A. LANTAI I
I. PEKERJAAN BETON PRAKTIS
1 Kolom Praktis m' 94.50 75,000.00 7,087,500.00 0.622 0.00 0.00 0.000 0
2 Balok praktis m' 38.65 75,000.00 2,898,750.00 0.255 0.00 0.00 0.000 0
3 Meja Dapur unit 2.00 750,000.00 1,500,000.00 0.132 0.00 0.00 0.000 0
4 Meja Wastafel unit 4.00 300,000.00 1,200,000.00 0.105 0.00 0.00 0.000 0
5 Topi-topi m2 5.58 300,000.00 1,672,500.00 0.147 0.00 0.00 0.000 0
6 Screed bawah lantai m2 273.24 40,000.00 10,929,600.00 0.960 0.00 0.00 0.000 0
Sub Total I 25,288,350.00
II. PEKERJAAN PASANGAN
1 Pasangan Bata Merah m2 503.40 92,500.00 46,564,500.00 4.089 0.00 0.00 0.000 0
2 Plasteran Dinding m2 772.63 42,000.00 32,450,544.00 2.850 0.00 0.00 0.000 0
3 Plasteran Beton m2 42,000.00 0.00
4 Acian Dinding m2 662.89 13,500.00 8,949,042.00 0.786 0.00 0.00 0.000 0
5 Acian Beton ekspos m2 133.36 13,500.00 1,800,333.00 0.158 0.00 0.00 0.000 0
Sub Total II 89,764,419.00
III. PEKERJAAN SPONENGAN
1 Sponeng pintu+jendela m' 176.38 10,000.00 1,763,800.00 0.155 0.00 0.00 0.000 0
2 Sponeng kolom beton m' 44.18 10,000.00 441,800.00 0.039 0.00 0.00 0.000 0
Sub Total III 2,205,600.00
IV. PEKERJAAN PENUTUP LANTAI+DINDING
1 Pek. Acian untuk pasangan vinyl m2 37.56 30,000.00 1,126,800.00 119,680.85 0.099 0.00 0.00 0.000 0
2 Pasang granit tile 60x60, m2 58.46 195,000.00 11,399,700.00 1.001 0.00 0.00 0.000 0
3 Pasang granit tile 60x60, m2 132.72 175,000.00 23,226,000.00 2.040 0.00 0.00 0.000 0
4 Pasang granit tile motif kayu m2 26.37 195,000.00 5,142,150.00 0.452 0.00 0.00 0.000 0
5 Pasang plint lantai m' 125.70 47,500.00 5,970,750.00 0.524 0.00 0.00 0.000 0
6 Keramik lantai KM 60x60 m2 16.71 195,000.00 3,258,450.00 4.60
0.286 0.00 0.00 0.000 0
7 Keramik dinding KM 60x60 m2 93.69 200,000.00 18,738,000.00 8.05
1.645 0.00 0.00 0.000 0
8 Keramik lantai KM 40x40 m2 5.22 100,000.00 522,000.00 4.60 0.046 0.00 0.00 0.000 0
9 Keramik dinding KM 40x40 m2 16.05 100,000.00 1,605,000.00 8.05 0.141 0.00 0.00 0.000 0
10 Keramik lantai KM 40x40 m2 5.50 100,000.00 550,000.00 4.60 0.048 0.00 0.00 0.000 0
PROGRESS MINGGUAN
2 Kisi kisi Hollo almunium Fasad Teras m' 35.00 85,000.00 2,975,000.00
0.261 0.00 0.00 0.000 0
3 Rangka Atap + Penutup atap roftop rangka baja ri m2 55.50 420,000.00 23,310,000.00 2.047 0.00 0.00 0.000 0
4 Rangka Atap + Penutup atap solar tuff flat m2 8.50 800,000.00 6,800,000.00 0.597 0.00 0.00 0.000 0
PROGRESS MINGGUAN
1 Pintu Bedroom uk. 0,9 x 2,2 m unit 3.00 3,000,000.00 9,000,000.00 0.790 0.00 0.00 0.000 0
2 Pintu KM uk. 0,8 x 2 m ( kamar mandi rumah ) unit 4.00 0.00 0.00 0.000 0.00 0.00 0.000 0
3 Pintu KM uk. 0,8 x 2 m ( kamar mandi toko ) unit 2.00 0.00 0.00 0.000 0.00 0.00 0.000 0
4 Pintu Ruang kantor uk. 0,9 x 2,2 m unit 1.00 3,000,000.00 3,000,000.00 0.263 0.00 0.00 0.000 0
5 Pintu Lipat Ruang makan uk. 3,25 x 2 m unit 1.00 0.00 0.00 0.000 0.00 0.00 0.000 0
6 Pintu Ruang keluarga uk. 1,4 x 2,4 m unit 1.00 0.00 0.00 0.000 0.00 0.00 0.000 0
7 Pintu Folding gate uk. 6,2 x 2,55 m unit 1.00 10,000,000.00 10,000,000.00 0.878 0.00 0.00 0.000 0
8 Pintu garasi area garasi uk. 6,5 x 2,5 m unit 1.00 7,500,000.00 7,500,000.00 0.659 0.00 0.00 0.000 0
9 Jalusi grill kayu area teras m2 6.98 550,000.00 0.000 0.00 0.00 0.000 0
9 Boven toilet uk. 0,85 x 0,55 m unit 4.00 500,000.00 2,000,000.00 0.176 0.00 0.00 0.000 0
10 Jendela bedroom uk. 1,25 x 1,6 m unit 1.00 2,000,000.00 2,000,000.00 0.176 0.00 0.00 0.000 0
11 Jendela bedroom uk. 1,00 x 1,6 m unit 2.00 1,600,000.00 3,200,000.00 0.281 0.00 0.00 0.000 0
12 Pintu jendela area taman belakang uk. (0,9x2,2)+( unit 1.00 3,500,000.00 3,500,000.00 0.307 0.00 0.00 0.000 0
13 Pintu jendela area pantry uk. (0,9x2,2)+(0,95x1,2 unit 1.00 3,120,000.00 3,120,000.00 0.274 0.00 0.00 0.000 0
14 Jendela Kantor uk. 1,00 x 1.50 m unit 2.00 1,500,000.00 3,000,000.00 0.263 0.00 0.00 0.000 0
15 Jendela Ruang keluarga uk. 1,65 x 2,4 m unit 2.00 3,000,000.00 6,000,000.00 0.527 0.00 0.00 0.000 0
16 Jendela Ruang keluarga uk. 2,4 x 1,6 m unit 1.00 3,840,000.00 3,840,000.00 0.337 0.00 0.00 0.000 0
16 Pintu pagar depan unit 1.00 16,500,000.00 16,500,000.00 1.449 0.00 0.00 0.000 0
