BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1
Axis: 1 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B26 L=1525mm 1B27 L=3450mm 1B28 L=2225mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
7.5 8.22
7.5
2.34 2.57
2.34
4.63 4.64
G=3.12 2.71 1.45 1.45 2.72
Q=0.98 0.85 0.85
Shear
Force -6.837
(Env.) -19.885
-47.713
19.731 22.193 20.197 17.802 18.055
2.504 9.12
Moment
(Env.) 1.844
-2.133
-24.147
Bending (Top Edge) ...
M (kN.m) 2.5 10.2 19.7 22.2 20.2 17.8 10.7 18.1
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.01 0.06 0.11 0.13 0.11 0.10 0.06 0.10
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 18.08 73.82 142.43 160.20 145.80 128.51 77.60 130.34
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 2.1 1.2 3.6 24.1 4.9
d (mm) 409.0 409.0 392.0 409.0 392.0
K/K' 0.01 0.01 0.02 0.14 0.03
x (mm) 45.44 45.44 43.56 45.44 43.56
As (mm2) 15.40 8.99 26.93 174.31 36.73
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 8.5 28.4 47.7 46.5 19.9 20.2
v (N/mm2) 0.09 0.31 0.52 0.51 0.22 0.22
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 95.8 95.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 3.73 < 58.61 OK 8.44 < 58.61 OK ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-2
Axis: 1 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B29 L=3225mm 1B30 L=512.5mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
4.14
3.94 4.14
3.94 3.93 4.14
G=2.711.29
1.23 1.232.71
1.29 2.71 1.23 1.29
Q=0.85 0.85 0.85
Shear
Force
-10.74
(Env.)
-43.267
19.78
6.846
2.946
Moment
(Env.)
-21.201
Bending (Top Edge) ...
M (kN.m) 19.8 6.8 2.9 1.1 0.1
d (mm) 409.0 409.0 409.0 411.0 411.0
K/K' 0.11 0.04 0.02 0.01 0.00
x (mm) 45.44 45.44 45.44 45.67 45.67
As (mm2) 142.79 49.42 21.27 7.74 0.94
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Bending (Bottom Edge) ...
M (kN.m) 3.0 21.2 11.0
d (mm) 392.0 409.0 392.0
K/K' 0.02 0.12 0.07
x (mm) 43.56 45.44 43.56
As (mm2) 22.38 153.05 83.08
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Shear and Torsion Design ...
Vd (kN) 43.3 34.7 10.7 3.0
v (N/mm2) 0.47 0.38 0.12 0.03
vc (N/mm2) 0.51 0.51 0.51 0.51 0.36 0.36
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 81.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.89 < 58.61 OK 1.25 < 15.78 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 X 0.00 X 0.00
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-3
Axis: 1 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B21 L=2225mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
6.093
Shear
Force
(Env.)
-5.972
0.207
Moment
(Env.)
-3.222
Bending (Top Edge) ...
M (kN.m) 0.1 0.2
d (mm) 259.0 259.0
K/K' 0.00 0.00
x (mm) 28.78 28.78
As (mm2) 0.79 2.36
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 1.9 3.2 1.9
d (mm) 259.0 259.0 259.0
K/K' 0.03 0.05 0.03
x (mm) 28.78 28.78 28.78
As (mm2) 22.03 36.73 21.10
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 6.0 6.1
v (N/mm2) 0.10 0.10
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 8.59 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-4
Axis: 1 Storey: 2 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B35 L=1525mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
4.226
Shear
Force
(Env.)
-4.101
0.572
Moment
(Env.)
-1.658
Bending (Top Edge) ...
M (kN.m) 0.6 0.0
d (mm) 259.0 259.0
K/K' 0.01 0.00
x (mm) 28.78 28.78
As (mm2) 6.52 0.36
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 1.3 1.7 1.0
d (mm) 259.0 259.0 259.0
K/K' 0.02 0.02 0.01
x (mm) 28.78 28.78 28.78
As (mm2) 15.28 18.90 11.44
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 4.1 4.2
v (N/mm2) 0.07 0.07
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 5.89 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-5
Axis: 10 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B49 L=725mm
BwxH (mm) 225 x 450
Flange BfxHf ---
7.16 7.15
6.33 6.87
2.24 2.24
1.98 2.15
G=3.23 3.23
Q=1.01 1.01
Shear
Force
(Env.)
-13.376
2.55
1.927
Moment
(Env.)
-1.712
-1.718 -1.745
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-6
Axis: 11 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B50 L=1725mm
BwxH (mm) 225 x 450
Flange BfxHf ---
G=3.6
Q=1.13
Shear
Force
(Env.)
-14.324
7.681
Moment
(Env.)
-5.338
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-7
Axis: 11 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B12 L=1725mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
7.167
Shear
Force
(Env.) -2.225
4.277
Moment
(Env.) -0.501
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-8
Axis: 12 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B51 L=1500mm
BwxH (mm) 225 x 450
Flange BfxHf ---
5.52
G=4.07 1.73 4.07
Q=1.27 1.27
Shear
Force
(Env.) -11.332
8.975
Moment
(Env.)
