Professional Documents
Culture Documents
CONSTRUCTION NOTES
TO BE CONTINUOUS
COLUMN TIES AS PER SCHEDULE 1. AT ANY LEVEL NO MORE THAN ALTERNATE
MAX STIRRUPS SPACING BARS SHOULD BE SPLICED.
2. MIN. DISTANCE BETWEEN TWO ADJACENT BAR
=ø6 BARS @ 150mm
SPLICES SHALL BE 600mm.
HALF OF "H"
COLUMN
SUSPENDED SLAB CONSTRUCTION
2. MAX. COL. DIMENSION
3. 450mm.
WHICHEVER IS GREATER
L/4
TOP OF FOOTING/ JOINT DETAIL
FOOTING TIE BEAM(FTB)
(MIN.) (MIN.)
DEPRESSION
t=FOR SLAB
CONT. FOOTING BOT. 225 mm WIDE x 6mm THK.
BARS AS SCHEDULED PVC WATERSTOP W/ FLAT TYPE
BLINDING CONCRETE
UNDERSIDE W/ FINS ON THE
(THICKNESS AS DETAILED) MAT FOOTING SIDE
2t=FOR SLAB
CONT. FTG./MAT FOOTING
CONSTRUCTION JOINT DETAIL (MIN.)
Ø 16 @ 100
REINFORCEMENT WALL VERT.
AS PER
(TYP.)
HOOP TIES
PVC WATERSTOP,
FIN-TYPE WITH CENTER BULB.
Ø 16 @ 100
WALL CONSTRUCTION WALL
NOTES:
1. YIELD STRESS OF HOOPS = 40KSI (276 MPa).
COLUMN ELEV.
WALL CONNECTION SHOWING DOWELS
GRAVEL BASE
SUBGRADE COMPACTED TO 95% OF AT INTERSECTION AND TIES SPACING DETAIL
VAPOR BARRIER MAXIMUM MOISTURE @ OPTIMUM
CONTENT (MAX. DEPTH OF
CONSTRUCTION NOTES & STANDARD DETAILS
WHEN REQ.
COMPRESSED
FILL = 200/LAYER)
SLAB-ON-GRADE EXPANSION
JOINT DETAIL
TABLE OF LAP SPLICE & ANCHORAGE LENGTH NOTES:
1. ACI SECTION 12.4 STATES THAT DEVELOPMENT LENGTH OF
FILLER (BITUMINOUS MATERIAL) INDIVIDUAL BARS W/IN A BUNDLE, IN TENSION OR COMPRESSION,
SHALL BE THAT FOR THE INDIVIDUAL BAR, INCREASED 20% FOR
SLAB REINF.
THREE BAR BUNDLE, AND 33% FOR FOUR-BAR BUNDLE.
FLR. LVL.
2. FOR COLUMNS, AT ANY LEVEL NO MORE THAN ALTERNATE BARS
SHOULD BE SPLICED. NOT MORE THAN 33 % OF THE BARS SHALL
BE SPLICED W/IN THE REQUIRED LAP LENGTH. MINIMUM
DISTANCE BETWEEN TWO ADJACENT BAR SPLICES SHALL BE 600
MM.
PEJ
GRAVEL BASE 3. TOP BARS ARE HORIZONTAL BARS W/ MORE THAN 300 MM DEPTH
SUBGRADE COMPACTED TO 95% OF
VAPOR BARRIER MAXIMUM DRY DENSITY @ OPTIMUM OF CONCRETE CAST BELOW THE REINFORCEMENT.
WHEN REQ. MOISTURE CONTENT (MAX. DEPTH OF
COMPRESSED
4. AS MUCH AS POSSIBLE, SPLICES SUBJECTED TO TENSILE
FILL=(200mm PER LAYER).
STRESSES ARE DISCOURAGED, THESE SHOULD BE AVOIDED OR
JOINT DETAIL
PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :
MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : CONSTRUCTION NOTES
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART
S - 01
PE
PL
PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE
AS
US
DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 01
ES
EN
N
I
EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY
SEE TABLE OF
ANCHORAGE
SIDE OF SLEEVE
30 BAR DIA.
Ø12x1000 LONG DIAGONALS AT MID-DEPTH OF
0
TOP BARS
50
SLAB AT EACH CORNER.
)
P.
FACE OF
(TYP.)
(TYP.)
Y
(T
SUPPORT TOP BARS
Ø 16 EXTRA BARS E.F.
(DIAGONALS)
d/5
NOTE:
d
CLR.
d/5
DOOR Ø 16 CROSS ANCHORS
MIN.
d/5
OPENING
40
WELDED TO SLEEVE
Ø=d/
Ø 16 EXTRA BARS
BOT. BARS
4d (MIN.) E.F. (TYPICAL) BOT. BARS
2
IN TWO WAY SLAB
SEE TABLE EXTEND BARS UP TO FACE OF SUPPORT
OF ANCHORAGE BEAM SUPPORT STIR. AS SCHED.
