
N L1
M
~1
PE
-0M1
220V
9W
C C
0.37A
PE PE
/13.A8 /22.E1
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
AIR CONDITIONING PANEL Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 15
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L-22 L-22
/7.E8 /45.A1
L-23 L-23
/7.E8 /45.A1
PE-2 PE-2
/7.E8
A A
L N PE
CONTROL TABLE
+S2 +S2
22/02/2019
-0X5 3 N PE -0X5 4 N PE
B B
-X4 14 N PE
Printing date:
IN
USV
OUT 24VDC-PLC
/22.A1
0VDC-PLC
/22.A1
BATCHING COMPUTER
Reproduction or distribution permitted only with our written permission
MONITOR
L N PE
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
SUPPLY CONTROL TABLE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 16
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 17
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
7 7
/13.A8 /25.A3
71
/19.A1
A A
B B
-0X000
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
EMERGENCY STOP Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 18
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
71
/18.A8
A 3.14 A
-0Q1
/5.B2 3.13
22/02/2019
D D
A1 A1 A1
-00K1 -00K2 -00K3
/19.E2 /19.E5 /19.E6
A2 A2 A2
6 6
/13.A8 /25.D3
Reproduction or distribution permitted only with our written permission
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
EMERGENCY STOP Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 19
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4-2 4-2
/12.D8 /27.A1
A A
14 14 14
C C
6-2 6-2
/12.D8 /34.E1
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OPERATION MODES Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 20
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 21
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
24VDC-PLC 24VDC-PLC
/16.D8 /23.A1
0VDC-PLC 0VDC-PLC
/16.D8 /23.A1
A A
22/02/2019
-STATION 3 24V -AI1 -AI2 -AI3 -AI4 -AI5 -AI6 -AI7 -AI8 -AI9 -AI10 -AI11
OFF
ON
0V
8 x ETHERNET 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS 750-430 INPUTS
B
7 x B
6 x LINK1
5 x LINK2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2 DI1 DI2
x
Printing date:
4
MS 1 5 1 5 1 5 1 5 1 5 1 5 1 5 1 5 1 5 1 5 1 5
3 x
/53.C1
/19.C7
/25.C6
/27.D2
/27.D7
/34.D2
/38.D4
/40.D2
/43.C2
/48.C2
/50.C5
/54.C2
/60.C6
/62.C2
/59.C3
/69.C5
/68.C3
/71.C2
/71.C7
2 x NS
1 x I/O
USR 24V 24V
DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4 DI3 DI4
2 6 2 6 2 6 2 6 2 6 2 6 2 6 2 6 2 6 2 6 2 6
/20.D2
/25.D7
/27.D3
/29.D8
/32.C2
/38.D5
/40.D6
/43.C3
/48.C3
/53.C2
/54.C3
/62.C3
/62.C4
/68.C5
/73.C5
/71.C3
/72.C2
C C
DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6 DI5 DI6
0V 0V 3 7 3 7 3 7 3 7 3 7 3 7 3 7 3 7 3 7 3 7 3 7
WAGO-I/O-SYSTEM
/20.D4
/55.D5
/27.D4
/34.D4
/38.D2
/41.C2
/43.C4
/49.C2
/56.D2
/53.C3
/55.D2
/59.C2
/65.C7
/68.C7
/73.C6
/71.C4
/72.C3
750-881
PE PE DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8 DI7 DI8
4 8 4 8 4 8 4 8 4 8 4 8 4 8 4 8 4 8 4 8 4 8
/20.D6
/55.D8
/27.D6
/34.C6
/38.D3
/39.C5
/43.C2
/49.C6
/56.D4
/53.C4
/55.D4
/62.C6
/59.C3
/66.C4
/55.D7
/71.C6
D D
LANW
/23.A1
Reproduction or distribution permitted only with our written permission
Rj 45
ETHERNET CAT 5
PE PE
/15.D8 /23.E1
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
WAGO STATION 3 INPUTS Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 22
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
24VDC-PLC 24VDC-PLC
/22.A8 /88.A1
0VDC-PLC 0VDC-PLC
/22.A8 /88.A1
A LAN A
LANW
/22.D8
24V 0V Rj 45
ETHERNET
22/02/2019
-AQ1 -AQ2 -AQ3 -AQ4 -AQ5 -AQ6 -AQ7 -AQ8 -AQ9 -Al101 -Al102 -Al103 -END MOXA CAT 5
B 750-530 OUTPUT 750-530 OUTPUT 750-530 OUTPUT 750-530 OUTPUT 750-530 OUTPUT 750-530 OUTPUT 750-530 OUTPUT 750-530 OUTPUT 750-530 750-467 750-467 750-467 750-600 B
OUTPUT INPUT INPUT INPUT Bus End
(1) DO1
DO1 DO2 DO1 DO2 DO1 DO2 DO1 DO2 DO1 DO2 DO1 DO2 DO1 DO2 DO1 DO2 Port 1
IW4
IW5
IW6
IW7
IW8
1 5 1 5 1 5 1 5 1 5 1 5 1 5 1 5
/75.B1
/76.B1
/77.B1
/78.B1
/79.B1
/80.B1
/81.B1
/82.B1
/75.B2
/76.B2
/77.B2
/78.B2
/79.B2
/80.B2
/81.B2
/82.B2
/84.D5
/85.D5
/86.D5
/87.D5
/89.D6
Port 2
+ + + + + +
(2) DO3
/75.B4
/76.B3
/76.B4
/77.B3
/77.B4
/78.B3
/78.B4
/79.B3
/79.B4
/80.B3
/80.B4
/81.B3
/81.B4
/82.B3
/82.B4
C Port 3 C
(3) DO5
/75.B6
/76.B5
/76.B6
/77.B5
/77.B6
/78.B5
/78.B6
/79.B5
/79.B6
/80.B5
/80.B6
/81.B5
/81.B6
/82.B5
/82.B6
Port 4
0V 0V 0V
(4) DO7
M4
M5
M6
M7
M8
4 8 4 8 4 8 4 8 4 8 4 8 4 8 4 8 Port 5
/75.B7
/75.B8
/76.B7
/76.B8
/77.B7
/77.B8
/78.B7
/78.B8
/79.B7
/79.B8
/80.B7
/80.B8
/81.B7
/81.B8
/82.B7
/82.B8
/84.D6
/85.D6
/86.D6
/87.D6
/89.D7
D D
Reproduction or distribution permitted only with our written permission
PE PE
/22.E8 /25.D1
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
WAGO STATION 3 OUTPUTS Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 23
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 24
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L13 L13
/15.A8 /42.A1
L23 L23
/15.A8 /42.A1
L33 L33
/15.A8 /42.A1
A 220V-AC 220V-AC A
/11.A8
4 4
/13.A8 /29.A1
7 7
/18.A8
-5X3 19
1/L1
3/L2
5/L3
-1Q1M -16X1 20
+S2
13...18 A -5X4 19 +S6
-16X2 20
22/02/2019
14
+S2
-1X4 14
+S6
-1X3 14 -16X2 21
3/L2
5/L3
1/L1
-1K1M
-5X3 8 5 -16X1 21
/25.E5
2/T1
4/T2
6/T3
DI2
C +S2 C
-5X4 8 /22.B2
x1 -AI1
+S2 COMPRESSOR ON
-1SH1 6
/25.B3
x2 DI4
+S2 /22.C2
A1 -5X4 20 A1(+) -AI1
-8K5 -1K1M
-5X3 20 COMPRESSED AIR
/25.D4 /25.D5 A2(-)
D A2 COMPRESSOR D
6 6
/19.D8 /29.E1
0V-AC 0V-AC
/11.A8
PE PE
/23.E8 /31.D1
-8K5 -1K1M
-1X5 1 2 3 PE /25.D3 /25.D5
Reproduction or distribution permitted only with our written permission
14 1/L1 2/T1
11
12 3/L2 4/T2
/25.B6 /25.C2
44 5/L3 6/T3
41
42 /25.B6 13 14
1 3 5 PE
21 22
P >
E 2 4 6 E
U V W PE
+COM
M
-1M1
3 ~
COMPRESSOR
220V/60Hz
4kW
16A
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
COMPRESSOR / PRESSURE MONITORING Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 25
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 26
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4-2 4-2
/20.A8 /32.A1
A A
C C
1 2 3 4 5
DI1 DI3 DI5 DI7 DI2
/22.B3 /22.C3 /22.C3 /22.D3 /22.B3
-AI2 -AI2 -AI2 -AI2 -AI2
D D
COARSE BATCHING BATCHING AGGREGATE K1 BATCHING AGGREGATE K2 BATCHING AGGREGATE K3 BATCHING AGGREGATE K4
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
BATCHING AGGREGATE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 27
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
3 3
/13.A8 /40.A1
A A
11 11 11
-1K2 11
-1K1 -1K3 -1K4
/75.D1 12 14 /75.D2 12 14 /75.D3 12 14 /75.D4 12 14
22/02/2019
B B
11 21
-1K8.1 31 41
Printing date:
D D
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
BATCHING AGGREGATE K1-K2 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 28
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
11
-10K1
/29.E1 12 14
+S11 1 +S11 1 +S11 1 +S11 1 +S11 1 +S11 1 +S11 1 +S11 1
-11B1 -11B2 -12B1 -12B2 -13B1 -13B2 -14B1 -14B2
2 2 2 2 2 2 2 2 11
-10K2
22/02/2019
/29.E3 12 14
B 11 B
