0 – COMPONENT 9
RUSA GRANT 2.0 – COMPONENT 9:
3) BIFURCATION OF GRANT
a) RENOVATION WORK – 37.5% Rs. 75,00,975.00
b) NEW CONSTRUCTION – 12.95% Rs. 26,22,900.00
c) EQUIPMENTS / FACILITIES – 49.55% Rs. 99,09,569.00
RENOVATION WORK:
A Savings
1 Dismantling 22,000
2 MS Grill 52,000
3 PCC 13,000
4 Brick work 36,000
5 Loft - Steel 1,05,000
6 Loft - RCC (17+18) 1,03,000
7 Aluminum Window 35,000
8 Door - Panelled door 23,000
9 Plaster - 26 3,600
10 Plaster - 27 17,000
11 Vitrified tiles floor + Skirting 2,98,000
12 Glazed tiles 7,000
13 Pest Control 6,000
14 Plumbing 83,000
15 Putty 1,08,000
16 Plastic Paint 1,65,000
17 MS Structure 18,000
18 Electrical installation work 2,00,000
19 False ceiling 27,000
Total 13,21,600
Say Rs. 13,49,000/-
EXCESS IN RENOVATION WORK
B Excess
1 Door - Flush 20,000
2 Kotah Stone 49,000
3 Granite 4,49,000
4 Painting on steel 52,000
5 Apex - External Paint 1,38,000
6 Gypusm Board 1,94,000
7 Aluminum Partition 20,300
8 Electrical installation work 2,70,000
Total 11,92,300