-3.505
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-9
Axis: 13 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B52 L=2750mm 1B53 L=2725mm 1B54 L=2950mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
10.8
G=8.46 9.06
8.46 3.38
Q=2.64 2.83
2.64 6.54
2.04
Shear
Force
(Env.)
-29.052
-40.327
-46.709
22.842 23.206 20.12
17.25
6.197 5.854
Moment
(Env.)
-10.077
-15.096 -17.596
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-10
Axis: 13 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B18 L=2750mm 2B19 L=2725mm 2B20 L=2950mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
Shear
Force
(Env.) -6.638 -7.138
-14.814
5.975
3.977 3.807 4.472
2.71
1.826
Moment
(Env.)
-1.383
-2.452
-4.519
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-11
Axis: 13a Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B13 L=1500mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
5.307
Shear
Force
(Env.)
-2.989
1.847
Moment
(Env.)
-0.833
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-12
Axis: 1a Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B4 L=3737.5mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
8.862
Shear
Force
(Env.)
-11.531
5.311
0.602
Moment
(Env.)
-6.958
Bending (Top Edge) ...
M (kN.m) 5.3 0.6
d (mm) 259.0 259.0
K/K' 0.08 0.01
x (mm) 28.78 28.78
As (mm2) 60.54 6.87
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 1.0 7.0 4.8
d (mm) 259.0 259.0 259.0
K/K' 0.01 0.10 0.07
x (mm) 28.78 28.78 28.78
As (mm2) 11.76 79.32 55.25
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 11.5 8.9
v (N/mm2) 0.20 0.15
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 14.43 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-13
Axis: 1a Storey: 2 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B14 L=3450mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
10.107
Shear
Force
(Env.)
-8.654
3.642
1.271
Moment
(Env.)
-5.786
Bending (Top Edge) ...
M (kN.m) 1.3 3.6
d (mm) 259.0 259.0
K/K' 0.02 0.05
x (mm) 28.78 28.78
As (mm2) 14.49 41.51
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 3.1 5.8 1.6
d (mm) 259.0 259.0 259.0
K/K' 0.04 0.08 0.02
x (mm) 28.78 28.78 28.78
As (mm2) 35.65 65.96 17.74
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 8.7 10.1
v (N/mm2) 0.15 0.17
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 13.32 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-14
Axis: 2 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B31 L=1225mm
BwxH (mm) 225 x 450
Flange BfxHf ---
G=2.4
Q=0.75
Shear
Force
(Env.)
-14.011
4.143
Moment
(Env.)
-3.475
Bending (Top Edge) ...
M (kN.m) 4.1 0.3
d (mm) 409.0 409.0
K/K' 0.02 0.00
x (mm) 45.44 45.44
As (mm2) 29.91 2.21
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 2.4 3.5 2.3
d (mm) 409.0 409.0 409.0
K/K' 0.01 0.02 0.01
x (mm) 45.44 45.44 45.44
As (mm2) 17.60 25.08 16.25
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 14.0 10.6
v (N/mm2) 0.15 0.12
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 3.0 < 45.09 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-15
Axis: 2 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B37 L=1225mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
3.198
Shear
Force
(Env.)
-3.486
0.73
Moment
(Env.)
-1.084
Bending (Top Edge) ...
M (kN.m) 0.7 0.0
d (mm) 259.0 259.0
K/K' 0.01 0.00
x (mm) 28.78 28.78
As (mm2) 8.32 0.18
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 0.9 1.1 0.7
d (mm) 259.0 259.0 259.0
K/K' 0.01 0.02 0.01
x (mm) 28.78 28.78 28.78
As (mm2) 10.31 12.36 7.49
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 3.5 3.2
v (N/mm2) 0.06 0.05
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 4.73 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-16
Axis: 3 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B32 L=3225mm 1B33 L=512.5mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
9.42
2.94
G=4.44 4.44 4.44 4.94
Q=1.39 1.39 2.72 1.39 1.54
0.85
Shear
Force
(Env.)
-40.091
-55.382
22.713 20.959
7.318
Moment
(Env.) -5.027
-26.564
Bending (Top Edge) ...
M (kN.m) 7.3 0.1 22.7 21.0 9.6 0.1
d (mm) 409.0 409.0 409.0 409.0 411.0 411.0
K/K' 0.04 0.00 0.13 0.12 0.05 0.00
x (mm) 45.44 45.44 45.44 45.44 45.67 45.67
As (mm2) 52.82 0.39 163.96 151.30 69.00 0.92
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Bending (Bottom Edge) ...
M (kN.m) 13.0 26.6 4.5 1.0 5.0
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.07 0.15 0.03 0.01 0.03
x (mm) 45.44 45.44 43.56 45.44 45.44
As (mm2) 93.86 191.76 34.21 7.44 36.29
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Shear and Torsion Design ...
Vd (kN) 40.1 49.7 55.4 49.7
v (N/mm2) 0.44 0.54 0.60 0.54
vc (N/mm2) 0.51 0.51 0.51 0.51 0.36 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 81.7
Td (kN.m) 0.0 0.1
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.89 < 58.61 OK 1.25 < 15.78 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 X 0.00 X 0.00
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-17
Axis: 4 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B34 L=1225mm 1B35 L=2125mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
8.52
8.52
2.66
2.66 5.94 6.48
5.94
4.74
G=4.68 2.03
1.48
Q=1.46 22.4
2.34 2.34 .34 2.88 1.86
1.8
1.86
00.75
0.73 0.73 .73 0.9 0.56
22.405
Shear
Force -8.581
(Env.)
