You are on page 1of 4
EVOEYTION sm uawouncunteresreeron (WITH RETURN FAN) (Central station) Prec: Al Muon 200 bed gener hospital [onroesarten ARTO isa save GRRE TRG FOR eranoroe Drea [eens FrsFner (sp ape ass) enous arrow 5) caer Fastoutes Foe) ssn Se Pere Pa charge Sic resue PT Fas touts Prenre(P) lise Fansoass ae [eeu Fo tay a Fett riiar Foe Oa ‘sir [08 Scr ite Ps Pap eT [chee SucParare a) = Fanfic rsowe art [ ae [enspoos nr an sa [ERoToRORAT ever = S| rower on co ofan] frat 70 | no a0 wiser) fanoee ts Sis [aos 1 pata TET a ry locos na 2. = [as Seas UL S|] ser sea ea aw eras ase Te erie Fer 1 overcoat We we) overarmea ve | [versd etna wo fer bast we “SUPA PAL OTE DATA a] fm foe ee ear [oes pe Fane aa 105 en Ptey fen Fansran cx in = frnsnstie [sory a 5 ir Pate ser sr = rsa [St Come Dstarca a) 3 svat cero ose nm Remar {ua porthe operator’ roquest the HEPA itr was removed fram he ABU ite due tote HEPA iter nse th GR wil. bi eulfoont forthe freton 2 Refeting to the provious remark, the operation trun was roduced to 48 Hrto alow the ‘osign vale, Thorfore, he actual supply fan speed was found two than te design. ppl fan's total tle pressure lls than the design value a to tho HEPA titers wore rrnoved andthe fan ‘peed se mentioned bore docreases 4 Aecording to the operators requirements the mixing dampers set at the filly open poston. While the exh ‘rae totaly elosed {-VED checks pat of the commissening ecope and oMt ofthe TAD zope, {Te aetual ator speed forthe supply sl eur ses Is not accessible do to theres reading So, will make a safely issue 9:1 not posse to tae ravers rodings at the main supp ue thre Ino enough staight Suet eva Reading By: ease nebo zasep2025 Checked ENG Osama Aitaming s Yate zasevi023 ‘Vertes by 5 engineer EES TECABES AMRF RO EVOLUTION AIR OUTLETS TEST REPORT BB Project: Al Mutan 200 bed genera hospital ‘System Dasinnation: AHULOR-02 Location: THIRD FLOOR ‘Test Apparatus: As per te approved method of statement ‘and measurement are nor required Reading By: Me Ahad Mehmous Date: 20/S09/2023 Ccheckod By: ENG. Osama AL-aminy ats: -zaiseptz023 Verified by STS engineer EES TECITABIAG-RO EVOLUTION AIR INLETS TEST REPORT Project: Al Mutan 200 bed genera nossa ‘System Designation: AMU-OR.02 Location THIRD FLOOR Test Anparatva: As per tho approved method of statement “THIRD FLOOR RAG] Rae ona] 325 | ae RAG | a36K236 | 0002 | 3.24 [ase RAG | a06n@36 | 0002 | 324 [a8 RAG | a05n235 | 0002 | 324 [28 RAG] vasxias | ots | 507 % RAG | sexes | ore | sor 6 0 RAG | vesKres | oie | 507 7% aro RAG] vasxtes [ore | sor 3, 400 LapaRAOSCOPY (03.074) TTTAK=1, Velocity information and measuromont are not require Remarks: checked By: ENG. Osama Alamimi Date: 20/S0p/2008 Verified by STS engineer ae ees TECITABHAO-RO evOEyric YN FRESH AIR INLETS / EXHAUST TEST REPORT Project: Al turan 200 064 genera hosptat ‘System Designation: AHU-OR.02 Location: ROOF FLOOR Test Apparatus: Aspe he approved method of statement ‘ROOF FLOOR. anuor-02 1 | war | sssmxa00] ove] ox | 150 | os vas | so Reading By: Me Aas Mehmoud 2arsen2023 checkou By: ENG Osama Altamimi 2arSepi2023 Verified by STS engineer EES-TECTABIAO-RO

You might also like