+S11 +S11 +S11 +S11 +S11 +S11 +S11 +S11 -10K3
-12X2 13 -12X2 14 -12X2 15 -12X2 16 -12X2 17 -12X2 18 -12X2 19 -12X2 20 /29.E4 12 14
Printing date:
C C
6
DI4
/22.C3
D -AI2 D
AGGREGATE CLOSED
A1 A1 A1 A1
-10K1 -10K2 -10K3 -10K4
/29.E2 /29.E3 /29.E5 /29.E6
A2 A2 A2 A2
Reproduction or distribution permitted only with our written permission
6 6
/25.D8 /34.D1
-10K1 -10K2 -10K3 -10K4
/29.D2 /29.D3 /29.D5 /29.D6
14 14 14 14
11 11 11 11
/29.A8 12 /29.B8 12 /29.B8 12 /29.C8 12
E 44 44 44 44 E
41 41 41 41
42 42 42 42
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
BATCHING AGGREGATE LIMIT SWITCH 1/2 TO Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 29
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 30
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/5.A8 /33.A1
L21 L21
/5.A8 /33.A1
L31 L31
/5.A8 /33.A1
A A
1/L1
1/L1
1/L1
1/L1
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
-11Q1M -12Q1M -13Q1M -14Q1M
1.60...2.50 A 1.60...2.50 A 1.60...2.50 A 1.60...2.50 A
22/02/2019
I> I> I> I> I> I> I> I> I> I> I> I>
2/T1
2/T1
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
B B
Printing date:
1/L1
1/L1
1/L1
1/L1
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
-11K1M -12K1M -13K1M -14K1M
C /32.D3 /32.D4 /32.D5 /32.D7 C
2/T1
2/T1
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
PE PE
/25.D8 /33.D1
-14X1 1 2 3 PE -14X1 4 5 6 -14X1 7 8 9 -14X1 10 11 12
+S11 +S11 +S11 +S11
-14X2 1 2 3 PE -14X2 4 5 6 -14X2 7 8 9 -14X2 10 11 12
D D
Reproduction or distribution permitted only with our written permission
U V W PE U V W PE U V W PE U V W PE
E +S11 +S11 +S11 +S11 E
-11M1 M -12M1 M -13M1 M -14M1 M
3~ 3~ 3~ 3~
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
VIBRATOR INLINE SILO Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 31
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4-2 4-2
/27.A8 /34.A1
1 1
/13.A8 /33.A4
A A
/76.C4 11 41
-2K3 -2K3
+S2 13 /76.D3 12 14 /76.E3 42 44
-10SH5
14
22/02/2019
+S2 41 41
B -1X4 22 B
-1K1 -1K2
/75.E1 42 44 /75.E2 42 44
Printing date:
-1X3 22
11 21
-1K8.2 -1K8.2
/75.D7 12 14 /75.E7 22 24
C C
2
DI3
/22.C3
-AI3
13 14 13 14 13 14 13 14
21 22 21 22 21 22 21 22
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
VIBRATOR INLINE SILO Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 32
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/31.A8 /36.A1
L21 L21
/31.A8 /36.A1
L31 L31
/31.A8 /36.A1
A 1 1 A
/32.A8 /37.A1
1/L1
3/L2
5/L3
21
-10Q1M
13
24...32 A 13
-10Q1M
22
14
I> I> I> /33.B2
/33.B5
14
2/T1
4/T2
6/T3
22/02/2019
B B
3/L2
5/L3
1/L1
Printing date:
-10K1M 11
-2K8
/33.D4 /76.D7 12 14
2/T1
4/T2
6/T3
C C
A1(+)
-10K1M
/33.D5
A2(-)
0 0
/32.D8 /37.D1
PE PE
/31.D8 /36.D1
-X1 1 2 3 PE -10K1M
/33.C4
1/L1 2/T1
3/L2 4/T2
D /33.B2 D
5/L3 6/T3
13 14
21 22
Reproduction or distribution permitted only with our written permission
U V W PE
+S11
E -10M1 M E
3~
WEIGHER BELT
220V/60Hz
7.5 kW
27A
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
WEIGHER BELT Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 33
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+S11 +S11
5-11 -12X2 3 -12X2 3 5-11
/29.A8
6-11 4 6-11
/28.E8
4 4
/29.A8 /40.A1
A 4-2 4-2 A
/32.A8 /38.A1
/76.C8
+S11 1
+S2 13 +S11 21 11
+
-10B1 2 -10SH3 -10S00 -0K2
3 /34.E5 12 14
22/02/2019
- 22
4 14
B B
21
+S11
-10S01
Printing date:
+S11 +S2 22
-12X2 24 -1X4 20
-12X1 24 -1X3 20
+S11
-12X2 23 8
DI8
C /22.D3 C
-12X1 23 -AI2
X1
D MATERIAL DETECTOR DISCHARGE A1 D
-0K2 +S2
WEIGHER BELT WEIGHER BELT -10H5
/34.E5 A2
X2
6 6
/29.E8 /40.D1
Reproduction or distribution permitted only with our written permission
6-2 6-2
/20.D8 /40.E1
-0K2
/34.D5
14
11
12
/34.B6
E 44 E
41
42
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LIMIT SWITCH INLINE SILO Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 34
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 35
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/33.A8 /39.A1
L21 L21
/33.A8 /39.A1
L31 L31
/33.A8 /39.A1
A A
1/L1
1/L1
1/L1
1/L1
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
21
21
21
21
13
13
13
13
-21Q1M -22Q1M -23Q1M -24Q1M
37...50 A 37...50 A 37...50 A
37...50 A
22
22
22
22
14
14
14
14
22/02/2019
I> I> I> I> I> I> I> I> I> I> I> I>
/37.A2
/37.A3
/37.A4
/37.A5
2/T1
2/T1
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
B B
Printing date:
1/L1
1/L1
1/L1
1/L1
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
-21K1M -22K1M -23K1M -24K1M
/37.D2 /37.D3 /37.D4 /37.D5
2/T1
2/T1
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
C C
PE PE
/33.D8 /39.D1
-X1 4 5 6 PE -X1 7 8 9 PE -X1 10 11 12 PE -X1 13 14 15 PE
D D
Reproduction or distribution permitted only with our written permission
U V W PE U V W PE U V W PE U V W PE
E +ZS1 +ZS2 +ZS3 +ZS4 E
-21M1 M -22M1 M -23M1 M -24M1 M
3~ 3~ 3~ 3~
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT SCREWS 1-4 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 36
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
1 1
/33.A8 /39.A5
A A
13 13 13 13
-21Q1M -22Q1M -23Q1M -24Q1M
/36.B2 /36.B3 /36.B5 /36.B6
14 14 14 14
22/02/2019
B B
Printing date:
11 11 11 11
-3K1 -3K2 -3K3 -3K4
/77.D1 12 14 /77.D2 12 14 /77.D3 12 14 /77.D4 12 14
C C
0 0
D /33.D8 /39.D5 D
-21K1M -22K1M -23K1M -24K1M
/37.D2 /37.D3 /37.D4 /37.D5
1/L1 2/T1 1/L1 2/T1 1/L1 2/T1 1/L1 2/T1
3/L2 4/T2 3/L2 4/T2 3/L2 4/T2 3/L2 4/T2
/36.C2 /36.C3 /36.C4 /36.C5
5/L3 6/T3 5/L3 6/T3 5/L3 6/T3 5/L3 6/T3
/41.B4 13 14 /41.B5 13 14 /41.B6 13 14 /41.B7 13 14
Reproduction or distribution permitted only with our written permission
21 22 21 22 21 22 21 22
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT SCREWS 1-4 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 37
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4-2 4-2
/34.A8 /39.A5
A A
14 14 14 14
B B
+S2 +S2 +S2 +S2
-1X4 23 -1X4 24 -2X4 1 -2X4 2
Printing date:
C C
3 4 5 6
DI5 DI7 DI2 DI4
/22.C3 /22.D3 /22.B3 /22.C3
D -AI3 -AI3 -AI3 -AI3 D
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT SCREWS 1-4 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 38
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11 1 1
/36.A8 /50.A1 /37.A8 /43.A1
L21 L21 4-2 4-2
/36.A8 /50.A1 /38.A8 /40.A1
L31 L31
/36.A8 /50.A1
A A
/78.C2
3/L2
5/L3
1/L1
11
-20Q1M 13 -4K1
+S2
0.63...1 A -20SH1 /78.D1 12 14
22/02/2019
-2X3 3
3/L2
5/L3
1/L1
-20K1M
/39.D6
2/T1
4/T2
6/T3
C 8 C
DI8
/22.D3
-AI3
A1(+)
-20K1M
PE PE
/36.D8 /42.D1 VIBRATOR CEMENT WEIGHER /39.D7 A2(-)
-18X1 1 2 3 PE
0 0
/37.D8 /43.D1
+S6
D -18X2 1 2 3 PE -20K1M D
/39.D6
1/L1 2/T1
3/L2 4/T2
/39.C1 5/L3 6/T3
13 14
21 22
Reproduction or distribution permitted only with our written permission
PE PE-18
/73.D1
U V W PE
E +S6 E
-20M1 M
3~
220V/60Hz
0.08kW
0.7A
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 39
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+S6
5-6 -16X2 3 5-6
/13.D5 /49.A1
