METALKOL SA
SCOPE OF WORK
Detailed Engineering, Procurement and Installation of Civil Works, Structural Steelwork & Sheeting, &
Installation of a free issue 10-ton overhead gantry crane.
Scope of Work Revision
Rehab Machine Workshop
Expansion # Date
METALKOL SA.
Document No.
0 2022/06/14
MR-HEN-363-S15-P03-007
Contents
METALKOL SA .............................................................................................................................................. 1
Contents .............................................................................................................................................................. 2
1. SCOPE OVERVIEW ........................................................................................................................................ 3
2 ENGINEERING, TECHNICAL DRAWINGS AND SPECIFICATIONS.................................................................... 7
3 OBLIGATIONS FROM ERG AFRICA................................................................................................................ 7
4 PROJECT SCHEDULE ..................................................................................................................................... 7
5 QUALITY REQUIREMENTS ............................................................................................................................ 8
6 SHE REQUIREMENTS .................................................................................................................................... 8
7 LICENCING AND PERMITS ............................................................................................................................ 8
8 DEFINITIONS ................................................................................................................................................ 8
Scope of Work Revision
Rehab Machine Workshop
Expansion # Date
METALKOL SA.
Document No.
0 2022/06/14
MR-HEN-363-S15-P03-007
1. SCOPE OVERVIEW
1.1 Purpose
(a) The purpose of this Scope of Work is to set out a description for the design, procurement and
installation of civil works, structural steelwork & sheeting. The 10-ton overhead gantry crane shall be
supplied by Metalkol to the appointed contractor for installation only.
(b) The existing boiler shop is limited to lifting a maximum of 3 tons which limits the works to be executed
in the boiler shop for above 3 tons.
(c) The appointed contractor shall be responsible for the detailed engineering for the civil works,
steelwork, and sheeting.
(e) The material of the steel shall comply with EN 10025 Grade S355JR and shall be supplied complete with
a protective coating, the corrosion protection shall be in accordance to SP0659-0000-0M5-05 Surface
Treatment Finishes Structural Steel –Metalkol Specification. (Attached)
(f) The material of the sheeting shall be Polyethylene and shall adhere to the following general
requirements listed below.
(f) The sheeting supplied should adhere to the following material requirements:
more cost effective. These benefits have made Polyethylene a long-term solution at their
operations as opposed to numerous short-term fixes.
• Polyethylene is 100% acid resistant and exhibits excellent UV resistance
• Due to its high mechanical strength, work can be done on top of the sheeting without
failures, when required
Metalkol is located outside Kolwezi in the Democratic Republic of the Congo (DRC)
1.3.2 Services
Not Applicable
1.3.3 Deliverables
Casting of all concrete including grouting as per AFC drawings and project specifications.
Data dossiers with complete traceability and permanent records of all fabrication, installation and handover of the
above-mentioned items in 1.3.3
NB – The below mentioned documents are mandatory and failure to submit these documents with the bid shall result
in immediate disqualification from the tender process.
• Org. chart of contractor’s plan for the fabrication & installation on to be submitted with bid
document.
• General method statement demonstrating safe works and technical ability for the fabrication &
installation to be submitted with bid document.
• Inspection & Test Plan per discipline such as civil works, structural steelwork & sheeting work to
be submitted with bid document.
• Base line risk assessment for works to be executed to be submitted with bid document.
• Project schedule indicating duration required to complete the job in a safe manner to be
submitted with bid document.
Scope of Work Revision
Rehab Machine Workshop
Expansion # Date
METALKOL SA.
Document No.
0 2022/06/14
MR-HEN-363-S15-P03-007
• Scaffolding
• Lighting (if required)
• Good working condition tools
• Transport for staff
• Accommodation for staff
• Cranage if required
• Offices for staff while on site (containers, park homes etc)
1.4 Training
Not Applicable
Company will provide the necessary site induction for the appointed contractor’s personnel.
Contractor Role
Advanced Riggers
Company Specific
Shut Coordinator
Trade Assistants
HSE Adviser
Supervisors
Contract /
Company Training
Riggers/
Trades
Site Inductions ✓ M M M M M M
Communicate information M M M
Legend:
M = Mandatory
Scope of Work Revision
Rehab Machine Workshop
Expansion # Date
METALKOL SA.
Document No.
0 2022/06/14
MR-HEN-363-S15-P03-007
Contractor Role
Advanced Riggers
Company Specific
Shut Coordinator
Trade Assistants
HSE Adviser
Supervisors
Contract /
Company Training
Riggers/
Trades
R = Mandatory for those personnel required to undertake tasks in the area
a) The Company will provide Specific Training, as listed in Table 1 above, for the Contractor’s personnel at the
commencement of the provision of the Services, in accordance with the Contract Schedule - Price. Ongoing
training costs will be limited as per the Contract Schedule - Price.
a) Company Specific Training will be amended and updated from time to time as part of the Company’s
changes to policies and procedures and the Contractor is expected to abide by those changes as they occur.
b) The Company has detailed work procedures and training procedures that may apply to some or all
aspects of the Services. The Contractor must train its personnel in all training procedures and detailed
work procedures. Further, the Contractor may recommend changes to the training and work
procedures as may reasonably be required.
c) The amount and ratios of the training required for the Contractor’s personnel will be determined in
conjunction with the Company Representative on a case by case basis and based on Company
requirements.
d) The Contractor is required to notify the Company in writing prior to any scheduled training that
Contractor Personnel are unable to attend.
Not Applicable
• The Contractor must affect and maintain all insurances that a prudent person in the Contractor’s position
would consider appropriate in the circumstances, in addition to the aforementioned Supplier shall take out
and maintain the following insurances:
o Public Liability Insurance
o Contractors All Risk Insurance
• Working Licence
• Six (6) month Guarantee Certificate on services rendered.
Scope of Work Revision
Rehab Machine Workshop
Expansion # Date
METALKOL SA.
Document No.
0 2022/06/14
MR-HEN-363-S15-P03-007
Drawings
Drawings Below:
Goods delivered to Sabot (108 EP Malan Road, Pomona AH, Kempton Park, 1619) for delivery to site.
Not applicable
Not applicable
Approval documentation
4 PROJECT SCHEDULE
5 QUALITY REQUIREMENTS
6 SHE REQUIREMENTS
All safety requirements to adhere to Metalkol safety specifications. HSE file shall be required and reviewed by
Metalkol SHS dept – this will be in line with the Metalkol Safety starter pack – scope of work aligned documents
needed.
Not applicable
8 DEFINITIONS
RISK ASSESSMENTS:
Before any work is done the team needs to have completed a risk assessment of the task/s. The hazards need
to be identified and the team to be made aware of said hazards. These Risk Assessments needs to be
documented before any work commences.
LEGAL COMPLIANCE:
The Supervisor responsible for the work needs to ensure that he/his team complies to all regulations
applicable to the work. It is his responsibility to ensure 100% compliance to regulations. This compliance must
be acknowledged and signed off (as part of the Risk Assessment) before any work commences.
Engineer: Client representative appointed to ensure compliance with this Specification and
administer the Contract.
Scope of Work Revision
Rehab Machine Workshop
Expansion # Date
METALKOL SA.
Document No.
0 2022/06/14
MR-HEN-363-S15-P03-007
The Specification: This Specification and all relevant standards and codes forming part of this
specification.