(TYP.) ADDITIONAL TRIMMER BARS(SHOWN AS
DOTTED LINES), AS SIDES OF OPENING L/4 L/2 L/4
EQUAL TO THE NUMBER OF BARS
TERMINATED BY THE OPENING. L
DOOR OPENING DETAIL WINDOW OPENING DETAIL SLAB OPENING DET. LIMIT LOCATION OF PIPE SLEEVE
NOTES:
1. SEEK STRUCTURAL ENGINEER'S APPROVAL FOR PIPE SLEEVES W/
DIAMETERS BIGGER THAN THE MAXIMUMSTIPULATED.
TOP BARS
AT SUPPORTS MIDSPAN
BEAM TRANSITION REINFORCEMENT DETAIL
SCALE: NTS
PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :
MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : CONSTRUCTION NOTES
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART
S - 02
PE
PL
PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE
AS
US
DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 02
ES
EN
N
I
EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY
THIS SITE
B262 L16 GRP. 7 ZONE 13
STA. MARIA ST., PEMBO,
MAKATI CITY
Ayalla Malls
26
th
St
oad
The Aston at
Two Serendra
ice R
SM Aura Premier
Serv
kwy
le yP C5
)
San Pedro (
c kin rcia
M Calungsod Chapel Ga
. NORTH
sP
rlo
Ca ad
o
c eR
rvi
SM Aura Office Tower Se
Emerald
y
Rub
Mayflower
Calla Aquarius
Tulip
Sampaloc
c
Sta. Maria
alo
TABLE 2
mp
Sa
Sa
mp
SCHEDULE OF CONCRETE HOLLOW BLOCK REINFORCEMENT
alo
c
CHB
REINFORCEMENT
THICKNESS NOTE
mm HORIZONTAL VERTICAL
TABLE 1
(400mm) ON EACH SIDE OF MASONRY
150 10mmØ @ 600mm O.C. 10mmØ @ 600mm O.C. WALL OPENING.
E. PROVIDE POST & LINTEL BEAM @ 3.00m O.C.
GRADE BAR DIAMETER
GRADE 415 (fy = 60 ksi) 28, 32, & 36 mm
PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :
MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : CONSTRUCTION NOTES
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART VICINITY MAP
S - 03
PE
PL
PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE
AS
US
DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 03
ES
EN
N
I
EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY
1 2 3 4
A C1 C1 C1 C1
CF-1 CF-2
B C1 C2 C2 C1
C C1 CF-3 C2 C2 CF-4 C1
4 FOUNDATION PLAN
S-2 SCALE: 1:100
REBARS 12-25mmØ
TIES 3-SETS 12mmØ
3@50mm, 8@75, 10@100,
rest @ 125mm to center
SCHEDULE OF FOOTINGS
3@50mm, 8@75, 10@100, 3@50mm, 8@75, 10@100,
rest @ 125mm to center rest @ 125mm to center
COLUMN DETAILS
FOUNDATION LEVEL
TO
1st FLOOR LEVEL SIZE 450 X 450 SIZE 400 X 400
PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :
MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY : foundation plan
CONSTRUCTION OF
M DES I GN
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART schedule of footings
S - 04
PE
PL
PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE schedule of columns
AS
US
DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE 04
ES
EN
N
I
EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
A C1 TB300x400 C1 TB300x400 C1 TB300x400 C1 A C1 2B-1 C1 2B-1 C1 2B-1 C1 A C1 3B-1 C1 3B-1 C1 3B-1 C1 A C1 RB-1 C1 RB-1 C1 RB-1 C1
1 2
TB300x400
TB300x400
TB300x400
TB300x400
2-WAY 2-WAY 2-WAY 2-WAY 2-WAY 2-WAY 2-WAY
RB-8
2B-8
3B-8
2-WAY
RB-7
2B-7
3B-7
RB-5
RB-6
2-WAY
2B-5
3B-5
2B-6
3B-6
SLAB SLAB SLAB SLAB SLAB SLAB SLAB
SLAB SLAB
B C1 TB300x400 C2 TB300x400 C2 TB300x400 C1 B C1 2B-2 C2 2B-2 C2 2B-2 C1 B C1 3B-2 C2 3B-2 C2 3B-2 C1 B C1 RB-2 C2 RB-2 C2 RB-2 C1 B C1 AB-1 C2
TB300x400
TB300x400
TB300x400
TB300x400
2-WAY 2-WAY
RB-8
2-WAY
2B-8
3B-8
2-WAY 2-WAY
AB-1
AB-1
RB-7
2-WAY
2B-7
RB-5
3B-7
2B-5
3B-5
RB-6
2B-6
3B-6
STAIR STAIR 2-WAY STAIR
SLAB SLAB SLAB SLAB SLAB SLAB
SLAB