3 3
/28.A8 /41.A1
4 4
/34.A8 /49.A1
A 4-2 4-2 A
/39.A8 /41.A1
/77.C8
13 11 13
+S2 -3K8 +S6
22/02/2019
11
-20SH4 /77.D7 12 14 -20S1 -2K2
14 14 /40.E5 12 14
B B
+S2 +S6
Printing date:
-2X3 4 +S2
-16X1 5 -16X1 6 -2X4 5
+S6
-16X2 5
C C
1
DI1
/22.B3 2
-AI4 DI3
/22.C3
CEMENT WEIGHER DISCHARGE A1 -AI4
-2K2
D +S2 X1 D
+S6 a /40.E5 -20H5
A2 CEMENT WEIGHER CLOSED
-20Y1 b
X2
6 6
/34.D8 /49.D1
Reproduction or distribution permitted only with our written permission
6-2 6-2
/34.E8 /49.D1
+S6
6-6 -16X2 4 6-6
/13.D5 /41.D1
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 40
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
3 3
/40.A8 /48.A1
4-2 4-2
/40.A8 /43.A1
A A
11
-3K7
/77.C7 /77.D7 12 14
+S2 13
-20SH9
22/02/2019
14
B B
+S2 -21K1M 13 -22K1M 13 -23K1M 13 -24K1M 13
-2X4 6
/37.E2 /37.E3 /37.E4 /37.E5
14
Printing date:
14 14 14
-2X3 6
-16X1 12 -16X1 13 -16X1 14 -16X1 15
3
DI5
/22.C3
-AI4
a a a a
CEMENT AERATION +S6 +S6 +S6 +S6
-21Y5 b
-22Y5 b
-23Y5 b
-24Y5 b
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT AERATION Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 41
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L13 L13
/25.A8
L23 L23
/25.A8
L33 L33
/25.A8
A A
1/L1
3/L2
5/L3
-21Q3M
6...10 A
I> I> I>
22/02/2019
2/T1
4/T2
6/T3
B B
Printing date:
1/L1
1/L1
1/L1
1/L1
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
-21K3M -22K3M -23K3M -24K3M
C /43.D5 /43.D6 /43.D7 /43.D7 C
2/T1
2/T1
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
PE PE
/39.D2 /50.D1
U V W PE U V W PE U V W PE U V W PE
E +S21 +S22 +S23 +S24 E
-21M3 M -22M3 M -23M3 M -24M3 M
3~ 3~ 3~ 3~
<no entry>
CEMENT EXHAUST AIR FILTER SILO 1 CEMENT EXHAUST AIR FILTER SILO 2 CEMENT EXHAUST AIR FILTER SILO 3 CEMENT EXHAUST AIR FILTER SILO 4
4-2 4-2
/41.A8 /48.A1
1 1
/39.A8 /50.A5
A A
13 13 13 13 11 11 11 11
+S2 +S2 +S2 +S2 -2K4 -2K5 -2K6 -2K7
-21SH3 -22SH3 -23SH3 -24SH3
22/02/2019
B B
+S2 +S2 +S2 +S2
-2X4 7 -2X4 8 -2X4 9 -2X4 10
Printing date:
C C
4 5 6 7
DI7 DI2 DI4 DI6
/22.D3 /22.B3 /22.C3 /22.C3
A1(+) A1(+) A1(+) A1(+)
-AI4 -AI4 -AI4 -AI4 -21K3M -22K3M -23K3M -24K3M
/43.D5 A2(-) /43.D6 A2(-) /43.D7 A2(-) /43.D7 A2(-)
CEMENT EXHAUST AIR FILTER 1 CEMENT EXHAUST AIR FILTER 2 CEMENT EXHAUST AIR FILTER 3 CEMENT EXHAUST AIR FILTER 4
0 0
D /39.D8 /50.D5 D
-21K3M -22K3M -23K3M -24K3M
/43.D5 /43.D6 /43.D7 /43.D7
1/L1 2/T1 1/L1 2/T1 1/L1 2/T1 1/L1 2/T1
3/L2 4/T2 3/L2 4/T2 3/L2 4/T2 3/L2 4/T2
/42.C2 5/L3 6/T3 /42.C4 5/L3 6/T3 /42.C5 5/L3 6/T3 /42.C7 5/L3 6/T3
Reproduction or distribution permitted only with our written permission
13 14 13 14 13 14 13 14
21 22 21 22 21 22 21 22
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT EXHAUST AIR FILTER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 43
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 44
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L-22 L-22
/16.A8 /46.A1
L-23 L-23
/16.A8 /46.A1
A A
+S2 +S2
22/02/2019
-21P1 -22P1
6 7 6 7
L1+ N- L1+ N-
B B
Printing date:
1 1
2 2
on on
C C
N.C.
N.C.
N.C.
+ - + - + - + -
1 2 4 5 8 9 10 11 12 13 14 15 16 17 18 19 1 2 4 5 8 9 10 11 12 13 14 15 16 17 18 19
+S2 +S2
-21X2 1 2 -22X2 1 2
D D
Reproduction or distribution permitted only with our written permission
+S21 +S22
-21B1 -22B1
1 1
2 2
E E
TRANSMITTER 1 TRANSMITTER 2
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT FILLING LEVEL DISPLAY Z1/Z2 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 45
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L-22 L-22
/45.A8
L-23 L-23
/45.A8
A A
+S2 +S2
22/02/2019
-23P1 -24P1
6 7 6 7
L1+ N- L1+ N-
B B
Printing date:
1 1
2 2
on on
C C
N.C.
N.C.
N.C.
+ - + - + - + -
1 2 4 5 8 9 10 11 12 13 14 15 16 17 18 19 1 2 4 5 8 9 10 11 12 13 14 15 16 17 18 19
+S2 +S2
-23X2 1 2 -24X2 1 2
D D
Reproduction or distribution permitted only with our written permission
+S23 +S24
-23B1 -24B1
1 1
2 2
E E
TRANSMITTER 3 TRANSMITTER 4
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT FILLING LEVEL DISPLAY Z3/Z4 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 46
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 47
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
3 3
/41.A8 /49.A1
4-2 4-2
/43.A8 /49.A1
A A
11
-4K3
/78.C4 /78.C4
/78.D3 12 14
+S2 13 +S2 13
-30SH1 -31SH1
14 14
22/02/2019
11
-4K4
+S2 +S2 /78.D4 12 14
B -2X4 11 -2X4 12 B
Printing date:
-2X3 11 -2X3 12
-16X1 9 -16X1 10
+S6 +S6
-16X2 9 -16X2 10
C C
1 2
DI1 DI3
/22.B4 /22.C4
-AI5 -AI5
a a
+S6 +S6
BATCHING WATER COARSE BATCHING WATER -31Y1 b -31Y2 b
+S6 +S6
D 6-6 -16X2 4 -16X2 4 6-6
D
/41.D8 /49.D1
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
BATCHING WATER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 48
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
3 3
/48.A8 /54.A1
4 4
/40.A8 /55.A1
4-2 4-2
/48.A8 /50.A5
A A
+S6
5-6 -16X2 3 5-6
/40.A8
/78.C8 11
-4K8 11
13 13 -4K2
+S2 /78.D7 12 14 +S6
-30SH4 -30S11 /49.E5 12 14
22/02/2019
14 14
B +S2 +S6 B
-2X4 13 -16X1 7 -16X2 8 -2X3 14
Printing date:
+S6 +S2
-2X3 13 -16X2 7 -16X1 8 -2X4 14
C C
3
DI5 4
/22.C4 DI7
X1
-AI5 -4K2 A1 /22.D4 +S2
a -AI5 -30H4
+S6 /49.D5
-30Y1 A2
WATER WEIGHER DISCHARGE b X2
WATER WEIGHER
CLOSED
6 6
/40.D8 /54.D1
6-2 6-2
D /40.E8 /55.E1 D
+S6
6-6 -16X2 4 6-6
/48.D8
11
/49.B7 12
44
41
42
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
WATER WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 49
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/39.A2 /52.A1
L21 L21
/39.A2 /52.A1
L31 L31
/39.A2 /52.A1
A 4-2 4-2 A
/49.A8 /53.A1
1 1
/43.A8 /53.A1
3/L2
5/L3
3/L2
5/L3
1/L1
1/L1
-30Q1M -31Q1M /78.C6
24...32 A 17...23 A 11 41
13 -4K6 -4K8
+S2
22/02/2019
2/T1
4/T2
6/T3
4/T2
6/T3
14
B B
Printing date:
+S2
-2X4 15
3/L2
5/L3
3/L2
5/L3
1/L1
1/L1
-30K1M -31K1M
/50.D6 /50.D7
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
-2X3 15
5
C DI2 C
/22.B4
A1(+) A1(+)
-AI5 -30K1M -31K1M
/50.D6 A2(-) /50.D7 A2(-)
BATCHING WATER PUMP
0 0
/43.D8 /53.D1
PE PE
/42.D8 /52.D1
-30K1M -31K1M
-X1 16 17 18 PE -X1 19 20 21 PE /50.C6 /50.C7
D 1/L1 2/T1 1/L1 2/T1 D
3/L2 4/T2 3/L2 4/T2
/50.C2 /50.C3
5/L3 6/T3 5/L3 6/T3
13 14 13 14
21 22 21 22
U V W PE U V W PE
+S6 +S6
E -30M1 M -31M1 M E
3~ 3~
220V/60Hz 220V/60Hz
7.5kW 5.5kW
25A 19A
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
BATCHING PUMP & DISCHARGE PUMP WATER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 50
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 51
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/50.A8 /58.A1
L21 L21
/50.A8 /58.A1
L31 L31
/50.A8 /58.A1
A A
3/L2
5/L3
1/L1
-41Q1M
9...14 A
I> I> I>
22/02/2019
2/T1
4/T2
6/T3
B B
Printing date:
3/L2
5/L3
1/L1
3/L2
5/L3
3/L2
5/L3
3/L2
5/L3
1/L1
1/L1
1/L1
-41K1M -42K1M -43K1M -44K1M
/53.D5 /53.D6 /53.D6 /53.D7
2/T1
4/T2
6/T3
C C
2/T1
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
4/T2
6/T3
PE PE
/50.D8 /58.D1
