You are on page 1of 1

15-04-2024

paint measurement rate Total


1 6 flat wall putty sec coat 3258x6= 19548 2.75 53757
2 Ground floor common area wall putty 2 4600 5.50 25300
coat
3 Wall putty 1 coat 1 coat primer 1 coat OBD 3616 6.75 43092
4 Parking white celling 6384 3.50 22344
5 14 flat 1 coat primer, 1 coat OBD complete 45612 4.00 182448
3258x14
6 Exterior case 1 coat primer 1 coat OBD 16618 4.00 66472
8309x2=
7 Common area 1 coat primer 1coat OBD
1+2+3+4+5+6+7+8= 4300x8 34400 4.00 137600
9 floor 4600x1 4600 4.00 18400
Ground flor 4600x1 4600 4.00 18400
8 Total enamel Paint 33516 9.50 318402
9 Exterior second coat 100105 4.75 475498
10 Balcony
64x10.764
Exterior coat primer 688 13.5 9300
Weather coat complete
11 Exterior repair wall putty 1 coat, 2 coat 8737 14.00 122318
weather complete 8737 feet
12 Pillar repair , cement wall putty 7000
13 2 Exterior case exciting granite arch with 7200
labor
14 Bit Machine Complete Wall Putty, primer 1090 9.50 10592
OBD
15 2 room lift store, lift room OBD 2 coat , 2 1115 9.50 10592
coat wall putty
16 Pipe House 2 coat weather coat 1506 9050 14307
17 Tarries pipe weather coat 6157 13.5 83119
Total 1625904
18% GST 292662
Net total 1918566