C C1 TB300x400 C2 TB300x400 C2 TB300x400 C1 C C1 2B-3 C2 2B-3 C2 2B-3 C1 C C1 3B-3 C2 3B-3 C2 3B-3 C1 C C1 RB-3 C2 RB-3 C2 RB-3 C1 C C1 AB-1 C2
ACB-1
ACB-1
RCB-1
RCB-2
RCB-3
2CB-1
2CB-2
3CB-1
3CB-2
3CB-3
RCB-4
1-WAY SLAB
2CB-3
2CB-4
3CB-4
1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB 1-WAY SLAB
2B-4 2B-4 2B-4 3B-4 3B-4 3B-4 RB-4 RB-4 RB-4 AB-1
2 TIE BEAM FRAMING PLAN 2 SECOND FLOOR FRAMING PLAN 2 THIRD FLOOR FRAMING PLAN 2 ROOF DECK FRAMING PLAN 2 APEX DECK FRAMING PLAN
E-5 SCALE: 1:100 E-5 SCALE: 1:100 E-5 SCALE: 1:100 E-5 SCALE: 1:100 E-5 SCALE: 1:100
SCHEDULE OF FOOTING TIE BEAM 2B-1 2B-2 2B-3 2B-4 3B-1 3B-2 3B-3 3B-4
SIZE MAIN REINFORCEMENT STIRRUPS STIFFENERS
MARK BAR AT SUPPORT AT MIDSPAN
b h DIA.
(mm) (mm) TOP BAR BOT. BAR TOP BAR BOT. BAR NO./SET DIA. SPACING WEB BARS
6-20mmØ 4-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ
2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ
SCHEDULE OF SECOND FLOOR BEAM 4-20mmØ 4-20mmØ 4-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 4-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ
4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ
2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ
3-20mmØ 3-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ
AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN
4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 4-20mmØ 4-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ SECTION
2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ
3-20mmØ 3-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 3-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ
SCHEDULE OF THIRD FLOOR BEAM AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN
SIZE MAIN REINFORCEMENT STIRRUPS STIFFENERS
MARK BAR AT SUPPORT AT MIDSPAN
b h DIA.
(mm) (mm) TOP BAR BOT. BAR TOP BAR BOT. BAR NO./SET DIA. SPACING WEB BARS
3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ
2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ
PLAN
2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ 3-20mmØ
AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN AT SUPPORT MIDSPAN
TOP BARS
3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ 3-20mmØ 2-20mmØ
AT SUPPORTS MIDSPAN
PREPARED BY: PRC NO. : 0150465 THE DESIGNS, TECHNICAL SPECIFICATIONS AND CONSTRUCTION PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :
MAY 16, 2023 DETAILS HAVE BEEN EXCLUSIVELY PREPARED FOR THIS PROJECT
VALIDITY :
CONSTRUCTION OF
M DES I GN TIE BEAM FRAMING PLAN WITH SCHECULE
CT
RU S
ONLY. IT SHALL NOT BE REPRODUCED OR COPIED IN ANY PART SECOND FLOOR FRAMING PLAN WITH SCHEDULE
S - 05
PE
PL
PTR NO. : 6439196 OR WHOLE WITHOUT THE DIRECT PERMISSION FROM THE THIRD FLOOR FRAMING PLAN WITH SCHEDULE
AS
US
DESIGNER. THIS DRAWING SHALL BE SCALED FOR 3 STOREY MIX USED BUILDING WITH GAUDIOSA O. MONTAJES ROOF DECK FRAMING PLAN WITH SCHEDULE
APEX DECK FRAMING PLAN WITH SCHEDULE
ENGR. ANDRO S. REBUYAS, CE, ME-1, MP, M.ASCE DATE ISSUED : JANUARY 02, 2020 CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE TO BE SLABS DETAILS 05
ES
EN
ROOF DECK
TYPICAL STAIR DETAILS
CHECKED ON SITE PRIOR TO MANUFACTURE AND
IC
G
N
I
EE RV
R I NG S E
CIVIL / STRUCTURAL ENGINEER, MATERIALS ENGINEER 1, MASTER PLUMBER ISSUED AT: PASIG CITY OWNER
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION. 05
ADDRESS: 8487 SANDOVAL AVENUE METRO MANILA, BRGY. PINAGBUHATAN PASIG CITY 1602 T. I. N. : 341 - 514 - 303 ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY ADDRESS: B262 L16 GRP. 7 ZONE 13 STA. MARIA ST., PEMBO, MAKATI CITY