EVOEYTION sm uawouncunteresreeron
(WITH RETURN FAN)
(Central station)
Prec: Al Muon 200 bed gener hospital
[onroesarten ARTO
isa save GRRE TRG FOR
eranoroe Drea
[eens FrsFner (sp
ape ass)
enous arrow 5)
caer
Fastoutes Foe)
ssn Se Pere Pa
charge Sic resue PT
Fas touts Prenre(P) lise
Fansoass ae [eeu Fo tay a
Fett riiar Foe Oa ‘sir [08
Scr ite Ps Pap eT
[chee SucParare a) =
Fanfic rsowe art [ ae
[enspoos nr an sa
[ERoToRORAT
ever = S| rower on
co ofan] frat 70 | no
a0 wiser) fanoee ts Sis [aos 1
pata TET a ry locos na 2. =
[as Seas UL S|] ser sea ea aw
eras ase Te erie Fer 1
overcoat We we) overarmea ve |
[versd etna wo fer bast we
“SUPA PAL OTE DATA a] fm
foe ee ear [oes pe
Fane aa 105 en Ptey fen
Fansran cx in = frnsnstie
[sory a 5 ir Pate
ser sr = rsa
[St Come Dstarca a) 3 svat cero ose nm
Remar
{ua porthe operator’ roquest the HEPA itr was removed fram he ABU ite due tote HEPA iter nse th GR wil.
bi eulfoont forthe freton
2 Refeting to the provious remark, the operation trun was roduced to 48 Hrto alow the
‘osign vale, Thorfore, he actual supply fan speed was found two than te design.
ppl fan's total tle pressure lls than the design value a to tho HEPA titers wore rrnoved andthe fan
‘peed se mentioned bore docreases
4 Aecording to the operators requirements the mixing dampers set at the filly open poston. While the exh
‘rae totaly elosed
{-VED checks pat of the commissening ecope and oMt ofthe TAD zope,
{Te aetual ator speed forthe supply sl eur ses Is not accessible do to theres
reading So, will make a safely issue
9:1 not posse to tae ravers rodings at the main supp ue thre Ino enough staight
Suet eva
Reading By: ease nebo zasep2025
Checked ENG Osama Aitaming s Yate zasevi023
‘Vertes by 5 engineer
EES TECABES AMRF ROEVOLUTION AIR OUTLETS TEST REPORT BB
Project: Al Mutan 200 bed genera hospital ‘System Dasinnation: AHULOR-02
Location: THIRD FLOOR ‘Test Apparatus: As per te approved method of statement
‘and measurement are nor required
Reading By: Me Ahad Mehmous Date: 20/S09/2023
Ccheckod By: ENG. Osama AL-aminy ats: -zaiseptz023
Verified by STS engineer
EES TECITABIAG-ROEVOLUTION
AIR INLETS TEST REPORT
Project: Al Mutan 200 bed genera nossa ‘System Designation: AMU-OR.02
Location THIRD FLOOR Test Anparatva: As per tho approved method of statement
“THIRD FLOOR
RAG] Rae ona] 325 | ae
RAG | a36K236 | 0002 | 3.24 [ase
RAG | a06n@36 | 0002 | 324 [a8
RAG | a05n235 | 0002 | 324 [28
RAG] vasxias | ots | 507 %
RAG | sexes | ore | sor 6 0
RAG | vesKres | oie | 507 7% aro
RAG] vasxtes [ore | sor 3, 400
LapaRAOSCOPY (03.074)
TTTAK=1, Velocity information and measuromont are not require
Remarks:
checked By: ENG. Osama Alamimi Date: 20/S0p/2008
Verified by STS engineer
ae
ees TECITABHAO-ROevOEyric YN FRESH AIR INLETS / EXHAUST TEST REPORT
Project: Al turan 200 064 genera hosptat ‘System Designation: AHU-OR.02
Location: ROOF FLOOR Test Apparatus: Aspe he approved method of statement
‘ROOF FLOOR.
anuor-02 1 | war | sssmxa00] ove] ox | 150 | os vas | so
Reading By: Me Aas Mehmoud 2arsen2023
checkou By: ENG Osama Altamimi 2arSepi2023
Verified by STS engineer
EES-TECTABIAO-RO