LAP SPLICE LENGTH:


MAIN REINFORCEMENTS

CONSTRUCTION NOTES
TO BE CONTINUOUS
COLUMN TIES AS PER SCHEDULE 1. AT ANY LEVEL NO MORE THAN ALTERNATE
MAX STIRRUPS SPACING BARS SHOULD BE SPLICED.
2. MIN. DISTANCE BETWEEN TWO ADJACENT BAR
=ø6 BARS @ 150mm
SPLICES SHALL BE 600mm.

CONFINING REINF. ZONE MAXIMUM OF


1. 1/6 CLEAR HEIGHT STRUCTURAL R.C. L

HALF OF "H"
COLUMN
SUSPENDED SLAB CONSTRUCTION
2. MAX. COL. DIMENSION
3. 450mm.
WHICHEVER IS GREATER
L/4
TOP OF FOOTING/ JOINT DETAIL
FOOTING TIE BEAM(FTB)

ADD'L 16mmØ CROSS TIES (MIN.) (MIN.)


SPACED @ 300 O.C. W/IN MAIN REINFORCEMENTS
FOOTING. TO BE CONTINUOUS
(TOP & BOT. BARS)

COLUMN VERTICAL BARS


EMBEDMENT TO FOOTING DETAIL Ø12 @100 O.C.

WHERE JOINT IS AT POINT OF


STRESS,
PROVIDE SHEAR RODS SUBJECT
TO ENGINEER'S
APPROVAL/RECOMMENDATIONS
COLUMN LAP SPLICE AND EXT.
BEAM CONSTRUCTION GIRDER TO COL. CONNECTION DET.
JOINT DETAIL

(MIN.) (MIN.)

DEPRESSION
t=FOR SLAB
CONT. FOOTING BOT. 225 mm WIDE x 6mm THK.
BARS AS SCHEDULED PVC WATERSTOP W/ FLAT TYPE
BLINDING CONCRETE
UNDERSIDE W/ FINS ON THE
(THICKNESS AS DETAILED) MAT FOOTING SIDE
2t=FOR SLAB
CONT. FTG./MAT FOOTING
CONSTRUCTION JOINT DETAIL (MIN.)

CONC. REINF. Ø 16 @ 100 CONC. REINF.


Ø 16 @ 100
BEAM/SLAB CHANGE SOFFIT
DETAIL
(MIN.) SEE WALL
SCHEDULE
4-Ø16 VERT. BARS
WALL HOR.

Ø 16 @ 100
REINFORCEMENT WALL VERT.

LEGNTH OF COL. REINFORCEMENT


REINFORCEMENT

SEE TABLE OF MIN. LAP SPLICE


FOR COL. BARS SPLICES
Ø 16 @ 100 O.C.
SCHEDULE
200mm WIDE X 6mm THK.

AS PER
(TYP.)

HOOP TIES
PVC WATERSTOP,
FIN-TYPE WITH CENTER BULB.

CONC. REINF. Ø 16 @ 100 CONC. REINF.


Ø 16 @ 100
BASEMENT EXTERIOR RETAINING

Ø 16 @ 100
WALL CONSTRUCTION WALL

NOTES:
1. YIELD STRESS OF HOOPS = 40KSI (276 MPa).

FILLER (BITUMINOUS MATERIAL) 2. D = USE MAXIMUM COLUMN DIMENSION, 1/6 CLEAR


SLAB REINF. HEIGHT OR 18" (450mm) WHICHEVER IS GREATER.

FLR. LVL. 3. NUMBER OF HOOP TIES SAME AS PER COLUMN TIES


SCHEDULE.

4. ALL CONCRETE REINFORCEMENT DETAIL SHOULD BE


DONE IN ACCORDANCE WITH ACI DETAILING MANUAL
PUB SP-66.

COLUMN ELEV.
WALL CONNECTION SHOWING DOWELS
GRAVEL BASE
SUBGRADE COMPACTED TO 95% OF AT INTERSECTION AND TIES SPACING DETAIL
VAPOR BARRIER MAXIMUM MOISTURE @ OPTIMUM
CONTENT (MAX. DEPTH OF
CONSTRUCTION NOTES & STANDARD DETAILS
WHEN REQ.
COMPRESSED
FILL = 200/LAYER)