-40X1 1 2 3 PE -40X1 4 5 6 PE -40X1 7 8 9 PE -40X1 10 11 12 PE
D D
Reproduction or distribution permitted only with our written permission
E U V W PE U V W PE U V W PE U V W PE E
+ADM +ADM +ADM +ADM
-41M1 M -42M1 M -43M1 M -44M1 M
3~ 3~ 3~ 3~
1 1
/50.A8 /58.A1
4-2 4-2
/50.A8 /54.A1
A A
14 14 14 14
C C
1 2 3 4
DI1 DI3 DI5 DI7
/22.B4 /22.C4 /22.C4 /22.D4 A1(+) A1(+) A1(+) A1(+)
-AI6 -AI6 -AI6 -AI6 -41K1M -42K1M -43K1M -44K1M
/53.D5 A2(-) /53.D6 A2(-) /53.D7 A2(-) /53.D7 A2(-)
BATCHING PUMP 1 BATCHING PUMP 2 BATCHING PUMP 3 BATCHING PUMP 4
0 0
/50.D8 /58.C1
D -41K1M -42K1M -43K1M -44K1M D
/53.D5 /53.D6 /53.D6 /53.D7
1/L1 2/T1 1/L1 2/T1 1/L1 2/T1 1/L1 2/T1
3/L2 4/T2 3/L2 4/T2 3/L2 4/T2 3/L2 4/T2
/52.C1 5/L3 6/T3 /52.C2 5/L3 6/T3 /52.C3 5/L3 6/T3 /52.C4 5/L3 6/T3
13 14 13 14 13 14 13 14
21 22 21 22 21 22 21 22
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
ADMIXTURE BATCHING PUMPS Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 53
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
3 3
/49.A8 /69.A1
4-2 4-2
/53.A8 /59.A1
A A
/79.C5 /79.C6
11 11 11 11
13 13 -5K5 -5K6 -5K7 -5K8
+S2 +S2 /79.D5 12 14 /79.D6 12 14 /79.D7 12 14 /79.D7 12 14
-40SH4 -40SH2
22/02/2019
14 14
B +S2 +S2 B
-2X4 20 -2X4 21
Printing date:
C C
a a a a
+S40 +S40 +S40 +S40
5 6 -40Y1 -40Y3 -40Y2 -40Y4
b b b b
DI2 DI4
/22.C4 +S40 +S40
/22.B4 -17X2 2 -17X2 12 +S40 +S40
-AI6 -AI6 -17X2 4 -17X2 14
6 6
/49.D8 /55.D1
Reproduction or distribution permitted only with our written permission
ADMIXTURE WEIGHER DISCHARGE 1 ADMIXTURE WEIGHER DISCHARGE 2 ADMIXTURE WEIGHER SCAVENGE 1 ADMIXTURE WEIGHER SCAVENGE 2
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
ADMIXTURE WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 54
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4 4
/49.A8 /60.A1
5 5
/13.A8 /56.A1
A A
+S40
-17X2 5 +S40 +S40 +S40 +S40
11 -17X2 7 -17X2 15 -17X2 9 -17X2 17
-40K1
22/02/2019
13 /55.E2 12 14
+S40
-40S1
B rd rd +S40 rd +S40 rd B
14 +S40 +S40
-40S2 -40S4 -40S3 -40S5
bu bu bu bu
Printing date:
+S2
-17X1 6 -2X4 22 -17X1 8 -17X1 16 -17X1 10 -17X1 18
C C
7
DI6
/22.C4
-AI6
8 7 8 8
ADMIXTURE WEIGHER CLOSED DI8 DI6 DI8 DI8
X1 /22.D4 /22.C2 /22.D5 /22.D2
D
+S2 D
-40K1 A1 -40H4 -AI6 -AI1 -AI9 -AI1
/55.E2 A2 OVERFILL PREVENTION OVERFILL PREVENTION OVERFILL PREVENTION OVERFILL PREVENTION
X2
WEIGHING CONTAINER 1 WEIGHING CONTAINER 2 OUTLET HOPPER 1 OUTLET HOPPER 2
6 6
/54.D8 /60.D1
Reproduction or distribution permitted only with our written permission
6-2 6-2
/49.D8 /60.D1
-40K1
/55.D2
14 ADMIXTURE WEIGHER OPEN
11
/55.B3 12
E 44 E
41
42
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
ADMIXTURE WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 55
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
5 5
/55.A8 /66.A1
A A
-17X1 19 -17X1 21
+S40 +S40
-17X2 19 -17X2 21
22/02/2019
B 3 3 B
+S40 +S40
-40S6 P -40S7 P
Printing date:
4 4
+S40 +S40
-17X2 20 -17X2 22
-17X1 20 -17X1 22
C C
7 8
DI6 DI8
/22.C4 /22.D4
D -AI5 -AI5 D
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
ADMIXTURE WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 56
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 57
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/52.A8 /64.A1
L21 L21
/52.A8 /64.A1
L31 L31
/52.A8 /64.A1
A 1 1 A
/53.A8 /59.A1
3/L2
5/L3
1/L1
21
-60Q1M
13
48...65 A
22
/59.A6 14
I> I> I>
22/02/2019
2/T1
4/T2
6/T3
B B
Printing date:
3/L2
5/L3
1/L1
1 3 5
1/L1
3/L2
5/L3
-60K1M -60K2M -60F4
/59.E6 /59.E7 6A
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
2 4 6
A1 L1 L2 L3
C -60F3 3~U ASY C
/58.D4 A2 A2 A1 U / PH
0 0
/53.D8 /59.D1
PE PE
/52.D8 /64.D1
-X1 22 23 24 PE
-60F3
/58.C4
18
15
/59.B6 16
D D
loader upwards
* (Y) -60M1: V2 W2
Reproduction or distribution permitted only with our written permission
(D) -60M1: W1 V2
E U V W PE E
+S61
-60M1 M
3~
1 1
/58.A8 /61.A1
4-2 4-2
/54.A8 /71.A1
A A
/80.C5 /80.C6
13
13 21 13 -60Q1M
+S2 +S2 +S2 /58.B2
-60SH1 -60S2 -60SH3 14
14 22 14
15
-60F3
+S2 +S2 +S2
22/02/2019
B
-60F10 05 B
-3X3 2 -3X3 3 -3X3 4
/61.D7 06 08
Printing date:
43
-60K6
/60.E2 44
C C
11 11
7 1 8 -6K5 -6K6
DI6 DI1 DI8 /80.D5 12 14 /80.D6 12 14
/22.C4 /22.B5 /22.D4
-AI7 -AI8 -AI7
21
-60K2M 21 -60K1M
LOADER UPWARDS LOADER STOP LOADER DOWNWARDS
/59.E7 /59.E6
22 22
D D
A1(+) A1(+)
-60K1M -60K2M
/59.E6 /59.E7 A2(-)
A2(-)
0 0
/58.C8 /61.D1
Reproduction or distribution permitted only with our written permission
-60K1M -60K2M
/59.D6 /59.D7
1/L1 2/T1 1/L1 2/T1
3/L2 4/T2 3/L2 4/T2
/58.C2 5/L3 6/T3 /58.C3 5/L3 6/T3
E 13 14 13 14 E
/59.D7 21 22 /59.D6 21 22
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LOADER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 59
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4 4
/55.A8 /65.A1
+S61
5-61 -13X2 3 5-61
A /13.E4 /62.A1 A
13
+S61 -60K6 13 -60K6 33
-60S6 /60.D2 /60.E2
14 14 34
22/02/2019
B +S61 B
-13X2 11 -2X3 23
Printing date:
+S2
-13X1 11 -2X4 23
1
DI1
/22.B4
C -AI7 C
PROTECTIVE GRID
ACTIVE
X1
+S2
A1 -60H6
-60K6
/60.D3 A2 X2
6 6
D /55.D8 /66.E1 D
6-2 6-2
/55.E8 /62.D1
-60K6
/60.D2
/60.B4 13 14
21 22
/60.B6 33 34
Reproduction or distribution permitted only with our written permission
/59.C6 43 44
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
SECURITY LOADER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 60
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
1 1
/59.A8 /65.A1
A A
22/02/2019
+S61
-60R2
B B
Printing date:
+S61 +S61
-13X2 5 -13X2 6
-13X1 5 -13X1 6
C C
T1 A1
-60F10
/61.D7 >
T2 A2
D 0 0
D
/59.D8 /65.E1
-60F10
/61.D7
08
05
/59.B6 06
98
Reproduction or distribution permitted only with our written permission
95
96
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
MOTOR FULL PROTECTION LOADER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 61
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+
2 21 2 2
-60B2 +S61 -60B4 -60B5
22/02/2019
- 3 -60S3 - 3 - 3
4 22 4 4
B B
Printing date:
5 2 6 -2X3 24 4 -3X3 1
C C
DI2 DI3 DI4 DI7
/22.B4 /22.C4 /22.C4 +S2 /22.D4 +S2
-2X4 24 -3X4 1
-AI7 -AI7 -AI7 -AI7
X1 X1
INTERMEDIATE STOP SLACK ROPE LOADER ABOVE +S2 LOADER BOTTOM +S2
-60H3 -60H4
X2 X2
6-2 6-2
/60.D8 /65.E1
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LIMIT SWITCH LOADER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 62
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 63
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/58.A8 /73.A1
L21 L21
/58.A8 /73.A1
L31 L31
/58.A8 /73.A1
A A
3/L2
5/L3
1/L1
21
-70Q1M
13
90...150 A
22
/66.D3 14
I> I> I> +S2
-70P1
2/T1
4/T2
6/T3
+S2 +S2
22/02/2019
3/L2
3/L2
3/L2
5/L3
5/L3
5/L3
1/L1
1/L1
1/L1
-70K1M -70K5M -70K3M
/65.E2 /65.E4 /65.E3
2/T1
2/T1
2/T1
4/T2
4/T2
4/T2
6/T3
6/T3
6/T3
C C
PE PE
/58.D8 /88.F1
-X1 25 26 27 PE -X1 28 29 30
D D
Reproduction or distribution permitted only with our written permission
+S71
E -70M1 E
PE
1U 2W
1V 3~ 2U
1W 2V
MIXER MOTOR
