PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL

A. LANTAI I
I. PEKERJAAN BETON PRAKTIS
1 Kolom Praktis m' 94.50 75,000.00 7,087,500.00 0.622 0.00 0.00 0.000 0
2 Balok praktis m' 38.65 75,000.00 2,898,750.00 0.255 0.00 0.00 0.000 0
3 Meja Dapur unit 2.00 750,000.00 1,500,000.00 0.132 0.00 0.00 0.000 0
4 Meja Wastafel unit 4.00 300,000.00 1,200,000.00 0.105 0.00 0.00 0.000 0
5 Topi-topi m2 5.58 300,000.00 1,672,500.00 0.147 0.00 0.00 0.000 0
6 Screed bawah lantai m2 273.24 40,000.00 10,929,600.00 0.960 0.00 0.00 0.000 0
Sub Total I 25,288,350.00
II. PEKERJAAN PASANGAN
1 Pasangan Bata Merah m2 503.40 92,500.00 46,564,500.00 4.089 0.00 0.00 0.000 0
2 Plasteran Dinding m2 772.63 42,000.00 32,450,544.00 2.850 0.00 0.00 0.000 0
3 Plasteran Beton m2 42,000.00 0.00
4 Acian Dinding m2 662.89 13,500.00 8,949,042.00 0.786 0.00 0.00 0.000 0
5 Acian Beton ekspos m2 133.36 13,500.00 1,800,333.00 0.158 0.00 0.00 0.000 0
Sub Total II 89,764,419.00
III. PEKERJAAN SPONENGAN
1 Sponeng pintu+jendela m' 176.38 10,000.00 1,763,800.00 0.155 0.00 0.00 0.000 0
2 Sponeng kolom beton m' 44.18 10,000.00 441,800.00 0.039 0.00 0.00 0.000 0
Sub Total III 2,205,600.00
IV. PEKERJAAN PENUTUP LANTAI+DINDING
1 Pek. Acian untuk pasangan vinyl m2 37.56 30,000.00 1,126,800.00 119,680.85 0.099 0.00 0.00 0.000 0
2 Pasang granit tile 60x60, m2 58.46 195,000.00 11,399,700.00 1.001 0.00 0.00 0.000 0
3 Pasang granit tile 60x60, m2 132.72 175,000.00 23,226,000.00 2.040 0.00 0.00 0.000 0
4 Pasang granit tile motif kayu m2 26.37 195,000.00 5,142,150.00 0.452 0.00 0.00 0.000 0
5 Pasang plint lantai m' 125.70 47,500.00 5,970,750.00 0.524 0.00 0.00 0.000 0
6 Keramik lantai KM 60x60 m2 16.71 195,000.00 3,258,450.00 4.60
0.286 0.00 0.00 0.000 0
7 Keramik dinding KM 60x60 m2 93.69 200,000.00 18,738,000.00 8.05
1.645 0.00 0.00 0.000 0
8 Keramik lantai KM 40x40 m2 5.22 100,000.00 522,000.00 4.60 0.046 0.00 0.00 0.000 0
9 Keramik dinding KM 40x40 m2 16.05 100,000.00 1,605,000.00 8.05 0.141 0.00 0.00 0.000 0
10 Keramik lantai KM 40x40 m2 5.50 100,000.00 550,000.00 4.60 0.048 0.00 0.00 0.000 0
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL
11 Pasang batu alam andesit + coating m2 20.85 350,000.00 7,297,500.00 22.00 0.641 0.00 0.00 0.000 0
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL
12 Keramik dinding Meja dapur granite 60x60 m2 4.80 195,000.00 936,000.00 0.082 0.00 0.00 0.000 0
13 Top table meja dapur granite 60x60 m2 3.42 195,000.00 666,900.00 0.059 0.00 0.00 0.000 0
14 Top table meja wastafel granite 60x60 m2 2.40 195,000.00 468,000.00 0.041 0.00 0.00 0.000 0
15 Paving block tebal mtu K-250 m2 134.80 122,500.00 16,513,000.00 1.450 0.00 0.00 0.000 0
16 Roster beton uk. 20 x 20 cm m2 5.76 350,000.00 2,016,000.00 0.177 0.00 0.00 0.000 0
17 Roster beton uk. 20 x 20 cm m2 3.60 350,000.00 1,260,000.00 0.111 0.00 0.00 0.000 0
Sub Total IV 100,696,250.00
V. PEKERJAAN PLAFON
1 Rangka Hollow + Plafon Gipsum 9 mm m2 162.12 85,000.00 13,780,200.00 1.210 0.00 0.00 0.000 0
2 Shawdowline m' 104.40 17,500.00 1,827,000.00 0.160 0.00 0.00 0.000 0
3 Drop Ceiling m' 89.36 50,000.00 4,468,000.00 0.392 0.00 0.00 0.000 0
4 Pek. Plafond PVC m2
Sub Total VIII 20,075,200.00
VI. PEKERJAAN TANGGA
1 Plasteran tangga m2 15.84 42,000.00 665,280.00 pekerjaan tangga hilang