-40.77
10.67 12.102
6.453
3.219
Moment
(Env.) 1.467
-1.511
-18.079
Bending (Top Edge) ...
M (kN.m) 3.2 5.2 10.7 12.1 6.5
d (mm) 409.0 409.0 409.0 409.0 409.0
K/K' 0.02 0.03 0.06 0.07 0.04
x (mm) 45.44 45.44 45.44 45.44 45.44
As (mm2) 23.24 37.27 77.02 87.36 46.58
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 1.5 1.0 2.7 18.1 11.4
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.01 0.01 0.02 0.10 0.06
x (mm) 45.44 45.44 43.56 45.44 45.44
As (mm2) 10.91 7.49 20.40 130.51 82.62
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 8.6 22.4 40.8 47.2
v (N/mm2) 0.09 0.24 0.44 0.51
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 95.8
Td (kN.m) 0.0 0.1
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 3.0 < 58.61 OK 5.2 < 58.61 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-18
Axis: 4 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B32 L=1225mm 2B33 L=2125mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
11.226
4.994
Shear
Force -2.019
(Env.)
-7.699
2.872
2.432 2.486
0.841
Moment 0.418
(Env.) -0.264
-3.056
Bending (Top Edge) ...
M (kN.m) 0.8 1.0 2.4 2.5 2.9
d (mm) 259.0 259.0 259.0 259.0 259.0
K/K' 0.01 0.01 0.03 0.04 0.04
x (mm) 28.78 28.78 28.78 28.78 28.78
As (mm2) 9.58 11.45 27.73 28.34 32.74
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 114.48 114.48 114.48 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 0.3 0.2 0.5 3.1 1.5
d (mm) 259.0 259.0 242.0 259.0 259.0
K/K' 0.00 0.00 0.01 0.04 0.02
x (mm) 28.78 28.78 26.89 28.78 28.78
As (mm2) 3.01 1.74 5.61 34.84 17.01
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 114.48 114.48 114.48 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 2.0 5.0 7.7 11.2
v (N/mm2) 0.03 0.09 0.13 0.19
vc (N/mm2) 0.66 0.66 0.66 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 91.6 91.6
Td (kN.m) 0.1 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-175 Y8-175 Y8-175 Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 4.73 < 61.72 OK 8.2 < 61.72 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-19
Axis: 5 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B46 L=1162.5mm 1B36 L=1425mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
G=6.48
6.48
Q=2.03
2.03
3.56 2.883.28 3.28
3.1 3.1
1.11 2.52
1.03
0.90.79 1.03
0.97 0.97
2.514
Shear
Force
(Env.)
-42.725
37.241 34.507
Moment
(Env.) -5.125 -1.852
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-20
Axis: 5 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B28 L=1837.5mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
1.852
Shear
Force
(Env.)
-8.416
6.155
Moment
(Env.) -0.461
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-21
Axis: 6 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B37 L=2850mm 1B38 L=2225mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
6.96 6.96
4.855.75
G=4.85 5.75 5.64
4.56 2.17 2.17
1.51 1.8
Q=1.51 1.8 1.76
1.43
3.66
3.66 3.66
1.14
1.14 1.14
17.323
Shear
Force
(Env.)
-37.705
-46.794
26.566 23.393
8.428
Moment
(Env.)
-7.475
-28.026
Bending (Top Edge) ...
M (kN.m) 8.4 0.1 26.6 23.4 7.9 0.2
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.05 0.00 0.15 0.13 0.04 0.00
x (mm) 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 60.84 0.41 191.78 168.87 57.13 1.40
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 12.8 28.0 0.9 7.5 5.4
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.07 0.16 0.01 0.04 0.03
x (mm) 45.44 45.44 43.56 45.44 45.44
As (mm2) 92.33 202.31 6.48 53.96 39.10
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 46.8 56.1 37.7 17.3
v (N/mm2) 0.51 0.61 0.41 0.19
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 95.8
Td (kN.m) 0.1 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.97 < 58.61 OK 5.44 < 58.61 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-22
Axis: 6 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B30 L=2850mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
7.837
Shear
Force
(Env.)
-7.642
2.333 2.671
Moment
(Env.)
-3.23
Bending (Top Edge) ...
M (kN.m) 2.3 2.7
d (mm) 259.0 259.0
K/K' 0.03 0.04
x (mm) 28.78 28.78
As (mm2) 26.60 30.45
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 1.2 3.2 1.1
d (mm) 259.0 259.0 259.0
K/K' 0.02 0.05 0.02
x (mm) 28.78 28.78 28.78
As (mm2) 14.20 36.82 12.46
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 7.6 7.8
v (N/mm2) 0.13 0.13
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 11.0 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-23
Axis: 7 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B39 L=3225mm 1B40 L=512.5mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
9.61
3
G=4.81 4.81 5.12
4.81
Q=1.5 1.5 2.72 1.51.6
0.85
Shear
Force
(Env.) -10.841
-45.804
9.723 8.068
2.994
Moment
(Env.)