SLAB-ON-GRADE EXPANSION
JOINT DETAIL
TABLE OF LAP SPLICE & ANCHORAGE LENGTH NOTES:
1. ACI SECTION 12.4 STATES THAT DEVELOPMENT LENGTH OF
FILLER (BITUMINOUS MATERIAL) INDIVIDUAL BARS W/IN A BUNDLE, IN TENSION OR COMPRESSION,
SHALL BE THAT FOR THE INDIVIDUAL BAR, INCREASED 20% FOR
SLAB REINF.
THREE BAR BUNDLE, AND 33% FOR FOUR-BAR BUNDLE.
FLR. LVL.
2. FOR COLUMNS, AT ANY LEVEL NO MORE THAN ALTERNATE BARS
SHOULD BE SPLICED. NOT MORE THAN 33 % OF THE BARS SHALL
BE SPLICED W/IN THE REQUIRED LAP LENGTH. MINIMUM
DISTANCE BETWEEN TWO ADJACENT BAR SPLICES SHALL BE 600
MM.

PEJ
GRAVEL BASE 3. TOP BARS ARE HORIZONTAL BARS W/ MORE THAN 300 MM DEPTH
SUBGRADE COMPACTED TO 95% OF
VAPOR BARRIER MAXIMUM DRY DENSITY @ OPTIMUM OF CONCRETE CAST BELOW THE REINFORCEMENT.
WHEN REQ. MOISTURE CONTENT (MAX. DEPTH OF
COMPRESSED
4. AS MUCH AS POSSIBLE, SPLICES SUBJECTED TO TENSILE
FILL=(200mm PER LAYER).
STRESSES ARE DISCOURAGED, THESE SHOULD BE AVOIDED OR

SLAB-ON-GRADE CONSTRUCTION PROVIDED W/ STANDARD HOOKS.

JOINT DETAIL

PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :

MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : CONSTRUCTION NOTES
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART
S - 01
PE

PL

PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE
AS

US

DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 01
ES
EN

CHECKED ON SITE PRIOR TO MANUFACTURE AND ROOF DECK


IC
G

N
I

EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY

Downloaded by Julie Anne Marie Flores (floresjulieannemarie@gmail.com)


lOMoARcPSD|38296890

PROPOSED PIPE SLEEVE LOCATIONS


SCH. 40 G.I. PIPE SLEEVE
NOTE: 2d (NO PIPE SLEEVE SHALL BE 2 - EXTRA STIR. EA. SIDE OF SLEEVE
PROVIDE THESE ADDITIONAL BARS FOR ALL OPENINGS PLUS BARS (SHOWN AS DOTTED LINES)
ALLOWED W/ IN THIS ZONE (TYP.))
2d 2d
PARALLEL TO SIDE OF OPENING EQUAL TO THE NUMBER OF INTERRUPTED BARS BY THE OPENING. SEE
ARCHITECTURAL & MECHANICAL PLANS FOR SLAB OPENING LOCATION. 2 - EXTRA STIR. EA.

SEE TABLE OF
ANCHORAGE
SIDE OF SLEEVE

30 BAR DIA.
Ø12x1000 LONG DIAGONALS AT MID-DEPTH OF

0
TOP BARS

50
SLAB AT EACH CORNER.

)
P.
FACE OF

(TYP.)

(TYP.)

Y
(T
SUPPORT TOP BARS
Ø 16 EXTRA BARS E.F.
(DIAGONALS)

d/5
NOTE:

SEE BEAM SCHEDULE


WINDOW OMIT TRIMMER BARS
OPENING WHERE OPENING IS
FRAMED BY BEAMS.
PIPE SLEEVE

d
CLR.
d/5
DOOR Ø 16 CROSS ANCHORS

MIN.

d/5
OPENING

40
WELDED TO SLEEVE

Ø=d/
Ø 16 EXTRA BARS
BOT. BARS
4d (MIN.) E.F. (TYPICAL) BOT. BARS

2
IN TWO WAY SLAB
SEE TABLE EXTEND BARS UP TO FACE OF SUPPORT
OF ANCHORAGE BEAM SUPPORT STIR. AS SCHED.
(TYP.) ADDITIONAL TRIMMER BARS(SHOWN AS
DOTTED LINES), AS SIDES OF OPENING L/4 L/2 L/4
EQUAL TO THE NUMBER OF BARS
TERMINATED BY THE OPENING. L
DOOR OPENING DETAIL WINDOW OPENING DETAIL SLAB OPENING DET. LIMIT LOCATION OF PIPE SLEEVE

NOTES:
1. SEEK STRUCTURAL ENGINEER'S APPROVAL FOR PIPE SLEEVES W/
DIAMETERS BIGGER THAN THE MAXIMUMSTIPULATED.

