Design Data and Schedule
c Refrigerant R-32
d Catalogue Yes
i Quantity 6
c Refrigerant R-32
d Catalogue Yes
i Quantity 5
Section 4 / Page 2 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
c Type 405
d Class Schedule 40
f Nominal Size XX mm
c Class PN 12.5
e Nominal Size XX mm
c Class PN 12
e Nominal Size XX mm
c Class PN 16
e Nominal Size XX mm
Section 4 / Page 3 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
h Quantity X
g Shape Cylindrical
i Quantity X
h Shape Cylindrical
i Quantity X
Section 4 / Page 4 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
h Quantity 1
Section 4 / Page 5 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
c Capacity 85 Liters
Section 4 / Page 6 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
e Flowrate 20GPM
g Weight 100 KG
Type Custom-made
a Material
b Size
c Location
d Inlet Diameter
e Outlet Diameter
Section 4 / Page 7 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
c Capacity 9 KG
d Quantity X
f Class of Fire A, B, C, E
c Capacity 5 KG
d Quantity X
f Class of Fire B, C
The contractor must complete the schedule below. The word or approved equivalent
wherever stated shall be deemed void. All information asked for must be given correctly
and supported by the manufacturer’s technical literatures.
Section 4 / Page 8 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
Technical evaluation will be based on the technical information given by the contractor,
without which the evaluation will not be comprehensive enough to ascertain the
conformance of the items, to the true intent of the specification and the extent of the
tender. Acceptance of the contract shall not be considered as the acceptance of all
items offered by the contractor. Therefore, where appropriate, contractor being awarded
this contract shall produce sample of each item, prior to the installation, for the
approval of the S.O. The S.O. shall reserve the right to reject, at any stage of the work,
with reason given, should any item found not meeting the specification and the
requirements of the contract, and the contractor shall replace the item at contractor’s
own cost and no claim on abortive work arising thereof, shall be entertained. Hence, the
contractor shall be fully responsible to ensure that the performance of all items to be
used, shall comply with the specification and requirement of the tender.
4.2.1.1 Split Unit (Bilik Guru TBT 8 Jenis A dan Jenis B, Blok Pentadiran Bertingkat)
a Type
c Refrigerant
d Catalogue
e Manufacturer
g Model
h Country of origin
i Quantity 6
a Type
c Refrigerant
d Catalogue
e Manufacturer
g Model
h Country of origin
i Quantity 5
Section 4 / Page 9 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
c Type 405
d Class Schedule 40
f Nominal Size XX mm
c Class PN 15
e Nominal Size XX mm
c Class PN 12
e Nominal Size XX mm
c Class PN 12
e Nominal Size XX mm
Section 4 / Page 10 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
h Quantity X
g Shape Cylindrical
i Quantity X
h Shape Cylindrical
i Quantity X
Section 4 / Page 11 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
i Quantity 1
a Manufacturer
b Material
Section 4 / Page 12 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
c Nominal Size
d Conforming Standard
a Manufacturer
b Material
c Nominal Size
d Conforming Standard
a Manufacturer
b Material
c Nominal Size
d Conforming Standard
b Material
c Nominal Size
d Conforming Standard
a Manufacturer
b Model
c Capacity
Section 4 / Page 13 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
d Dimension
a Manufacturer
b Model
c Material
d Capacity
e Flowrate
f Dimension
g Weight
a Manufacturer
b Model
c Material
d Dimension
a Manufacturer
b Model
c Material
d Dimension
a Manufacturer
b Model
Section 4 / Page 14 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
c Capacity / Weight
d Quantity 16
f Class of Fire
Name : _______________________________________
Date : ________________________________________
Address : ________________________________________
Section 4 / Page 15 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
3. Which Head and Subhead is the company registered with Pukonsa /CIDB: ________________
Wiremen/Chargeman/Plumber
Category / Competent Person
No. Name
Certificate
PW4, A4, LTPS, CP etc No.
8. Is the company a certified technical servicing agent for the brands being offred? (Yes /No):_____
(Please attach a photocopy of the certificate)
9. It is understood that the contractor shall comply with the following requirement:
a. Install on site items approved by either SIRIM or Suruhanjaya Tenaga.
b. Ensure that contractor’s qualified Foreman / Supervisor is on site to supervise the
installations
c. Installation method in compliance with IEE, SESB, BOMBA and other relevant
authorities ‘regulations.
d. Failure to provide full information as requested in the tender document will
cause the tender submitted to be rejected.
Name : _______________________________________
Date : ________________________________________
Address : ________________________________________
Section 4 / Page 16 of 17
SECTION 4: DESIGN DATA AND SCHEDULE Section 4
Design Data and Schedule
a. ______________________________________________________
b. ______________________________________________________
c. ______________________________________________________
d. ______________________________________________________
e. ______________________________________________________
f. ______________________________________________________
g. ______________________________________________________
h. ______________________________________________________
i. ______________________________________________________
j. ______________________________________________________
k. ______________________________________________________
l. ______________________________________________________
m. ______________________________________________________
n. ______________________________________________________
o. ______________________________________________________
p. ______________________________________________________
q. ______________________________________________________
r ______________________________________________________
s. ______________________________________________________
t. ______________________________________________________
u. ______________________________________________________
v. ______________________________________________________
Section 4 / Page 17 of 17