Integrated Management System (IMS)

Manual
This manual has been documented around Mango Limited’s certified Management System.

It should be used as a template only.

It is designed to be modified to reflect your organisation.

Contents
Context of the Organisation.................................................................................................................4
Company Overview..........................................................................................................................4
External and Internal Issues..............................................................................................................4
Interested Parties.............................................................................................................................4
Vision, Mission and Values...............................................................................................................5
SWOT Analysis..................................................................................................................................5
Key Business Strategies....................................................................................................................6
Scope................................................................................................................................................6
Management Representative...........................................................................................................7
IMS Structure....................................................................................................................................7
Process Flow.....................................................................................................................................9
Leadership..........................................................................................................................................10
Leadership and Commitment.........................................................................................................10
Quality Policy..................................................................................................................................11
Environmental Policy......................................................................................................................11
Health and Safety Policy.................................................................................................................12
Organisation Roles, Responsibilities and Authorities.....................................................................13
Planning..............................................................................................................................................15
Actions to Address Risks and Opportunities...................................................................................15

Page 1 of 69 © 2017, Mango Ltd. All Rights Reserved.


Legal and Other Requirements.......................................................................................................16
Objectives, Targets and Plans.........................................................................................................18
Support...............................................................................................................................................19
Resources and Infrastructure.........................................................................................................19
Training, Competency and Knowledge Management.....................................................................20
Communication, Consultation and Awareness...............................................................................22
Documented Information and Control of Documents....................................................................23
Operations – Marketing......................................................................................................................25
Marketing - How to Publish a Blog.................................................................................................25
How to Manage Webinars..............................................................................................................26
How to Publish Release Notes........................................................................................................26
Reporting End of Month Marketing Lead Performance..................................................................26
Operations – Sales and Partnering.....................................................................................................27
Sales...............................................................................................................................................27
Partner Process..............................................................................................................................27
Operations - Development.................................................................................................................28
Developers Documentation............................................................................................................28
Development Requests and Bugs...................................................................................................28
Mango Application.........................................................................................................................29
Operations – Support and Testing......................................................................................................30
Mango Testing................................................................................................................................30
Communication of Releases...........................................................................................................30
Support...........................................................................................................................................31
Implementation..............................................................................................................................31
Operations - Supplier Evaluation and Control....................................................................................32
Operations – Health and Safety..........................................................................................................33
Hazard Identification, Assessment and Control..............................................................................33
Accidents / Incidents......................................................................................................................36
Employee Participation...................................................................................................................38
Emergency Planning – Health and Safety.......................................................................................40
Operations – Environmental...............................................................................................................40
Aspects and Impacts Identification, Assessment and Control........................................................40
Environmental Incident Reporting, Recording and Investigations..................................................41
Environmental Emergency Planning...............................................................................................42
Performance Evaluation.....................................................................................................................43
Monitoring, Measurement and Evaluation.....................................................................................43

Page 2 of 69 © 2017, Mango Ltd. All Rights Reserved.


Internal Audit.................................................................................................................................44
Management Review......................................................................................................................44
Improvement......................................................................................................................................45
Improvement and Corrective Actions.............................................................................................45

Context of the Organisation


Company Overview
Established in 2005, the company provides cloud based QHSE compliance software.

The company enables its customers to meet their compliance requirements be they ISO 9001, ISO
14001, ISO 45001, ISO 22000, ISO 13485, local and government legislation and regulations.

This Integrated Management System (IMS) serves to formalise the policies, processes and operating
standards that will apply to the company’s employees, partners and contractors.

External and Internal Issues


The company determines the external and internal issues that are relevant to its purpose and
strategic direction and that affect its ability to achieve the intended results of the IMS.

Consideration is given to the:

• Positive and negative factors or conditions.


• External context and issues, such as legal, regulatory, technological, competitive, cultural,
social, political and economic environments.
• Internal context and issues, such as values, culture, organisation structure, knowledge and
performance of the business.
• Determination and requirements of the needs and expectations of interested parties
relevant to the IMS.
• Authority and ability to exercise control and influence.
• Activities, products and services relevant to the business.
• Documented information is retained as evidence to support that the context of the
organisation has been taken into account in the IMS.

Interested Parties
Interested Party Needs, Expectations and Issues
Owners/Shareholders • Have a growing business that provides profit.
• Be well governed and well managed.
• Want staff to enjoy their work, be challenged, perform their job
competently and meet the company and customer requirements.
Customers • Value for money.
• A simple solution that manages compliance easier.
• Implementation of the product in-line with customer expectations.
• Receive responsive support.
• Delivery of free content to educate around compliance.
Suppliers/Contractors • Ongoing and secure work.

Page 3 of 69 © 2017, Mango Ltd. All Rights Reserved.


• To be paid on time.
• Clear understanding of requirements.
• Constructive feedback.
• Want to provide services/products to a reliable, reputable and
financially viable business
Partners • Make them more financially secure through additional revenue
from Mango sales.
• Enable them to change their business model from hour-based to
value based income.
 Want a solution that they can sell, promote and support that will
assist their client’s to manage compliance.
 Provide great support and knowledge to help them support their
customers.
Employees within  Job security.
business  Salary for work performed.
 Flexible work hours.

 Clear understanding of their role and responsibilities.

 Able to raise issues of concern and provide constructive feedback.

 Good, friendly work environment.

 To feel valued and appreciated.

 Opportunities for personal development.


Regulators  To meet the required laws and regulations.
 To submit all tax obligations accurately and on time.

 To maintain high standards of corporate governance.


Community  Good corporate citizen.
 Diversity of employees

Vision, Mission and Values


Vision: “Gets everyone involved and participating in QHSE” Mission:

Makes compliance enjoyable.

Values: Our customers’ are successful in compliance

SWOT Analysis
Strengths Weaknesses
• Provider of a great quality product. • Identification of good partners to meet our
• Provider of great support for the product. standards/ requirements.

Page 4 of 69 © 2017, Mango Ltd. All Rights Reserved.


• Responsive development to market • Managing and review partner performance
requirements. • Too operational and not strategic enough
• Responsive to identified software issues. for partners
• Depth of knowledge of buyer’s persona. • Reliance on key employees within the
• Regular delivery of free content. business.
• Low client turnover relative to the industry. • Time poor in a few key areas
• Quick deployment of product post sales.  • Don’t have strong relationships with
Deep knowledge of customer’s pain industry players
• Adaptable, responsive and able to make • Measurable marketing outcomes based on
decisions. known starting points
• Flexible to meet a wide range of customer
service issues.
• Open to suggestions to improving the
product
• Owners have recognised the need to have
external expertise to grow the business.
• Looking at ways of improving the business.
Opportunities Threats
• Changes to standards in our core markets: • Competition
ISO 9001, ISO 14001, ISO 45001, H&S Act, • Technology
Food Safety.
• New technologies
• Partnering with other solutions: Software
and Hardware
• New focussed markets.
• Certification to ISO 9001 will open up other
market opportunities through the
marketing of the process.
• More marketing via additional platforms 
To educate industry in compliance.

Key Business Strategies


Strategy Description
Develop business processes Develop and implement business processes that are suitable for
to accommodate the the business.
expected growth. Achieve certification to ISO 9001.
Transfer of knowledge to partners and employees for all key
processes
Use technology to manage as many processes as appropriate
Improve the efficiency and Identify the core processes (i.e. development and release, sales,
effectiveness of the core marketing, implementation, support)
processes Identify new ways (e.g. lean techniques) of doing the core
processes
Update and embed the core processes to ensure knowledge is
retained

Page 5 of 69 © 2017, Mango Ltd. All Rights Reserved.


Personnel to be capable of Key leadership personnel to be capable of leading and managing
delivering the growth for the their staff.
business Competency gaps to be identified by leadership personnel
Personnel to be assessed as competent for their role
Personnel to receive training for the role
Personnel to receive appropriate experience to do the role
Grow market share in all Identify and train new partners
markets Continuously review partner performance
Identify changes to legislation, standards and regulation
Identify key market verticals in each jurisdiction
Increase the number of qualified lead by creating more content
and deliver across multiple channels
Improve the sales conversion rate from qualified leads to sale

Scope
The IMS describes how the company requirements are to be addressed throughout its operations
and addresses the requirements of ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018.

The scope is: provision of marketing, sales, support, development and implementation of software
solutions. Location Unit 5, 340 Durham St North, Christchurch, New Zealand.

Management Representative
The Operations Manager is the currently appointed Management Representative and has
responsibility and authority for:

1. Ensuring that the:


a. IMS is established, implemented and maintained in accordance with the
requirements of ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018.
b. IMS processes are delivering their intended outputs.
c. Promotion of customer focus throughout the company.
d. Integrity of the IMS is maintained when changes to the IMS are planned and
implemented.
2. Reporting on the performance of the IMS to top management for review and as a basis for
improvement.

IMS Structure
Interaction of Processes in the IMS

The company’s IMS complies with:

• ISO 9001:2015,
• ISO 14001:2015
• ISO 45001:2018
The IMS consists of the following levels of documented information:

Page 6 of 69 © 2017, Mango Ltd. All Rights Reserved.


• Policies: Policies are documents that demonstrate the overall commitment to improving
quality performance and are authorised by the Management Team.
• System procedures: high-level procedures that define the activities that are to be fulfilled to
ensure that the IMS that complies with standards.
• Module workflows, operational procedures and work instructions. Control and operational
procedures:
o Meet customers’ requirements. o Provide supplementary guidance and
instructions to support the intent of the IMS.
o Ensure that the requirements of the IMS will be adequately addressed within the
organisation.
• Forms, registers and records are evidence to prove the IMS is operational.
A diagram of the structure of the IMS structure is presented below.

Policies

System
Procedures
Module workflows,
operational procedures and
work instructions.

Forms, registers and records

Mango compliance software solution:

• Provides automated workflows for the effective and efficient operation of the IMS.
• Underpins the IMS and serves as the main retention application for all documented
information.
• Workflows and modules replace written procedures and forms associated with the process.
They include the following:
Modules Actions
Accident/Incident Controls all near miss, accident, incident or injury reporting,
investigation, corrective action and injury management. The workflow
manages the process.
Audit/Inspection Controls the audit process, from scheduling through to audit reports.
Its captures all the corrective actions in the Improvement module.

Page 7 of 69 © 2017, Mango Ltd. All Rights Reserved.


Compliance Controls all the reporting and investigation of legal, regulatory and
standard registers in a seamless workflow.
Documents Controls and maintains the approval, publishing and authorisation of
all documentation within the module with electronic signatures.
Event Management Controls scheduled tasks to ensure critical activities can be managed
and monitored. It includes email reminders and alerts when events
are due or overdue.
Human Resources Controls all a comprehensive central database of employee details
that links people with their skills and positions.
Improvement Controls all reporting, investigation and corrective actions for
customer complaints, audit findings, internal issues or
nonconformances. The workflow manages the process.
Plant/Equipment Controls the maintenance of plant and equipment with email
reminders and alerts when maintenance is due or overdue.
Risk Management Controls identified and managed risks. The workflow manages the
process
Supplier and Contractor Controls all external suppliers and contractor’s details and
Management performance is captured and reviewed.

Process Flow
Purpose and Scope

To describe the interaction of process through the customer journey.

Page 8 of 69 © 2017, Mango Ltd. All Rights Reserved.


Procedure

References:
ISO 9001 ISO 14001 ISO 45001
4.1, 4.2, 4.3, 4.4 4.1, 4.2, 4.3, 4.4 4.1, 4.2, 4.3, 4.4

Page 9 of 69 © 2017, Mango Ltd. All Rights Reserved.


Leadership
Leadership and Commitment
Purpose and Scope

To define how the company demonstrates leadership and commitment to its IMS.

Procedure

1. Top management will take responsibility for the effectiveness of the IMS and will demonstrate their
commitment to the IMS by:
a. Defining roles, allocating responsibilities and accountabilities, and delegating authorities, to
facilitate effective IMS management.
b. Roles and Responsibilities are documented in Leadership - Organisation Roles, Responsibilities
and Authorities and through position descriptions, and IMS procedures where applicable.
Ensuring:
i. That relevant policies and objectives are established for the IMS and that these are
aligned with the context and strategic direction.
ii. The integration of the IMS requirements into the organisation's business processes.
iii. That resources needed for the IMS are available. iv. The IMS achieves its intended
results.
v. The process approach and risk based thinking is promoted. Communicating the
importance of effective IMS management and of conforming to the IMS
requirements.
vi. Engaging, directing and supporting personnel to contribute to the effectiveness of the
IMS.
vii. Improvement is promoted.
viii. Other relevant management roles are supported to demonstrate their leadership as it
applies to their areas of responsibility.
2. Top management is committed to our customers and enhancing customer satisfaction. This
commitment is demonstrated by:
a. Ensuring that applicable customer and statutory requirements are determined, understood
and met throughout the business.
b. Ensuring the risks and opportunities that can affect conformity of products and services and
the ability to enhance customer satisfaction are determined and addressed.
c. Exercising due care with our customer's property (data) whilst it is under the control of the
company.
d. Monitoring customer's perceptions of the degree to which their needs and expectations have
been fulfilled.
3. The key aspects of the customer information and data generated through the effective
implementation of the IMS processes are collected and collated by the Management Representative
and presented at each Management meeting.

