You are on page 1of 1

A B C D E F

1 GOVIND CIVIL BUILDING CONTRACTOR M : 7838745751


DAWARKA SEC-6 /368/ DEHLI
2
3 sno estatement size per sqfr rate amount
4 1 demolation works:-
5 out side wall 9'' inch wall briking and rapier cost 16000/-
6
7 2 Drawing room
8 3 one wall domalation and rapier cost 8x4 5500/-
9
10 4 chowkhat removing all 10 remov 22000/-
11
12 5 Two bathroom wall tile & floor tile removed
13 kitchen wall tile and floor tile slap, balcony floor tile removing
14 and demolation work cost 28000/-
15
16
17 6 Outdoor room floor 4'' P.C.C & Plastering cost 14x7 98x150 14700/-
18
19 7 chowkhat installation ( 10wood chowkhat) cost 160000/-
20
21 8 kitchen Granite stone fixing 25000
22
23 9 Room ''two piece chowkhat And window attach removing rapier 16000/-
24
25 10 main Gate wall tile instalation 8x10,14x10 240sqft ****
26
27 11 kitchen floor 10x8 80sqft
28 wall tile 28x7 196sqft
29 1st' bathrrom floor tile 7.6x5.8 44sqft
30 1st'bathroom wall tile 27x7.7 208sqft
31 2nd' bathrrom floor tile 5.6x7.6 41.8sqft
32 2nd' bathrrom wallr tile 26x7.7 200sqft
33 camical latricate adesive 305 etc 1009.8x85 85833/-
34
35 12 Paint work
36 royal paint in your home
37 two coat putty
38 one coat priemer
39 asian 3 coat paint 130000/-
40 not include chowkhat and windows
41 13 Asian priemum paint cost not include statement 110000/-