Sub Total VIII 72,660,000.00
B. LANTAI II
I. PEKERJAAN BETON PRAKTIS
1 Kolom Praktis m' 65.00 75,000.00 4,875,000.00 0.428 0.00 0.00 0.000 0
2 Balok praktis m' 64.00 75,000.00 4,800,000.00 0.421 0.00 0.00 0.000 0
3 Topi-topi m2 300,000.00 0.00
3 Planter Bunga m' 175,000.00 0.00
PROGRESS MINGGUAN
1 Pintu Kamar uk. 0,9 x 2,2 m unit 2.00 0.00 0.00 0.000 0.00 0.00 0.000 0
1 Jendela area void uk. 0,85 x 1,5 m unit 3.00 1,000,000.00 3,000,000.00 0.263 0.00 0.00 0.000 0
2 Jendela mezzanine uk. 1,85 x 2 m unit 1.00 3,700,000.00 3,700,000.00 0.325 0.00 0.00 0.000 0
3 Jendela Facade depan unit 1.00 5,000,000.00 5,000,000.00 18.00 0.439 0.00 0.00 0.000 0
Sub Total VIII 11,700,000.00
PROGRESS MINGGUAN
49.628 0.000
GRAND TOTAL 565,163,726.50
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT
0.000 0.000
PROGRESS MINGGUAN
80.000
70.000
PROGRESS MINGGUAN
70.000
60.000
80.000
PROGRESS MINGGUAN
PROGRESS MINGGUAN
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
Chart Title
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
0.002
0.009 0.009 0.009
0.007 0.007 0.007 0.007
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
0.049 0.049
0.333 0.333 0.333
0.408 0.408 0.408 0.408 0.408
0.226 0.226
0.131 0.131 0.131 0.131
0.143 0.143
0.548 0.548 0.548
0.015 0.015 0.015
0.035 0.035 0.035 0.035
0.016 0.016 0.016
0.160 0.160 0.160 0.160
0.027 0.027 0.027
0.020 0.020 0.020
0.021 0.021
0.483 0.483 0.483
0.088 0.088
0.037 0.037 0.037
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
0.112 0.112 0.112
0.483 0.483 0.483
0.011 0.011
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.088 0.088 0.088
0.108 0.108 0.108
0.146 0.146 0.146
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050
0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062
0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054
0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042
0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
ER NOVEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI KET
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087
0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037
Row 423 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
12 1.21413 1.21214 1.21215 1.20316 0.574 17 0.766 18 0.766 19 0.739 20 0.512 21 0.512 22 0.512 23 0.512 240.512 250.929 260.929 1.072
27 9.249
28 9.995
29 9.290
30 6.863
31 4.268
32 2.866
33 3.681
34 4.566
35 4.429
36 5.147
37 2.874
38 6.161
39 4.597
40 1.581
41 0.018
42 0.018 0.018 0.000
12.243 13.455 14.667 15.869 16.444 17.210 17.976 18.715 19.227 19.739 20.250 20.762 21.273 22.202 23.131 24.203 33.452 43.447 52.737 59.599 63.867 66.733 70.415 74.980 79.409 84.556 87.430 93.591 98.188 99.769 99.788 99.806 100 0.000
REKAPITULASI PROGRESS MINGGUAN
2 Cor Balok
iv. Balok Anak 15/20
a. Beton sitemix m3 3.84 0.245 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 51.20 0.450 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø6 kg 262.71 0.323 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 325.51 0.400 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Cor Talang
a. Beton sitemix m3
b. Bekisting m2
c. Besi Ø 8 kg
4 Cor Talang
a. Beton sitemix m3 0.62 0.040 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 6.20 0.054 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 62.19 0.076 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
A. LANTAI I
I. PEKERJAAN BETON PRAKTIS
1 Kolom Praktis m' 94.50 0.622 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Balok praktis m' 38.65 0.255 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Meja Dapur unit 2.00 0.132 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Meja Wastafel unit 4.00 0.105 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Topi-topi m2 5.58 0.147 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Screed bawah lantai m2 273.24 0.960 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Keramik lantai KM 60x60 m2 16.71 0.286 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Keramik dinding KM 60x60 m2 93.69 1.645 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Keramik lantai KM 40x40 m2 5.22 0.046 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Keramik dinding KM 40x40 m2 16.05 0.141 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
