-300.

0
(+95.0

-1200.0
(+95.0)

+900.0
(+97.1)

UP -900.0
(+95.3)

100m3 Water Tank +1200.0 Void


DW
Phase 01 DUCT
(+97.4) DW

5m(D) x 6.5m (H)

Store area
DW 03
+0.0
(+96.2)

+1050.0
(+97.25)
Void
75m3 Water Tank
Phase 01
5m(D) x 5m (H)
RAMP
DOWN

Hoist
+2000.0
(+98.5)

G2
ST
GV

GV
FC

FC
NR
ST
GV
FC

FC
NR
GV
PV

Potable Water/
Fire Pump Room Compressed
air motor
NR
GV

GV
FC

FC

room
ST
GV
NR

GV
FC

FC

ST
PV

G1

Above Ground
Sewer Treatment Plant

F2
Chilled Water +1200.0
Pump Room (+97.4)

F1

Air Compressor Room

E1

Chemical
room

Standby Generator
+2300.0
(+98.8)

FG
D3 Stores

Electrical Main
+1200.0
Panel room (+97.4)

D2
CEB +1200.0
(+97.4)
Panel room
RM
Stores
+2000.0
(+98.5) D1
Glass Mixed
paper

+1175.0
(+97.375)
+1200.0
(+97.4)
DUCT

Corrugated
C2 Metal cardboard +3600.0
(+99.8)

Battery UP
collecting +2300.0
room (+98.8)
+1050.0
+1200.0
(+97.25)
(+97.4)
Plastics

E - waste

C1 +1800.0
(+98.0)
Janitorial
Room
06

VISITOR
TOILET
-2 -1
PROPOSED CAR PARK

DUCT
DISABLE
05 TOILET

S.F.L.+1650
F.F.L.+1775

+1800.0
+900.0 (+98.0)
04 (+97.1) Lift RAMP
DOWN -750.0
+1050.0 (+95.45)
(+97.25)
+2000.0
(+98.5)
+1200.0 +1200.0
(+97.4) (+97.4)
03
DW DW

+2550.0 UP
(+98.75)
+1500.0 +1650.0 Hoist
02 (+97.7) (+97.85) Reception
Area

+1800.0
(+98.0)
+1200.0 +3600.0 -300.0
(+97.7) (+99.8) (+95.9)
Loading bay +1200.0
01 (+97.4)
DW

DW
+4500.0
(+100.7) +150.0
(+96.35)

RAMP RAMP
DOWN UP +1775.0 Concrete roof slab
+1650.0 (+97.975) at +2700 level
(+97.85)
R O A D R O A D R O A D

+2000.0
(+98.5)
+1650.0
(+97.85)
UP UP 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73

+1650.0
+0.0 PROPOSED BICYCLE PARK
(+97.85)
(+96.2)

R O A D R O A D
PROPOSED BICYCLE PARK

49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

UP
VISITOR'S
AREA
UP +150.0
(+96.35)
+0.0
(+96.20) R O A D -700.0 R O A D R O A D
(+95.5)
+0.0
(+96.20)
+150.0
(+96.35) 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25

RAMP PROPOSED BICYCLE PARK


+2000.0 UP
(+98.5)
+0.0 R O A D R O A D
(+96.50) SECURITY
ROOM
PROPOSED BICYCLE PARK
WORK TOP
(GRANITE)

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

M
+0.0 -700.0
(+95.5) R O A D R O A D R O A D
(+96.20)

LEGEND

TP

TP

EP

Pavement

NORMAL DIAMETER INCHES DIAMETER POLYPROPYLENE(PPR) PIPE OUTER DIAMETER (PN 10)

STATUS :- DRAWING TITLE :-


PROJECT TITLE
SHOP DRAWING
P R O P O S E D F A C T O R Y D P L G @ B I Y A G A M A DISCIPLINE :- WATER SUPPLY PIPING ARRANGEMENT
PLUMBING
SITE LAYOUT
REFERENCE DRAWINGS
ARCHITECTURAL CONSULTANTS : MEP CONSULTANTS : SUB CONTRACTOR:
DRAWING NO: DESCRIPTION REV. DATE DRAWING No :-
FOUNDATION LAYOUT & DETAILS , STUB COLUMN
Rev.
FENT/SD/PLM/WTS/SIT/01
DPL/BIY/SG/STR/01 , 02, 03 R 00 22.12.2021
LAYOUT & DETAILS , TIEBEAM LAYOUT & DETAILS
R2
DPLG/CON/ARC/000/000/001 -1-R00 LAYOUT PLAN WITH CONTOURS (GROUND FLOOR) R 00 14.02.2022

k.d.r.I.kathrIachchI k2 consultants (pvt) ltd Fentons LTD, K2145/CON/PLM/WTS/SITE/01 WATER SUPPLY LAYOUT SITE PLAN R 00 14.02.2022 DATE :
21-SEPTEMBER-2022
SHEET NO :
1 OF 1
Scale:
1:175
Size
A1
No 180, Deans Road,
(chartered architect) no.32, mIlagIrIYa avenue, colombo, 00400, srI lanka
m:+94777727067, o:+94117327067, o:+94114324505 Colombo 10, Sri Lanka, Detailed/Drawn By: Checked By: Reviewed By: Reviewed By:
11/107, salaWa road, mIrIhana, nugegoda. e-mail:office@k2consultants.lk, skype:k2consultants.lk,
TEL- +94.11.2448517 REVISIONS SILVA KC RUCHIKA DHANUKA
tel:+94112834684 , fax:+94112834684 Web:www.k2consultants.lk
e-mail : rukmalkd@sltnet.lk Email:info@fentons.com REV DESCRIPTION NAME DATE Sign: Sign: Sign: Sign:
R1 REVISED AS PER THE CONSULTANT COMMENT CHANAKA 21/09/22