2 Acian m2 7.92 13,500.00 106,920.00


3 Sponeng tangga m' #REF! #REF!
4 Keramik tangga granite m2 12.72 204,400.00 2,599,968.00
5 Step noising 10x60 m' 24.00 55,000.00 1,320,000.00
6 Cat interior tangga m2 7.92 21,000.00 166,320.00
Sub Total VI
VII. PEKERJAAN FINISHING
1 Cat interior, ex. Jotun jotaplast m2 720.95 17,500.00 12,616,625.00 1.108 0.00 0.00 0.000 0
2 Cat plafond ex. Jotun jotashield m2 162.12 17,500.00 2,837,100.00 0.249 0.00 0.00 0.000 0
2 Cat Exterior ex. Jotun jotashield m2 75.30 25,000.00 1,882,500.00 0.165 0.00 0.00 0.000 0
Sub Total IX 17,336,225.00
VIII. PEKERJAAN BESI
1 Railing Tangga m' 5.75 550,000.00 3,162,500.00 0.278 0.00 0.00 0.000 0

2 Kisi kisi Hollo almunium Fasad Teras m' 35.00 85,000.00 2,975,000.00
0.261 0.00 0.00 0.000 0
3 Rangka Atap + Penutup atap roftop rangka baja ri m2 55.50 420,000.00 23,310,000.00 2.047 0.00 0.00 0.000 0
4 Rangka Atap + Penutup atap solar tuff flat m2 8.50 800,000.00 6,800,000.00 0.597 0.00 0.00 0.000 0
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL
5 Rangka Atap + Penutup atap solar tuff gelombang m2 5.00 450,000.00 2,250,000.00 0.198 0.00 0.00 0.000 0
Sub Total VIII 38,497,500.00
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL
IX. PEKERJAAN KUSEN + PINTU
1 Pintu P1 unit 3.00 3,500,000.00 0.00 10,500,000.00 0.000 0.00 0.00 0.000 0
2 Pintu P1.a unit 6.00 3,250,000.00 0.00 19,500,000.00 0.000 0.00 0.00 0.000 0
3 Boven BV 2 unit 1,500,000.00 0.00
4 Boven BV 2a unit 1,500,000.00 0.00
5 Pintu besi garasi unit 1.00 16,800,000.00 0.00 0.000 0.00 0.00 0.000 0
6 Pintu harmonika toko unit 1.00 18,676,000.00 0.00 0.000 0.00 0.00 0.000 0
7 Pintu pagar depan unit 1.00 11,880,000.00 0.00 0.000 0.00 0.00 0.000 0

1 Pintu Bedroom uk. 0,9 x 2,2 m unit 3.00 3,000,000.00 9,000,000.00 0.790 0.00 0.00 0.000 0
2 Pintu KM uk. 0,8 x 2 m ( kamar mandi rumah ) unit 4.00 0.00 0.00 0.000 0.00 0.00 0.000 0
3 Pintu KM uk. 0,8 x 2 m ( kamar mandi toko ) unit 2.00 0.00 0.00 0.000 0.00 0.00 0.000 0
4 Pintu Ruang kantor uk. 0,9 x 2,2 m unit 1.00 3,000,000.00 3,000,000.00 0.263 0.00 0.00 0.000 0
5 Pintu Lipat Ruang makan uk. 3,25 x 2 m unit 1.00 0.00 0.00 0.000 0.00 0.00 0.000 0
6 Pintu Ruang keluarga uk. 1,4 x 2,4 m unit 1.00 0.00 0.00 0.000 0.00 0.00 0.000 0
7 Pintu Folding gate uk. 6,2 x 2,55 m unit 1.00 10,000,000.00 10,000,000.00 0.878 0.00 0.00 0.000 0
8 Pintu garasi area garasi uk. 6,5 x 2,5 m unit 1.00 7,500,000.00 7,500,000.00 0.659 0.00 0.00 0.000 0
9 Jalusi grill kayu area teras m2 6.98 550,000.00 0.000 0.00 0.00 0.000 0
9 Boven toilet uk. 0,85 x 0,55 m unit 4.00 500,000.00 2,000,000.00 0.176 0.00 0.00 0.000 0
10 Jendela bedroom uk. 1,25 x 1,6 m unit 1.00 2,000,000.00 2,000,000.00 0.176 0.00 0.00 0.000 0
11 Jendela bedroom uk. 1,00 x 1,6 m unit 2.00 1,600,000.00 3,200,000.00 0.281 0.00 0.00 0.000 0
12 Pintu jendela area taman belakang uk. (0,9x2,2)+( unit 1.00 3,500,000.00 3,500,000.00 0.307 0.00 0.00 0.000 0
13 Pintu jendela area pantry uk. (0,9x2,2)+(0,95x1,2 unit 1.00 3,120,000.00 3,120,000.00 0.274 0.00 0.00 0.000 0
14 Jendela Kantor uk. 1,00 x 1.50 m unit 2.00 1,500,000.00 3,000,000.00 0.263 0.00 0.00 0.000 0
15 Jendela Ruang keluarga uk. 1,65 x 2,4 m unit 2.00 3,000,000.00 6,000,000.00 0.527 0.00 0.00 0.000 0
16 Jendela Ruang keluarga uk. 2,4 x 1,6 m unit 1.00 3,840,000.00 3,840,000.00 0.337 0.00 0.00 0.000 0
16 Pintu pagar depan unit 1.00 16,500,000.00 16,500,000.00 1.449 0.00 0.00 0.000 0
Sub Total VIII 72,660,000.00
B. LANTAI II
I. PEKERJAAN BETON PRAKTIS
1 Kolom Praktis m' 65.00 75,000.00 4,875,000.00 0.428 0.00 0.00 0.000 0
2 Balok praktis m' 64.00 75,000.00 4,800,000.00 0.421 0.00 0.00 0.000 0
3 Topi-topi m2 300,000.00 0.00
3 Planter Bunga m' 175,000.00 0.00
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL
Sub Total I 9,675,000.00
II. PEKERJAAN PASANGAN
1 Pasangan Bata Merah m2 228.70 92,500.00 21,154,750.00 1.858 0.00 0.00 0.000 0
2 Plasteran Dinding m2 424.40 42,000.00 17,824,800.00 1.565 0.00 0.00 0.000 0
3 Plasteran Beton ekspose m2 42,000.00 0.00
3 Acian Dinding m2 385.10 13,500.00 5,198,782.50 0.457 0.00 0.00 0.000 0
5 Acian Beton ekspos m2 13,500.00 0.00
Sub Total II 44,178,332.50
III. PEKERJAAN SPONENGAN
1 Sponeng pintu+jendela m' 36.20 10,000.00 362,000.00 0.032 0.00 0.00 0.000 0
3 Sponeng beton ekspose m' 10,000.00 0.00
2 Tanggulan Railing Void m' 17.80 75,000.00 1,335,000.00 0.117 0.00 0.00 0.000 0
Sub Total III 1,697,000.00
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL
IV. PEKERJAAN PENUTUP LANTAI+DINDING
1 Pek. Acian untuk pasangan vinyl m2 81.39 30,000.00 2,441,700.00 0.214 0.00 0.00 0.000 0
2 Keramik lantai KM 40x40 m2 2.61 150,000.00 391,500.00 4.60 0.034 0.00 0.00 0.000 0
3 Keramik dinding KM 40x40 m2 8.03 175,000.00 1,404,375.00 8.05 0.123 0.00 0.00 0.000 0
3 Pasang batu alam andesit + coating m2 8.40 350,000.00 2,940,000.00 0.258 0.00 0.00 0.000 0
4 Woodplank fins woodstain m2 22.88 250,000.00 5,720,000.00 0.502 0.00 0.00 0.000 0
5 Roster terakota uk 20x20 m2 450,000.00 0.00
6 Top table meja granite 60x60 m2 195,000.00 0.00
Sub Total IV 12,897,575.00
VII. PEKERJAAN PENGECATAN
1 Cat interior, ex. Jotun jotaplast m2 207.70 17,500.00 3,634,750.00 0.319 0.00 0.00 0.000 0
2 Cat plafond ex. Jotun jotashield m2 3.00 17,500.00 52,500.00 0.005 0.00 0.00 0.000 0
3 Cat Exterior ex. Jotun jotashield m2 216.70 28,000.00 6,067,600.00 0.533 0.00 0.00 0.000 0