10 Keramik lantai KM 40x40 m2 5.50 0.048 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN
V. PEKERJAAN PLAFON
1 Rangka Hollow + Plafon Gipsum 9 mm m2 162.12 1.210 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Shawdowline m' 104.40 0.160 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Drop Ceiling m' 89.36 0.392 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pek. Plafond PVC m2
3 Boven BV 2 unit
4 Boven BV 2a unit
5 Pintu besi garasi unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Pintu harmonika toko unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Pintu pagar depan unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
1 Pintu Bedroom uk. 0,9 x 2,2 m unit 3.00 0.790 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pintu KM uk. 0,8 x 2 m ( kamar mandi rumah ) unit 4.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pintu KM uk. 0,8 x 2 m ( kamar mandi toko ) unit 2.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pintu Ruang kantor uk. 0,9 x 2,2 m unit 1.00 0.263 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pintu Lipat Ruang makan uk. 3,25 x 2 m unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Pintu Ruang keluarga uk. 1,4 x 2,4 m unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Pintu Folding gate uk. 6,2 x 2,55 m unit 1.00 0.878 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Pintu garasi area garasi uk. 6,5 x 2,5 m unit 1.00 0.659 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Jalusi grill kayu area teras m2 6.98 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
B. LANTAI II
I. PEKERJAAN BETON PRAKTIS
PROGRESS MINGGUAN
1 Pintu Kamar uk. 0,9 x 2,2 m unit 2.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
1 Jendela area void uk. 0,85 x 1,5 m unit 3.00 0.263 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN
X. PEKERJAAN ATAP
1 Penutup Atap Genteng Keramik m2 136.60 2.831 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Penutup Atap UPVC ( rooftop ) m2 150.00 4.610 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Bubungan genteng keramik m' 17.35 0.296 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Nok Rooftop m' 14.00 0.215 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Talang area toko m' 28.00 0.492 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Talang galvalum teras depan m' 16.50 0.145 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Waterproofing dak atap m2 12.58 0.077 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Pekerjaan ornament ACP area façade + rangka holm2 22.35 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Pekerjaan Lettering " SENTRAL PAPERA SOLO'' ls 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
I. LANTAI I
i. INSTALASI SANITAIR
a. PIPA AIR BERSIH
1 Pemipaan Air Bersih PVC Ø 1" (Inlet) m' 16.49 0.058 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pemipaan Air Bersih PVC Ø 1" (Outlet) m' 12.00 0.042 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pemipaan Air Bersih PVC Ø 3/4" m' 99.66 0.219 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pemipaan Air Panas PEX Ø 1/2 m' 9.60 0.042 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. PIPA AIR KOTOR
1 Pemipaan Air Kotor PVC Ø 3" m' 80.65 0.496 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pemipaan Air Kotor PVC Ø 4" m' 78.98 0.624 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pemipaan Air Tinja PVC Ø 4" m' 68.15 0.539 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pekerjaan Septictank unit 1.00 0.263 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
ii. PENDUKUNG SANITAIR
II. LANTAI II
i. INSTALASI SANITAIR
a. PIPA AIR BERSIH
1 Pemipaan Air Bersih PVC Ø 1" (Inlet) m'
1 Pemipaan Air Bersih PVC Ø 1" (Outlet) m'
2 Pemipaan Air Bersih PVC Ø 3/4" m'
b. PIPA AIR KOTOR
1 Pemipaan Air Kotor PVC Ø 4" m'