-32.502
Bending (Top Edge) ...
M (kN.m) 9.7 8.1 3.0 1.1 0.1
d (mm) 409.0 409.0 409.0 411.0 411.0
K/K' 0.06 0.05 0.02 0.01 0.00
x (mm) 45.44 45.44 45.44 45.67 45.67
As (mm2) 70.19 58.24 21.61 7.93 0.98
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Bending (Bottom Edge) ...
M (kN.m) 13.5 32.5 15.1
d (mm) 409.0 409.0 392.0
K/K' 0.08 0.18 0.09
x (mm) 45.44 45.44 43.56
As (mm2) 97.37 234.63 113.66
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Shear and Torsion Design ...
Vd (kN) 45.8 44.4 10.8 3.1
v (N/mm2) 0.50 0.48 0.12 0.03
vc (N/mm2) 0.51 0.51 0.51 0.51 0.36 0.36
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 81.7
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.89 < 58.61 OK 1.25 < 15.78 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 X 0.00 X 0.00
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-24
Axis: 8 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B41 L=3775mm 1B42 L=3900mm 1B43 L=1500mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
14.46
G=11.4 11.4 4.52 11.88
Q=3.56 3.56 3.71 8.467.32
4.56
4.02 6.06
6.06 2.642.29 4.81 5.47
3.483.48 1.89
1.89 3.663.66 2.41
2.41
1.42
1.26
1.091.09 1.141.14 1.5 1.71
0.75
0.75
Loads 0.11 1.3 1.73 2.36 2.9 3.66 0.88 1.56 2.79 3.79 0.11 0.61 0.75 1.39
1.5
UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m
86.82
49.392
15.19
Shear
Force
(Env.) -24.731
-46.406
-68.157
65.002 57.68
23.59 19.31
6.806
Moment
(Env.) 5.279
-23.786
-40.666
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-25
Axis: 8 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B44 L=1725mm 1B45 L=512.5mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
6.01 4.82
G=2.41
2.41 1.88 1.5 1.36 2.41
2.41
Q=0.75
0.75 0.42 0.75
0.75
22.405
Shear
Force
-19.967
(Env.) -33.437
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-26
Axis: 8 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B9 L=1500mm 2B10 L=2237.5mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
10.139
7.502
Shear
Force -1.635
(Env.)
-8.734
4.107 4.405
2.098
Moment
(Env.)
-1.49
-2.635
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-27
Axis: 8 Storey: 2 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B22 L=4525mm 2B23 L=1675mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
17.331
Shear
Force
(Env.) -7.40
-13.061
22.449
14.288
Moment
(Env.)
-5.519
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-28
Axis: 9 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B47 L=1162.5mm 1B48 L=1425mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
11.236
Shear
Force
(Env.)
-72.304
50.056 47.259
Moment
(Env.) 0.249
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-29
Axis: 9 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B29 L=1837.5mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
Shear
Force
(Env.)
-16.97
21.539
Moment
(Env.)
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-30
Axis: A Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B23 L=2925mm
BwxH (mm) 225 x 450
Flange BfxHf ---
7.65
6.44
G=5.76 2.39 6.44
5.76
2.01
Q=1.8 2.011.8
Shear
Force
(Env.)
-40.023
6.206 4.611
Moment
(Env.)
-27.452
Bending (Top Edge) ...
M (kN.m) 6.2 4.6
d (mm) 409.0 409.0
K/K' 0.04 0.03
x (mm) 45.44 45.44
As (mm2) 44.80 33.29
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 12.9 27.5 14.1
d (mm) 409.0 409.0 409.0
K/K' 0.07 0.16 0.08
x (mm) 45.44 45.44 45.44
As (mm2) 93.09 198.17 101.88
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 40.0 38.7
v (N/mm2) 0.43 0.42
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.15 < 45.09 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-31
Axis: A1 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B24 L=2925mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
7.52
Shear
Force
(Env.)
-8.388
2.144
1.119
Moment
(Env.)
-4.349
Bending (Top Edge) ...
M (kN.m) 2.1 1.1
d (mm) 259.0 259.0
K/K' 0.03 0.02
x (mm) 28.78 28.78
As (mm2) 24.44 12.75
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 1.5 4.3 2.3
d (mm) 259.0 259.0 259.0
K/K' 0.02 0.06 0.03
x (mm) 28.78 28.78 28.78
As (mm2) 17.62 49.57 26.73
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 8.4 7.5
v (N/mm2) 0.14 0.13
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 11.29 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-32
Axis: B Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B21 L=2000mm 1B22 L=1200mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
5.996 6.727
1.087
Moment
(Env.) -1.549
-9.212
Bending (Top Edge) ...