Sub Total VII 9,754,850.00


VIII. PEKERJAAN BESI
1 Railing Area Void mezzanine m' 17.80 550,000.00 9,790,000.00 0.860 0.00 0.00 0.000 0
2 Railing Tangga & Mezzanine m' 550,000.00 0.00
Sub Total VIII 9,790,000.00
IX. PEKERJAAN PLAFON
1 Rangka Hollow + Plafon Gipsum 9 mm m2 3.00 85,000.00 255,000.00 0.022 0.00 0.00 0.000 0
2 Drop Ceiling m' 50,000.00 0.00
2 Pek. Plafond PVC m2 165,000.00 0.00
Sub Total VIII 255,000.00
IX. PEKERJAAN KUSEN + JENDELA
1 Pintu P1 area mezzanine unit 2.00 3,500,000.00 0.00 7,000,000.00 0.000 0.00 0.00 0.000 0
2 Jendela J1 unit 1.00 6,120,000.00 0.00 0.000 0.00 0.00 0.000 0
3 Jendela J2 unit 4.00 1,200,000.00 0.00 0.000 0.00 0.00 0.000 0

1 Pintu Kamar uk. 0,9 x 2,2 m unit 2.00 0.00 0.00 0.000 0.00 0.00 0.000 0
1 Jendela area void uk. 0,85 x 1,5 m unit 3.00 1,000,000.00 3,000,000.00 0.263 0.00 0.00 0.000 0
2 Jendela mezzanine uk. 1,85 x 2 m unit 1.00 3,700,000.00 3,700,000.00 0.325 0.00 0.00 0.000 0
3 Jendela Facade depan unit 1.00 5,000,000.00 5,000,000.00 18.00 0.439 0.00 0.00 0.000 0
Sub Total VIII 11,700,000.00
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