220V/60Hz
37kW
124A
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
MIXER MOTOR Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 64
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
1 1
/61.A8 /70.A1
4 4
/60.A8 /66.A1
A A
13
-70K10 33 -70K1M
/66.F3 /65.E2
14
22/02/2019
34
B B
Printing date:
11 11 11 13
-7K1 -7K2 -7K3 -70K5M
/81.D1 12 14 /81.D2 12 14 /81.D3 12 14 /65.E4
14
C 3 C
-3X3 5 DI5
/22.C5
+S2 -AI8
-70K5M 21 -70K3M 21 -3X4 5
/65.E4 /65.E3 MIXER RUNNING
22 22
-70G1
h
D X1 D
A1(+) A1(+) A1(+)
+S2
-70K1M -70K3M -70K5M -70H1
/65.E2 A2(-) /65.E3 A2(-) /65.E4 A2(-) X2
Reproduction or distribution permitted only with our written permission
0 0
/61.D8 /70.D1
6-2 6-2
/62.D8 /68.D1
-70K1M -70K3M -70K5M
/65.D2 /65.D3 /65.D4
1/L1 2/T1 1/L1 2/T1 1/L1 2/T1
3/L2 4/T2 3/L2 4/T2 3/L2 4/T2
E /64.C2 5/L3 6/T3 /64.C4 5/L3 6/T3 /64.C3 5/L3 6/T3 E
/65.B6 13 14 13 14 /65.B6 13 14
21 22 /65.D4 21 22 /65.D3 21 22
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
ACTIVATION MIXER MOTOR Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 65
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+S71
5-71 -19X2 3 5-71
/13.C7 /68.A1
4 4
/65.A8
5 5
/56.A8 /72.A1
A A
+S71 21
-70S01 -70K10 13
22 /66.E3
14
+S71
-19X2 11
22/02/2019
-19X1 11
B -3X3 6 B
+S2
Printing date:
-3X4 6
8
DI8
13 /22.D5
+S2
-70S0
-AI8
14
SECURITY MIXER
+S2 OK
C -3X4 7 C
-3X3 7
-70Q1M 13
/64.B2
14
05
D -70F10 D
/70.D2 06 08
A1
Reproduction or distribution permitted only with our written permission
-70K10
/66.E3 A2
6 6
/60.D8 /68.D1
E /13.C7
6-71 6-71
/68.A1 E
-70K10
/66.E3
13 14
/66.A4
21 22
33 34
/65.B2
43 44
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
MIXER - SECURITY Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 66
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 67
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-5X3 7 -5X3 9
1 2 3
C C
+S2 DI1 DI3 +S2 DI5
-5X4 7 /22.B5 /22.C5 -5X4 9 /22.C5
-AI9 -AI9 -AI9
X1 A1 MIXER GATE OPEN MIXER GATE 1/2 OPEN X1 A1 MIXER GATE CLOSED
-71K4 +S2 -71K3
+S2
-71H3 /68.D3 A2 -71H4 /68.D6 A2
X2 X2
6-2 6-2
D /65.E8 /69.D1 D
6 6
/66.E8 /69.D1
-71K4 -71K3
/68.D3 /68.D6
14 14
11 11
12 12
/69.B7 /69.B8
44 44
Reproduction or distribution permitted only with our written permission
41 41
42 42
MIXER GATE OPEN MIXER GATE 1/2 OPEN MIXER GATE CLOSED
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LIMIT SWITCH MIXER GATE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 68
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
3 3
/54.A8
+S71 +S71
5-71 -19X2 3 -19X2 3 5-71
/68.A8
A A
11 11
+S71 1
+S71 3 -7K4 -7K5
-71S1 P -71S2 P /81.D4 12 14 /81.D5 12 14
11 41
2 11 4 -72K2 -72K3
-72K3
/69.E1 12 14 /69.E3 12 14 /69.E1 42 44
22/02/2019
+S71 +S71
-19X2 5 -19X2 14 11 11
B
-71K4 -71K3 B
/68.D2 12 14 /68.D6 12 14
-19X1 5 -19X1 14
Printing date:
5
DI2
-5X3 10 -3X3 8 /22.B5 -19X1 6 -19X1 7
-AI8
+S2 +S2 +S71 +S71
C -5X4 10 -3X4 8 HYDRAULIC EXCESS PRESSURE -19X2 6 -19X2 7 C
MIXER
A1 A1
-72K3 X1 -72K2 X1 a a
/69.D2 +S2 /69.D3 +S2 +S71 +S71
A2 A2 A B
-72H2 -70H2 -71Y1.1 b -71Y1.2 b
X2 X2
+S71 +S71
6-71 -19X2 4 -19X2 4 6-71
D /68.A8 /72.D1 D
6-2 6-2
/68.D8 /75.D1
6 6
/68.D8 /75.D1
-72K3 -72K2
/69.D1 /69.D3 OPEN MIXER GATE CLOSE MIXER GATE
14 14
11 11
/69.B3 12 /69.B4 12
Reproduction or distribution permitted only with our written permission
44 44
41 41
/69.B5 42 42
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
MIXER SENSORS / ACTUATORS Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 69
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
1 1
/65.A8 /73.A4
A A
2
+S71
-71R1
22/02/2019
B B
Printing date:
+S71 +S71
-19X2 13 -19X2 12
-19X1 13 -19X1 12
C C
T1 A1
-70F10
/70.D2 >
T2 A2
0 0
D /65.E8 /73.D4 D
-70F10
/70.D2
08
05
06
/66.D3 98
Reproduction or distribution permitted only with our written permission
95
96
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
MONITORING MIXER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 70
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4-2 4-2
/59.A8 /72.A1
A A
+S2 13 +S2 21
+S2 13 +S2 13 +S2 13
-70SH1 -70S2 -70S3 -71SH1 -71SH2
22/02/2019
14 22 14 14 14
B B
Printing date:
C C
1 2 3 4 5
DI1 DI3 DI5 DI7 DI2
/22.B5 /22.C5 /22.C5 /22.D5 /22.B5
-AI10 -AI10 -AI10 -AI10 -AI10
MIXER ON MIXER OFF MIXER ON DIRECTLY MIXER GATE OPEN MIXER GATE CLOSE
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
MIXER CONTROL SWITCH Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 71
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
5 5
/66.A8
4-2 4-2
/71.A8 /73.A4
A A
/80.C7 /81.C6
11
13 13 -7K6
+S2 +S2
-79SH1 -79SH2 /81.D6 12 14
22/02/2019
14 14
+S2 +S2
B -3X4 14 -3X4 15 -19X1 15 B
Printing date:
+S71
-3X3 14 -3X3 15 -19X2 15
6 7
DI4 DI6
/22.C5 /22.C5
C C
-AI10 -AI10
+S71
6-71 -19X2 4 6-71
D /69.D8 D
HORN TRUCK
LOADING COMPLETE
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
LOADING SYSTEM Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 72
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L11 L11
/64.A8
L21 L21
/64.A8
L31 L31
/64.A8
A 1 1 A
/70.A8
4-2 4-2
/72.A8
3/L2
5/L3
3/L2
5/L3
1/L1
1/L1
-75Q1M -76Q1M
/81.C7 /81.C8
6...10 A 1...1.6 A
13 13 11 11
I> I> I> I> I> I> +S2 +S2 -7K7 -7K8
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
-70SH11 -70SH12
22/02/2019
/81.D6 12 14 /81.D7 12 14
14 14
B B
+S2 +S2
-3X4 16 -3X4 17
Printing date:
-3X3 16 -3X3 17
3/L2
5/L3
3/L2
5/L3
1/L1
1/L1
-75K1M -76K1M
/73.E8 /73.E7
2/T1
2/T1
4/T2
6/T3
4/T2
6/T3
6 7
C C
DI4 DI6
/22.C5 /22.C5
-AI9 -AI9
-18X1 4 5 6 -18X1 7 8 9
A1(+) A1(+)
-76K1M -75K1M
D /73.E7 /73.E8 D
A2(-) A2(-)
0 0
/70.D8
PE-18 PE PE PE-18
/39.E2
-76K1M -75K1M
/73.D7 /73.D8
Reproduction or distribution permitted only with our written permission
220V/60Hz 220V/60Hz
2.2kW 0.20kW
9.5A 1.3A
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
VIBRATOR MIXER DUST EXTRACTION Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 73
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 74
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
6 6
D /69.D8 /76.D1 D
6-2 6-2
/69.D8 /76.D1
-1K1 -1K2 -1K3 -1K4 -1K8.2 -1K8.1
/75.D1 /75.D2 /75.D3 /75.D4 /75.D7 /75.D7
14 14 14 14 14 14
11 11 11 11 12 11 12 11
/28.A2 12 /28.A3 12 /28.A5 12 /28.A6 12 /32.C4 /28.B2
44 44 44 44 24 24
Reproduction or distribution permitted only with our written permission
41 41 41 41 /32.C7 22 21 /28.B4 22 21
/32.B3 42 /32.B6 42 42 42
34 31 34 31
32 /28.B6 32
44 41 44 41
42 /28.B7 42
E BATCHING AGGREGATE BATCHING AGGREGATE BATCHING AGGREGATE BATCHING AGGREGATE BATCHING VALVE AGGREGATE E
K1 K2 K3 K4 COARSE
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ1 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 75
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
6 6
D /75.D8 /77.D1 D
6-2 6-2
/75.D8 /77.D1
-2K3 -2K4 -2K5 -2K6 -2K7 -2K8
/76.D3 /76.D4 /76.D5 /76.D6 /76.D7 /76.D7
