Professional Documents
Culture Documents
1
Date of Date Venue No. of Designation Copy of
advertis of Stat Distr Sub- Vill Distance Peopl of Presiding duly
ement PH e ict Distric age from the e Officer signed
t project attend [District Proceed
boundary ed Magistrate ings of
(Km) /District Public
Collector/ Hearing
Deputy in
Commissio English
ner /
Additional
District
Magistrate/
Sub-
Divisional
Magistrate,
Other
(please
specify)
#Calenda #Cale Dro Drop Dropdo Drop #Num# #Num# Dropdown Upload
r# ndar# pdo down wn down
wn
+ Add
rows for
multiple
hearings
2.1.2
No. of written comments/suggestions/objections received : #Num#
2.1.3
Major issues raised during public hearing & written
submissions
Major issues raised Response of Project Whether addressed in Reference of
Proponent Final EIA/EMP Final
(Yes/No) EIA/EMP
#Free Text# #Free Text# Dropdown #Free Text#
+Add Rows
2.1.4 Action Plan on issues raised during public hearing & written Upload
submissions as per MoEF&CC OM dated 30/09/2020
2.1.5 Upload documents if any (pdf/jpg/video clip) Upload
3 Summary of Baseline Data
3.1 Details of Base Line data collection (Auto fetch from Form-1 Part-
A editable)
Season Period of Number of monitoring locations
[Summe collection
r / Pre- From To Meteoro Ambient Surface Ground Ground Noise Soil
monsoo logy Air Water water Water Level Quality
n / Post- (Nos.) (Nos.) (Nos.)
2
monsoo Quality Quality Quality Level
n / (Nos.) (Nos.) (Nos.) (Nos.)
Winter/
All
Seasons
]
Dropdo #Calend #Calend #Num# #Num# #Num# #Num# #Num# #Num# #Num#
wn ar# ar#
3.2 Meteorological Parameters
Sl Parameter Min. Value Max. Value Mean Value
1 Temperature (oC) #Num# #Num# #Num#
2 Wind Speed (m/s) #Num# #Num# #Num#
3 Relative Humidity (%) #Num# #Num# #Num#
4 Solar Radiation (W/m2) #Num# #Num# #Num#
5 Rainfall Total rainfall No. of rainy days Average annual
(mm) rainfall (mm)
#Num# #Num# #Num#
6 Predominant Wind direction Dropdown
[North (N)/
North-northeast (NNE)/
Northeast (NE)/
East-northeast (ENE)/
East (E)/
East-southeast (ESE)/
Southeast (SE)/
South-southeast (SSE)/
South (S)/
South-southwest (SSW)/
Southwest (SW)/
West-southwest (WSW)/
West (W)/
West-northwest (WNW)/
Northwest (NW)/
North-northwest (NNW)]
3.3 Ambient Air Quality
Note: (Please Specify range in case of data monitored at multiple
locations)
Monitoring Location Criteria Unit [Micro Observed Value Mean Value Prescribed
(Core /Buffer) Pollutant Gram per Standard
[PM10/ Meter
PM2.5/ SO2/ Cube/
NOx/ Other Nano Gram
parameters per Meter
specific to
3
sector Cube/ Milli From To
(please Gram per
specify)] Meter
Cube/
Other
(please
specify)]
+Add rows
Buffer Zone Dropdown Dropdown #Num# #Num# #Num# #Num#
+Add rows
3.4 Surface Water Quality (Validation: User may be allowed to fill
either core or buffer, if required both can be also filled with
multiple add rows)
(Please Specify range in case of data monitored at multiple locations)
Monitoring Location Criteria Unit [mg/L, Observed Standard as CPCB Water Quality
(Core /Buffer) Pollutant Other Value per IS: Criteria
[pH/ TSS/ (please 2296-1982
TDS/ Total specify)] Class Standard
Hardness/
Chlorides/
Fluoride/
Heavy
Metal/ DO/
BOD/
COD/ Total
Coliform/
Other
From To
parameters
specific to
the sector
(please
specify)]
4
spl. spl.
char char
+Add rows
Buffer Zone Dropdown Dropdown #N #Nu #Free #Free #Num#
um m# Text# Text# with
# with Special
wit spl. character
h char
spl.