Sub Pekerjaan : Arsitektur

UPAH + MATERIAL HARGA TOTAL HARGA SUB TOTAL MINGGU LALU M


NO MACAM PEKERJAAN SAT VOL BOBOT (%)
Rp. Rp. Rp. VOL REALISASI BOBOT VOL
X. PEKERJAAN ATAP
1 Penutup Atap Genteng Keramik m2 136.60 236,000.00 32,237,600.00 2.831 0.00 0.00 0.000 0
2 Penutup Atap UPVC ( rooftop ) m2 150.00 350,000.00 52,500,000.00 4.610 0.00 0.00 0.000 0
3 Bubungan genteng keramik m' 17.35 194,500.00 3,374,575.00 0.296 0.00 0.00 0.000 0
4 Nok Rooftop m' 14.00 175,000.00 2,450,000.00 0.215 0.00 0.00 0.000 0
5 Talang area toko m' 28.00 200,000.00 5,600,000.00 0.492 0.00 0.00 0.000 0
6 Talang galvalum teras depan m' 16.50 100,000.00 1,650,000.00 0.145 0.00 0.00 0.000 0
7 Waterproofing dak atap m2 12.58 70,000.00 880,250.00 0.077 0.00 0.00 0.000 0
8 Pekerjaan ornament ACP area façade + rangka holm2 22.35 tidak termasuk 0.000 0.00 0.00 0.000 0
9 Pekerjaan Lettering " SENTRAL PAPERA SOLO'' ls 1.00 0.00 0.00 0.000 0.00 0.00 0.000 0
Sub Total IX 98,692,425.00

49.628 0.000
GRAND TOTAL 565,163,726.50
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT
0.00 0.000 0.00 0.00 0.00 -
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT
0.00 0.000 0.00 0.00 0.00 -
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
MINGGU INI S/D MINGGU INI
KET
REALISASI BOBOT VOL REALISASI BOBOT

0.00 0.000 0.00 0.00 0.00 -


0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -
0.00 0.000 0.00 0.00 0.00 -

0.000 0.000
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy
Sub Pekerjaan : Struktur

AGUSTUS SEPTEMBER OKTOBER


HARGA SATUAN HARGA TOTAL HARGA SUB TOTAL BOBOT
NO MACAM PEKERJAAN SAT VOL
(%)
Rp. Rp. Rp. 1 2 3 4 1 2 3 4 1 2 3
I. PEKERJAAN PERSIAPAN
1 Gudang Bahan Ls 1.00 2,000,000.00 2,000,000.00 0.176 0.176
2 Pagar Sementara Proyek m' 16.50 120,000.00 1,980,000.00 0.174 0.174
3 Pengukuran & bouwplank m' 90.00 20,000.00 1,800,000.00 0.158 0.079 0.079
4 Keamanan Proyek Ls 1.00 2,500,000.00 2,500,000.00 0.219 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
6 Air kerja Ls 1.00 3,000,000.00 3,000,000.00 0.263 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
100.000
7 Listrik kerja Ls 1.00 3,000,000.00 3,000,000.00 0.263 0.007 0.007 0.007 0.007 0.007 0.007 0.007
8 Pembersiahn Lokasi, Potong rumput, dll Ls 1.00 3,500,000.00 3,500,000.00 0.307 0.154 0.154
17,780,000.00 0.000
II. PEKERJAAN TANAH 0.000
1 Galian tanah pondasi 0.000
a. Footplat 50x50 m3 8.64 150,000.00 0.000
a. Footplat 120x120x30 m3 44.82 70,000.00 3,137,316.00 0.275 0.055 0.055 0.055 0.055 0.055
c. Footplat 125x125 m3 70,000.00 0.00 0.000
b. Footplat 50x50x25 m3 18.47 70,000.00 1,292,760.00 0.113 0.019 0.019 0.019 0.019 0.019 0.019
2 Galian tanah pondasi batu kali m3 81.52 70,000.00 5,706,206.19 0.501 0.083 0.083 0.083 0.083 0.083 0.083
3 Galian Sloof m3 24.87 70,000.00 1,741,092.50 0.153 0.025 0.025 0.025 0.025 0.025 0.025
4 Urugan tanah kembali m3 74.79 20,000.00 1,495,825.06 0.131 0.022 0.022 0.022 0.022 0.022 0.022
5 Urugan pasir bawah pondasi , T. 10 cm 0.000
a. Footplat 80x80 m3 275,000.00 0.00 0.000
a. Footplat 120x120x30 m3 2.70 200,000.00 540,800.00 0.047 0.008 0.008 0.008 0.008 0.008 0.008
b. Footplat 50x50x25 m3 0.97 200,000.00 194,400.00 0.017 0.002 0.002 0.002 0.002 0.002 0.002
c. Sloof 15x20 m3 3.69 200,000.00 738,700.00 4620000 0.065 0.009 0.009 0.009 0.009
d. Sloof 20x30 m3 2.66 200,000.00 531,000.00 0.047 0.007 0.007 0.007
Urugan tanah peninggian bangunan t=120cm +
6 m3 412.50 56,000.00 23,100,000.00
pemadatan 23100000 2.027 0.676 0.676 0.676
38,478,099.75 0.000
III. PEKERJAAN PONDASI 0.000
1 Lantai kerja t. 5 cm bawah Footplat 0.000
a. Footplat 120x120 m2 21.97 50,000.00 1,098,500.00 0.096 0.019 0.019 0.019 0.019 0.019
b. Footplat 50x50 m2 12.25 50,000.00 612,500.00 0.054 0.011 0.011 0.011 0.011 0.011
2 Stros pile 0.000
a. Galian strous pile m' 180.00 70,000.00 12,600,000.00 12600000 1.106 0.369 0.369 0.369
b. Beton m2 9.42 500,000.00 4,710,000.00 6,108,600.00 0.413 0.138 0.138 0.138
c. Besi D8 kg 297.21 14,000.00 4,160,908.95 15,563,654.67 0.365 0.122 0.122 0.122
c. Besi D13 kg 999.76 14,000.00 13,996,688.16 1.228 0.409 0.409 0.409
3 Pondasi batukali 0.000
a. Pondasi batukali uk 30/60/80 m3 76.55 450,000.00 34,449,312.66 90000 3.023 0.302 0.302 0.302 0.302 0.302 0.302
4 Cor Footplat 0.000
I. Footplat 120x120 tb, 30 0.000
a. Beton sitemix m3 6.91 727,500.00 5,028,480.00 0.441 0.055 0.055 0.055 0.055
b. Bekisting m2 23.04 80,000.00 1,843,200.00 0.162 0.020 0.020 0.020 0.020
c. Besi D13 kg 1,019.76 14,000.00 14,276,621.92 2100 1.253 0.157 0.157 0.157 0.157
II. Footplat 50x50 tb, 25 0.000
a. Beton sitemix m3 1.69 727,500.00 1,227,656.25 0.108 0.013 0.013 0.013 0.013
b. Bekisting m2 13.50 80,000.00 1,080,000.00 0.095 0.012 0.012 0.012 0.012
c. Besi D13 kg 404.90 14,000.00 5,668,658.70 0.497 0.062 0.062 0.062 0.062
5 Cor Kolom Pedestal 0.000
90.000
I. Kolom Pedestal 15x20 0.000
a. Beton sitemix m3 0.97 700,000.00 680,400.00 0.060 0.007 0.007 0.007
b. Bekisting m2 22.68 100,000.00 2,268,000.00 0.199 0.025 0.025 0.025
c. Besi D13 kg 74.75 14,000.00 1,046,521.61 0.092 0.011 0.011 0.011
d. Besi Ø8 kg 89.85 14,000.00 1,257,838.47 0.110 0.014 0.014 0.014