2. PIPE SLEEVES SHALL BE LOCATED W/IN TENSION ZONES OF BEAM.

3. NO PIPE SLEEVE SHALL BE ALLOWED AT TWICE THE THE BEAM DEPTH


(2d) FROM THE SUPPORT.

PIPE SLEEVE THRU BEAM DETAIL

WALL FOOTING DETAILS (UNLESS OTHERWISE SHOWN)

CONSTRUCTION NOTES & STANDARD DETAILS


NOT TO SCALE

TOP BARS

BOTTOM BARS STIFFENER


(WEB BAR)

AT SUPPORTS MIDSPAN
BEAM TRANSITION REINFORCEMENT DETAIL
SCALE: NTS

PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :

MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : CONSTRUCTION NOTES
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART
S - 02
PE

PL

PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE
AS

US

DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 02
ES
EN

CHECKED ON SITE PRIOR TO MANUFACTURE AND ROOF DECK


IC
G

N
I

EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY

Downloaded by Julie Anne Marie Flores (floresjulieannemarie@gmail.com)


lOMoARcPSD|38296890

THIS SITE
B262 L16 GRP. 7 ZONE 13
STA. MARIA ST., PEMBO,
MAKATI CITY

Ayalla Malls

26
th
St

oad
The Aston at
Two Serendra

ice R
SM Aura Premier

Serv
kwy
le yP C5
)
San Pedro (
c kin rcia
M Calungsod Chapel Ga
. NORTH
sP
rlo
Ca ad
o
c eR
rvi
SM Aura Office Tower Se

Emerald

y
Rub
Mayflower

Calla Aquarius
Tulip

Sampaloc

c
Sta. Maria

alo
TABLE 2

mp
Sa

Sa
mp
SCHEDULE OF CONCRETE HOLLOW BLOCK REINFORCEMENT

alo
c
CHB
REINFORCEMENT
THICKNESS NOTE
mm HORIZONTAL VERTICAL

A. MINIMUM LAP SPLICES - 30cm


B. PROVIDE 1-12Ø VERTICAL BAR @ CORNERS
3 VICINITY MAP
100 10mmØ @ 600mm O.C. 10mmØ @ 600mm O.C. S-1 SCALE: NTS
INTERSECTIONS, END OF WALLS, AND EACH
SIDE OF OPENING.
C. WHERE CHB WALLS ADJOIN COLUMNS RC
BEAMS & WALLS DOWELS WITH THE SAME
125 10mmØ @ 600mm O.C. 10mmØ @ 600mm O.C. SIZE AS VERTICAL OR HORIZONTAL REIN-
FORCEMENT SHALL BE PROVIDED.
D. LINTEL BEAMS SHALL BEAR AT LEAST 16"

TABLE 1
(400mm) ON EACH SIDE OF MASONRY
150 10mmØ @ 600mm O.C. 10mmØ @ 600mm O.C. WALL OPENING.
E. PROVIDE POST & LINTEL BEAM @ 3.00m O.C.
GRADE BAR DIAMETER
GRADE 415 (fy = 60 ksi) 28, 32, & 36 mm

GRADE 275 (fy = 40 ksi) 25, 20 &16 mm


CONT. L-SHAPED DOWEL
GRADE 228 (fy = 33 ksi) ALTERNATELY INSTALLED.
SMALLER THAN 16 mm
MATCH CHB HOR. BARS

CONT. L-SHAPED DOWEL TO


MATCH CHB HOR. BARS

FOR SIZE AND SPACING FOR SIZE AND SPACING


OF HOR. & VERT. BARS OF HOR. & VERT. BARS
SEE SCHEDULE OF CONC. SEE SCHEDULE OF CONC.
HOLLOW BLOCK REINFORCE- HOLLOW BLOCK REINFORCEMENT
MENT @ 0.60 M C-C.