14 14 14 14 14 14
11 11 11 11 11 11
/32.A3 12 /43.B5 12 /43.B6 12 /43.B7 12 /43.B7 12 /33.B4 12
44 44 44 44 44 44
Reproduction or distribution permitted only with our written permission
41 41 41 41 41 41
/32.A6 42 42 42 42 42 42
E VIBRATOR AGGREGATE SILO CEMENT EXHAUST AIR FILTER 1 CEMENT EXHAUST AIR FILTER 2 CEMENT EXHAUST AIR FILTER 3 CEMENT EXHAUST AIR FILTER 4 WEIGHER BELT DISCHARGE E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ2 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 76
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
6 6
D /76.D8 /78.D1 D
6-2 6-2
/76.D8 /78.D1
-3K1 -3K2 -3K3 -3K4 -3K7 -3K8
/77.D1 /77.D2 /77.D3 /77.D4 /77.D7 /77.D8
14 14 14 14 14 14
11 11 11 11 11 11
/37.B2 12 /37.B3 12 /37.B4 12 /37.B5 12 /41.A4 12 /40.B3 12
44 44 44 44 44 44
Reproduction or distribution permitted only with our written permission
41 41 41 41 41 41
42 42 42 42 42 42
E BATCHING CEMENT BATCHING CEMENT BATCHING CEMENT BATCHING CEMENT CEMENT LOOSENING CEMENT WEIGHER E
Z1 Z2 Z3 Z4 SILO 1-4 DISCHARGE
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ3 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 77
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
6 6
D /77.D8 /79.D1 D
6-2 6-2
/77.D8 /79.D1
-4K1 -4K3 -4K4 -4K6 -4K8
/78.D1 /78.D3 /78.D4 /78.D6 /78.D7
14 14 14 14 14
11 11 11 11 11
/39.B6 12 /48.A5 12 /48.B6 12 /50.B6 12 /49.B4 12
44 44 44 44 44
Reproduction or distribution permitted only with our written permission
41 41 41 41 41
42 42 42 42 /50.B7 42
E VIBRATOR CEMENT WEIGHER BATCHING FRESH WATER BATCHING FRESH WATER BATCHING PUMP WATER WATER WEIGHER DISCHARGE E
FINE COARSE
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ4 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 78
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
6 6
D /78.D8 /80.D1 D
6-2 6-2
/78.D8 /80.D1
-5K1 -5K2 -5K3 -5K4 -5K5 -5K6 -5K7 -5K8
/79.D1 /79.D2 /79.D3 /79.D4 /79.D5 /79.D6 /79.D7 /79.D8
14 14 14 14 14 14 14 14
11 11 11 11 11 11 11 11
/53.B5 12 /53.B6 12 /53.B6 12 /53.B7 12 /54.B4 12 /54.B5 12 /54.B6 12 /54.B7 12
44 44 44 44 44 44 44 44
Reproduction or distribution permitted only with our written permission
41 41 41 41 41 41 41 41
42 42 42 42 42 42 42 42
E BATCHING ADMIXTURES 1 BATCHING ADMIXTURES 2 BATCHING ADMIXTURES 3 BATCHING ADMIXTURES 4 ADMIXTURE WEIGHER ADMIXTURE WEIGHER ADMIXTURE WEIGHER ADMIXTURE WEIGHER E
DISCHARGE 1 SCAVENGE 1 DISCHARGE 2 SCAVENGE 2.
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ5 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 79
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
6 6
D /79.D8 /81.D1 D
6-2 6-2
/79.D8 /81.D1
-6K5 -6K6
/80.D5 /80.D6
14 14
11 11
/59.C6 12 /59.C7 12
44 44
Reproduction or distribution permitted only with our written permission
41 41
42 42
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ6 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 80
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
6 6
D /80.D8 /82.D1 D
6-2 6-2
/80.D8
-7K1 -7K2 -7K3 -7K4 -7K5 -7K6 -7K7 -7K8
/81.D1 /81.D2 /81.D3 /81.D4 /81.D5 /81.D6 /81.D7 /81.D7
14 14 14 14 14 14 14 14
11 11 11 11 11 11 11 11
/65.B2 12 /65.B3 12 /65.B4 12 /69.A7 12 /69.A8 12 /72.B5 12 /73.B7 12 /73.B8 12
44 44 44 44 44 44 44 44
Reproduction or distribution permitted only with our written permission
41 41 41 41 41 41 41 41
42 42 42 42 42 42 42 42
E MIXER ON MIXER ON MIXER ON MIXER GATE OPEN MIXER GATE CLOSE LOADING COMPLETE VIBRATOR VENTILATOR E
(MAIN CONTACTOR) (WYE CONTACTOR) (DELTA CONNECTION) HORN TRUCK MIXER DUST EXTRACTION MIXER DUST EXTRACTION
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ7 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 81
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
C C
A1
-8K1
/82.D1
A2
6 6
D /81.D8 /88.E1 D
-8K1
/82.D1
14
11
/25.B5 12
44
41
42
Reproduction or distribution permitted only with our written permission
E COMPRESSOR ON E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
OUTPUT PLC/ISOLATING RELAY AQ8 Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 82
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
22/02/2019
B B
Printing date:
C C
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
RESERVE Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 83
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L-3 L-3
/16.C8 /85.A1
N-3 N-3
/16.C8 /85.A1
PE-3 PE-3
/16.C8 /85.A1
A A
+S2
-10P1
1 2 3
GND
230V
0V
22/02/2019
PAX
USER-1
USER-2
USER-3
B B
+EXC
+SIG
COM
COM
0-10V DC 4-20mA
-SIG
+ - + -
Printing date:
3 4 5 6 7 8 9 10 16 17 18 19
C C
gn
bn
ye
gy
pk 0 2
+AGG IW4 M4
-X91 1 2 3 4 5 6 7 8 /23.B5 /23.D5
-Al101 -Al101
E E
DMS
+AGG
-1B10
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
AGGREGATE WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 84
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L-3 L-3
/84.A8 /86.A1
N-3 N-3
/84.A8 /86.A1
PE-3 PE-3
/84.A8 /86.A1
A A
+S2
-20P1
1 2 3
GND
230V
0V
22/02/2019
PAX
USER-1
USER-2
USER-3
B B
+EXC
+SIG
COM
COM
0-10V DC 4-20mA
-SIG
+ - + -
Printing date:
3 4 5 6 7 8 9 10 16 17 18 19
C C
wh
gn
bu
bn
ye
gy
pk
1 3
+CEM IW5 M5
-X92 1 2 3 4 5 6 7 8 /23.B5 /23.D5
-Al101 -Al101
CEMENT WEIGHER CEMENT WEIGHER
D INPUT 0-10V INPUT GROUND D
Reproduction or distribution permitted only with our written permission
E E
DMS
+CEM
-2B10
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
CEMENT WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 85
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L-3 L-3
/85.A8 /87.A1
N-3 N-3
/85.A8 /87.A1
PE-3 PE-3
/85.A8 /87.A1
A A
+S2
-30P1
1 2 3
GND
230V
0V
22/02/2019
PAX
USER-1
USER-2
USER-3
B B
+EXC
+SIG
COM
COM
0-10V DC 4-20mA
-SIG
+ - + -
Printing date:
3 4 5 6 7 8 9 10 16 17 18 19
C C
wh
gn
bu
bn
ye
gy
pk 0 2
+WAT IW6 M6
-X93 1 2 3 4 5 6 7 8 /23.B5 /23.D5
-Al102 -Al102
WATER WEIGHER WATER WEIGHER
D INPUT 0-10V INPUT GROUND D
Reproduction or distribution permitted only with our written permission
E E
DMS
+WAT
-3B10
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
WATER WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 86
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L-3 L-3
/86.A8
N-3 N-3
/86.A8
PE-3 PE-3
/86.A8
A A
+S2
-40P1
1 2 3
GND
230V
0V
22/02/2019
PAX
USER-1
USER-2
USER-3
B B
+EXC
+SIG
COM
COM
0-10V DC 4-20mA
-SIG
+ - + -
Printing date:
3 4 5 6 7 8 9 10 16 17 18 19
C gn C
bn
ye
gy
pk 1 3
+ADD IW7 M7
-X94 1 2 3 4 5 6 7 8 /23.B5 /23.D5
-Al102 -Al102
ADMIXTURE WEIGHER ADMIXTURE WEIGHER
D INPUT 0-10V INPUT GROUND D
Reproduction or distribution permitted only with our written permission
E E
DMS
+ADD
-4B10
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
ADMIXTURE WEIGHER Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 87
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
24VDC-PLC 24VDC-PLC
/23.A8
0VDC-PLC 0VDC-PLC
/23.A8
A A
22/02/2019