80.000

70.000
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
90.000
Pemilik : Ibu Poppy
Sub Pekerjaan : Struktur

AGUSTUS SEPTEMBER OKTOBER


HARGA SATUAN HARGA TOTAL HARGA SUB TOTAL BOBOT
NO MACAM PEKERJAAN SAT VOL
(%)
Rp. Rp. Rp. 1 2 3 4 1 2 3 4 1 2 3
II. Kolom Pedestal 20x30 0.000
a. Beton sitemix m3 1.44 727,500.00 1,047,600.00 0.092 0.011 0.011 0.011
b. Bekisting m2 21.12 100,000.00 2,112,000.00 0.185 0.023 0.023 0.023
c. Besi D13 kg 67.01 14,000.00 938,192.21 0.082 0.010 0.010 0.010
d. Besi Ø8 kg 139.47 14,000.00 1,952,538.00 0.171 0.021 0.021 0.021
5 Cor Sloof 0.000
I. Sloof uk 15x20 0.000
a. Beton sitemix m3 4.43 727,500.00 3,221,370.00 0.283 0.035
b. Bekisting m2 59.04 100,000.00 5,904,000.00 0.518 0.065
c. Besi Ø8 kg 302.70 14,000.00 4,237,766.51 0.372 0.046
d. Besi D10 kg 375.80 14,000.00 5,261,181.16 0.462 0.058
I. Sloof uk 20x30 0.000
a. Beton sitemix m3 5.30 727,500.00 3,858,660.00 0.339
b. Bekisting m2 53.04 100,000.00 5,304,000.00 0.465
c. Besi Ø8 kg 251.30 14,000.00 3,518,220.79 0.309
d. Besi D13 kg 575.84 14,000.00 8,061,829.94 0.707
151,422,645.33 0.000
IV. PEKERJAAN STRUKTUR ATAS LANTAI I 0.000
1 Cor Kolom 0.000
i. Kolom uk. 15/20 0.000
a. Beton sitemix m3 2.70 727,500.00 1,964,250.00 0.172
b. Bekisting m2 63.00 100,000.00 6,300,000.00 0.553
c. Besi Ø 8 kg 196.57 14,000.00 2,751,964.23 0.241
d. Besi D13 kg 231.82 14,000.00 3,245,533.83 0.285
ii. Kolom uk. 25/30 0.000
a. Beton sitemix m3 3.60 727,500.00 2,619,000.00 0.230
b. Bekisting m2 52.80 100,000.00 5,280,000.00 0.463
c. Besi Ø 8 kg 156.37 14,000.00 2,189,115.16 0.192
d. Besi D13 kg 319.42 14,000.00 4,471,941.87 0.392
0.000
2 Cor Balok 0.000
iv. Balok Anak 15/20 0.000
a. Beton sitemix m3 3.84 727,500.00 2,793,600.00 0.245
b. Bekisting m2 51.20 100,000.00 5,120,000.00 0.449
c. Besi Ø6 kg 262.71 14,000.00 3,677,898.98 0.323
d. Besi D13 kg 325.51 14,000.00 4,557,205.72 0.400
80.000
0.000
3 Cor dak tandon 0.000
a. Beton sitemix m3 0.70 727,500.00 509,250.00 0.045
b. Bekisting m2 7.00 100,000.00 700,000.00 0.061
c. Besi Ø 8 kg 60.42 14,000.00 845,874.80 0.074
47,025,634.58 0.000
V. PEKERJAAN STRUKTUR ATAS LANTAI II 0.000
ii. Kolom uk. 25/30 0.000
a. Beton sitemix m3 3.60 727,500.00 2,619,000.00 0.230
b. Bekisting m2 52.80 100,000.00 5,280,000.00 0.463
c. Besi Ø 8 kg 156.37 14,000.00 2,189,115.16 0.192
d. Besi D13 kg 319.42 14,000.00 4,471,941.87 0.392
0.000