CONCRETE HOLLOW BLOCKS CONCRETE HOLLOW BLOCKS

INTERSECTING WALL CORNER WALL

PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :

MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : CONSTRUCTION NOTES
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART VICINITY MAP
S - 03
PE

PL

PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE
AS

US

DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 03
ES
EN

CHECKED ON SITE PRIOR TO MANUFACTURE AND ROOF DECK


IC
G

N
I

EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY

Downloaded by Julie Anne Marie Flores (floresjulieannemarie@gmail.com)


lOMoARcPSD|38296890

1 2 3 4

A C1 C1 C1 C1

CF-1 CF-2

B C1 C2 C2 C1

C C1 CF-3 C2 C2 CF-4 C1

4 FOUNDATION PLAN
S-2 SCALE: 1:100

COMBINED FOOTING - A COMBINED FOOTING - B


SCHEDULE OF COLUMNS
MARK / FLOOR LEVEL C1 C2

Roof Deck LEVEL


TO
Apex Deck LEVEL SIZE 400 X 400

REBARS 12-25mmØ
TIES 3-SETS 12mmØ
3@50mm, 8@75, 10@100,
rest @ 125mm to center

3rd FLOOR LEVEL


TO
Roof DECK LEVEL SIZE 450 X 450 SIZE 400 X 400

REBARS 12-25mmØ REBARS 12-25mmØ


TIES 3-SETS 12mmØ TIES 3-SETS 12mmØ
3@50mm, 8@75, 10@100, 3@50mm, 8@75, 10@100,
rest @ 125mm to center rest @ 125mm to center

COMBINED FOOTING - C COMBINED FOOTING - D


2nd FLOOR LEVEL
TO
3rd FLOOR LEVEL SIZE 450 X 450 SIZE 400 X 400

REBARS 12-25mmØ REBARS 12-25mmØ


TIES 3-SETS 12mmØ TIES 3-SETS 12mmØ

SCHEDULE OF FOOTINGS
3@50mm, 8@75, 10@100, 3@50mm, 8@75, 10@100,
rest @ 125mm to center rest @ 125mm to center

1st FLOOR LEVEL


TO
2nd FLOOR LEVEL SIZE 450 X 450 SIZE 400 X 400

REBARS 12-25mmØ REBARS 12-25mmØ


TIES 3-SETS 12mmØ TIES 3-SETS 12mmØ
3@50mm, 8@75, 10@100, 3@50mm, 8@75, 10@100,
rest @ 125mm to center rest @ 125mm to center

COLUMN DETAILS
FOUNDATION LEVEL
TO
1st FLOOR LEVEL SIZE 450 X 450 SIZE 400 X 400

REBARS 12-25mmØ REBARS 12-25mmØ


TIES 3-SETS 12mmØ TIES 3-SETS 12mmØ
3@50mm, 8@75, 10@100, 3@50mm, 8@75, 10@100,
rest @ 125mm to center rest @ 125mm to center

PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :

MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : foundation plan
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART schedule of footings

S - 04
PE

PL

PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE schedule of columns
AS

US

DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 04
ES
EN

CHECKED ON SITE PRIOR TO MANUFACTURE AND ROOF DECK


IC
G

N
I

EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY

Downloaded by Julie Anne Marie Flores (floresjulieannemarie@gmail.com)


lOMoARcPSD|38296890

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

A C1 TB300x400 C1 TB300x400 C1 TB300x400 C1 A C1 2B-1 C1 2B-1 C1 2B-1 C1 A C1 3B-1 C1 3B-1 C1 3B-1 C1 A C1 RB-1 C1 RB-1 C1 RB-1 C1

1 2

TB300x400
TB300x400
TB300x400

TB300x400
2-WAY 2-WAY 2-WAY 2-WAY 2-WAY 2-WAY 2-WAY

RB-8
2B-8

3B-8
2-WAY

RB-7
2B-7

3B-7

RB-5

RB-6
2-WAY

2B-5

3B-5
2B-6

3B-6
SLAB SLAB SLAB SLAB SLAB SLAB SLAB
SLAB SLAB

B C1 TB300x400 C2 TB300x400 C2 TB300x400 C1 B C1 2B-2 C2 2B-2 C2 2B-2 C1 B C1 3B-2 C2 3B-2 C2 3B-2 C1 B C1 RB-2 C2 RB-2 C2 RB-2 C1 B C1 AB-1 C2

TB300x400

TB300x400

TB300x400

TB300x400
2-WAY 2-WAY

RB-8
2-WAY

2B-8

3B-8
2-WAY 2-WAY

AB-1

AB-1
RB-7
2-WAY

2B-7

RB-5
3B-7
2B-5

3B-5

RB-6
2B-6

3B-6
STAIR STAIR 2-WAY STAIR
SLAB SLAB SLAB SLAB SLAB SLAB
SLAB

C C1 TB300x400 C2 TB300x400 C2 TB300x400 C1 C C1 2B-3 C2 2B-3 C2 2B-3 C1 C C1 3B-3 C2 3B-3 C2 3B-3 C1 C C1 RB-3 C2 RB-3 C2 RB-3 C1 C C1 AB-1 C2

