HARGA JUMLAH
NO. JENIS PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (Rp)
1 2 3 4 5.00 6=4x5
I PEKERJAAN PERSIAPAN
0.29
g Pekerjaan sanitary
lantai 1
1 Closet duduk + Jet Shower + aksesoris unit 2
2 westafle + buangan ( sifon ) unit 1
3 Kitchen sink royal + aksesoris pembuangan +kran unit 1
4 Floor drain PVC Standar unit 2
Lantai 2
1 Closet duduk + Jet Shower + aksesoris unit 2 1,218,000.00 0 4,200,000.00
2 Shower head std unit 2
3 westafle + buangan ( sifon ) unit 2
6 Floor drain stainless unit 2
7 Roof drain Pvc unit 1 36,250.00 0 125,000.00
IV PEKERJAAN MEP 19,720.00 0 68,000.00
h Pekerjaan Plumbing - 0
1 Pipa 1" dari toren menuju distribusi m1 12 36,250.00 0 125,000.00
2 pipa 3/4" distribusi air m1 65 19,720.00 0 68,000.00
3 pipa 1/2" menuju kran m1 35 - 0
4 stop kran titik 2 - 0
5 Bak kontrol titik 2 75,400.00 0 260,000.00
6 Pek Septictank titik 1 75,400.00 0 260,000.00
i Pekerjaan Kelistrikan 75,400.00 0 260,000.00
Lantai 1 75,400.00 0 260,000.00
1 Pek instalasi lampu titik 15 75,400.00 0 260,000.00
2 Pek instalasi stop kontak titik 6 24,650.00 0 85,000.00
3 Pek instalasi stop kontak ac titik 1 - 0
4 Pek instalasi antena titik 2 75,400.00 0 260,000.00
5 Pek MCB 6-10 A titik 4 75,400.00 0 260,000.00
6 Pek Box MCB 4 gang titik 1 75,400.00 0 260,000.00
Lantai 2 24,650.00 0 85,000.00
1 Pek instalasi lampu titik 14 - 0
2 Pek instalasi stop kontak titik 6 - 0
3 Pek instalasi stop kontak ac titik 2 - 0
4 Pek instalasi antena titik 2 40,600.00 0 140,000.00
11 Pek MCB 6-10 A titik 4 28,420.00 0 98,000.00
12 Pek Box MCB 4 gang titik 1 - 0
40,600.00 0 140,000.00
v Pekerjaan Besi dan lain lain 28,420.00 0 98,000.00
1 pekerjaan dinding batu alam paras palimanan m2 19.07 - 0
- 0
- 0
- 0
- 0
- 0
13,050.00 0 45,000.00
11,600.00 0 40,000.00
13,050.00 0 45,000.00
232,000.00 0 800,000.00
- 0
- 0
13,050.00 0 45,000.00
11,600.00 0 40,000.00