70.000

60.000
80.000

PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy
Sub Pekerjaan : Struktur

AGUSTUS SEPTEMBER OKTOBER


HARGA SATUAN HARGA TOTAL HARGA SUB TOTAL BOBOT
NO MACAM PEKERJAAN SAT VOL
(%)
Rp. Rp. Rp. 1 2 3 4 1 2 3 4 1 2 3
2 Cor Balok Elevasi +3.00 0.000
i. Balok 20/30 0.000
a. Beton sitemix m3 3.41 727,500.00 2,478,228.75 0.217
b. Bekisting m2 34.07 100,000.00 3,406,500.00 0.299
c. Besi Ø 8 kg 268.76 14,000.00 3,762,707.32 0.330
d. Besi D13 kg 614.74 14,000.00 8,606,388.59 0.755
0.000
3 Cor plat lantai 0.000
a. Beton sitemix m3 9.46 727,500.00 6,879,240.00 0.604
b. Bekisting m2 78.80 100,000.00 7,880,000.00 0.691
c. Besi Ø 8 kg 645.84 14,000.00 9,041,805.34 0.793
0.000
4 Cor Talang 0.000
a. Beton sitemix m3 0.62 727,500.00 451,050.00 0.040
b. Bekisting m2 6.20 100,000.00 620,000.00 0.054
c. Besi Ø 8 kg 62.19 14,000.00 870,610.57 0.076
0.000
5 Cor Canopy Segitiga Depan 0.000
a. Beton sitemix m3 1.83 727,500.00 1,327,687.50 0.117
b. Bekisting m2 18.25 100,000.00 1,825,000.00 0.160
c. Besi Ø 8 kg 161.11 14,000.00 2,255,482.10 0.198
0.000
V. PEKERJAAN STRUKTUR ATAS LANTAI ATAP 0.000
1 Cor Balok Elevasi +6.00 0.000
i. Balok 20/30 0.000
a. Beton sitemix m3 2.75 727,500.00 1,996,987.50 0.175
b. Bekisting m2 27.45 100,000.00 2,745,000.00 0.241
c. Besi Ø 8 kg 129.91 14,000.00 1,818,741.25 0.160
70.000
d. Besi D13 kg 296.35 14,000.00 4,148,880.81 0.364
0.000
6 Pek. Struktur Baja 0.000
a. Rangka Atap baja ringan area rumah m2 136.60 170,000.00 23,222,000.00 2.038
b. Rangka Atap CNP 150 area toko m2 150.00 450,000.00 67,500,000.00 5.923
c. Tangga Baja IWF mezanine + hollo 30/30 m' 5.75 3,000,000.00 17,250,000.00 1.514
182,646,366.75 0.000
0.000
A. LANTAI I 0.000
I. PEKERJAAN BETON PRAKTIS 0.000
1 Kolom Praktis m' 94.50 75,000.00 7,087,500.00 0.622
2 Balok praktis m' 38.65 75,000.00 2,898,750.00 0.254
3 Meja Dapur unit 2.00 750,000.00 1,500,000.00 0.132
4 Meja Wastafel unit 4.00 300,000.00 1,200,000.00 0.105
5 Topi-topi m2 5.58 300,000.00 1,672,500.00 0.147
6 Screed bawah lantai m2 273.24 40,000.00 10,929,600.00 0.959
25,288,350.00 0.000
II. PEKERJAAN PASANGAN 0.000
1 Pasangan Bata Merah m2 503.40 92,500.00 46,564,500.00 4.086
2 Plasteran Dinding m2 772.63 42,000.00 32,450,544.00 2.848
3 Plasteran Beton m2 42,000.00 0.00 0.000
4 Acian Dinding m2 662.89 13,500.00 8,949,042.00 0.785
5 Acian Beton ekspos m2 133.36 13,500.00 1,800,333.00 0.158
89,764,419.00 0.000
III. PEKERJAAN SPONENGAN 0.000
1 Sponeng pintu+jendela m' 176.38 10,000.00 1,763,800.00 0.155
2 Sponeng kolom beton m' 44.18 10,000.00 441,800.00 0.039
2,205,600.00 0.000
IV. PEKERJAAN PENUTUP LANTAI+DINDING 0.000
1 Pek. Acian untuk pasangan vinyl m2 37.56 30,000.00 1,126,800.00 0.099
2 Pasang granit tile 60x60, m2 58.46 195,000.00 11,399,700.00 1.000
3 Pasang granit tile 60x60, m2 132.72 175,000.00 23,226,000.00 2.038
4 Pasang granit tile motif kayu m2 26.37 195,000.00 5,142,150.00 0.451
5 Pasang plint lantai m' 125.70 47,500.00 5,970,750.00 0.524
6 Keramik lantai KM 60x60 m2 16.71 195,000.00 3,258,450.00 0.286
7 Keramik dinding KM 60x60 m2 93.69 200,000.00 18,738,000.00 1.644
8 Keramik lantai KM 40x40 m2 5.22 100,000.00 522,000.00 0.046
9 Keramik dinding KM 40x40 m2 16.05 100,000.00 1,605,000.00 0.141
### Keramik lantai KM 40x40 m2 5.50 100,000.00 550,000.00 0.048
### Pasang batu alam andesit + coating m2 20.85 350,000.00 7,297,500.00 0.640
60.000