ACB-1
ACB-1
RCB-1

RCB-2

RCB-3
2CB-1

2CB-2

3CB-1

3CB-2

3CB-3

RCB-4
1-WAY SLAB

2CB-3

2CB-4

3CB-4
1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB

2B-4 2B-4 2B-4 3B-4 3B-4 3B-4 RB-4 RB-4 RB-4 AB-1

2 TIE BEAM FRAMING PLAN 2 SECOND FLOOR FRAMING PLAN 2 THIRD FLOOR FRAMING PLAN 2 ROOF DECK FRAMING PLAN 2 APEX DECK FRAMING PLAN
E-5 SCALE: 1:100 E-5 SCALE: 1:100 E-5 SCALE: 1:100 E-5 SCALE: 1:100 E-5 SCALE: 1:100

SCHEDULE OF FOOTING TIE BEAM 2B-1 2B-2 2B-3 2B-4 3B-1 3B-2 3B-3 3B-4
SIZE MAIN REINFORCEMENT STIRRUPS STIFFENERS
MARK BAR AT SUPPORT AT MIDSPAN
b h DIA.
(mm) (mm) TOP BAR BOT. BAR TOP BAR BOT. BAR NO./SET DIA. SPACING WEB BARS
6-20mmØ 4-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ

2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ
SCHEDULE OF SECOND FLOOR BEAM 4-20mmØ 4-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ

SIZE MAIN REINFORCEMENT STIRRUPS STIFFENERS


MARK BAR AT SUPPORT AT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN
b h DIA.
(mm) (mm) TOP BAR BOT. BAR TOP BAR BOT. BAR NO./SET DIA. SPACING WEB BARS
2B-5 2B-6 2B-7 2B-8 3B-5 3B-6 3B-7 3B-8

4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ

2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ

3-20mmØ 3-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ

AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN

2CB-1 2CB-2 2CB-3 2CB-4 3CB-1 3CB-2 3CB-3 3CB-4

4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ SECTION

2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ

3-20mmØ 3-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ

SCHEDULE OF THIRD FLOOR BEAM AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN
SIZE MAIN REINFORCEMENT STIRRUPS STIFFENERS
MARK BAR AT SUPPORT AT MIDSPAN
b h DIA.
(mm) (mm) TOP BAR BOT. BAR TOP BAR BOT. BAR NO./SET DIA. SPACING WEB BARS

RB-1 RB-2 RB-3 RB-4 AB-1 ACB-1 TB300x400

3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ

2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ
PLAN
2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ

AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN

RB-5 RB-6 RB-7 RB-8


1
SECTION

TOP BARS
3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ

2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ


SLAB DETAILS
SCHEDULE OF ROOF DECK BEAM 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ

SIZE MAIN REINFORCEMENT STIRRUPS STIFFENERS


MARK BAR AT SUPPORT AT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN
b h BOTTOM BARS STIFFENER
DIA. SPACING WEB BARS
(mm) (mm) TOP BAR BOT. BAR TOP BAR BOT. BAR NO./SET DIA.
RCB-1 RCB-2 RCB-3 RCB-4 (WEB BAR)

BEAM TRANSITION REINFORCEMENT DETAIL


3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ

2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ

2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ

AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN

AT SUPPORTS MIDSPAN

SCHEDULE OF APEX DECK BEAM


SIZE MAIN REINFORCEMENT STIRRUPS STIFFENERS
MARK BAR AT SUPPORT AT MIDSPAN
b h DIA.
(mm) (mm) TOP BAR BOT. BAR TOP BAR BOT. BAR NO./SET DIA. SPACING WEB BARS

TYPICAL STAIR DETAILS

PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :

MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY :
CONSTRUCTION OF
M DES I GN TIE BEAM FRAMING PLAN WITH SCHECULE
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART SECOND FLOOR FRAMING PLAN WITH SCHEDULE
S - 05
PE

PL

PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE THIRD FLOOR FRAMING PLAN WITH SCHEDULE
AS

US

DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES ROOF DECK FRAMING PLAN WITH SCHEDULE
APEX DECK FRAMING PLAN WITH SCHEDULE
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE SLABS DETAILS 05
ES
EN

ROOF DECK
TYPICAL STAIR DETAILS
CHECKED ON SITE PRIOR TO MANUFACTURE AND
IC
G

N
I

EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY

Downloaded by Julie Anne Marie Flores (floresjulieannemarie@gmail.com)

You might also like