M (kN.m) 6.0 1.1 6.7 2.2 0.3
d (mm) 409.0 409.0 409.0 409.0 409.0
K/K' 0.03 0.01 0.04 0.01 0.00
x (mm) 45.44 45.44 45.44 45.44 45.44
As (mm2) 43.28 7.85 48.56 15.89 2.06
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 4.3 9.2 6.3 1.5 1.3
d (mm) 409.0 409.0 392.0 409.0 409.0
K/K' 0.02 0.05 0.04 0.01 0.01
x (mm) 45.44 45.44 43.56 45.44 45.44
As (mm2) 31.16 66.50 47.41 11.18 9.31
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 23.4 18.6 17.0 8.0
v (N/mm2) 0.25 0.20 0.18 0.09
vc (N/mm2) 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 95.8
Td (kN.m) 0.0 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 4.89 < 58.61 OK 2.93 < 58.61 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-33
Axis: B Storey: 1 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B24 L=3750mm
BwxH (mm) 225 x 450
Flange BfxHf ---
G=8.46
Q=2.64
Shear
Force
(Env.)
-43.379
17.872
Moment
(Env.)
-41.045
Bending (Top Edge) ...
M (kN.m) 0.7 17.9
d (mm) 409.0 409.0
K/K' 0.00 0.10
x (mm) 45.44 45.44
As (mm2) 4.83 129.02
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 23.1 41.0 12.4
d (mm) 409.0 409.0 409.0
K/K' 0.13 0.23 0.07
x (mm) 45.44 45.44 45.44
As (mm2) 166.70 296.30 89.81
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 43.4 52.5
v (N/mm2) 0.47 0.57
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 9.17 < 38.41 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-34
Axis: B Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B25 L=2000mm 2B26 L=3150mm 2B27 L=4725mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
17.634 20.514
7.21
Shear
Force 0.836
-0.122
(Env.)
-28.966
36.259
24.756
18.315
Moment
(Env.)
-24.998 -24.974
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-35
Axis: B1 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B25 L=2925mm
BwxH (mm) 225 x 450
Flange BfxHf ---
10.89
10.17 11.43
10.89
8.86
8.86 3.57
6.29
6.29
G=5.81 2.77
2.77 3.183.4 3.4
1.96
1.96
Q=1.81 3.47
2.882.88
1.08
0.9 0.9
Shear
Force
(Env.)
-61.634
8.402 7.694
Moment
(Env.)
-52.288
Bending (Top Edge) ...
M (kN.m) 8.4 7.7
d (mm) 409.0 409.0
K/K' 0.05 0.04
x (mm) 45.44 45.44
As (mm2) 60.65 55.54
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 20.1 52.3 28.9
d (mm) 409.0 409.0 409.0
K/K' 0.11 0.30 0.16
x (mm) 45.44 49.46 45.44
As (mm2) 144.77 379.22 208.61
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 61.6 79.6
v (N/mm2) 0.67 0.87
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 7.15 < 30.39 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-36
Axis: C Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B20 L=2550mm
BwxH (mm) 225 x 450
Flange BfxHf ---
5.52 5.524.8
3.6 1.73 1.731.5
G=2.64
1.13
Q=0.83
Shear
Force
(Env.)
-40.361
9.005
4.406
Moment
(Env.)
-18.996
Bending (Top Edge) ...
M (kN.m) 9.0 4.4
d (mm) 409.0 409.0
K/K' 0.05 0.03
x (mm) 45.44 45.44
As (mm2) 65.01 31.81
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 8.9 19.0 10.0
d (mm) 409.0 409.0 409.0
K/K' 0.05 0.11 0.06
x (mm) 45.44 45.44 45.44
As (mm2) 64.59 137.13 72.53
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 40.4 31.7
v (N/mm2) 0.44 0.34
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 6.23 < 45.09 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-37
Axis: C Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B36 L=2550mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
6.404
Shear
Force
(Env.)
-10.678
3.814
1.053
Moment
(Env.)
-3.114
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-38
Axis: D Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B55 L=512.5mm 1B19 L=2550mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
8.7
6.24 2.72 6.24
G=2.72 1.95 1.95
Q=0.85 1.36
0.42
Shear
Force
(Env.)
-40.638
15.287 16.882
Moment
(Env.) -2.112
-17.644
Bending (Top Edge) ...
M (kN.m) 1.7 7.8 15.3 16.9 0.0 0.1
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0
K/K' 0.01 0.04 0.09 0.10 0.00 0.00
x (mm) 45.67 45.67 45.44 45.44 45.44 45.44
As (mm2) 12.35 56.20 110.35 121.87 0.18 0.57
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 2.1 2.5 17.6 11.1
d (mm) 392.0 392.0 409.0 409.0
K/K' 0.01 0.02 0.10 0.06
x (mm) 43.56 43.56 45.44 45.44
As (mm2) 15.90 18.83 127.37 79.99
As' (mm2) 0.00 0.00 0.00 0.00
As-min 0.00 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 30.6 37.1 40.6 28.6
v (N/mm2) 0.33 0.40 0.44 0.31
vc (N/mm2) 0.51 0.36 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 81.7 95.8
Td (kN.m) 0.1 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 1.25 < 15.78 OK 6.23 < 58.61 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-39
Axis: D Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B34 L=3062.5mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
7.532
Shear
Force
(Env.)
-13.343
4.891
Moment
(Env.)
-5.175
Bending (Top Edge) ...