References:
ISO 9001 ISO 14001 ISO 45001
5.1 5.1 5.1

Page 10 of 69 © 2017, Mango Ltd. All Rights Reserved.


Quality Policy
The company is committed to providing and delivering the customer great product, great support and great
marketing to make the management of our customer's compliance an easy and enjoyable experience.

We are committed to:

• Meeting legal requirements.


• Continually improving our IMS.
• Meeting the needs and expectations of interested parties.
To achieve this we will:

• Provide our customers with a quality product for the management of their compliance needs.
• Provide our customers with free content, information and industry insight to improve their compliance
knowledge.
• Provide timely and accurate support to our customers
• Listen to our customers when developing and enhancing the product.
• Provide an environment where staff can grow and learn new skills.
• Provide a return to shareholders
We will measure our progress through:

• Setting objectives
• Documenting plans
• Reviewing performance
We will enable this by:

• Training our employees


• Training our Partners
• Improving Mango
• Investing in resources
• Investigating new technologies

Environmental Policy
The organisation has identified environmental management as one of its highest corporate priorities. The
organisation has established policies, programmes and practices to reduce risk to the environment and the
organisation and conduct business activities in an environmentally sound manner.

The organisation is committed to environmental management and will:

• Integrate its environmental policies and procedures fully into all business activities as a critical
element,
• Comply with all environmental legislation, standards and contract requirements that are applicable to
the company’s operation,
• Continually improve its environmental performance and prevention of environment impact and taking
into account current best practice, technological advances, current scientific understanding, customer

Page 11 of 69 © 2017, Mango Ltd. All Rights Reserved.


and community needs, educate, train and promote employees to work in an environmentally
responsible manner,
• Complete environmental assessments for aspects and impacts of all new activities that the company
may undertake, promote, develop and design services, facilities, equipment and work practices that
have the least environmental impact, taking into account the efficient use of energy and materials, the
sustainable use of renewable resources and the responsible disposal of waste, thereby minimising any
serious or irreversible environmental degradation,
• Promote and encourage the adoption of these principals by suppliers and contractors acting on behalf
of the organisation,
• Develop, implement and maintain emergency preparedness plans,
• Foster openness and dialogue with both employees and the public, encouraging them to respond with
their concerns or improvement ideas within the scope of the organisation’s operations and maintain a
set of environmental objectives and targets that are monitored through the management review
process to ensure effectiveness.

Health and Safety Policy


The company is committed to a safe and healthy working environment for everyone using the premises as a
place of work or visiting on business.

Management will:

• Set health and safety objectives and performance criteria for all managers and work areas
Annually review health and safety objectives and managers’ performance
• Encourage accurate and timely reporting and recording of all incidents and injuries
• Investigate all reported incidents and injuries to identify all contributing factors and, where
appropriate, formulate plans for corrective action
• Actively encourage the early reporting of any pain or discomfort
• Provide treatment and rehabilitation plans that ensure a safe, early and durable return to work
• Identify all existing and new hazards and take all practicable steps to eliminate or minimise the
exposure to any hazards
• Ensure that all employees are made aware of the hazards in their work areas and are adequately
trained so they can carry out their duties in a safe manner
• Encourage employee consultation and participation in all health and safety matters Enable employees
to elect health and safety representatives
• Ensure that all contractors and subcontractors are actively managing health and safety for themselves
and their employees
• Promote a system of continuous improvement, including annual reviews of policies and procedures
• Meet legal obligations as specified in the legislation, codes of practice and any relevant standards or
guidelines.

Every manager, supervisor or foreperson is accountable to the employer for the health and safety of
employees working under their direction.

Each employee is expected to help maintain a safe and healthy workplace through:

• Share in the commitment to health and safety.


• Following all safe work procedures, rules and instructions

Page 12 of 69 © 2017, Mango Ltd. All Rights Reserved.


• Properly using all safety equipment and clothing provided
• Reporting early any pain or discomfort
• Taking an active role in the company’s treatment and rehabilitation plan, for their ‘early and durable
return to work’
• Reporting all incidents, injuries and hazards to the appropriate person.
The Health and Safety Committee includes representatives from senior management and union and elected
health and safety representatives. The Committee is responsible for implementing, monitoring, reviewing and
planning health and safety policies, systems and practices.

References:
ISO 9001 ISO 14001 ISO 45001
5.2 5.2 5.2

Organisation Roles, Responsibilities and Authorities


Purpose and Scope

To describe the responsibilities and authorities for the IMS and to define the organisation structure for the
effective operation of the IMS.

Associated Documents Job/Position

Descriptions.

Employee Contracts.

Human Resources Module.

Access Rights Sub-Module.

Procedure

1. The responsibility, accountability and authority of all personnel involved in the IMS is to be defined,
documented and communicated in order to facilitate effective IMS. This is to include any
responsibilities and accountability that is imposed by legislation.
2. Responsibilities, accountabilities and authorities are documented in position descriptions and
throughout the IMS.
3. Where suppliers are involved, their responsibilities and accountabilities are to be clarified and
documented by the responsible employee with authority.
4. All employees and Suppliers will comply with their responsibilities.

The Management Team are to:

1. Ensure organisation-wide compliance to the IMS.


2. Appoint the IMS Management Representative.
3. Ensure that the assigned roles, responsibilities and authorities are communicated and understood.
4. Communicate the importance of meeting customer, statutory and regulatory requirements.
5. Establish appropriate policies that include a commitment to continual improvement of the IMS.
6. Establish IMS objectives.

Page 13 of 69 © 2017, Mango Ltd. All Rights Reserved.


7. Ensure that all employees are aware of:
a. Policies.
b. Current IMS objectives, targets and plans.
c. The importance of compliance with the IMS.
d. Their contribution to the effectiveness of the IMS, including the benefits of improved
performance.
e. Potential consequences of non-compliance with the IMS requirements.
8. Hold people accountable for carrying out assigned responsibilities and the results delivered.
9. Make resources available.
10. Participate in IMS meetings including the Management Review.
11. Utilise Mango for the effective control of the IMS.
12. Actively promote and participate in IMS initiatives.

The Management Representative is to:

1. Ensure that the:


a. IMS is established implemented and maintained in accordance with the requirements of the
standards.
b. IMS processes are delivering their intended outputs.
c. Promotion of customer focus throughout the company.
d. Integrity of the IMS is maintained when changes to the IMS are planned and implemented.
2. Report on the performance of the IMS for review and as a basis for continual improvement.
3. Perform the role of Administrator which has the authority to ensure access rights in the IMS, for
individuals, are in-line with their levels of authorities and responsibility in the organisation.
4. Monitor, communicate and incorporate changes in the legal and other requirements in the IMS.
5. Communicate amendments to the IMS.
6. Advise and provide guidance to ensure compliance to the IMS is maintained.
7. Provide guidance in developing action plans and conducting management system reviews.
8. Ensure that audits and inspections are conducted in accordance with the schedule.
9. Ensure that Mango is effectively utilised to administer and control the IMS.
10. Provide and or arrange for ongoing training and coaching to personnel with respect to IMS matters.
11. Coordinate and participate in IMS meetings including the Management Review.
12. Publish and control all IMS documents.
13. Actively promote and participate in IMS initiatives.
14. Coordinate and administer arrangements with the certification agency.

Employees are to:

1. Ensure that the IMS is effectively implemented and maintained within their area of responsibility.
2. Actively encourage all personnel to contribute towards the continual improvement of the IMS.
3. Incorporate the IMS as part of site and departmental inspections and reviews.
4. Determine and escalate the need for resource requirements for the effective operation of the IMS.
5. Participate in IMS meetings including the Management Review.

Page 14 of 69 © 2017, Mango Ltd. All Rights Reserved.


6. Utilise Mango for the effective control of the IMS.
7. Actively promote and participate in IMS initiatives.
8. Promptly report any unsafe working conditions, faulty equipment, hazards/risks, injuries or incidents

Suppliers and Contractors are to:

1. Comply with the requirements of the IMS and participate in IMS promotions.
2. Promptly report any unsafe working conditions, faulty equipment, hazards/risks, injuries or incidents

Organisation Structure

1. The Company recognises that the structure of the organisation needs to constantly evolve in order to
meet the changing needs of clients, the market and compliance obligations.
2. The Management Team are responsible for ensuring the structure of the organisation is appropriate to
the current business needs and will ensure that the organisation chart is regularly reviewed and
maintained.

References:
ISO 9001 ISO 14001 ISO 45001
5.3 5.3 5.3

Planning
Actions to Address Risks and Opportunities
Purpose and Scope

To describe the manner in which the company identifies and manages the risks and opportunities within the
business.

Associated Documents Risk

Management Module.

Supplier Module.

Events Management Module.

Human Resources Module.

Procedure

1. The company is committed to identifying and addressing relevant risks and opportunities as a
means for:
a. Increasing the effectiveness of the IMS.
b. Improving performance.
c. Preventing or mitigating negative effects.
2. When undertaking risk management activities the company must give consideration to the:
a. Positive and negative factors or conditions.

Page 15 of 69 © 2017, Mango Ltd. All Rights Reserved.


b. External context and issues, such as legal, regulatory, technological, competitive,
cultural, social, political and economic environments.
c. Internal context and issues, such as values, culture, organisation structure, knowledge
and performance of the business.
d. Determination of the requirements and needs and expectations of interested parties
relevant to the IMS.
e. Authority and ability to exercise control and influence.
f. Activities, products and services relevant to the business.
3. The company may adopt any or a combination of the following risk options:
a. Avoid the risk.
b. Eliminate the risk source.
c. Take the risk to pursue an opportunity.
d. Change the likelihood or consequences of the risk.
e. Share the risk.
f. Retain the risk by informed decision.
4. Opportunities identified by the company may lead to:
a. Adoption of new and improved processes.
b. Launching new products or services.
c. Pursuing new markets.
d. Utilising new technology.
e. Improved ways of addressing customer needs.
5. The company will manage risk and opportunities as follows:
a. Through ongoing effective leadership and commitment to the IMS.
b. Manage business and quality risks and opportunities in the Board meeting and the
Management meetings.
c. Through the effective management and control of suppliers and contractors.
d. Through the effective training of personnel to ensure they are competent to perform
relevant tasks safely.
e. By monitoring, measurement and review of relevant processes and outputs.

References:
ISO 9001 ISO 14001 ISO 45001
6.1 6.1 6.1

Legal and Other Requirements


Purpose and Scope

To describe how the company ensures that it has identified, complies with and verifies compliance with all of
the relevant legislative, regulatory and other requirements that apply to the activities conducted by the
company employees and contractors within its operations.

Page 16 of 69 © 2017, Mango Ltd. All Rights Reserved.


Associated Documents

Compliance Module Procedure

1. The company is to ensure that all relevant legislative and other requirements are identified.
2. Legislative and other requirements may include, but are not limited to:
a. Acts and Regulations.
b. Codes of Practice.
c. Guidelines.
d. Standards.
e. Agreements with clients, communities or public authorities.
f. Corporate requirements.
g. Industry standards or codes.
h. Voluntary commitments.
3. Details of all relevant legislative and other requirements are to be contained within the Compliance
Module. These will include mitigations and control methods. The verification of compliance will be
reviewed by the Board.
4. The Management Team are to ensure that where possible, they are notified of changes and/or
additions to legal and other requirements as those changes occur.
5. The means of ensuring notification of changes and/or additions may include:
a. Agreements with external legal or consulting organisations to monitor and advise of any
changes.
b. Registering with Standards New Zealand.
c. Advice from employer or industry associations.
6. When changes and/or additions occur they are to be included in the Compliance module and the
means of verifying compliance is to be defined as previously described.
7. A review of the Compliance module will be conducted as per the annual work plan in the Board
meeting. These will include:
a. Confirm that all updates to applicable legal and other requirements have been captured and
included.
b. Confirm that the means of ensuring and verifying compliance are appropriate.
8. The company is to ensure that all changes, additions and updates to the Compliance module are
communicated to relevant employees, contractors and other stakeholders.

Means of Ensuring Compliance

1. Once the application of a particular requirement has been defined, the means of how compliance to
the requirement is going to be ensured is to be established by the company, in consultation with
appropriate personnel.
2. Various means of ensuring compliance are available and include, but are not limited to the following:
a. Policies and/or procedures being established documented and implemented.
b. Training being provided.
c. Engineered solutions being implemented.
d. Instructional signs being displayed.

Page 17 of 69 © 2017, Mango Ltd. All Rights Reserved.


3. Details of the means of ensuring compliance are to be entered into the Legal and Other Requirements
Register in the “Means of Ensuring Compliance” column alongside the corresponding requirement in
the Compliance Module.