B B
-FMS-II
Printing date:
+ -
-E00 -E01 -E02 -E03 END
PROFIBUS 750-402 750-402 750-550 750-653 750-600
RUN INPUT INPUT OUTPUT INPUT Bus End
BF
E00.1
E00.0
+A1
+A2
1
6
5
1
DIA
-R1
C C C
/89.D2
/89.D3
/89.B6
9
5
RUN
+ + + + + + + + 2 6
ERR -X11 1 2 3 4 PE
I/O
24V DC 24V DC
M1
M2
- - - - - - 3 7 /90.B3
-
x1 /90.B3
WAGO-I/O-SYSTEM
/89.B7
D /90.A3 D
B
0V 0V /90.A3
750-833
E00.2
E00.3
x10 PE PE S1 S2
8
Reproduction or distribution permitted only with our written permission
/89.D4
/89.D5
E E
6 6
/82.D8
PE PE
/64.D8
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
FMS CONNECTION Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 88
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
MOISTURE 1 MOISTURE 1
AGGREGATE SILO AGGREGATE SILO AGGREGATE SILO BATCHING AGGREGATE INPUT 0-10V INPUT GROUND
COMPONENTS 1 COMPONENTS 2 COMPONENTS 3 FINE FMS II FMS II
C C
1 2 3 4 0 2
E00.0 E00.1 E00.2 E00.3 IW8 M8
/88.C4 /88.C4 /88.E4 /88.E4 /23.B5 /23.D5
D -E00 -E00 -E00 -E00 -Al103 -Al103 D
START INPUT 1 FMS II START INPUT 2 FMS II START INPUT 3 FMS II INPUT 4 FMS II FINE MOISTURE 1 MOISTURE 1
INPUT 0-10V INPUT GROUND
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
FMS - BATCHING SIGNAL Compactmix 1.0 00 +S3
Construction 11/12/2018
Job Number Drawing Number Page 89
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A ye A
/88.D8
B gn B
/88.D8
+ wh +
/88.D8
bn -
22/02/2019
-
/88.D8
B + B
-
Printing date:
A
B
C C
SCREEN TERMINALS
A
B
+
D D
- COLOUR - code
bk = black
bn = brown
+ rd = red
Reproduction or distribution permitted only with our written permission
og = orange
- ye = yellow
R = 120 ohm gn = green
A bu = blue
vt = violet
B gy = grey
E FMS - sensor 1 FMS - sensor 2 wh = white E
pk = pink
tq = turquoise
F F
Authorization Date Name Project Description Version =2_SCHEMATIC SHEET
FMS connection Compactmix 1.0 00 +S3
Construction 11/12/2018
(FMS = moistures measuring system) Job Number Drawing Number Page 90
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Modifications:
A A
No. Modification No. Date Name Type/ Designation of modification/ Completement
1
22/02/2019
B B
3
Printing date:
C 5 C
Compactmix 1.0-A-R/R
Type
6
D
LTH AUTOMATIC CONTROL SYSTEM GENERATION III D
Batching system
8
Reproduction or distribution permitted only with our written permission
9
GA433081
E 10 E
Overview of cabling
11
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
COVER SHEET Compactmix 1.0 00 +S1
Construction 11/12/2018
Job Number Drawing Number Page 1
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
POWER UNIT A
PANEL +S3 -X1 4X16 M
3~
-60M1 LOADER
15 kW
3~ 7.5 kW
B B
3~ 4.0 kW
C C
D D
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
OVERVIEW MOTOR Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 2
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
POWER UNIT A
PANEL +S3 -1X5 4X1.5 M
3~
-21M3 CEMENT EXHAUST AIR FILTER 1
B B
-1X5 4X1.5 M -23M3 CEMENT EXHAUST AIR FILTER 3
3~
Printing date:
C C
-40X1 4X1.5 M -41M1 ADMIXTURE PUMP 1
3~
D 4X1.5 M D
-40X1 -43M1 ADMIXTURE PUMP 3
3~
4X1.5 M
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
OVERVIEW MOTOR Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 3
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
POWER UNIT A
PANEL +S3
22/02/2019
B -21P1 B
Vegamet
381
-22P1
Vegamet -22X2 2X0.75 SCREENED 22B1 FILLING LEVEL CONTI. CEMENT SILO 2
C 381 C
-23P1
Vegamet -23X2 2X0.75 SCREENED 23B1 FILLING LEVEL CONTI. CEMENT SILO 3
381
-24P1
D D
Vegamet -24X2 2X0.75 SCREENED 24B1 FILLING LEVEL CONTI. CEMENT SILO 4
381
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
CEMENT FILLING LEVEL DISPLAY 1-4 Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 4
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
POWER UNIT TERMINAL BOX A
PANEL +S3 MIXER PLATFORM +S71
3X1.5
OPEN MIXER GATE
3X1.5
CLOSE MIXER GATE
22/02/2019
B
3X0.75 MIXER GATE OPEN B
Printing date:
2X1.5
THERMO FEELER MIXER
3X1.5
D HORN TRUCK MIXER CHANGE D
3X1.5
LIMIT SWITCH MIXER COVER 1&2
Reproduction or distribution permitted only with our written permission
E E
-X1 4X35
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
OVERVIEW MIXER PLATFORM Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 5
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
F
E
B
A
D
C
Reproduction or distribution permitted only with our written permission Printing date: 22/02/2019
Production
Construction
Authorization
1
1
-19X2
EMERGENCY STOP
1
1
MIXER PLATFORM
Date
2
10/10/2018
11/12/2018
3
3
3
Name
3
+24V/DC
3
Sarawut K
4
4
4
0V/DC
2
4
TERMINAL BOX MIXER PLATFORM +S71
4
P
OIL EXCESS PRESSURE SWITCH
5 5
6
6
7
7
3
3
4
4
LIMIT SWITCH
MIXER COVER
11
11
12
5
5
12
25X1.5
POWER UNIT
15
15
HORN TRUCK
6
6
Job Number
16
16
WN18262/66
Project Description
Compactmix 1.0
17
7
7
17
18
18
Drawing Number
19
00
19
Version
20
20
21
21
22
22
+CBLT
23
23
8
8
24
24
=3_CABLING SHEET
Page 6
115 Pgs
F
E
B
A
D
C
1 2 3 4 5 6 7 8
A
POWER UNIT A
PANEL +S3
TERMINAL BOX
LOADER +S61 3X1.5 -60S01 EMERGENCY STOP
ABOVE LOADER
22/02/2019
B B
18X1.5 -13X2
-13X1
C 4X1.5 -60B2 LOADER INTERMEDIATE STOP C
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX LOADER Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 7
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
F
E
B
A
D
C
Reproduction or distribution permitted only with our written permission Printing date: 22/02/2019
Production
Construction
Authorization
1
1
Date
LOADER +S61
10/10/2018
11/12/2018
TERMINAL BOX
-13X2
EMERGENCY STOP
Name
ABOVE LOADER 1
Sarawut K
2
-0X000
EMERGENCY STOP
LOADER BOTTOM 2
3
3
3
+24V/DC
3
3
4
4
3
3
4
0V/DC
6
6
1
+
4
4
LOADING ABOVE 2
- 3
4 7
7
5
5
1
+
4 9
9
1
+
6
6
Job Number
WN18262/66
Project Description
Compactmix 1.0
12
12
7
7
13
13
Drawing Number
14
14
00
Version
15
15
16
16
+CBLT
8
8
=3_CABLING SHEET
Page 8
115 Pgs
F
E
B
A
D
C
1 2 3 4 5 6 7 8
TERMINAL BOX
POWER UNIT
A WEIGHING PLATFORM +S6 A
PANEL +S3 3X1.5 -31Y1 FRESH WATER FINE
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX WEIGHING PLATFORM Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 9
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
F
E
B
A
D
C
Reproduction or distribution permitted only with our written permission Printing date: 22/02/2019
Production
Construction
Authorization
1
1
-16X2
Date
1
10/10/2018
11/12/2018
2
Name
3
3
3
Sarawut K
+24V/DC
3
3
2
4
4
4
0V/DC
4
4
TERMINAL BOX WEIGHING PLATFORM +S6
5
5
7
7
3
3
9
9
10
10
4
4
11
11
25X1.5
POWER UNIT
12
12
13
13
5
5
14
14
15
15
16
16
6
6
17
17
18
18
Job Number
WN18262/66
Project Description
19
Compactmix 1.0
19
20
7
7
20
Drawing Number
Version
22
22
23
23
+CBLT
8
8
24
=3_CABLING SHEET
24
Page
115 Pgs
10
F
E
B
A
D
C
1 2 3 4 5 6 7 8
A
POWER UNIT A
PANEL +S3
TERMINAL BOX
WEIGHING PLATFORM +S6
22/02/2019
B B
3~
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX WEIGHING PLATFORM Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 11