cha
r
+Add rows
3.5 Ground Water Quality
(Please Specify range in case of data monitored at multiple locations)
Monitoring Location Criteria Unit [mg/L, Observed Standard as Standard as
(Core /Buffer) Pollutant Other Value per per
[pH/ TSS/ (please IS:10500 IS:10500
TDS/ Total specify)] Desired Permissible
Hardness/ Limits Limits
Chlorides/
Fluoride/
Heavy
Metals/
other
parameters From To
specific to
the sector
(please
specify)]
Core Zone Dropdown Dropdown #Nu #Nu #Free #Free
m# m# Text# Text#
wit with
h spl.
spl. char
char
+Add rows
Buffer Zone Dropdown Dropdown #Nu #Nu #Free #Free
m# m# Text# Text#
wit with
h spl.
spl. char
char
+Add rows
3.6 Ground Water level (Phreatic surface)
3.6.1 Monitoring Location Range of Water Table Range of Water Table Post-Monsoon Season (in
{ Core /Buffer} Pre-monsoon Season m below ground level
(in m below ground
level))
From To From To
5
Core Zone #Num# #Num# #Num# with Special #Num# with Special
with with character character
Special Special
character character
Buffer Zone #Num# #Num# #Num# with Special #Num# with Special
with with character character
Special Special
character character
3.6. Whether Ground Water Intersection will be there [Yes / No]? If Dropdown
2 Yes
3.6.2.1 Copy of Central Ground Water Authority Letter Upload
3.7 Noise level
Monitoring Location Category Observed Noise Level Prescribed Standard
(Core /Buffer) [Industrial (dB(A)) (dB(A))
area/ Day Time Night Time Day Time Night Time
Commercia Level Level Level Level
l area/
Residential
area/ From To Fro To
Silence m
Zone]
Core Zone Dropdown #Nu #N #Nu #N #Num# #Num#
m# um m# um with spl. with spl.
with # with # char char
spl. wit
spl. wit
char h
spl. char h
cha spl.
r cha
r
+Add
Rows
Buffer Zone Dropdown #Nu #N #Nu #N #Num# #Num#
m# um m# um with spl. with spl.
with # with # char char
spl. wit spl. wit
char h char h
spl. spl.
cha cha
r r
+Add
Rows
3.8 Soil Quality
(Please Specify range in case of data monitored at multiple locations)
3.8.1 Physical Characteristics
Monitoring Location Particle Size Distribution
6
(Core /Buffer) Soil Sand (%) Silt (%) Clay (%) Water Porosity
Texture Holding (%)
[sand/ loamy Capacity
sand/ sandy (%)
loam/ loam/
silt loam/
silt/ sandy
clay loam/
clay loam/ Fro To Fro To Fro To Fro To From To
silty clay m m m m
loam/ sandy
clay/ silty
clay/ clay/
Others (Pl.
Specify)]
Core Zone Dropdown #Nu #Nu #Nu #N #Nu #Nu #Nu #Nu #Nu #N
m# m# m# um m# m# m# m# m# um
with with with # with with wit with with #
spl. spl. spl. wit spl. spl. h spl. spl. wit
char char char h char char spl. char char h
spl. char spl.
cha cha
r r
Buffer Zone #Nu #Nu #Nu #N #Nu #Nu #Nu #Nu #Nu #N
m# m# m# um m# m# m# m# m# um
with with with # with with wit with with #
spl. spl. spl. wit spl. spl. h spl. spl. wit
char char char h char char spl. char char h
spl. char spl.
cha cha
r r
3.9 Chemical Properties
Note: (Please Specify range in case of data monitored at multiple locations)
Monitoring Location Criteria Parameter Unit Observed Value Permissible
(Core /Buffer) [Calcium, Carbon, [gm/mg/ standard
Nitrogen, Phosphorus, Other
Potassium, Magnesium, (please
Sodium Absorption specify)]
Ratio, Salinity] From To
Core Zone Dropdown Dropdown #Num# #Num# #Num# with spl.
with spl. with spl. char
char char
+Add Rows
7
3.10.1 Existing
Road V (volume in PCU/ C (capacity Existing LOS
day) in PCU/day) V/C Ratio
#Free #Num# #Num# #Num# #Num#
Text#
3.10.2 Proposed
Road V (volume in PCU/ C (capacity Existing LOS
day) in PCU/day) V/C Ratio
#Free #Num# #Num# #Num# #Num#
Text#
If No,
Reasons thereof #Free Text#
3.11 Whether any Schedule-I Species found in the study area? [Yes/No] : Dropdown
If Yes,
3.11.1 Details of Schedule-I Species #Free Text#
3.11.2 Whether conservation plan for Schedule-I Species has Dropdown
been prepared? [Yes/No]
If Yes,
3.11.2.1 Copy of conservation plan Upload
3.11.2.2 Fund Provision made (Lakhs) #Number#
3.11.2.3 Period of Implementation #YYMM#
If No,
3.11.2.1 Reasons thereof : #Free Text#
3.11.3 Whether conservation plan for Schedule-I Species has Dropdown
been approved by competent authority? [Yes/ No]
If Yes,
3.11.3.1 Copy of approval (Upload PDF Only) : Upload
3.11.3.2 Letter No. : #Free Text#
3.11.3.3 Date of issue : Calendar
3.11.3.4 Recommendations if any : #Free Text#
If, No
3.11.3.1 Reasons thereof : #Free Text#
4 Impact Prediction
4.1 Air Quality Impact Prediction
Monitoring Location
8
Lati Lon Core Criteria Unit Baseline Predicted Total GLC Prescribed
tude gitu /Buffer Pollutant [microgram Concentrati incremental [A]+[B] Standard
de [PM10, per m3, NA] on [A] value
PM2.5, SO2, considering
NOx, Other worst case
parameters stability
specific to class [B]
the sector
(Please
specify)]
Deg/ Deg/ Dropdown Dropdown Dropdown #Num# #Num# Auto fill #Num#
Min/ Min/ Calculate
Sec Sec
+Add rows
5 Funds Allocated for Environment Management
5.1 Funds Allocated for Environment Management (Capital) (in #Num#
Lakhs)
5.2 Funds Allocated towards Corporate Environmental Responsibility #Num#
(in Lakhs)
5.3 Funds Allocated for Environment Management Plan (EMP) #Num#
(Recurring per Annum) (in Lakhs)
5.4 Summary of allocation of fund for EMP
S.No EMPs: (Eg.: Air Capital Cost Recurring cost
Environment, Water (Lakhs) per annum
Environment) (Lakhs)
1 #Free Text# #Num# #Num#
2 #Free Text# #Num# #Num#
+Add rows
Total #Auto Calculate# #Auto Calculate#
6 Status of Land Acquisition [Acquired / Partially acquired / yet to be acquired / Not : Dropdown
required (No acquisition is involved)]
If partially acquired,
6.1 Acquired Land (Ha) #Num#
6.2 Land yet to be acquired (Ha) #Num#
7 Details of Post-project monitoring program
7.1 Parameters to be monitored during construction and operation of the unit
Attribute [Air Parameters Monitoring Mode of Frequency of Project Monito
Quality/Water proposed for locations Monitoring Monitoring phase in ring
Quality/Noise monitoring [Online [Once in which Agency
Continuous /
Quality/Soil year/Twice in monitoring [Propo
Manual]
quality/Biodiversity/ year /thrice in is required nent
9
Other (please Latit Longi year/ [Constructi itself/
specify)] ude tude Daily/Continu on/Operati Third
ous, Other on/Closure Party /
(Please /All Other
Specify)] phases] (Pl.
Specify
)]
Dropdown #Free Text# Deg/ Deg/M Dropdown Dropdown Dropdown Dropdo
Min/S in/Sec wn
ec
+Add
rows
10
9.4 Upload Copy of Final Layout Plan (pdf only) Upload
9.5 Upload copy of District Survey Report (for mining of minor URL of the site
minerals only) where it available
/ Upload
9.6 Upload copy of Replenishment Study Report (for river bed mining URL of the site
proposals only) where it is
available /Upload
10 Undertaking
I hereby give undertaking that the data and information given in the #Checkbox#
application and enclosures are true to be best of my knowledge and belief
and I am aware that if any part of the data and information found to be false
or misleading at any stage, the project will be rejected and clearance given
if any to the project will be revoked at our risk and cost. In addition to
above, I hereby give undertaking that no activity such as change in project
layout, construction, expansion, etc. has been taken up.
10.1 Name : #Auto Fetch#
11