Means of Verifying Compliance

1. Once the means of ensuring compliance has been determined, the means of how compliance to each
requirement is to be verified on a continuous basis is to be established by the company, in consultation
with appropriate personnel.
2. Various means of verifying compliance are available and include, but are not limited to the following:
a. Internal auditing. (To verify compliance to the corresponding policies and/or procedures).
b. Periodic workplace inspections.
c. Periodic review of records.
3. Details of the means of ensuring compliance are to be entered into the Legal and Other Requirements
Register in the “Means of Ensuring Compliance” column alongside the corresponding requirement in
the Compliance module.

Monitoring Changes

1. The Management Team are to ensure that where possible, they are notified of changes and/or
additions to legal and other requirements as those changes occur.
2. The means of ensuring notification of changes and/or additions may include:
a. Agreements with external legal or consulting organisations to monitor any advice of changes.
b. Registering with Standards or Government organisations.
c. Advice from employer or industry associations.
3. When changes and/or additions occur they are to be included in the Legal and Other Requirements
Register and the means of ensuring and verifying compliance is to be defined as previously described.
4. On an annual basis, usually in Q4 each year, the Management Team, in consultation with appropriate
personnel, is to coordinate a full review and update of the Legal and Other Requirements Register in
order to:
a. Confirm that all updates to applicable legal and other requirements have been captured and
included.
b. Confirm that the means of ensuring and verifying compliance are appropriate.
5. The Management Team is to ensure that all changes, additions and updates to the Legal and Other
Requirements Register are:
a. Tabled at management review and other relevant meetings.
b. Communicated to relevant employees, contractors and other stakeholders.

References:
ISO 9001 ISO 14001 ISO 45001
5.1.1, 6.3 6.1.3, 9.1.2 6.1, 9.1

Page 18 of 69 © 2017, Mango Ltd. All Rights Reserved.


Objectives, Targets and Plans
Purpose and Scope

To define the processes for establishing measurable IMS objectives and targets, for establishing plans to
achieve those objectives and targets and for periodically monitoring performance in achieving each objective
and target.

Associated Documents

Mango Data

Management Review Minutes.

Objectives, Targets and Plans

Procedure

1. The company will establish measurable objectives and targets in relation to its IMS performance.
2. The established objectives and targets must be:
a. Consistent with the applicable policies.
b. Measurable.
c. Monitored and updated.
d. Effectively communicated to relevant parties.
3. When establishing, reviewing and updating measurable objectives and targets, consideration is to be
given to:
a. Health and safety hazards/risks.
b. Significant environmental aspects and risks/opportunities.
c. Significant business or quality risks/opportunities.
d. Technological, financial and Operational and business requirements.
e. Products and services provided to customers.
f. The enhancement of customer satisfaction.
g. Views of stakeholders.
h. Legal and other requirements.
4. Once measurable objectives and targets have been established, plans for achieving those measurable
objectives and targets are to be established.
5. Performance in achieving each measurable objective and target is to be periodically monitored during
Management Review meetings.

References:
ISO 9001 ISO 14001 ISO 45001
6.2 6.2 6.2

Page 19 of 69 © 2017, Mango Ltd. All Rights Reserved.


Support
Resources and Infrastructure
Purpose and Scope

To describe how the resources and infrastructure required to establish, implement, maintain and
continually improve the effectiveness of the IMS and business operations are to be identified, provided
and maintained. Associated Documents Asset Register (Mango)

PPE/Items module Procedure

1. Resources include human resources and infrastructure, technology and financial resources.
2. The infrastructure and work environment needed to achieve conformity to product requirements is to
be determined, provided, managed and maintained. This can include, as applicable:
a. Buildings and associated utilities.
b. Equipment including hardware and software.
c. Information and communication technology.
3. The Management Team will provide the organisational infrastructure, technology and financial
resources. They are to review the adequacy of the resources as part of BOD meetings. As new
technology becomes available, the possibility of introducing it to improve the IMS is to be considered.
4. The Management Representative is to identify the resources required to establish and maintain the
IMS.
5. The Management Team are to prioritise the financial resources available and allocate them to the
various departments to provide the resources needed.
6. Each Department is to identify the resources required and to provide adequate support when planning
work. They are to identify the infrastructure needed to implement and continually improve the IMS
and meet requirements. The infrastructure to be considered could include, but is not limited to:
a. Buildings and workspace.
b. Hardware and Software.
c. IT requirements.
d. Communications.
7. The Management Team will determine and maintain an appropriate work environment needed to
achieve conformity to the product or service requirements.

Plant and Equipment

1. Details of equipment used by employees are recorded in the PPE/Item module and on the asset
register.
2. All repairs, must be carried out:
a. In accordance with any regulatory and the original manufacturer’s requirements.
b. By appropriately trained, qualified, competent and experienced personnel.
c. All records of maintenance are recorded on the suppliers invoice

Equipment License

Microsoft Office Products used within the company are under the Microsoft Partner MAP programme or have
been purchased from the supplier or, are open source.

Page 20 of 69 © 2017, Mango Ltd. All Rights Reserved.


References:
ISO 9001 ISO 14001 ISO 45001
7.1 7.1 7.1

Training, Competency and Knowledge Management


Purpose and Scope

To ensure all relevant personnel are adequately trained, competent and informed in accordance with their
position and IMS requirements.

Associated Documents

Position Descriptions

Induction Checklist Human

Resources Module.

Event Management Module.

Procedure

Commencement and Induction of New Employees:

1. Employee setup in Employee module


1. Before a new employee commences work, the employee's manager is to arrange for induction training
in accordance with the induction checklist.
2. During the induction any training needs will be identified and logged in Employee module.
3. Once completed the induction checklist must be signed and dated by both the new employee and the
employees’ manager.
4. A record of the induction is to be maintained in Employee module.

Initial Employee Assessment:

1. The employee’s manager assesses the employees’ competency against the skill set that has been
established within the Skills/Qualifications Module.
2. The employee and the manager agree current competency and future training needs.
3. The Skills/Qualifications Module for that employee is updated by the employees’ manager or delegate.
Any supporting records are also loaded into Mango at this time.
4. The next review date for any further assessment of the employee's competency and training needs is
to be scheduled in the Events Management Module. Mango will automatically generate an email
advising the manager and employee of the next review.
5. Scheduled training is also able to be captured within the Events Management Module, if necessary.
6. The employee’s manager is to ensure that training identified is undertaken, and whilst under training
the employee is appropriately supervised, as may be required.

Further Assessment of Employee Competency and Training Needs

1. The employees manager is responsible for conducting:


a. 90 day performance reviews.

Page 21 of 69 © 2017, Mango Ltd. All Rights Reserved.


b. Ongoing performance reviews.
c. Further assessment of employee competency and training needs.
2. The further assessments of employee competency and training needs are conducted using Mango and
involves the following steps:
a. Upon email notification from Mango, the manager will conduct an assessment of the
employee.
b. The employee and manager agree current competency, review training undertaken during the
previous year and evaluate the effectiveness of it and decide on future training needs.
c. The Skills/Qualifications Module for that employee is updated by the manager or delegate.
Any supporting records are also loaded into Employee module at this time.
d. The next review date for assessment of the employee's competency and training needs is to
be scheduled in the Mango Events Management Module.
e. Scheduled training is also able to be captured within the Events Management Module, if
necessary.
f. The manager is to ensure that training identified is undertaken, and whilst under training the
employee is appropriately supervised.

Induction of Suppliers

1. Relevant suppliers must be inducted prior to commencement of work in accordance with the
applicable induction checklist. Records of the induction are to be retained.
2. During the induction they will be advised of any potential hazards/risks together with information
about required control measures and emergency procedures.
3. The induction is to also cover (as applicable):
a. Quality Policies.
b. Current IMS objectives, targets and plans.
c. The importance of compliance with the IMS.
d. Their contribution to the effectiveness of the IMS, including the benefits of improved
performance.
e. Potential consequences of non-compliance with the IMS requirements.

Training Providers

1. In-house training is to be conducted by appropriately skilled and competent trainers with relevant
experience, depending upon the subject matter.
2. Training may be performed by suitably trained, qualified and experienced external service providers.

Knowledge Management

The following items are how we capture knowledge:

• Monthly Company meetings


• Scrum meetings
• Weekly development meetings
• Weekly marketing meetings
• Use of Wiki by the development team

Page 22 of 69 © 2017, Mango Ltd. All Rights Reserved.


• Use of Mango by all staff and partners
• Use of Hubpot (our CRM and our Marketing platform)
• Use of Mantis (our bug tracking software)
• Use of Xero (our accounting system)
• Use of Lynda.com (online training portal)
We capture this knowledge in each of these tools and share it amongst the company to ensure the knowledge
is used in giving the customer value. We review the effectiveness and efficiency of these sources monthly in
the company’s Management Review.

References:
ISO 9001 ISO 14001 ISO 45001
7.1 7.1 7.1

Communication, Consultation and Awareness


Purpose and Scope

This outlines the framework for communication and consultation with employees, contractors and external
parties in relation to IMS issues and initiatives.

The main objectives are to ensure personnel at all levels and functions are:

• Are aware of IMS requirements and are effectively involved in the development, implementation and
review of policies and procedures.
• Consulted when there are any changes that affect the workplace and or IMS systems.
Associated Documents

Meeting Minutes.

Event Management Module.

Procedure

Communication of IMS Information with the Board:

The IMS and legal requirements are communicated and discussed at the board level. The BOD minutes record
what items have been discussed and actions to be done.

Where required actions will be assigned to the Monthly Mango Meeting. Communication and

Awareness of IMS Information with Internal Parties:

1. The IMS communication and consultation processes will occur at the monthly company meeting run by
the Director/s and attended by all employees.
2. The meeting will have an agenda that includes, but not limited to:
a. Quality Policies, Objectives, targets and plans.
b. Risks and Issues
c. Marketing, Sales, Support and Development improvement and performance.
d. Audits/Process Improvement

Page 23 of 69 © 2017, Mango Ltd. All Rights Reserved.


3. An email from Mango will notify the owner when meetings are due and will be signed off the event
including relevant evidence attached.

The company has ad-hoc meetings support the consultation processes:


Forum Attended by
Development Meeting Development Team
Scrum Meeting Development Team + Management
Marketing Meeting Marketing Department
Support Support Team + Management

Communication and Awareness of IMS Information to External Parties:

The company will communicate information externally about its IMS performance based on their enquiry.

References:
ISO 9001 ISO 14001 ISO 45001
7.2, 7.3, 7.4 7.2, 7.3, 7.4 7.2, 7.3, 7.4

Documented Information and Control of Documents


Purpose and Scope

To describe the methods to control and manage documented information critical to the IMS.

Associated Documents

Records

Documents Module.
Improvement Module.

Records Retention and Disposal Matrix.

Procedure

1. Documented information includes manuals, policies, procedures, work instructions, forms, registers,
flow charts, records and other IMS document requirements.
2. The Management Representative is responsible for ensuring that all IMS documented information is
effectively controlled.
3. All employees are responsible for ensuring they are always up to date with all IMS documented
information available in the Documents module.
4. Copies of procedures, policies and other documented information may be printed from Mango, but
these printouts will be deemed "uncontrolled".
5. To prevent the unintended use of obsolete documented information, superseded documents are
automatically identified and removed from general view through the workflow. Obsolete documents
are only able to be accessed by personnel, with the required access levels, through the "History"
button in the Documents Module.

Editing, Approval, Publishing and acknowledge of Documents:

Page 24 of 69 © 2017, Mango Ltd. All Rights Reserved.


The Documents module workflow manages the following document control activities:

1. Creation and editing


• Approval
• Publishing
• Acknowledged
• Retention of previous version
• Revision numbering
• Control of approvers and publisher.
• Notifications
The FAQ describe the process in more detail.

Requests for changes:

1. All requests must be raised in the Improvement Module.

Advice of Changes:

1. When a change is made or new document added, personnel are able to be notified by email
automatically generated through Mango at the time of publication.
2. Changes can also be communicated via monthly meetings as deemed appropriate.
3. Changes to all IMS documents can be tracked through the Document Change History Module.

Maintenance of IMS Documents

1. All IMS documents are to be reviewed at least once every three years, revised as necessary and
approved for adequacy.
2. This review is to be coordinated by the Management Representative in conjunction with the relevant
competent and responsible personnel as determined by the Management Representative at the time
of review.
External Documents

1. It is the responsibility of the Management Representative to review, implement and maintain external
documents and verify that they remain current.
2. External documents are kept in the Manage Files Module.
3. All external documents are verified as current and when necessary have their distribution controlled
through Mango. Updates to external documents shall be placed in the appropriate file in the
Documents Module and approved and published in accordance with this procedure.
4. The Management Representative subscribes to relevant external regulators, agencies and bodies who
may provide periodic advice of changes to their specific documents. Upon receiving advice of changes
to an external document the Management Representative will action this change in Mango and ensure
the change is communicated to relevant parties.

Computer Back-Up

1. The Management Team are responsible for ensuring that appropriate arrangements are in place to
ensure that a back-up of data stored on the server is carried out on a daily basis.

Page 25 of 69 © 2017, Mango Ltd. All Rights Reserved.