M (kN.m) 4.9 0.1
d (mm) 259.0 259.0
K/K' 0.07 0.00
x (mm) 28.78 28.78
As (mm2) 55.76 0.68
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 2.2 5.2 3.1
d (mm) 259.0 259.0 259.0
K/K' 0.03 0.07 0.04
x (mm) 28.78 28.78 28.78
As (mm2) 25.20 59.00 35.42
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 13.3 7.5
v (N/mm2) 0.23 0.13
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 11.82 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-40
Axis: E Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B18 L=1400mm
BwxH (mm) 225 x 450
Flange BfxHf ---
10.31
G=9.06 10.32
8.51
3.22 7.5 7.5
7.44
3.22
Q=2.832.66 2.342.34
2.33
Shear
Force
(Env.)
-27.615
3.979
2.708
Moment
(Env.)
-7.974
Bending (Top Edge) ...
M (kN.m) 4.0 2.7
d (mm) 409.0 409.0
K/K' 0.02 0.02
x (mm) 45.44 45.44
As (mm2) 28.72 19.55
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 4.9 8.0 5.7
d (mm) 409.0 409.0 409.0
K/K' 0.03 0.05 0.03
x (mm) 45.44 45.44 45.44
As (mm2) 35.60 57.57 41.28
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 27.6 24.6
v (N/mm2) 0.30 0.27
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.1
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 3.42 < 45.09 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-41
Axis: E Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B31 L=1400mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
3.687
Shear
Force
(Env.)
-4.459
1.106
0.698
Moment
(Env.)
-0.897
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-42
Axis: F Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B17 L=1750mm
BwxH (mm) 225 x 450
Flange BfxHf ---
G=7.32
Q=2.29
Shear
Force
(Env.)
-20.278
3.259
Moment
(Env.)
-9.452
Bending (Top Edge) ...
M (kN.m) 0.1 3.3
d (mm) 409.0 409.0
K/K' 0.00 0.02
x (mm) 45.44 45.44
As (mm2) 0.56 23.53
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 5.7 9.5 5.9
d (mm) 409.0 409.0 409.0
K/K' 0.03 0.05 0.03
x (mm) 45.44 45.44 45.44
As (mm2) 41.36 68.24 42.30
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 20.3 22.0
v (N/mm2) 0.22 0.24
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 4.28 < 45.09 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-43
Axis: G Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B16 L=3500mm
BwxH (mm) 225 x 450
Flange BfxHf ---
16.0616.07
5.02 5.02 13.43
4.2
6.23
G=5.68
1.95
Q=1.78 0.35
0.34
0.11
Loads 1.14 1.48 2.03 3.39
UDL G=12.84 Q=0 kN/m
60.803
Shear
Force
(Env.)
-68.711
10.346 12.757
Moment
(Env.)
-52.168
Bending (Top Edge) ...
M (kN.m) 10.3 12.8
d (mm) 409.0 409.0
K/K' 0.06 0.07
x (mm) 45.44 45.44
As (mm2) 74.69 92.09
As' (mm2) 0.00 0.00
As-min 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 25.5 52.2 20.4
d (mm) 409.0 409.0 409.0
K/K' 0.14 0.30 0.12
x (mm) 45.44 49.34 45.44
As (mm2) 184.12 378.29 147.08
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 68.7 60.8
v (N/mm2) 0.75 0.66
vc (N/mm2) 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38
Vnom (kN) 95.8
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 8.56 < 30.47 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-44
Axis: H Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B13 L=512.5mm 1B14 L=3950mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
6.3 6.3
1.97 1.97
G=2.72
Q=0.85 1.36
0.42
Shear
Force
(Env.)
-53.974
27.193
22.381
11.852
Moment
(Env.)
-36.43
Bending (Top Edge) ...
M (kN.m) 6.2 13.6 22.4 27.2 11.9
d (mm) 411.0 411.0 409.0 409.0 409.0
K/K' 0.03 0.08 0.13 0.15 0.07
x (mm) 45.67 45.67 45.44 45.44 45.44
As (mm2) 44.32 97.92 161.57 196.30 85.56
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 0.00 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 8.5 36.4 15.7
d (mm) 392.0 409.0 409.0
K/K' 0.05 0.21 0.09
x (mm) 43.56 45.44 45.44
As (mm2) 64.12 262.99 112.98
As' (mm2) 0.00 0.00 0.00
As-min 0.00 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 37.3 43.1 54.0 46.9
v (N/mm2) 0.40 0.47 0.59 0.51
vc (N/mm2) 0.51 0.36 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 81.7 95.8
Td (kN.m) 0.2 0.0
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 1.25 < 15.78 OK 9.66 < 55.11 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-45
Axis: H Storey: 1 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B15 L=1225mm
BwxH (mm) 225 x 450
Flange BfxHf ---
Shear
Force
(Env.) -12.401
8.283
Moment
(Env.)
