Professional Documents
Culture Documents
0
(+95.0
-1200.0
(+95.0)
+900.0
(+97.1)
UP -900.0
(+95.3)
Store area
DW 03
+0.0
(+96.2)
+1050.0
(+97.25)
Void
75m3 Water Tank
Phase 01
5m(D) x 5m (H)
RAMP
DOWN
Hoist
+2000.0
(+98.5)
G2
ST
GV
GV
FC
FC
NR
ST
GV
FC
FC
NR
GV
PV
Potable Water/
Fire Pump Room Compressed
air motor
NR
GV
GV
FC
FC
room
ST
GV
NR
GV
FC
FC
ST
PV
G1
Above Ground
Sewer Treatment Plant
F2
Chilled Water +1200.0
Pump Room (+97.4)
F1
E1
Chemical
room
Standby Generator
+2300.0
(+98.8)
FG
D3 Stores
Electrical Main
+1200.0
Panel room (+97.4)
D2
CEB +1200.0
(+97.4)
Panel room
RM
Stores
+2000.0
(+98.5) D1
Glass Mixed
paper
+1175.0
(+97.375)
+1200.0
(+97.4)
DUCT
Corrugated
C2 Metal cardboard +3600.0
(+99.8)
Battery UP
collecting +2300.0
room (+98.8)
+1050.0
+1200.0
(+97.25)
(+97.4)
Plastics
E - waste
C1 +1800.0
(+98.0)
Janitorial
Room
06
VISITOR
TOILET
-2 -1
PROPOSED CAR PARK
DUCT
DISABLE
05 TOILET
S.F.L.+1650
F.F.L.+1775
+1800.0
+900.0 (+98.0)
04 (+97.1) Lift RAMP
DOWN -750.0
+1050.0 (+95.45)
(+97.25)
+2000.0
(+98.5)
+1200.0 +1200.0
(+97.4) (+97.4)
03
DW DW
+2550.0 UP
(+98.75)
+1500.0 +1650.0 Hoist
02 (+97.7) (+97.85) Reception
Area
+1800.0
(+98.0)
+1200.0 +3600.0 -300.0
(+97.7) (+99.8) (+95.9)
Loading bay +1200.0
01 (+97.4)
DW
DW
+4500.0
(+100.7) +150.0
(+96.35)
RAMP RAMP
DOWN UP +1775.0 Concrete roof slab
+1650.0 (+97.975) at +2700 level
(+97.85)
R O A D R O A D R O A D
+2000.0
(+98.5)
+1650.0
(+97.85)
UP UP 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73
+1650.0
+0.0 PROPOSED BICYCLE PARK
(+97.85)
(+96.2)
R O A D R O A D
PROPOSED BICYCLE PARK
49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72
UP
VISITOR'S
AREA
UP +150.0
(+96.35)
+0.0
(+96.20) R O A D -700.0 R O A D R O A D
(+95.5)
+0.0
(+96.20)
+150.0
(+96.35) 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
M
+0.0 -700.0
(+95.5) R O A D R O A D R O A D
(+96.20)
LEGEND
TP
TP
EP
Pavement
NORMAL DIAMETER INCHES DIAMETER POLYPROPYLENE(PPR) PIPE OUTER DIAMETER (PN 10)
k.d.r.I.kathrIachchI k2 consultants (pvt) ltd Fentons LTD, K2145/CON/PLM/WTS/SITE/01 WATER SUPPLY LAYOUT SITE PLAN R 00 14.02.2022 DATE :
21-SEPTEMBER-2022
SHEET NO :
1 OF 1
Scale:
1:175
Size
A1
No 180, Deans Road,
(chartered architect) no.32, mIlagIrIYa avenue, colombo, 00400, srI lanka
m:+94777727067, o:+94117327067, o:+94114324505 Colombo 10, Sri Lanka, Detailed/Drawn By: Checked By: Reviewed By: Reviewed By:
11/107, salaWa road, mIrIhana, nugegoda. e-mail:office@k2consultants.lk, skype:k2consultants.lk,
TEL- +94.11.2448517 REVISIONS SILVA KC RUCHIKA DHANUKA
tel:+94112834684 , fax:+94112834684 Web:www.k2consultants.lk
e-mail : rukmalkd@sltnet.lk Email:info@fentons.com REV DESCRIPTION NAME DATE Sign: Sign: Sign: Sign:
R1 REVISED AS PER THE CONSULTANT COMMENT CHANAKA 21/09/22
R2 REVISED AS PER THE CONSULTANT COMMENT KASUN 02/11/22
Date Date Date Date
02-11-2022 02-11-2022 02-11-2022