2. The IMS as documented in Mango is backed up automatically by the application. Back-ups are
captured each hour within the primary data centre with additional back-ups being captured every
eight hours at a secondary data centre.

Records Management

1. All IMS records are retained in Mango for as long as the company uses the Mango Software solution.
2. All IMS Procedures and Forms are maintained within the Documents Module.
3. The Management Representative is responsible for the management of records with respect to the
IMS.

References:
ISO 9001 ISO 14001 ISO 45001
7.5 7.5 7.5

Operations – Marketing
Marketing - How to Publish a Blog
Purpose and Scope

To describe how the company publishes a blog.

Procedure

Step 1 - Create image for blog

Step 2 - Clone previous blog

Step 3 – Create Blog

Step 4 – Edit the Settings section

Step 5 – Publish or Schedule


How to Manage Webinars
Purpose and Scope

To describe how the company manages a webinar. This includes, pre and post webinar steps.

Procedure

Pre-Webinar

Step 1 -Create webinar in Go-to-Webinar

Step 2 - Integrate the webinar into HubSpot

Step 3 - Create Landing Page

Step 4 - Create an Email invitation to attend webinar

Step 5 – Webinar Presenter arranges planning

Post Webinar

Page 26 of 69 © 2017, Mango Ltd. All Rights Reserved.


Step 1 - Transport Webinar Recoding

Step 2 - Create Lists – attendees and non-attendees

Step 3 - Create a blog with webinar recording

Step 4 - Email a recording of the webinar to each list

How to Publish Release Notes


Purpose and Scope

To describe how the company publishes release notes so customers/evangelists are aware of any new Mango
updates. This procedure takes place once Support gives marketing the release notes.

Procedure

Step 1 – Create a new Mango News

Step 2 – Disable previous release notes news

Step 3 – Upload the FAQ into Mango (Support may assist with this)

Step 4 – Send out email to customers/evangelists to inform them of release

Reporting End of Month Marketing Lead Performance


Purpose and Scope

To describe how to report on the marketing leads at the end of each month. Reporting on this allows us to
keep track on how marketing is performing.

Procedure

Step 1 – Open up spreadsheet of leads

Step 2 – Get numbers of leads from HubSpot

Step 3 – Record the numbers on spreadsheet


References:
ISO 9001 ISO 14001 ISO 45001
8.1, 8.2

Operations – Sales and Partnering


Sales
Purpose and Scope

To describe how the company controls and Manages sales enquiries.

Procedure

Step 1 - Receipt of Leads

Step 2 - Verifying of Leads

Page 27 of 69 © 2017, Mango Ltd. All Rights Reserved.


Step 3 - Demo

Step 4 - Negotiation

Step 5 - Won

Step 6 - Closed/Lost Disengaged

Partner Process
Purpose and Scope

To describe the steps in the partner process.

Procedure

At the end of each step the Lead is notified.

Step 1 - Partner Enquiry

Step 2 - Partner Pack

Step 3 - Demo

Step 4 - Agreement

Step 5 - Sales and Marketing Plans

Step 6 - Training

Step 7 - Support, Monitoring and Communication References:


ISO 9001 ISO 14001 ISO 45001
8.1, 8.2

Operations - Development
Developers Documentation
Purpose and Scope

To describe where and how the development team maintain shared technical information.

Associated Documents

Mango Wiki

Procedure

The development team maintain a Wiki.

The CTO determines what information will be maintained in the Wiki to enable the development team to code
using standard methods.

Development Requests and Bugs


Purpose and Scope

To describe now development requests and bugs are managed and controlled.

Page 28 of 69 © 2017, Mango Ltd. All Rights Reserved.


Associated Documents

Dev Request Module.

Support Module.

Mantis

MRS (Mango Requirement Specification)

Procedure Releases:

A Mantis release is made up of a number individual Mantis's which can be Bugs, Enhancements, Improvements
or a complete new or reworked Module.

Sales, Development and Support will determine what makes up a Mantis release. Final decision for a release is
approved by Sales.

During a Release cycle, Mantis may be added or removed based on the following:

• Urgency
• Workload and Resources
• System Development requirements
• End User requirements and requests
• Technical updates
Release cycles are 3 weekly; 2 weeks of development and 1 week of testing. Any bugs identified within the
testing will be fixed and retested.

If required a Mantis may be re-scheduled to meet a release date or the release date can be moved based.
Each Mantis within a release will show the history, notes and current status as it travels through the
development cycle until it is passed.

Bugs:

Bugs can be received via Phone, Support Module, and support@xxxxlive.com or are entered into Mantis and
assigned to a development Mantis release.

Patch:

If a bug is determined to be a major bug (i.e. stops Mango from performing a function that will effect data) and
the release has been finalised. Management can request a patch to be applied to address the bug.

Enhancements:

Enhancements must be entered via the Dev Request module. If the request has merit it will be entered into
Mantis release. Dev request status is viewed via My Dev Request.

Major Enhancements:

A major enhancement can be a full rewrite of an existing module or a new module, this work will be
documented on a MRS.

MRS will be discussed with the Development Team and updated until development understand the
requirements.

Page 29 of 69 © 2017, Mango Ltd. All Rights Reserved.


A Mantis will be raised to cover the body of work to be done, Development may break the requirements down
to individual Mantis's so development can be split across the development team and to enable support to test
individual Mantis as work is completed.

Testing:

All development will be tested before release to production, refer to the Testing procedure.

Mango Application
Purpose and Scope

To describe the preservation of the Mango Application and customer data on the servers.

Associated Documents

Release Notes

Procedure

Production Server:

This is the live server that holds the Mango Application and the Mango Database that our customers access.

Datacentre NAS:

This is a drive that holds data that is backup from the Production Server.

Test Server:
This is the server that holds the code that will be next released. It is used for internal testing purpose only and
the Source Control. Customers can't access this.

Backup Server

This is a secondary server that holds data that has been backed up from the Production Server.

NAS Drive:

This is a drive that holds data that is backup from the Backup Server.

Sandpit Server:

This server holds an old version of the Mango Application and the Mango Database. This server can be
refreshed from the NAS Drive. Customers only access this to review and approve custom workflows prior to
release to the live server.

Backups

Backups are performed automatically on a defined backup schedule.

References:
ISO 9001 ISO 14001 ISO 45001
8.3, 8.4, 8.5, 8.6

Page 30 of 69 © 2017, Mango Ltd. All Rights Reserved.


Operations – Support and Testing
Mango Testing
Purpose and Scope

To describe the testing procedures/processes for testing updates prior to release.

Procedure

1. Mantis is raised for development or bug fix


2. Mantis is scheduled
3. Mantis is coded and committed to test environment
4. Create Test plan
a. Where the development dictates, a comprehensive test plan will be created
b. Where the mantis is for minor work, no test plan is required
5. Test development against the Mantis
a. Where the testing fails, document the issues in Mantis and change status to 'Failed
Test'
b. Where testing has been successful, document testing completed in the Mantis
6. Release notes written
7. Code committed to live environment
8. Testing completed again in live environment
a. If the testing fails, raise a new Mantis
9. When the testing is successful, close the Mantis

Communication of Releases
Purpose and Scope

To describe the communication of Mango releases and updates.

Procedure

1. Mantis testing has been completed and passed


2. Download list of items for release from Mantis to excel.
3. Insert additional information as required to clarify
4. RSS Created and Updates communicated to Partners
5. FAQs updated and FAQ Release notes written
6. List of items relevant for client communication sent to Marketing.
7. Marketing Releases Mango News and sends out email with notes written
8. FAQ and Release notes published

Support
Purpose and Scope

To describe the procedures/processes for responding to support queries.

Page 31 of 69 © 2017, Mango Ltd. All Rights Reserved.


Procedure

1. Query received from Client


2. Make contact with client and supply information as required
3. Update support query in Mango with Module details, owner and a summary of the communication -
such that it may be a useful resource for the client if they refer back to it at a later stage.
4. If the support query requires further development, convert Support request to a Dev Request
5. Close support query and archive If support query has been addressed
6. Report produced monthly on support queries received

Implementation
Purpose and Scope

To describe the Implementation processes.

Procedure

1. Client signs up to Mango


2. Make contact with client to welcome them to Mango and supply upload spreadsheets
3. Create Implementation kit
4. Upload information to client account as information sheets are returned
5. Arrange implementation date(s)
6. Complete implementation following the Client Implementation Guide
7. Create Action list of items to be addressed by client and/or Mango and document on Post
Implementation Action List
8. Create monthly event to follow up with client until implementation is secure or the client no longer
requires regular contact
9. Archive Event and file client details
10. Transfer client information to NAS Drive

References:
ISO 9001 ISO 14001 ISO 45001
8.4, 8.5, 8.6

Operations - Supplier Evaluation and Control


Purpose and Scope

To describe the process and method by which the company’s suppliers (the term also includes contractors and
subcontractors) are evaluated, selected and controlled.

Associated Documents Suppliers

Module.

Supplier Evaluation Form

Page 32 of 69 © 2017, Mango Ltd. All Rights Reserved.


Procedure

1. The selection criteria for suppliers is as follows:


a. Ability and preparedness to meet IMS requirements.
b. Ability and capability to meet legislative obligations and relevant industry and government
standards and codes.
c. Qualifications, experience and capability within the scope they are contracted for.
d. Quality, consistency and reliability of product or service provided.
e. Delivery performance.
f. Price of product or service including commercial arrangements.
g. Quality, environmental, health and safety management systems.
h. Past performance including health, safety and environmental record.
2. Suppliers are classified on the basis of the potential risk their products or services may pose to:
a. Products or services.
b. Workplace health and safety.
c. The environment.
3. Consideration needs to be given to whether:
a. Failure of the supplier to deliver agreed products or services will impact upon profitability?
b. Failure of the supplier to deliver agreed products or services will result in failure to meet any
contractual, legislative and statutory obligations for delivery of products and services?
c. Supplier will introduce or potentially introduce any high risk hazards or significant
environmental impacts to the workplace?
4. Suppliers that are identified as having the potential to significantly affect activities, products or services
are deemed “critical” and must undergo a thorough documented evaluation and re-evaluation
process. Non-critical suppliers are required to be evaluated but not necessarily to the same extent as
those deemed to be critical. Examples of critical suppliers would include:
a. Suppliers of Hosting Services.
b. Suppliers of IT services.
5. The following rating system will be used for suppliers:
a. Critical
b. Approved
c. Approved and inducted
d. Back-up
6. Where applicable, Suppliers must have current and appropriate insurance arrangements in place.
Certificates of currency for required insurances are to be provided as part of the formal evaluation
process.
7. Products and services essential to meet contract requirements shall only be purchased from qualified
and approved suppliers.
8. The details of suppliers are specified in the Suppliers Module, inclusive of their rating.

Supplier Induction

Page 33 of 69 © 2017, Mango Ltd. All Rights Reserved.


1. All Suppliers and their staff are to be effectively inducted, including training with respect to specific
site procedure requirements. Refer to the Training, Competence and Awareness procedure for
further details.
2. A record of the induction training conducted in to be retained in Supplier Employee Module.

Re-Evaluation

1. Once evaluated and approved, suppliers are to be subjected to formal periodic reevaluation. Re-
evaluations are scheduled within the Supplier Module.
2. Re-evaluation is to take place at least once every two years or sooner if reasons apply. Some reasons
for early re-evaluation are:
a. Incidents and/or poor performance involving the supplier or contractor.
b. Change in circumstances or structure such as new ownership, or change of location or key
personnel.
c. Change in scope of services.
3. Re-evaluation is to follow the same process as for the initial evaluation.

References:
ISO 9001 ISO 14001 ISO 45001
8.4, 8.5, 8.6 8.1 8.3, 8.4, 8.5
Operations – Health and Safety
Hazard Identification, Assessment and Control
Purpose and Scope

The purpose of this procedure is to effectively and systematically identify, document review and control actual
and potential hazards onsite.

Associated Documents

Risk Management Module

Procedure

1. Hazard Identification - On identification of a new hazard it will be entered into the Report a Risk
module along with the potential harm that the hazard is likely to cause.
2. Risk Analysis - The module will step you through the process of assessing and developing appropriate
controls based on significance.
3. Once the hazard has been entered and controls set, attach the new hazard to the appropriate register.
4. Once attached, print off the updated register and circulate to the appropriate employees or areas.
5. Register Review - Mango will notify the organisation when a register is due for review. The
organisation will review any changes that have a bearing on the health and safety of employees to
ensure that procedures can be updated or training arranged.
6. Monitoring of Hazards - Mango will notify the organisation when any hazard monitoring is due.
Examples of this include noise monitoring, atmospheric monitoring

Identification

1. Hazards may be identified by the following methods

Page 34 of 69 © 2017, Mango Ltd. All Rights Reserved.


a. Initial and routine plant inspections of the workplace.
b. Employee may raise the hazard concern at a meeting
c. Hazard is drawn to the attention of the Safety rep, Supervisor or Manager.
d. Accident and incident or critical event identifies a new hazard.
e. New equipment and tasks will be subject to a hazard review before use

Assessment

1. Hazards will be assessed for significance/ risk.


2. Risk assessment matrix and risk scores will be recorded for all new hazards reported and will also be
recorded in hazard registers.