2 Pemipaan Air Tinja PVC Ø 4" m'
ii. PENDUKUNG SANITAIR
1 Pek. Kloset Monoblock + Accecories, toto bh
2 Pek. Wastafel Toto bh
3 Pasangan Kran Ø1/2" + Accecories, ex. Lokalbh
4 Pasangan Floor Drain, ex. Toto bh
1 Pasangan Roof Drain, Talang bh 6.00 0.042 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Water Torn+Dudukan ±1000 ltr bh 1.00 0.220 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Water Torn+Dudukan ±500 ltr utk toko bh 1.00 0.132 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Mesin Pompa Dorong + Otomatis bh 1.00 0.132 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
I. LANTAI I
i. INSTALASI
1 Pasang KWh 2200 V ls 1.00 0.220 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pasang KWh 5500 V ls 1.00 0.685 0.00 0.00 0.000 1 100.00 0.685 1.00 100.00 0.68 SELESAI
3 Box Panel/MCB ls 1.00 0.176 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Instalasi Lampu, NYM 2x1,5 mm titik 66.00 0.869 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Instalasi Stop Kontak, NYM 3x2.5mm titik 20.00 0.307 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Instalasi Stop Kontak AC, NYM 3x2. titik 4.00 0.061 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Instalasi Exhautst Fan, NYM 2x1,5 m titik 4.00 0.053 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Instalasi Kabel Antena (Coaxial RG 6)titik 4.00 0.061 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Instalasi Kabel LAN (Cat 6) titik 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
ii. FIXTURE
1 Pasangan Saklar Tunggal + Imbodos bh 5.00 0.024 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pasangan Saklar Ganda + Imbodos bh 22.00 0.106 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pasangan Saklar Hotel bh
3 Pasangan Stop Kontak + Imbodos bh 20.00 0.097 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pasangan Stop Kontak AC bh 4.00 0.032 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pasangan Stop Kontak Waterproof bh
5 Pasangan Downlight Inbow bh 48.00 0.421 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Pasangan Downlight Outbow bh 6.00 0.053 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Pasangan Lampu Spotlight Outdoor bh 12.00 0.158 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Pasangan Lampu Gantung bh
9 Pasangan Lampu Strip LED m'
10 Pasangan Lampu Pagar T5 90 cm (14 bh
9 Pek. Pasang Ceiling Exhaust Fan 8" bh 4.00 0.176 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
10 Pek. Pasang Outlet Antena bh 4.00 0.018 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
11 Pek. Pasang Outlet Data bh
12 Pasangan Lampu strip led m' 44.62 0.137 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
II. LANTAI II
i. INSTALASI
1 Box Panel/MCB Ls 1.00 0.009 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Instalasi Lampu, NYM 2x1,5 mm titik 15.00 0.198 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Instalasi Stop Kontak, NYM 3x2.5mm titik 2.00 0.031 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Instalasi Stop Kontak AC, NYM 3x2. titik
4 Instalasi Exhautst Fan, NYM 2x1,5 m titik 1.00 0.013 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Instalasi Kabel Antena (Coaxial RG 6)titik
6 Instalasi Kabel LAN (Cat 6) titik
ii. FIXTURE
1 Pasangan Saklar Tunggal + Imbodos bh
1 Pasangan Saklar Ganda + Imbodos bh 4.00 0.019 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pasangan Saklar Hotel bh
2 Pasangan Stop Kontak + Imbodos bh 2.00 0.009 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pasangan Stop Kontak AC bh
4 Pasangan Stop Kontak Waterproof bh
3 Pasangan Downlight Inbow bh 1.00 0.009 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pasangan Downlight Outbow bh
5 Pasangan Lampu Spotlight Outdoor bh
4 Pasangan Lampu Gantung bh 14.00 0.369 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pasangan Lampu Strip LED m'
6 Pek. Pasang Ceiling Exhaust Fan 8" bh
7 Pek. Pasang Outlet Antena bh
8 Pek. Pasang Outlet Data bh
5 Pek. Pasang Ceiling Exhaust Fan 8" bh 1.00 0.044 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -