You are on page 1of 4
BYOLYTION AIR HANDLING UNIT TEST REPORT (WITH RETURN FAN) : (Central Station) esgraton aR Sans ROTTHRO FLOOR eaion ‘ROOF FLOOR eran Dre ese Frere aa [cows —] ear ar roa RF WA) = = [ett ar Row < @ [Sn Ae rows) Te Ta frasioutes A rem er —| 10a cen Sacre Pa au) [Remower [passe sian rene 7) ais] [ove cecews [= Seces erm Zt | ae | fran ar fc it arFor Cm 157 sense resus Pa [rcs SncPrvaca a [estou ste rocone (P = [DELEAOTORDAAT [COSTCO] (RETURN RNNOTOR DATA [nei TOAD frensecize Dee Fusisacer TEE Provo 7 Ta] rower nw is = [vison eo [aos] ts “eo aan [anew se [aron ez] farceo ay 31s faeeaneacr| [oeeicno, o Ea loca te a % [sr ease cy Ha] eer Sen cz 73 rice Face 7 [sees er Te [orcasranoa a Wo [ wo | fomrosterosm wo [Brea entra wo [oerinss song we, ao) mom Pine ioe ear foe fine =r Fenty a vary S [any Tea) co Fsnsraeais (om EJ [rsnsede ion Ey for ute ais 5 fc Paty in = fuser seat ac 3s Jae sen aston) 7 [sn ceno oes) 3 snot cos sincogam) 7 Remark {Aspe the operators raquet the HEPA iter was removed rom the RMU HEH cto the HEPA fiter las the OR wi be sulilnt forthe fonction, 2. Relering tothe prvious remark, the operation traquency Was reduced to 9 Hao allow te a flow rte to match the ‘osign value, Therfore, he actual supply fan speed was fund iower han te design. “The supply fa’ oll lati prossure ie oe than the design value duo tothe HEPA ters were remeved and tho fan 1 ae mentioned before dereased {According to the operator’ requirements the mixing damperte eat at he fly open positon. Wal the exhaust side as totaly eased 5. Al lactical readings are within acceptable ents 6 Design data were abalned from the approved product report and drawings 7. WFD check part ofthe commmissloning scope and out of the TAB scope. 8: The actual motor speed forthe supply ard ett shes Is no accessible eo to thoreis no anough space to take the ‘ading. 80, il make a safety Issue. Srtie not poslbe to take traverse reading a the man su duct ovalabe Reading By ie nag Mennoull © ue: Z88en/2023 CChoekea 8): ENG. Osama Atami je 2518092025, ‘Vettes by 58 engineer. EVOLUTION AIR OUTLETS TEST REPORT Project: A Mutan 200 bed genera nospta ‘System Designation: AHU-OR-O7 Location: THIRD FLOOR Test Apparatus: Aspe the aproved method of statement THIRD FLOOR ‘GENERAL OR (08000) oro Jaco 10 war was | 100% SEER aa 1 oor] Volociiy Information and measurement are not requirod: Romorks: Reading By Me. Ahad Mehmoud ft Date: 20"Sopr2028 Checked by: ENG, Osama Alamimi Date: 20/Sepr2028 Vorified by 813 engineer. EES TECrTAIAO-RO EVOLUTION AIR INLETS TEST REPORT BB Projet: nun 200 el ost system esgnatn: 1.08.07 Cements FLOOR Tet appara a pee apres ct alent "THIRD FLOOR RAG [amass | oo] a7 RAG | asexeas | cosa | —a24 RAG | «35x25 | oosz | 370 RAG | anexa3s | oss | 374 RAG | waKns | coro | S07 RAG | wsxtes | coro | S07 RAG] waxtes | 0019 RAG | eKias | 0019 Cs] EEE ESS NAA “AKT, Velocity Information and measurement are not requved GENERAL OR (03-009) Reading By Me Abed Mehmoud Z a Date: 20180p/2028 Checked By ENG, Osama AL-amimi Date: 2aisepr2023 Vorifiod by $13 engineer EES TECITABIAO-RO ev@iyrIon FRESH AIR INLETS / EXHAUST TEST REPORT Project Al Muran 200 bea genera ospital ‘System Designation: AMUOR 07 Location: ROOF FLOOR, Test Apparatus: As per the approved method of statement. See eae ie Verified by STS engineor, a EES-TECITABIAO-RO

You might also like