Documentation and registers

1. Hazards that are significant are documented in the company hazard register
2. Task analysis (TA), Job safety analysis (JSA), Safe Work Statement Methods (SWMS) or Site Specific
Safety Plans (SSSP) may also be used to identify hazards and document the associated controls.

Application of controls

Hazards that are significant will be controlled by applying all reasonably practicable steps. Controls will be
applied in the following order

1. Elimination
2. Substitution
3. Engineering controls
4. Administrative controls
5. Personal protective equipment

Induction and training of staff in relation to hazards

1. All new staff will be inducted and sign an induction record


2. The hazard reporting process will be explained
3. The expected work methods, standards and controls will be covered at induction

Induction of visitors, suppliers and sub-contractors

1. Visitors, suppliers and sub-contractors will typically sign in at reception and be inducted on site.
2. The induction content typically relates to the hazards they will be exposed to during their visit as a
minimum general hazards and emergency procedures are covered.
Reviews

Review of hazards onsite will completed as follows:

1. On a determined frequency (annual as a minimum) the hazard register is reviewed and updated if
necessary. Review is documented in the Event Management Module in Mango.
2. Work sites are reviewed and records held
3. Vehicles are checked and records held
4. Workshops and offices are checked and records held

Page 35 of 69 © 2017, Mango Ltd. All Rights Reserved.


Critical events

1. Critical events are recorded on an accident, incident or near miss form.


2. The investigation and actions are recorded and these events are tabled at the safety committee
meeting for review.
3. The need for health monitoring may arise from a critical event and this monitoring will be completed
and results supplied to the employee.

Purchasing policy and associated reviews of new equipment and processes

1. The company shall assess and record at pre purchase and upon arrival or commissioning stage the
relevant H & S aspects of the plant, process or substances.
2. Refer to purchasing procedure.

Specialist advisors and external audits

1. Hazards that require specific specialist advice or monitoring then the Management Representative
may authorise these services.
2. A list of specialist advisors is held in the Documents module
3. External audits may be commissioned as requested by the Managing Director

Legal compliance and access to relevant information

1. The compliance module in Mango is used to record all legal compliance.


2. A review of compliance with relevant and new legislation or industry guidelines will be conducted
annually.
3. Access to relevant information and codes of practice can be sources from the following: a. Documents
folder
b. Legislation – www.legislation.govt.nz
c. Industry guidelines and approved codes - Worksafe NZ – www.worksafe.govt.nz
d. Industry publications: (add relevant standards or industry publications)
e. Other web sites – Chemwatch - http://www.chemwatch.net/
f. Consultants

Health monitoring

1. The control of hazards may involve the regular monitoring of employees or the workplace
e.g. noise levels and audiometry. The frequency and type of monitoring (including exit testing) is
detailed in the table below and typically established as an event within Mango.
2. Employees will be required to provide written and signed consent to the health monitoring provider.
3. The health monitoring provider may release relevant health information to employer (PCBU) so the
employer can execute their duties under the Act and ensure that hazards are adequately controlled to
protect workers from harm.
4. Results for monitoring - Results for monitoring in the workplace will be made available to employees.
5. Sub optimal or adverse results from monitoring will be reviewed and necessary controls applied and
employee's medical and vocational needs will be considered. See process flow below.

Personal Protective Equipment

Page 36 of 69 © 2017, Mango Ltd. All Rights Reserved.


1. The company name will provide:
a. All PPE required to protect employees from hazards while at work.
b. The necessary PPE if worn out or expired and parts for basic maintenance.
c. The necessary training in respect to the wearing or operation of the PPE
2. The PPE provided will comply with all relevant standards 3. PPE issued is recorded on
the:
a. Induction record
b. Human Resources module
4. An employee may provide PPE for their own use. This will be noted on the PPE issued record and
signed. If the PPE supplied by the employee is not of the required standard or worn out the employee
will be requested to replace it.
5. The hazard register or task analysis/ SWMS will detail the necessary tasks/ machinery hazards that
require PPE to be worn.
6. The company will take all practicable steps to ensure employees wear PPE.
7. Employees failing to wear PPE as instructed may be subject to the companies’ disciplinary procedure.
8. Visitors will be issued PPE necessary for the hazards and area they will be visiting.
9. Contractors and subcontractors will provide and wear PPE appropriate to the task they are completing.
10. A list of the standard issue of PPE is held in PPE module

Safety Data Sheets (SDS) previously known as (MSDS - Material Safety Data Sheets)

1. The Management Representative will obtain Safety Data Sheets from the relevant suppliers.
2. Controls outlined in the SDS will be incorporated into training, documentation and site procedures
where necessary.
3. Employees will be suitably trained.
4. MSDS will be filed in an appropriate documents folder.
5. Where requested by the Site Specific Safety Plan (SSSP), site owner or main contractor, copies will be
held on sites for reference.

References:
ISO 9001 ISO 14001 ISO 45001
8.1, 8.2

Accidents / Incidents
Purpose and Scope
The organisation will ensure an active reporting, recording and investigating all incidents and accidents.

Associated Documents

Accident / Incident Module

Return to work plans

Medical documentation

Page 37 of 69 © 2017, Mango Ltd. All Rights Reserved.


Procedure

1. All accidents, incidents or near misses (involving injury, illness, persistent or unusual pain) will be
reported early and promptly on the accident report form.
2. If necessary, the trained first aiders on site will attend to the accident.
3. The employee will forward all Medical documents to the Co-ordinator who will action and file these as
required.
4. All Notifiable events need to be advised to the Co-ordinator as soon as practical
5. The accident scene of a “Notifiable events” is not to be interfered with or disturbed until given a
clearance.
6. An accident investigation may be required (refer to below)
7. Rehabilitation plans will be established as outlined in the rehab procedure.

Accident Investigation

1. Only people with the appropriate skills and experience should investigate accidents.
2. Gather all the facts; all investigations will be initially recorded on an Accident / Incident Module:
a. Interview witnesses and describe events in detail, using any photos, diagrams or other exhibits
that may be appropriate.
b. Have the prescribed agencies, been informed?
c. Be sure that you understand the sequence of events fully before any analysis takes place.
d. Identify all the hazards involved.
e. Consider:
i. equipment,
ii. materials,
iii. work practices and procedures, iv. work environment,
v. health issues, vi. hazards
3. Assess the Hazard Controls in place. What controls were in place, and why didn't they work? What is
needed? Is there a need to train or inform employees?
4. Decide on Future Action. Describe fully what needs to be done to prevent further accidents or
incidents. Who should do what and by when?
5. Records of those who hold relevant investigation skills are recorded in Human Resources module.
6. Inform all those affected. Inform everyone who needs to know, not only those directly involved. Health
and Safety meeting agenda will include the results of any findings and actions to be undertaken.
7. Follow up. There must be checks to ensure that recommended changes have been made and results
achieved.
8. The Manager or Supervisor will implement any corrective actions or improvements that arise from the
accident investigation. Actions must be signed off as they are completed.

Injury Management and Return to Work

1. Medical documents and medical certificates are received. They will be filed as necessary.
2. Employee having more than 5 days off and/or the injury would benefit from rehabilitation.
3. Signed consent form is required by the employee to authorise the release of information from the
doctor.

Page 38 of 69 © 2017, Mango Ltd. All Rights Reserved.


4. Consult doctor or treatment provider as to possible duties the injured employee could undertake.
5. Employee, Employee’s Manager/Supervisor and Co-ordinator meet and discuss possible options and
formalise the options in a rehabilitation plan. The employee may have a Union or support person
present.
6. A Third party rehabilitation provider may assist with the plan and monitoring of progress.
7. Rehabilitation plan and set milestones are monitored as agreed.
8. If rehabilitation milestones or the rehabilitation plan are not proceeding as agreed an occupational
health specialist or physician may be involved. Typical transitional duties include:
a. Admin/ paper work e.g. electrical compliance certificates.
b. Non lifting site work
c. Reduced hours per day
d. Motor vehicle driving/ deliveries
9. Early intervention with a rehab programme is the best option. Remember that an employee has a
fitness level and muscle toning from the type of work they have been doing and the longer they are
out of the workforce the longer it will take them to get back to full fitness.
10. The threat of re-injury is also a serious possibility if the rehabilitation is not designed and handled
correctly.
11. Remember an employee may feel threatened by the meeting format and the desire for the company
to get them back to work earlier than they may be happy with.
12. Always offer the employee the option of having a support person or H & S rep present.
13. It is good policy to clearly explain to the employee that the companies aim is the smooth
reintroduction back into the workforce.
14. Remember that high achievers and very active people can also overdo their return to work and
reinjure themselves.

Employee Participation
Purpose and Scope

The organisation will ensure that employees have the opportunity to be fully involved in the development,
implementation and operation of safe workplace practices.

The organisation actively encourages employees to be involved in the Health and Safety meetings.

Associated Documents

Health and Safety Meeting Minutes.

Event Management Module


Procedure

Meetings are scheduled in the Event Management module. When completed, the event will be signed off and
the minutes attached.

The following events may be used to facilitate participation:

Toolbox Meeting

1. The site foreman will chair and take minutes of site toolbox meetings.

Page 39 of 69 © 2017, Mango Ltd. All Rights Reserved.


2. The frequency of toolbox meetings is determined by the:
a. Main Contractor/ Principal
b. Site contract requirements
c. Company directive
3. All employees and contractors on the site at the time of the meeting MUST attend unless excused by
the foreman for an extraordinary reason.
4. Site foreman will record
a. Names of all attendees
b. Concerns or hazards raised
c. Accident reported
d. Concerns raised
e. A brief summary of specific topics covered or instructions given
5. Completed site safety toolbox meeting records shall be held in Adhoc Training Module.

Health and Safety Meeting

1. The Health and Safety Meeting is made up of representatives from all levels within the organisation.
The meeting can be a committee or it can be a full company meeting.
2. The meetings will be minuted with action points clearly identifying responsibility with target date for
completion. The following items will be discussed:
a. Previous minutes and actions taken
b. Reviews of policies
c. Correspondence, i.e. new laws and legislative requirements
d. Objectives achieved
e. Hazards/risk
f. New equipment and new work processes (including hazards associated with new equipment
or processes)
g. Training undertaken and training for next period
h. Accidents and incidents
i. Upcoming and overdue events from Mango
j. Changes that affect workplace safety
k. General business Excellence

Appointment of Employee Health and Safety Representatives

If required annual nominations will be asked from employees for representatives to be elected. If more
nominations are received for the positions available, an election will be held by ballot Trained
representatives have the following duties as outlined in the responsibilities section.

References:
ISO 9001 ISO 14001 ISO 45001
7.3, 7.4 7.3, 7.4 7.3, 7.4

Page 40 of 69 © 2017, Mango Ltd. All Rights Reserved.


Emergency Planning – Health and Safety
Purpose and Scope

The purpose is to ensure that the organisation has an emergency plan to manage and test all types of potential
emergencies.

Associated Documents

Emergency Plans

Event Management Module

Procedure

Emergency Plans

1. All potential emergencies will have document plans.


2. A copy of the emergency plan will be in a readily accessible location for all staff to refer to.
3. The emergency plan will incorporate all of the potential emergency situations that can affect the site
that the plan has been developed for, and how to respond to them.

Testing Emergency Plans

1. Trial Emergencies will be scheduled in the Manage Events module.


2. When completed, the event will be signed off and the evidence attached.
3. All emergency wardens will undertake in house training every 12 months in their role and the
emergency plan and procedures.
4. Training will be recorded on the individuals training record.
5. Any corrective actions or improvements will be recorded in the Improvement module in Mango.
6. Tests will be conducted every 6 months.
7. Following each test the Chief Warden will review the drill and implement any actions identified with
the other wardens.

References:
ISO 9001 ISO 14001 ISO 45001
8.2 8.6

Operations – Environmental
Aspects and Impacts Identification, Assessment and Control
Purpose and Scope

The purpose is to describe the procedures for identifying, assessing and controlling the environmental aspects
and impacts.

Associated Documents

Risk Management Module


Environmental Aspects and Impacts Register

Page 41 of 69 © 2017, Mango Ltd. All Rights Reserved.


Procedure

Aspects Identification

1. Ascertain the area(s) of the organization to be evaluated.


2. Identify environmental aspects via interviews, site reconnaissance, and document review for the area
or function defined.
3. Consider the following;
a. Waste streams (air, water, solid waste),
b. Energy exchange (energy used and energy released),
c. Resource consumption,
d. Community
e. Interested stakeholder input, and
f. Human and Ecosystem toxicity.
4. Identify those aspects that are significant
5. Identify all resource consents.
6. Record the identified aspects in Risk Management Module

Assessment and Control

1. The Risk Management module will step you through the process of assessing and developing
appropriate controls.
2. Once the aspect and impact has been entered and controls set, attach the new aspects to the
appropriate register.
3. Once attached, print off the updated register and circulate to the appropriate employees or areas.

Review and Monitoring

Mango will notify the organisation when a review is due. This may be from a contractual requirement (for
example: resource consent) or an operational site review.

