You are on page 1of 4

College of Engineering

Department of Petroleum and Chemical Engineering

PNGE4412

Reservoir Engineering

Fall 2023

HW#3
Submitted by

Ahmed Mohammed Al-Harthi 133084

Calculations were done via Excel.


(a) GIIP using volumetric method:

Data provided :

A 8870 acres
h 32.5 ft
Ø 0.308
Swi 0.425
T 615 ⁰R
Pi 2333 psi
Zi 0.882

ZiT
Bgi =0.00504
Pi
0.882 ×615
¿ 0.00504 = 1.172 ×10−3 rb /scf
2333

G=7758 Ah ∅ ( 1−S wc ) / Bgi

7758 ×8870 × 32.5× 0.308 ×(1−0.425)


G= −3
=3.38 ×1011 scf
1.172× 10
(b) Using Material Balance Equation:

Time Gp P Z P/Z
(years) 2645.125
0 0 2333 0.882 2628.539
2 2.30500*10^9 2321 0.883 2492.081
4 2.02570*10^10 2203 0.884 2283.784
6 4.97190*10^10 2028 0.888 2073.826
8 8.01340*10^10 1854 0.894 1903.226
10 1.05930*10^11 1711 0.899 1687.982
12 1.35350*10^11 1531 0.907 1554.825
14 1.57110*10^11 1418 0.912 1418.024
16 1.78300*10^11 1306 0.921 1330.803
18 1.92089*10^11 1227 0.922 1242.457
20 2.05744*10^11 1153 0.928

P/Z Plot
3000

2500 f(x) = − 6.82594883976272E-09 x + 2632.09925186713

2000

1500
P/Z

1000

500

0
0 50000000000 100000000000 150000000000 200000000000 250000000000
Gp (scf)

The P/Z plot indicates the absence of water influx, as evidenced by the absence of any deviation
in the line. To determine the Gas Initially In Place (GIIP), extrapolate the line to zero by
substituting y with 0 in the equation. This yields a GIIP value of 3.76014×10^11 standard cubic
feet (scf).

( c ) Energy Plot
1-
(PZi/PiZ Energy Plot
)
0 0.6
6.27E- 0.5 f(x) = 2.58057731472337E-12 x + 0.00492432922204084
03
0.05785 0.4

1-(PZi/PiZ)
9
0.3
0.13660
6 0.2
0.21598
0.1
2
0.28047 0
8 0 50000000000 100000000000 150000000000 200000000000 250000000000
0.36185 Gp (scf)
2
0.41219
2
0.46391
0.49688
5
0.53028
4

The energy plot suggests the absence of water influx, as evidenced by the angle being equal to
45⁰. The slope is calculated as 1/G, where G is equal to 3×10^(-12) scf. Consequently, the Gas
Initially In Place (GIIP) is determined to be 3.333×10^11 scf.

You might also like