TRAINING PLAN

Qualification: ELECTRICAL MAINTENANCE SERVICES NC II


Trainees’ Facilities/
Mode of Staff Assessment Date and
Training Training Activity/Task Tools and Venue
Training Method Time
Requirements Equipment
Install Wiring Devices of Floor and Wall Mounted Outlets, Lighting Fixtures/Switches, and Auxiliary Outlets
LO 1. Select Present drawings are read and interpreted Dual JOHN CARLO Practical work South Central May 18,
Practical
wiring devices
to determine job requirements Training ARELLANO area/Production Mindanao 2024
Demonstration
System Trainer area College of 8AM-5PM
with oral
Apply correct type and quantity of wiring PPE Science and
questioning
devices and consumable items are UPS Technology,
identified in line with job requirements Dry type Inc. Observation
Transformer with oral
Select and use tools and equipment in Capacitor bank questioning
line with job requirements AVR
Rectifier/Frequency
Select correct PPE in line with safety converter
requirement. Fire alarm system
Intercom
Digital watt meter

ELECTRICAL Date Developed: Document No.


MAINTENANCE SERVICES April 2024 Issued by:
NC II Date Revised:
Install Wiring Devices of Floor April 2024 BTVTED ET
Page of
and Wall Mounted Outlets, Developed by:
Lighting Fixtures/Switches, and John Carlo Arellano
Auxiliary Outlets Revision # 00
LO 2. Install Follow safety procedures are followed Dual JOHN CARLO Practical work South Central May 20,
Practical
wiring devices
based on safety regulations Training ARELLANO area/Production Mindanao 2024
Demonstration
System Trainer area College of 8AM-5PM
with oral
Perform correct procedures for PPE Science and
questioning
installation of wiring devices in line with UPS Technology,
job requirements Dry type Inc. Observation
Transformer with oral
Follow schedule of work based on agreed Capacitor bank questioning
time, quality standard and minimum AVR
wastage Rectifier/Frequency
converter
Present instructions are sought if Fire alarm system
unplanned events or conditions occur Intercom
Digital watt meter
Apply on-going checking of quality of
work is done in accordance with
instructions and requirements.

ELECTRICAL Date Developed: Document No.


MAINTENANCE SERVICES April 2024 Issued by:
NC II Date Revised:
Install Wiring Devices of Floor April 2024 BTVTED ET
Page of
and Wall Mounted Outlets, Developed by:
Lighting Fixtures/Switches, and John Carlo Arellano
Auxiliary Outlets Revision # 00
LO 3. Install Follow safety procedures based on safety Dual JOHN CARLO Practical work South Central May 22,
Practical
lighting fixture/ regulations Training ARELLANO area/Production Mindanao 2024
Demonstration
switches System Trainer area College of 8AM-5PM
with oral
Perform correct procedures for PPE Science and
questioning
installation of wiring devices in line with UPS Technology,
job requirements Dry type Inc.
Observation
Transformer
with oral
Follow schedule of work based on agreed Capacitor bank
questioning
time, quality standard and minimum AVR
wastage Rectifier/Frequency
converter
Present instructions are sought if Fire alarm system
unplanned events or conditions occur Intercom
Digital watt meter
Apply on-going checking of quality of
work is done in accordance with
instructions and requirements.

LO. 4 Notify Apply final checks are made to ensure Dual JOHN CARLO Practical work South Central May 24,
Practical
completion of that work conforms with instructions and Training ARELLANO area/Production Mindanao 2024
Demonstration
work to requirements System Trainer area College of 8AM-5PM
with oral
PPE Science and
questioning
ELECTRICAL Date Developed: Document No.
MAINTENANCE SERVICES April 2024 Issued by:
NC II Date Revised:
Install Wiring Devices of Floor April 2024 BTVTED ET
Page of
and Wall Mounted Outlets, Developed by:
Lighting Fixtures/Switches, and John Carlo Arellano
Auxiliary Outlets Revision # 00
Clean, check, and return tools equipment UPS Technology,
and any surplus resources and materials Dry type Inc.
Observation
are in accordance with established Transformer
with oral
procedures Capacitor bank
questioning
AVR
Check work area is cleaned and made Rectifier/Frequency
safe converter
Fire alarm system
Intercom
Digital watt meter

ELECTRICAL Date Developed: Document No.


MAINTENANCE SERVICES April 2024 Issued by:
NC II Date Revised:
Install Wiring Devices of Floor April 2024 BTVTED ET
Page of
and Wall Mounted Outlets, Developed by:
Lighting Fixtures/Switches, and John Carlo Arellano
Auxiliary Outlets Revision # 00