References:
ISO 9001 ISO 14001 ISO 45001
6.1

Environmental Incident Reporting, Recording and Investigations


Purpose and Scope

The purpose of this procedure is to ensure that environmental incidents are reported, recorded, investigated
and appropriate corrective and preventive action is performed.

Associated Documents

Improvement module

Procedure

1. When an environmental incident is reported, an improvement will be raised in the Improvement


module.

Page 42 of 69 © 2017, Mango Ltd. All Rights Reserved.


2. The workflow in the Improvement module, as setup then ensures the environmental incidents has
corrective action assigned.
3. All actions will be recorded in the Improvement module.
4. When an environmental incident is reported, an improvement will be raised in the register. Examples
of environmental incidents include:
a. Discharge to air
b. Discharge to land
c. Discharge to water
5. Contain the environmental incident and prevent or minimise the risk of further environmental harm.
Contact the appropriate Environmental Protection Agency.
6. The environmental incidents has corrective action assigned.
7. All actions will be recorded
8. The preventive actions are verified in the Management review meeting to ensure they are effective

References:
ISO 9001 ISO 14001 ISO 45001
10.2 8.6

Environmental Emergency Planning


Purpose and Scope

The purpose is to ensure that the organisation has an emergency plan to manage and test all types of potential
emergencies.

Associated Documents

Emergency Plans

Event Management Module

Procedure

1. All emergency situations will have an Environmental Emergency Plan


2. A copy of the environmental emergency plans will be in a readily accessible location for all staff to
refer to.
3. The emergency plan will incorporate all of the potential emergency situations that can affect the site
that the plan has been developed for, and how to respond to them.

Testing Emergency Plans

1. Trial Emergencies will be scheduled in the Manage Events module.


2. When completed, the event will be signed off and the evidence attached.
3. All emergency wardens will undertake in house training every 12 months in their role and the
emergency plan and procedures.
4. Training will be recorded on the individuals training record.
5. Any corrective actions or improvements will be recorded in the Improvement module.
6. Tests will be conducted every 6 months.

Page 43 of 69 © 2017, Mango Ltd. All Rights Reserved.


7. Following each test the Chief Warden will review the drill and implement any actions identified with
the other wardens.
References:
ISO 9001 ISO 14001 ISO 45001
8.2 8.6
Performance Evaluation
Monitoring, Measurement and Evaluation
Purpose and Scope

To describe how we will monitor, measure, analyse and evaluate the IMS in order to identify and take suitable
action to ensure the continual improvement of the management system.

Associated Documents Events

Management Module.

Mango Reports.

Procedure

1. The company will determine:


a. The aspects of the IMS that will be monitored and measured.
b. The responsibilities, frequency and methods for monitoring, measurement, analysis and
evaluation needed.
c. The criteria against which we will evaluate its IMS performance.
d. When the monitoring and measuring:
i. Will be performed.
ii. Results will be analysed and evaluated.
2. The results of the analysis and evaluation conducted is to evaluate the:
a. Degree of customer satisfaction.
b. Conformity of products and services.
c. Performance and effectiveness of the IMS including the environment, health and safety and
quality.
d. If planning has been effectively implemented.
e. Effectiveness of actions taken to address risks and opportunities.
f. Performance of external providers.
g. Need for improvements to the IMS.
3. Appropriate documented information must be retained as evidence of the monitoring, measurement,
analysis and evaluation that is conducted.

Monitoring Arrangements

1. Generally, individual procedures within the IMS describe the specific monitoring, measurement,
analysis and evaluation requirements to be met.
2. Whenever required, an event will manage the process.

References:

Page 44 of 69 © 2017, Mango Ltd. All Rights Reserved.


ISO 9001 ISO 14001 ISO 45001
9.1 9.1 9.1

Internal Audit
Purpose and Scope

To describe the responsibilities and methods used to evaluate the effectiveness of the implementation and
maintenance of the IMS.

Audits and inspections are completed for the following purposes:

• To identify the compliance status against the company policies, procedures, legal requirements and
other obligations including the ISO 9001,
• To identify areas where IMS performance needs to be improved or changed.
• To identify leading practice, so as such practices can be communicated and implemented in other the
company activities.

Associated Documents

Internal and External Audit Reports.

Event Management Module.

Improvement Module.

Audit / Inspection Module.

Compliance module.

Procedure

The company will use the DIME matrix methodology for internal audits. This will be an audit of the system
based on the ISO clauses.

The company will audit using the Compliance Module to capture the records of DIME (documented,
implemented. monitored, evidence/effective).

1. An audit of the IMS will be conducted as per the schedule in Event Management
Module.
2. An event will remind Management when the audit is due. 3. The Audit team will audit
the assigned section of the IMS.
4. An auditor can’t audit a core function they are responsible for.
5. Once complete, the event will be signed off and a copy of the report uploaded.
6. An improvement will be raised for each non-conformance identified.

References:
ISO 9001 ISO 14001 ISO 45001
9.2 9.2 9.2

Page 45 of 69 © 2017, Mango Ltd. All Rights Reserved.


Management Review
Purpose and Scope

To ensure that the IMS is effectively reviewed on a regular basis with the purpose to:

• Ensure its continuing suitability, adequacy, effectiveness and alignment with the strategic direction.
• Consider relevant changes in external and internal issues, including changes to legislative and other
requirements.
• Ensure all employees are aware of the current status of IMS performance and changes to the IMS
system and procedures.
• Allow for all employees to provide suggestions, direction and resources for the continual improvement
of IMS performance.

Associated Documents

Management Review Meeting Minutes.

Event Management Module

Data in Mango.

Procedure

1. A formal review of the IMS is to be conducted every six weeks, all staff are invited and expected to
attend in person or via appropriate communication.
2. The agenda will be:
a. the status of actions from previous management reviews;
b. changes in external and internal issues that are relevant to the quality management system;
c. information on the performance and effectiveness of the quality management system,
including trends in:
i. customer satisfaction and feedback from relevant interested parties;
ii. the extent to which quality objectives have been met;
iii. process performance and conformity of products and services; iv. nonconformities
and corrective actions;
v. monitoring and measurement results;
vi. audit results;
vii. the performance of external providers;
d. the adequacy of resources;
e. the effectiveness of actions taken to address risks and opportunities (see 6.1);
f. opportunities for improvement.
3. An event has been setup to ensure the Management Review happens.
4. The Management Representative will run, keep minutes and publish records in Event Management
module.
5. The Management review will follow the standard agenda format in the minutes.
6. Actions are assigned and recorded on the Management Minutes with agreed timeframes.

References:

Page 46 of 69 © 2017, Mango Ltd. All Rights Reserved.


ISO 9001 ISO 14001 ISO 45001
9.3 9.3 9.3

Improvement
Improvement and Corrective Actions
Purpose and Scope

To ensure that improvements, non-conformities and corrective actions are reported, recorded, investigated
and followed-up.
The procedure also ensures that non-conforming products or services are identified, reported, recorded,
investigated and controlled.

Associated Documents

Improvement Module.

Procedure

1. Employees must report improvement opportunities, non-conformances, failures and any other IMS
issues.
2. Improvements can be initiated by any employee when any of the following issues are identified:
a. To initiate a change to the IMS.
b. To initiate an improvement to the performance and effectiveness of the IMS.
c. When an innovation or improvement opportunity is identified.
d. When a non-conformance is identified at any time, (Software Bugs - nonconformances are
handled via Mantis software).
e. When a discrepancy, non-conformance or improvement is identified during auditing.
f. When a customer complaint or any significant customer feedback is received (including
compliments).
3. Improvements are to be retained in Mango including associated documents and records with respect
to the improvement
4. The improvement workflow will manage the improvement process
5. Findings will be reported to the Management Review meeting including their status.

References:
ISO 9001 ISO 14001 ISO 45001
10.1, 10.2, 10.3 10.1, 10.2, 10.3 10.1, 10.2, 10.3

 Certainly! An integrated management system (IMS) that combines ISO 9001:2015 (Quality
Management System) and ISO 13485:2016 (Medical Devices - Quality Management Systems) can
streamline processes and improve overall efficiency. Here’s a sample outline for such an IMS:

Page 47 of 69 © 2017, Mango Ltd. All Rights Reserved.


Integrated Quality, Environmental, and Occupational Health and Safety Manual

Introduction
Your Company has developed and implemented an integrated Quality, Environmental, and
Occupational Health and Safety Management System (IMS). The IMS aims to document the
company’s best practices, meet customer requirements, enhance environmental performance, promote
health and safety practices, and improve overall management.

External and Internal Context


To fully understand the organization and its context, Your Company has identified relevant external
and internal issues that affect the IMS’s ability to achieve intended results.

ISO 9001:2015
Your Company complies with ISO 9001:2015, addressing design, development, production,
installation, and servicing of products. The process approach ensures consistent and predictable results
by managing activities as interrelated processes.

ISO 14001:2015
The IMS also adheres to ISO 14001:2015, emphasizing environmental management. Your Company
considers environmental aspects, legal requirements, and continuous improvement.

ISO 13485:2016
For medical devices, Your Company meets ISO 13485:2016 requirements. The IMS covers design,
development, production, installation, and servicing of medical products.

Manual Structure
The IMS manual is divided into sections corresponding to ISO 9001:2015, ISO 14001:2015, and
OHSAS 18001:2007 (Occupational Health and Safety). It delineates authorities, responsibilities, and
interrelationships within the system.

Key Sections

1. Quality Management: Describes processes related to ISO 9001:2015.


2. Environmental Management: Addresses ISO 14001:2015 requirements.
3. Health and Safety Management: Incorporates OHSAS 18001:2007 elements.

Customization
Review the manual’s blue text and suggestions, replacing or updating them to reflect your company’s
unique information. Use the replace function to personalize the document.
Remember, this sample serves as a template. Adapt it to your organization’s specific needs and
context.
For more detailed examples, you can explore additional resources and templates available online 123.
Creating a well-integrated IMS ensures efficient operations, compliance, and continuous improvement
across quality, environmental, and health and safety domains.

Page 48 of 69 © 2017, Mango Ltd. All Rights Reserved.


Learn more
1integrated-standards.com2integrated-standards.com313485store.com4integrated-standards.com5medical-
device-regulation.eu613485store.com+4 more

 What are the benefits of integrating ISO 9001 and ISO 13485?
 How do I implement an IMS in my organization?
 Can you provide more details about risk management within the IMS?

Let’s chat
See more

Integrated Standards
http://integrated-standards.com/.../2016/...manual-sample.pdf
How do I implement an IMS in my organization?
Copilot

Implementing an Integrated Management System (IMS) in your organization involves combining


multiple management systems (such as ISO 9001:2015 and ISO 13485:2016) into a unified
framework. Here are the steps to guide you through the process:
1. Initial Assessment:
o Conduct a gap analysis to assess your existing management systems (e.g., quality, environmental, health and
safety).
o Identify areas for integration and understand the current state of each system.
2. Unified Framework Development:
o Create a unified structure that merges relevant requirements from different standards (e.g., ISO 9001, ISO
14001, ISO 13485).
o Develop common policies, procedures, and processes that align with the IMS.
3. Standardize Documentation and Processes:
o Use PAS 99 as a guide to map and define one set of documentation, policies, procedures, and processes
suitable for all management systems.
o Ensure consistency in handling requirements such as policy approval, document control, and record
management.
4. Roles and Responsibilities:
o Clearly define roles and responsibilities for IMS implementation.
o Ensure employees understand their tasks and expectations related to the IMS.
5. Adapt Existing Processes:
o Modify existing processes and systems to align with the IMS.
o Address specific requirements related to product/service planning, environmental management, and risk
management.
6. Training and Awareness:
o Train employees on the IMS framework, emphasizing its benefits and objectives.
o Foster awareness of integrated practices and encourage participation.

Remember that IMS implementation is context-specific, and the approach may vary based on your
organization’s needs, existing systems, and maturity level. Adapt the IMS to suit your unique
requirements and ensure efficient operations across quality, environmental, and health and safety
domains123.

Page 49 of 69 © 2017, Mango Ltd. All Rights Reserved.


Learn more
1advisera.com2agilitysystem.net3british-assessment.co.uk4datamyte.com5practicalrisktraining.com+1 more
2of30
Show learn more suggestions

How to implement integrated


management systems

Article by Rhand Leal5 min read





Recently, we saw the release of new versions of two of the best-known ISO standards: ISO
9001 (requirements for Quality Management Systems) and ISO 14001 (requirements for
Environmental Management Systems). Like ISO 22301 and ISO 27001, these standards follow a
similar structure, based on Annex SL, Appendix 2 of ISO/IEC Directives (for more information about
Annex SL, as well as about the PDCA cycle in ISO management systems, please read Has the PDCA
cycle been removed from the new ISO standards?).
Since the new versions of the standards define transition periods for the adequacy of ISO management
systems certified against previous versions, integrated or not, we can expect a cycle of
implementation / integration projects all over the world in the next few years. In this article, I will
present to you a brief overview of the main aspects you should consider to take advantage of the
standards’ similarities, which makes it easier to integrate them and enable your organization to work
more efficiently.