-3.578
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-46
Axis: H Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B15 L=4462.5mm 2B16 L=2975mm 2B17 L=3500mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
12.43
7.618 7.682
3.843
Shear
Force 1.169
-1.40
(Env.) -6.014
-11.473
-17.876
9.396
7.179
6.035 7.015
3.865 3.39
Moment 2.169 3.10
(Env.) -0.68
-5.385
-7.226
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-47
Axis: I Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B8 L=512.5mm 1B9 L=1150mm 1B10 L=3322.5mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
7.2
7.2
2.25
2.25
G=2.72 2.22 1.97
1.43 1.43
Q=0.85 1.36
0.42 0.69 0.45 0.62
0.45
Loads 0.12 0.4 0.11 0.58 1.04 0.11 1.61 2.91 3.21
UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m
54.658
36.05
15.523
Shear
Force -10.007
(Env.) -42.018
24.157
13.235 12.781 16.002 20.617
Moment 11.231
(Env.) -2.779
-18.758
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-48
Axis: I Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B11 L=1227.5mm 1B12 L=4725mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
9.6
9.6
7.86 7.86 33 7.44
4.81 4.81 6.12 2.46 2.46 5.64 5.16
1.91 2.33 4.74
4.56 4.56
G=1.972.51 1.5 1.5 1.76 1.61
1.48
1.42 1.43
1.68
Q=0.620.78 0.52
Loads 0.11 0.35 0.61 1.12 0.11 0.75 2.34 2.7 3.25 4.09
UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m
67.982
34.115
Shear
Force -6.039
(Env.)
-80.842
62.189
49.364
22.637
Moment
(Env.)
-55.182
Bending (Top Edge) ...
M (kN.m) 26.6 38.3 49.4 62.2 0.1 22.6
d (mm) 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.15 0.22 0.28 0.35 0.00 0.13
x (mm) 45.44 45.44 46.53 59.52 45.44 45.44
As (mm2) 192.04 276.55 356.80 456.37 0.72 163.42
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 1.2 55.2 25.1
d (mm) 392.0 409.0 409.0
K/K' 0.01 0.31 0.14
x (mm) 43.56 52.37 45.44
As (mm2) 8.96 401.57 181.00
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 20.3 34.1 80.8 68.0
v (N/mm2) 0.22 0.37 0.88 0.74
vc (N/mm2) 0.51 0.51 0.58 0.58 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 95.8
Td (kN.m) 0.1 0.1
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d --- 11.55 < 37.18 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 603.19 603.19 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 3Y16 3Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-49
Axis: I Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B5 L=1662.5mm 2B6 L=3322.5mm 2B7 L=1227.5mm
BwxH (mm) 225 x 300 225 x 300 225 x 300
Flange BfxHf --- --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
8.876
6.37
1.828
Shear
Force
(Env.) -6.507
-9.385 -9.259
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-50
Axis: I Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B8 L=4725mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
15.035
Shear
Force
(Env.)
-13.587
9.375
7.643
Moment
(Env.)
-7.648
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-51
Axis: J Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B6 L=3550mm 1B7 L=712.5mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
6.66
G=6.12 6.66
2.08
Q=1.91 2.08
3.06 3.06 3.06 3.06
0.96 0.96 2.04 0.96 0.96
0.64
Loads 0.11 0.75 1.69 2.44 2.8 3.44 0.11 0.54 0.63 0.71
UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m
57.935
Shear
Force
(Env.)
-37.099
-46.945
27.203 24.043
13.133
Moment
(Env.)
-31.015
Bending (Top Edge) ...
M (kN.m) 13.1 27.2 24.0 14.9 6.4
d (mm) 409.0 409.0 409.0 411.0 411.0
K/K' 0.07 0.15 0.14 0.08 0.04
x (mm) 45.44 45.44 45.44 45.67 45.67
As (mm2) 94.81 196.37 173.56 107.26 46.01
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Bending (Bottom Edge) ...
M (kN.m) 12.1 31.0 5.9
d (mm) 409.0 409.0 392.0
K/K' 0.07 0.18 0.04
x (mm) 45.44 45.44 43.56
As (mm2) 87.65 223.89 44.73
As' (mm2) 0.00 0.00 0.00
As-min 171.72 171.72 171.72 171.72 171.72 0.00
Shear and Torsion Design ...
Vd (kN) 46.9 57.9 37.1 28.1
v (N/mm2) 0.51 0.63 0.40 0.30
vc (N/mm2) 0.51 0.51 0.51 0.51 0.36 0.36
v-max (N/mm2) 4.38 4.38 4.38 4.38
Vnom (kN) 95.8 81.7
Td (kN.m) 0.1 0.2
vt (N/mm2) 0.00 0.00
vt-min(N/mm2) 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 8.68 < 58.61 OK 1.74 < 15.78 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 X 0.00 X 0.00
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-52
Axis: J Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B11 L=4262.5mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
12.215
Shear
Force
(Env.)
-13.149
7.328
4.425
Moment
(Env.)
-8.599
Bending (Top Edge) ...
M (kN.m) 7.3 4.4
d (mm) 259.0 259.0
K/K' 0.10 0.06
x (mm) 28.78 28.78
As (mm2) 83.54 50.44
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 0.9 8.6 3.1
d (mm) 259.0 259.0 259.0
K/K' 0.01 0.12 0.04
x (mm) 28.78 28.78 28.78
As (mm2) 10.20 98.03 35.72
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 13.1 12.2
v (N/mm2) 0.23 0.21
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 16.46 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-53
Axis: L Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B1 L=512.5mm 1B2 L=1150mm 1B3 L=3322.5mm
BwxH (mm) 225 x 450 225 x 450 225 x 450
Flange BfxHf --- --- ---
9.12
9.12
2.85
2.85
G=4.64 3.93 4.63 4.64
Q=1.45 2.72 2.71 2.71 2.71 1.45 1.45 2.72
0.85 0.85 1.23 0.85 0.85 0.85
Loads 0.12 0.4 0.11 0.4 0.58 0.76 1.04 0.11 0.4 1.61 2.64
UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m
47.943
20.017
10.76
Shear
Force -7.689
(Env.)