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER UNIT
A A
25X1.5
22/02/2019
B TERMINAL BOX B
WEIGHING PLATFORM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 19 20 21 22 23 24
-18X2
Printing date:
+S6
21
20
22
23
24
11
10
12
13
14
15
16
17
18
19
2
4
3
9
1
C C
U V W U V W U V W
M M M
D 3~ 3~ 3~ D
VENTILATOR MIXER DUST EXTRACTION
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX WEIGHING PLATFORM Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 12
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER UNIT
A
TERMINAL BOX A
PANEL +S3
ADMIXTURE WEIGHER
+S40
+S40 3X1.5 -40Y1 CONTAINER 1 DISCHARGE
+S40
3X1.5 -40Y2 RISING VALVE CONTAINER 1
22/02/2019
B
+S40 B
3X1.5 -40Y3 CONTAINER 2 DISCHARGE
Printing date:
+S40
3X1.5 -40Y4 RISING VALVE CONTAINER 2
+S40
C 3X1.5 P -40S6 PRESSURE CONTROL GATE 1 C
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX ADMIXTURE WEIGHER Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 13
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
F
E
B
A
D
C
Reproduction or distribution permitted only with our written permission Printing date: 22/02/2019
Production
Construction
Authorization
1
1
-17X2
Date
1
10/10/2018
11/12/2018
CONTAINER 1 DISCHARGE
Name
Sarawut K
3
3
RISING VALVE CONTAINER 1
2
4
TERMINAL BOX ADMIXTURE WEIGHER +S40
5
5
6
6
3
3
7
7
8
8
9
9
OVERFILL PREVENTION
OUTLET HOPPER 1
10
10
4
4
11
11
CONTAINER 2 DISCHARGE
12 25X1.5
12
POWER UNIT
13
13
5
5
14
14
15
15
6
6
17
17
OVERFILL PREVENTION
OUTLET HOPPER 2
Job Number
18
WN18262/66
Project Description
18
Compactmix 1.0
19
19
7
7
Drawing Number
20
20
00
Version
21
21
22
22
+CBLT
8
8
=3_CABLING SHEET
Page
115 Pgs
14
F
E
B
A
D
C
1 2 3 4 5 6 7 8
A A
B
-12X2 B
-14X2
Printing date:
K4 K3 K2 K1
C C
RELEASE -14Y2
5/2
-14Y1
5/2
-13Y2
5/2
-13Y1
5/2
-12Y2
5/2
-12Y1
5/2
-11Y2
5/2
-11Y1
5/2
COARSE COARSE / FINE COARSE COARSE / FINE COARSE COARSE / FINE COARSE COARSE / FINE
R4 R3 R2 R1
R = VIBRATOR
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
OVERVIEW INLINE SILO Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 15
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
3X1.5 -13Y1
22/02/2019
K3
3X1.5 -13Y2
B B
3X1.5 -14Y1
K4
Printing date:
3X1.5 -14Y2
2X0.75 -11B1
LIMIT SWITCH GATE CLOSED POSITION K1
2X0.75 -11B2
C C
2X0.75 -13B1
LIMIT SWITCH GATE CLOSED POSITION K3
2X0.75 -13B2
D D
2X0.75 -14B1
LIMIT SWITCH GATE CLOSED POSITION K4
2X0.75
Reproduction or distribution permitted only with our written permission
-14B2
3X1.5 -10S00
RIPCORD
3X1.5 -10S01
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX INLINE SILO Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 16
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER UNIT
A A
25X1.5
TERMINAL BOX INLINE SILO +S11
22/02/2019
B B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
-12X2 +24V/DC 0V/DC
Printing date:
21
11
20
22
23
24
10
12
13
14
15
16
17
18
19
1
9
4
4
4
4
3
3
3
3
C C
4
2
- 3
1
+
2 2 2 2
1 1 1 1
D D
Reproduction or distribution permitted only with our written permission
COARSE
COARSE
COARSE
COARSE
FINE
FINE
FINE
FINE
E E
MATERIAL DETECTOR
COMPONENTS K1
COMPONENTS K1
COMPONENTS K2
COMPONENTS K3
COMPONENTS K4
COMPONENTS K2
COMPONENTS K3
COMPONENTS K4
WEIGHER BELT
RIPCORD
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX INLINE SILO 12X2 Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 17
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
POWER UNIT A
PANEL +S3
TERMINAL BOX
INLINE SILO +S11
22/02/2019
B B
Printing date:
C 4X1.5 M C
-13M1 VIBRATOR 1 AGGREGATE SILO 2
3~
D D
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX INLINE SILO St.14 Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 18
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
POWER UNIT
A A
25X1.5
22/02/2019
B TERMINAL BOX B
INLINE SILO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
-14X2
Printing date:
+S11
21
11
20
22
24
23
10
12
13
14
15
16
17
18
19
1
4
3
9
C C
U V W U V W U V W U V W
M M M M
D 3~ 3~ 3~ 3~ D
AGGREGATE SILO 1
AGGREGATE SILO 1
AGGREGATE SILO 2
AGGREGATE SILO 2
Reproduction or distribution permitted only with our written permission
VIBRATOR 1
VIBRATOR 1
VIBRATOR 2
VIBRATOR 2
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
TERMINAL BOX INLINE SILO St.14 Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 19
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
MEASURING AMPLIFIER
LOAD CELL LOAD CELL
+S2 l l
B B
LOAD CELL LOAD CELL
l l
Printing date:
LOAD CELL
l
C C
7X0.34 SCREENED
LOAD CELL CEMENT WEIGHER
l
LOAD CELL
l
D D
7X0.34 SCREENED
LOAD CELL WATER WEIGHER
l
Reproduction or distribution permitted only with our written permission
E E
7X0.34 SCREENED
LOAD CELL ADMIXTURE WEIGHER
l
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
OVERVIEW LOAD CELLS SCALES Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 20
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
POWER UNIT A
MOISTURE MEASURING
PANEL +S3
JUNCTION BOX FMS - SENSOR
Litronic FMS-II
22/02/2019
SENSOR 6 - K4
B B
SENSOR 5 - K3
C C
SENSOR 4 - K2
D D
SENSOR 3 - K2 COLOUR-code
IEC 60757:
bk=BLACK
Reproduction or distribution permitted only with our written permission
bn=BROWN
rd=RED
og=ORANGE
ye=YELLOW
gn=GREEN
bu=BLUE
E vt=VIOLET E
gy=GREY
wh=WHITE
pk=PINK
tq=turquoise
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
MOISTURE MEASURING Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 21
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
POWER UNIT A
PANEL +S3
X 2X36W
-X4 3X1.5 TRAVEL LANE
22/02/2019
X 2X36W
B B
Printing date:
X 1X36W
-X4 3X1.5 MIXER PLATFORM
X 2X36W
X 1X36W
C C
X 1X36W
3X1.5 WEIGHING PLATFORM
X 1X36W
D X 1X36W D
Reproduction or distribution permitted only with our written permission
1X36W
X
X 1X36W
E -X4 3X1.5 5x1.5 INLINE SILO E
1X36W X 1X36W
X
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
LIGHTING MIXING PLANT Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 22
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
-2X3 25X1.5 -2X4
Printing date:
C C
-4X3 25X1.5 -4X4
D D
-X4 -0X5
7X2.5
Reproduction or distribution permitted only with our written permission
-0X2 -0X4
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
OVERVIEW CONTROL DESK Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 23
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8
1 2 3 4 5 6 7 8
13
14
N
N
1
PE
2
-0X2 -X4
22/02/2019
1 2 3 4 5 6 7
B B
Printing date:
7X2.5
C C
D D
1 2 3 4 5 6 PE
PE
N
N
1
1
2
2
-0X4 -0X5
Reproduction or distribution permitted only with our written permission
E E
F F
Authorization Date Name Project Description Version =3_CABLING SHEET
OVERVIEW CONTROL DESK +S2 Compactmix 1.0 00 +CBLT
Construction 11/12/2018
Job Number Drawing Number Page 24
Production 10/10/2018 Sarawut K
WN18262/66 115 Pgs
1 3 4 5 6 7 8