ISO’s management systems high-level structure


Since the publication of Annex SL, all ISO management systems must be developed following this
structure:
1. Scope
2. Normative references
3. Terms and definitions
4. Context of the organization
5. Leadership
6. Planning
7. Support

Page 50 of 69 © 2017, Mango Ltd. All Rights Reserved.


8. Operation
9. Performance evaluation
10. Improvement
For certification purposes, the most important clauses are clauses 4 through 10. In clauses 4, 5, 7, 9,
and 10, the texts of the standards are almost the same. The specifics of each standard are concentrated
on clauses 6 and 8, as follows:
 Clauses 6 and 8 of ISO 9001 refer to Product / Service planning and realization
 Clauses 6 and 8 of ISO 14001 refer to Environmental management
 Clauses 6 and 8 of ISO 27001 refer to Risk management
Therefore, you can see that most of the standards’ requirements (clauses 4, 5, 7, 9, and 10) can be
unified without compromising the individual standard’s purpose.

Project plan for ISO 27001/ISO 22301 implementation


Free template to prepare an effective plan for your ISMS/BCMS implementation
DOWNLOAD NOW

Approach to integrate management systems


When talking about an integrated management system (IMS), we mean systems where we deal with as
many requirements as possible in the same way. E.g., if two systems have policy requirements (like
management approval, revision, and communication), why don’t we deal with them the same way?
Why don’t we control documents and records in the same form?
When thinking about integrating management systems, there are many courses of action to be
considered based on the organization’s context, the number of existing systems, and the systems’
maturity, for example. In terms of standards requirements, you can use PAS 99 as a guide (it can help
you map and define one set of documentation, policies, procedures, and processes suitable for all of
your management systems). For actions to be considered, see the following:
Awareness & training. Use a single procedure to prescribe the method and frequency of training and
awareness activities, as well as the same training materials related to common requirements. This
makes it easier to make the organization’s employees aware of the standards’ requirements, how these
requirements can help improve business results, and how employees can help to implement and be
compliant with them.

Page 51 of 69 © 2017, Mango Ltd. All Rights Reserved.


Objectives and policy definition. Identify the organization’s purposes for the system and develop a
single policy that covers all the organization’s management systems.
Context definition. Determine all the internal / external factors and interested parties through a unified
system to find correlations more quickly and more thoroughly.
Actions to treat risks / seize opportunities. Previously known as preventive actions, your
organization should develop plans to deal with potential negative / positive impacts that it may be
exposed to.
Documentation design and implementation. Use unified documentation for the processes of the
integrated management system, like document and records control and internal audit.
Internal audit. Make use of the same internal auditor to verify if the integrated processes are being
realized as planned and achieving the expected results.
Management review. Turn multiple reviews into a single one to aid top management’s understanding
of the integrated management system achievements and results.
Corrective actions. A single procedure can be used to take and follow up on the measures taken if
processes and / or results are not as expected.
For organizations with certified systems, or those considering certification, when top management asks
about the certificates and the certification processes, you can answer that by using the IMS approach
the certification process will be cheaper, because the integrated certification will be performed only
one time for all integrated systems.

Benefits of an integrated management system


The main benefits of implementing an integrated management system are:
 Decreased cost when going for an integrated certification audit
 Cost optimization by unification of internal audits, document control, training, and administration
 Maintenance optimization through using the same approach to manage multiple standards
 Better understanding by top management of systems issues, increasing agility and effectiveness of related
decisions involving multiple standards’ requirements
 Less effort required to integrate new management systems

Integrated management system: A good answer to


address multiple challenges
An integrated management system is relevant to any organization because it helps the organization to
deal effectively with challenges like limited resources, growing competitiveness, and higher
expectations from customers and other interested parties (e.g., government and regulatory bodies) –
regardless of its market.
Therefore, if you have many management systems in your organization, or you are planning to deploy
new ones, now is an ideal time to consider management system integration in your organization, to
improve results and optimize the alignment of management practices.
To see an example of integrated systems documentation, please see these free materials: Project plan
for ISO 27001 / ISO 22301 implementation and ISO 9001 vs. ISO 27001 matrix.

Page 52 of 69 © 2017, Mango Ltd. All Rights Reserved.


TagsArticlesMultiple StandardsRevisions & Related

Project plan for ISO 27001/ISO 22301 implementation


Free template to prepare an effective plan for your ISMS/BCMS implementation
DOWNLOAD NOW

Rhand Leal
Rhand Leal has more than 15 years of experience in information security, and for six years he continuously
maintained а certified Information Security Management System based on ISO 27001. Rhand holds an MBA in
Business Management from Fundação Getúlio Vargas. Among his certifications are: ISO 27001 Lead Auditor,
ISO 9001 Lead Auditor, Certified Information Security Manager (CISM), Certified Information Systems Security
Professional (CISSP), and others. He is a member of the ISACA Brasília Chapter.
READ MORE ARTICLES BY RHAND LEAL

What is an Integrated Management System?


An Integrated Management System (IMS) is a unified framework that combines
multiple management system standards to streamline business processes,
enhance performance, and achieve regulatory compliance.

An IMS allows organisations to establish a single, cohesive system, aligning the


requirements of various standards such as ISO 9001, ISO 14001, and ISO 45001.
By merging these standards, businesses can improve efficiency, reduce
duplication, and simplify reporting.

Page 53 of 69 © 2017, Mango Ltd. All Rights Reserved.


The Benefits of Implementing an Integrated
Management System
An IMS offers several advantages that contribute to an organisation’s success.
These benefits extend beyond the initial advantages mentioned earlier and include:
Streamlined Communication and Collaboration
By consolidating management systems, companies can encourage cross-
functional collaboration and improve communication within the organisation.
An IMS breaks down departmental silos, fostering a shared understanding of
business objectives and promoting a unified approach to problem-solving.
Enhanced Organisational Performance
An IMS provides a holistic view of an organisation’s operations, enabling better
decision-making and resource allocation. By integrating multiple management
standards, businesses can identify areas for improvement, reduce waste, and
optimise processes.
Cost Reduction
Implementing an IMS minimises the need for separate audits, certifications, and
documentation, ultimately lowering operational costs. Additionally, an IMS enables
companies to reduce duplication of effort, leading to further cost savings.
Simplified Compliance
An IMS simplifies regulatory compliance by providing a centralised system for
managing multiple standards. This unified approach streamlines reporting and
ensures that all aspects of the organisation are aligned with relevant regulations.

Page 54 of 69 © 2017, Mango Ltd. All Rights Reserved.


Improved Employee Engagement
By consolidating various management system standards, an IMS fosters a culture
of collaboration and accountability. Employees become more engaged in company
processes, increasing productivity and job satisfaction.

Sustainability and Corporate Social Responsibility


An IMS helps organisations address their environmental and social impacts, also
known as ESG reporting, while maintaining a focus on financial performance. By
integrating sustainability and corporate social responsibility initiatives, companies
can achieve long-term growth and contribute positively to the global community.

In summary, an IMS offers a wide range of benefits that contribute to an


organisation’s overall success. From streamlined communication and collaboration
to enhanced stakeholder confidence and sustainability, an IMS can help
businesses excel in today’s competitive market.
The Comprehensive Guide to Integrated Management Systems
Whether you’re a seasoned professional looking to refine your skills or a newcomer eager
to grasp the IMS basics, “The Comprehensive Guide to Integrated Management Systems”
is an invaluable resource for your journey.
Download free ebook

Page 55 of 69 © 2017, Mango Ltd. All Rights Reserved.


Page 56 of 69 © 2017, Mango Ltd. All Rights Reserved.
Key Components of an Integrated
Management System
An effective IMS requires several key components to ensure the successful
integration of various management system standards. This comprehensive
overview expands on the essential elements that contribute to a robust IMS:
Leadership and Commitment
Strong leadership and commitment from top management are crucial for the
successful implementation and maintenance of an IMS. Executives should actively
support the integration process, allocate necessary resources, and demonstrate
ongoing commitment to the IMS objectives.
Policy
A comprehensive set of guiding principles that outline an organisation’s
commitment to meeting specific goals, such as quality, environmental, and health
and safety objectives. These policies should be clearly communicated, accessible
to all stakeholders, and regularly reviewed to ensure ongoing relevance.
Planning
A detailed planning process that includes identifying risks, opportunities, and
objectives, as well as developing strategies to address them. Planning should
consider the requirements of all integrated standards and take into account the
organisation’s context and relevant interested parties.
Implementation
The successful execution of plans requires the allocation of resources, effective
communication, and training for employees on their roles and responsibilities within
the IMS. Implementation should also involve the integration of IMS requirements
into the organisation’s processes and operations.
Performance Measurement
An IMS should include a comprehensive performance measurement system that
monitors and evaluates processes and results against objectives and targets. This
measurement system should enable data-driven decision-making and support
continuous improvement initiatives.
Review and Improvement
Regular assessments of the IMS are essential to ensure its ongoing effectiveness
and to identify areas for enhancement. Management reviews should consider the
results of internal and external audits, customer feedback, and performance data,
with the aim of driving continual improvement across the organisation.
Documentation and Record Management
An IMS should include a well-organised documentation system that consolidates
policies, procedures, and records, ensuring consistency and accessibility across

Page 57 of 69 © 2017, Mango Ltd. All Rights Reserved.


the organisation. Document management should also incorporate version control
and a review process to maintain the currency and accuracy of information.

Screenshot of the Agility System showing the document management functionality


Internal and External Audits
Regular audits are necessary to verify the effectiveness of the IMS and to identify
areas for improvement. Internal audits should be conducted by trained auditors
within the organisation, while external audits should be performed by accredited
certification bodies.
Corrective and Preventive Actions
An effective IMS should include a risk management component for identifying,
reporting, and addressing non-conformities and potential non-conformities.
Corrective and preventive actions should be taken to resolve issues, prevent
recurrence, and drive continuous improvement.

Incorporating these key components into an IMS ensures a cohesive and effective
approach to managing multiple standards, driving performance improvement, and
maintaining regulatory compliance.

Page 58 of 69 © 2017, Mango Ltd. All Rights Reserved.


Steps to Implement an Integrated
Management System
Implementing an IMS requires a structured approach to ensure successful
integration of multiple management system standards. The following detailed steps
will guide organisations through the process:

1. Initial Assessment: Conduct a gap analysis to determine the current state of


the organisation’s management systems and identify areas for integration.

2. IMS Development: Develop a unified framework, merging relevant


management system standards requirements.

3. Training and Communication: Train employees on the IMS, ensuring they


understand their roles and responsibilities within the system.

4. Implementation: Integrate the IMS into the organisation’s processes and


operations.

5. Monitoring and Review: Continuously monitor and review the IMS, identifying
areas for improvement and adjusting as necessary.

6. Certification: Obtain IMS certification from an accredited certification body to


demonstrate compliance with relevant standards.

Do you need help with implementing an IMS? The Agility System is a process-
based integrated management system which combines all of an organisation’s
systems and processes into one centralised framework, with each function aligned
to work as a single unit with unified objectives.

Our experienced business analysts will do all the heavy lifting by conducting a
thorough discovery exercise to identify your organisation’s key documents and
processes to be included in your new management system. Simply book a
demo today and we’ll be in touch to discuss your requirements and how we can
help.
Popular Management System Standards
ISO 9001: An internationally recognised standard for quality management systems,
focusing on customer satisfaction and continuous improvement. ISO 9001 helps
organisations to implement efficient processes, reduce errors, and improve overall
product and service quality.

ISO 14001: The global standard for environmental management systems, assisting
businesses in minimising their environmental impact, conserving resources, and

Page 59 of 69 © 2017, Mango Ltd. All Rights Reserved.


adhering to relevant legislation. ISO 14001 promotes sustainable development and
environmental responsibility.

ISO 45001: An international standard for occupational health and safety


management systems, designed to protect employees, contractors, and visitors by
reducing workplace hazards and improving overall safety performance. ISO 45001
supports a proactive approach to risk management and worker well-being.

ISO 27001: The leading standard for information security management,


safeguarding confidential data and protecting against cyber threats. ISO 27001
helps organisations to manage risks related to information assets and maintain the
confidentiality, integrity, and availability of critical data.

Integrating Management System Standards


When integrating multiple management system standards, it’s essential to consider
the following factors:

Common Elements: Identify the overlapping requirements between the standards


to reduce duplication and streamline processes.

Document Management: Consolidate documentation, such as policies,


procedures, and records, to simplify management and ensure consistency across
the organisation.

Process Mapping: By incorporating a process mapping tool into an IMS,


businesses can achieve better alignment between different management system
standards and streamline their operations.

Page 60 of 69 © 2017, Mango Ltd. All Rights Reserved.


Risk Management: Adopt a unified approach to risk assessment and
management, taking into account risks and opportunities related to quality,
environment, health and safety, and information security.

Performance Measurement: Establish consistent metrics and reporting


mechanisms to track progress against objectives and targets, providing valuable
insights for continuous improvement.
The Next Steps
An IMS offers a comprehensive and efficient approach to managing multiple
standards, driving performance improvement and ensuring regulatory compliance.