-43.421
23.251
13.121 15.536
2.956 5.385
Moment 4.398
(Env.)
-23.187
Bending (Top Edge) ...
M (kN.m) 0.1 1.1 3.0 5.4 8.2 13.1 15.5 23.3
d (mm) 411.0 411.0 409.0 409.0 409.0 409.0 409.0 409.0
K/K' 0.00 0.01 0.02 0.03 0.05 0.07 0.09 0.13
x (mm) 45.67 45.67 45.44 45.44 45.44 45.44 45.44 45.44
As (mm2) 0.95 7.78 21.34 38.87 58.91 94.72 112.15 167.84
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 171.72 171.72 171.72 171.72 171.72 171.72 171.72 171.72
Bending (Bottom Edge) ...
M (kN.m) 6.4 23.2 2.4
d (mm) 392.0 409.0 392.0
K/K' 0.04 0.13 0.01
x (mm) 43.56 45.44 43.56
As (mm2) 48.47 167.38 18.07
As' (mm2) 0.00 0.00 0.00
As-min 0.00 171.72 171.72 171.72 171.72 171.72 171.72 171.72 171.72
Shear and Torsion Design ...
Vd (kN) 3.0 10.8 7.7 20.0 43.4 47.9
v (N/mm2) 0.03 0.12 0.08 0.22 0.47 0.52
vc (N/mm2) 0.51 0.36 0.51 0.51 0.51 0.51 0.51 0.51 0.51
v-max (N/mm2) 4.38 4.38 4.38 4.38 4.38 4.38
Vnom (kN) 81.7 95.8 95.8
Td (kN.m) 0.0 0.0 0.0
vt (N/mm2) 0.00 0.00 0.00
vt-min(N/mm2) 0.00 0.00 0.00
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 Y8-300
Deflection Check ...
L/d 1.25 < 15.78 OK --- 8.12 < 58.61 OK
Provided Steel Areas (mm2)
Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16 2Y16
Top SupBar 2Y16 2Y16 2Y16 2Y16 2Y16
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-54
Axis: L Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
1B4 L=1227.5mm 1B5 L=2550mm
BwxH (mm) 225 x 450 225 x 450
Flange BfxHf --- ---
Loads 0.11 0.4 0.61 0.83 1.12 0.11 0.86 1.69 2.44
UDL G=12.84 Q=0 kN/m UDL G=12.84 Q=0 kN/m
24.481
6.319
Shear
Force
(Env.) -21.719
-32.36
21.499
11.515 12.191
11.421 3.981
Moment
(Env.)
-12.655
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-55
Axis: L Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B3 L=2550mm
BwxH (mm) 225 x 300
Flange BfxHf ---
Loads
UDL G=3.87 Q=0 kN/m
7.067
Shear
Force
(Env.)
-6.759
0.941
Moment
(Env.)
-4.169
Bending (Top Edge) ...
M (kN.m) 0.1 0.9
d (mm) 259.0 259.0
K/K' 0.00 0.01
x (mm) 28.78 28.78
As (mm2) 0.83 10.73
As' (mm2) 0.00 0.00
As-min 114.48 114.48 114.48
Bending (Bottom Edge) ...
M (kN.m) 2.5 4.2 2.3
d (mm) 259.0 259.0 259.0
K/K' 0.04 0.06 0.03
x (mm) 28.78 28.78 28.78
As (mm2) 28.42 47.52 26.52
As' (mm2) 0.00 0.00 0.00
As-min 114.48 114.48 114.48
Shear and Torsion Design ...
Vd (kN) 6.8 7.1
v (N/mm2) 0.12 0.12
vc (N/mm2) 0.66 0.66 0.66
v-max (N/mm2) 4.38 4.38
Vnom (kN) 91.6
Td (kN.m) 0.0
vt (N/mm2) 0.00
vt-min(N/mm2) 0.00
b-sup (mm) 0.0 0.0
Links Y8-175 Y8-175 Y8-175
Deflection Check ...
L/d 9.85 < 47.48 OK
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Top Bar 2Y16
Top SupBar
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-56
Axis: L1 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
2B1 L=1662.5mm 2B2 L=4550mm
BwxH (mm) 225 x 300 225 x 300
Flange BfxHf --- ---
Loads
UDL G=3.87 Q=0 kN/m UDL G=3.87 Q=0 kN/m
22.972
8.988
Shear
Force
(Env.)
-16.479
22.792
19.871
1.709
Moment
(Env.)
-5.747
-8.468
Top SupBar
Side Bars
Project: EPH_4BEDROOM_F
4 BED ROOM WT (*1KE-QB46-HVAE-G8DF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-57