By combining various management system standards, organisations can enhance


decision-making, reduce costs, and foster a culture of collaboration and continuous
improvement. Implementing an IMS not only simplifies compliance but also
contributes to sustainable business growth and long-term success.

That’s why we developed the Agility System – an integrated management system


that transforms document-heavy systems into process-based frameworks. Request
a demo today and take the first step towards implementing an integrated
management system.

Our team of experts will be happy to walk you through the system, answer any
questions you may have, and help you determine if the Agility System is the right
solution for your organisation.
[ratemypost]
More insights

The Essential Pillars of Manufacturing Quality Management: A Comprehensive Guide


January 31, 2024 No Comments

Explore key strategies for manufacturing excellence with our guide on effective quality management and
operational efficiency.

Page 61 of 69 © 2017, Mango Ltd. All Rights Reserved.


Working in Silos: How to Break Them Down
December 11, 2023 No Comments

Discover the secret to breaking down silos and unleashing team collaboration for unprecedented
organisational success!

QMS Documentation Essentials


November 16, 2023 No Comments

Explore our in-depth guide on QMS Documentation. Discover strategies for effective quality management
and continuous improvement in your organisation.
See more articles

Introduction
Your Company has developed and implemented an integrated Quality, Environmental, and
Occupational Health and Safety Management System (IMS). The IMS aims to document the
company’s best practices, meet customer requirements, enhance environmental performance, promote
health and safety practices, and improve overall management.

External and Internal Context


To fully understand the organization and its context, Your Company has identified relevant external
and internal issues that affect the IMS’s ability to achieve intended results.

Page 62 of 69 © 2017, Mango Ltd. All Rights Reserved.


ISO 9001:2015
Your Company complies with ISO 9001:2015, addressing design, development, production,
installation, and servicing of products. The process approach ensures consistent and predictable results
by managing activities as interrelated processes.

ISO 14001:2015
The IMS also adheres to ISO 14001:2015, emphasizing environmental management. Your Company
considers environmental aspects, legal requirements, and continuous improvement.

ISO 13485:2016
For medical devices, Your Company meets ISO 13485:2016 requirements. The IMS covers design,
development, production, installation, and servicing of medical products.

Manual Structure
The IMS manual is divided into sections corresponding to ISO 9001:2015, ISO 14001:2015, and
OHSAS 18001:2007 (Occupational Health and Safety). It delineates authorities, responsibilities, and
interrelationships within the system.

Key Sections

1. Quality Management: Describes processes related to ISO 9001:2015.


2. Environmental Management: Addresses ISO 14001:2015 requirements.
3. Health and Safety Management: Incorporates OHSAS 18001:2007 elements.

Customization
Review the manual’s blue text and suggestions, replacing or updating them to reflect your company’s
unique information. Use the replace function to personalize the document.
Remember, this sample serves as a template. Adapt it to your organization’s specific needs and
context.
For more detailed examples, you can explore additional resources and templates available online 123.
Creating a well-integrated IMS ensures efficient operations, compliance, and continuous improvement
across quality, environmental, and health and safety domains.
Learn more
1integrated-standards.com2integrated-standards.com313485store.com4integrated-standards.com5medical-
device-regulation.eu613485store.com+5 more
You
What are the benefits of integrating ISO 9001 and ISO 13485?
Copilot

Integrating ISO 9001 (Quality Management System) and ISO 13485 (Medical Devices - Quality
Management Systems) offers several advantages for organizations:
1. Enhanced Efficiency: Combining processes and documentation reduces duplication, streamlines
workflows, and minimizes complexity. This efficiency leads to better resource utilization and cost
savings.

Page 63 of 69 © 2017, Mango Ltd. All Rights Reserved.


2. Consistent Practices: An integrated system ensures uniformity across quality, environmental, and
health and safety practices. Employees follow standardized procedures, leading to consistent
outcomes.
3. Reduced Audit Burden: Instead of separate audits for ISO 9001 and ISO 13485, an integrated
approach allows for combined audits. This reduces the audit workload, saving time and resources.
4. Improved Risk Management: Integrating risk management practices helps identify and address
potential risks related to quality, safety, and compliance. A holistic view allows for better risk
mitigation.
5. Better Customer Satisfaction: Meeting both quality and medical device requirements ensures that
products meet customer expectations. Satisfied customers lead to repeat business and positive brand
reputation.
6. Compliance with Regulatory Requirements: ISO 13485 specifically addresses medical devices.
Integrating it with ISO 9001 ensures compliance with relevant regulations and standards in the
healthcare industry.
7. Strong Foundation for Continuous Improvement: Both standards emphasize continuous
improvement. An integrated system provides a solid base for ongoing enhancements in quality, safety,
and environmental performance.
Remember that successful integration requires careful planning, training, and commitment from all
levels of the organization. By aligning quality and medical device management, companies can
achieve better outcomes and maintain their competitive edge123.
Learn more
1qmsregs.com2linkedin.com3qmii.com4sgs.com
2of30
Show learn more suggestions

 How do I start integrating these standards in my organization?


 Can you provide examples of companies that have successfully implemented an integrated system?
 What are the challenges associated with IMS implementation?

Chats
Plugins
Copilot GPTs

 Certainly! Here’s a sample of an integrated management system (IMS) that combines ISO
9001:2015 (Quality Management System) and ISO 13485:2016 (Medical Devices - Quality
Management Systems):

Integrated Quality, Environmental, and Occupational Health and Safety Manual

Introduction
Your Company has developed and implemented an integrated Quality, Environmental, and
Occupational Health and Safety Management System (IMS). The purpose of this IMS is to document
the company’s best business practices, enhance customer satisfaction, improve environmental
performance, promote health and safety practices, and enhance overall management.

Key Components
1. ISO 9001:2015: This standard addresses the design, development, production, installation, and
servicing of the company’s products. It emphasizes a process approach for achieving consistent and
predictable results.

Page 64 of 69 © 2017, Mango Ltd. All Rights Reserved.


2. ISO 14001:2015: Focused on environmental management, ISO 14001 helps organizations minimize
their environmental impact, comply with regulations, and improve sustainability.
3. OHSAS 18001:2007: Although OHSAS 18001 has been replaced by ISO 45001, it still plays a role in
occupational health and safety management. It ensures a safe and healthy work environment.

Manual Structure
The IMS manual is divided into sections that correlate with the clauses of ISO 9001:2015 and ISO
14001:2015, while also incorporating the requirements of OHSAS 18001:2007. Here are some key
features:
 Control-Monitor-Measure-Equipment: This section outlines the management of equipment and
measurement devices within the IMS.
 Documentation Master Lists: These lists help identify documented information related to the IMS,
including common elements across quality, environmental, and health and safety systems.

Customization
Remember that methods and systems used in developing and operating management systems can vary
from company to company. Use this manual as a template and customize it to reflect your unique
requirements. Replace the blue text with your company-specific information.

Conclusion
An integrated management system streamlines processes, enhances efficiency, and demonstrates
commitment to quality, environmental responsibility, and employee well-being. Your Company’s IMS
aligns with international standards and best practices.
For more details, you can refer to the sample IMS manual provided.
!Sample IMS
Please note that this is a template, and you should adapt it to your organization’s specific context and
needs.
Learn more
1integrated-standards.com213485store.com3simpleque.com413485store.com+2 more

 What are the benefits of integrating ISO standards?


 How do I implement an IMS in my organization?
 Can you provide examples of key performance indicators (KPIs) for IMS?

Let’s chat
See more

Integrated Standards
http://integrated-standards.com/wp-content/uploads/2016/...

[PDF]

Page 65 of 69 © 2017, Mango Ltd. All Rights Reserved.


ISO 9001:2015 QUALITY MANAGEMENT SYSTEM - Integrated …
Web Result Your
Company meets the requirements of the international standard ISO 14001:2015.
The system addresses the management of environmental aspects, compliance …

integrated-standards.com

Recommended to you based on what's popular • Feedback


ISO - International Organization for Standardization


https://www.iso.org/standard/62085.html

ISO 9001:2015 - Quality management systems — Requirements

108K+ Facebook followers

wnload ISO 9001:2015 | ISO Quality management systems


Ad InternationalStandard 2015 version. Download ISO 9001:2015 Quality management systems
Site visitors: Over 10K in the past month
Member Discounts · Discounted Packages · Instant Access · Collections by Topic
Products: Publisher Collections · Standards Packages · Training · Selected Standards
o Download PDF
o PDF version or Print
o ANSI Standards
o Quality Management System
o iso 9001 system
o Download PDF Standards

iso 9001 2015 process management

Certainly! Key Performance Indicators (KPIs) are essential metrics for measuring the performance and
quality of an Integrated Management System (IMS). Here are some examples of KPIs that can be used
to evaluate different aspects of an IMS:
1. Customer Satisfaction:
o Percentage of satisfied customers based on surveys or feedback.
o Number of customer complaints resolved within a specific timeframe.
2. Quality Management (ISO 9001:2015):
o Number of non-conformities identified during audits.

Page 66 of 69 © 2017, Mango Ltd. All Rights Reserved.


o On-time delivery performance.
o Percentage of products meeting quality specifications.
3. Environmental Performance (ISO 14001:2015):
o Reduction in energy consumption.
o Waste reduction percentage.
o Compliance with environmental regulations.
4. Occupational Health and Safety (OHSAS 18001:2007 or ISO 45001):
o Lost Time Injury Frequency Rate (LTIFR).
o Near-miss reporting rate.
o Percentage of employees trained in safety procedures.
5. Resource Efficiency:
o Energy consumption per unit of production.
o Water usage efficiency.
o Raw material waste reduction.
6. Risk Management:
o Number of risk assessments conducted.
o Effectiveness of risk mitigation actions.
7. Process Efficiency:
o Cycle time for key processes.
o First-pass yield rate.
o Process cost per unit.
8. Employee Competency:
o Training hours per employee.
o Competency assessment scores.
o Employee turnover rate.
9. Health and Safety Culture:
o Participation in safety committees.
o Safety observations conducted by employees.
o Safety leadership assessments.
10. Sustainability Metrics:
o Carbon footprint reduction.
o Social impact initiatives.
o Community engagement activities.

Remember that KPIs should align with your organization’s goals and objectives. Choose KPIs that are
relevant, measurable, and actionable. Regularly monitor and analyze these indicators to drive

continuous improvement within your IMS. 📊🌟

ISO requires you to analyse and evaluate appropriate data and information arising from
monitoring and measurement. The results of the analysis should help you evaluate:

 CONFORMITY OF PRODUCTS AND SERVICES

 THE DEGREE OF CUSTOMER SATISFACTION

 THE PERFORMANCE AND EFFECTIVENESS OF THE QUALITY MANAGEMENT


SYSTEM

Page 67 of 69 © 2017, Mango Ltd. All Rights Reserved.


 IF PLANNING HAS BEEN IMPLEMENTED EFFECTIVELY

 THE EFFECTIVENESS OF ACTIONS TAKEN TO ADDRESS RISKS AND


OPPORTUNITIES

 THE PERFORMANCE OF EXTERNAL PROVIDERS

 THE NEED FOR IMPROVEMENTS TO THE QUALITY MANAGEMENT SYSTEM


 Working long hours is an investment in your craft and not necessarily a punishment. Short-term pain for
longer-term gain.

📍Your colleagues genuinely want to hear your point of view and it is okay to share even though you think
you are not experienced enough.

📍Everything you do matters; your inactions also matter. They cumulatively form a reputation of who you are
as a career professional.

📍Delivery of quality work is great but what is even better is Quality + Speedy delivery.

📍Your most important work is to help lighten the burden of your boss. Be the solver; be the helper.

📍There is always a smarter way to deal with people. Staying calm in tricky situations and giving people the
benefit of the doubt will never go out of style.

📍You are exactly who you think you are. You just need to show it more and keep improving at it.

📍There is someone out there who has the answers you are looking for. Leveraging their experiences will get
you quick answers and will help you get through complex situations in time.

📍Project management is a skill not only for work situations but also for life situations.

📍 You are not arrogant, you are just talking about the good pieces of work you have done every chance you
get.

📍Choose your work friends wisely, you could be forming a bond that will transform your life and
relationships that will last a lifetime.

📍It is okay not to have a lot of answers. Start with the ones you have and work your way through using
available resources including people.

Page 68 of 69 © 2017, Mango Ltd. All Rights Reserved.


📍The only person who suffers due to your lack of confidence is you. There's nothing to be afraid of. My
hack: Communicate like you are chatting with a friend.

📍Every meeting you attend is your opportunity to impress. Go with your agenda and be the 2nd or 3rd
person speaking up.

📍Feedback is not criticism. Feedback is Feedback. The areas for improvement are a great source of direction
for the next review period.

📍It is okay to talk about your ambitions and seek guidance on how you can achieve them.

📍Visibility will amplify your work. Don’t downplay it.

Go and be fantastic today.

Page 69 of 69 © 2017, Mango Ltd. All Rights Reserved.