### Keramik dinding Meja dapur granite 60x60 m2 4.80 195,000.00 936,000.00 0.082
### Top table meja dapur granite 60x60 m2 3.42 195,000.00 666,900.00 0.059
### Top table meja wastafel granite 60x60 m2 2.40 195,000.00 468,000.00 0.041
### Paving block tebal mtu K-250 m2 134.80 122,500.00 16,513,000.00 1.449
### Roster beton uk. 20 x 20 cm m2 5.76 350,000.00 2,016,000.00 0.177
### Roster beton uk. 20 x 20 cm m2 3.60 350,000.00 1,260,000.00 0.111
100,696,250.00 0.000
V. PEKERJAAN PLAFON 0.000
1 Rangka Hollow + Plafon Gipsum 9 mm m2 162.12 85,000.00 13,780,200.00 1.209
2 Shawdowline m' 104.40 17,500.00 1,827,000.00 0.160
3 Drop Ceiling m' 89.36 50,000.00 4,468,000.00 0.392
4 Pek. Plafond PVC m2 0.000
20,075,200.00 0.000
VI. PEKERJAAN TANGGA 0.000
1 Plasteran tangga m2 15.84 42,000.00 665,280.00 0.058
2 Acian m2 7.92 13,500.00 106,920.00 0.009
3 Sponeng tangga m' 0.000
4 Keramik tangga granite m2 12.72 204,400.00 2,599,968.00 0.228
5 Step noising 10x60 m' 24.00 55,000.00 1,320,000.00 0.116
6 Cat interior tangga m2 7.92 21,000.00 166,320.00 0.015
0.000
VII. PEKERJAAN FINISHING 0.000
1 Cat interior, ex. Jotun jotaplast m2 720.95 17,500.00 12,616,625.00 1.107
2 Cat plafond ex. Jotun jotashield m2 162.12 17,500.00 2,837,100.00 0.249
2 Cat Exterior ex. Jotun jotashield m2 75.30 25,000.00 1,882,500.00 0.165
17,336,225.00 0.000
VIII. PEKERJAAN BESI 0.000
1 Railing Tangga m' 5.75 550,000.00 3,162,500.00 0.278
2 Kisi kisi Hollo almunium Fasad Teras m' 35.00 85,000.00 2,975,000.00 0.261
3 Rangka Atap + Penutup atap roftop rangka baja rin m2 55.50 420,000.00 23,310,000.00 2.045
4 Rangka Atap + Penutup atap solar tuff flat m2 8.50 800,000.00 6,800,000.00 0.597
5 Rangka Atap + Penutup atap solar tuff gelombang m2 5.00 450,000.00 2,250,000.00 0.197
38,497,500.00 0.000
IX. PEKERJAAN KUSEN + PINTU 0.000
1 Pintu P1 unit 3.00 3,500,000.00 0.00 0.000
2 Pintu P1.a unit 6.00 3,250,000.00 0.00 0.000
3 Boven BV 2 unit 1,500,000.00 0.00 0.000
4 Boven BV 2a unit 1,500,000.00 0.00 0.000
5 Pintu besi garasi unit 1.00 16,800,000.00 0.00 0.000
6 Pintu harmonika toko unit 1.00 18,676,000.00 0.00 50.000
0.000
7 Pintu pagar depan unit 1.00 11,880,000.00 0.00 0.000
0.000
1 Pintu Bedroom uk. 0,9 x 2,2 m unit 3.00 3,000,000.00 9,000,000.00 0.790
2 Pintu KM uk. 0,8 x 2 m ( kamar mandi rumah ) unit 4.00 0.00 0.00 0.000
3 Pintu KM uk. 0,8 x 2 m ( kamar mandi toko ) unit 2.00 0.00 0.00 0.000
4 Pintu Ruang kantor uk. 0,9 x 2,2 m unit 1.00 3,000,000.00 3,000,000.00 0.263
5 Pintu Lipat Ruang makan uk. 3,25 x 2 m unit 1.00 0.00 0.00 0.000
6 Pintu Ruang keluarga uk. 1,4 x 2,4 m unit 1.00 0.00 0.00 0.000
7 Pintu Folding gate uk. 6,2 x 2,55 m unit 1.00 10,000,000.00 10,000,000.00 0.878
8 Pintu garasi area garasi uk. 6,5 x 2,5 m unit 1.00 7,500,000.00 7,500,000.00 0.658
9 Jalusi grill kayu area teras m2 6.98 550,000.00 0.000
9 Boven toilet uk. 0,85 x 0,55 m unit 4.00 500,000.00 2,000,000.00 0.176
### Jendela bedroom uk. 1,25 x 1,6 m unit 1.00 2,000,000.00 2,000,000.00 0.176
### Jendela bedroom uk. 1,00 x 1,6 m unit 2.00 1,600,000.00 3,200,000.00 0.281
### Pintu jendela area taman belakang uk. (0,9x2,2)+(0, unit 1.00 3,500,000.00 3,500,000.00 0.307
### Pintu jendela area pantry uk. (0,9x2,2)+(0,95x1,2) unit 1.00 3,120,000.00 3,120,000.00 0.274
### Jendela Kantor uk. 1,00 x 1.50 m unit 2.00 1,500,000.00 3,000,000.00 0.263
### Jendela Ruang keluarga uk. 1,65 x 2,4 m unit 2.00 3,000,000.00 6,000,000.00 0.527
50.000

PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy
Sub Pekerjaan : Struktur

AGUSTUS SEPTEMBER OKTOBER


HARGA SATUAN HARGA TOTAL HARGA SUB TOTAL BOBOT
NO MACAM PEKERJAAN SAT VOL
(%)
Rp. Rp. Rp. 1 2 3 4 1 2 3 4 1 2 3
### Jendela Ruang keluarga uk. 2,4 x 1,6 m unit 1.00 3,840,000.00 3,840,000.00 0.337
### Pintu pagar depan unit 1.00 16,500,000.00 16,500,000.00 1.448
72,660,000.00 0.000
B. LANTAI II 0.000
I. PEKERJAAN BETON PRAKTIS 0.000
1 Kolom Praktis m' 65.00 75,000.00 4,875,000.00 0.428
2 Balok praktis m' 64.00 75,000.00 4,800,000.00 0.421
3 Topi-topi m2 300,000.00 0.00 0.000
3 Planter Bunga m' 175,000.00 0.00 0.000
9,675,000.00 0.000
II. PEKERJAAN PASANGAN 0.000
1 Pasangan Bata Merah m2 228.70 92,500.00 21,154,750.00 1.856
2 Plasteran Dinding m2 424.40 42,000.00 17,824,800.00 1.564
3 Plasteran Beton ekspose m2 42,000.00 0.00 0.000
3 Acian Dinding m2 385.10 13,500.00 5,198,782.50 0.456
5 Acian Beton ekspos m2 13,500.00 0.00 0.000
44,178,332.50 0.000
III. PEKERJAAN SPONENGAN 0.000
1 Sponeng pintu+jendela m' 36.20 10,000.00 362,000.00 0.032
3 Sponeng beton ekspose m' 10,000.00 0.00 0.000
2 Tanggulan Railing Void m' 17.80 75,000.00 1,335,000.00 0.117
40.000
1,697,000.00 0.000
IV. PEKERJAAN PENUTUP LANTAI+DINDING 0.000
1 Pek. Acian untuk pasangan vinyl m2 81.39 30,000.00 2,441,700.00 0.214
2 Keramik lantai KM 40x40 m2 2.61 150,000.00 391,500.00 0.034
3 Keramik dinding KM 40x40 m2 8.03 175,000.00 1,404,375.00 0.123
3 Pasang batu alam andesit + coating m2 8.40 350,000.00 2,940,000.00 0.258
4 Woodplank fins woodstain m2 22.88 250,000.00 5,720,000.00 0.502
5 Roster terakota uk 20x20 m2 450,000.00 0.00 0.000
6 Top table meja granite 60x60 m2 195,000.00 0.00 0.000
12,897,575.00 0.000
VII. PEKERJAAN PENGECATAN 0.000
1 Cat interior, ex. Jotun jotaplast m2 207.70 17,500.00 3,634,750.00 0.319
2 Cat plafond ex. Jotun jotashield m2 3.00 17,500.00 52,500.00 0.005
3 Cat Exterior ex. Jotun jotashield m2 216.70 28,000.00 6,067,600.00 0.532
0.000
9,754,850.00 0.000
VIII. PEKERJAAN BESI 0.000
1 Railing Area Void mezzanine m' 17.80 550,000.00 9,790,000.00 0.859
2 Railing Tangga & Mezzanine m' 550,000.00 0.00 0.000
9,790,000.00 0.000
IX. PEKERJAAN PLAFON 0.000
1 Rangka Hollow + Plafon Gipsum 9 mm m2 3.00 85,000.00 255,000.00 0.022
2 Drop Ceiling m' 50,000.00 0.00 0.000
2 Pek. Plafond PVC m2 165,000.00 0.00 0.000
255,000.00 0.000
IX. PEKERJAAN KUSEN + JENDELA 0.000
1 Pintu P1 area mezzanine unit 2.00 3,500,000.00 0.00 0.000
2 Jendela J1 unit 1.00 6,120,000.00 0.00 0.000
3 Jendela J2 unit 4.00 1,200,000.00 0.00 0.000
0.000
1 Pintu Kamar uk. 0,9 x 2,2 m unit 2.00 0.00 0.00 0.000
1 Jendela area void uk. 0,85 x 1,5 m unit 3.00 1,000,000.00 3,000,000.00 0.263
2 Jendela mezzanine uk. 1,85 x 2 m unit 1.00 3,700,000.00 3,700,000.00 0.325
3 Jendela Facade depan unit 1.00 5,000,000.00 5,000,000.00 0.439
11,700,000.00 0.000
X. PEKERJAAN ATAP 0.000
1 Penutup Atap Genteng Keramik m2 136.60 236,000.00 32,237,600.00 2.829
2 Penutup Atap UPVC ( rooftop ) m2 150.00 350,000.00 52,500,000.00 4.607
3 Bubungan genteng keramik m' 17.35 194,500.00 3,374,575.00 0.296
30.000
4 Nok Rooftop m' 14.00 175,000.00 2,450,000.00 0.215
5 Talang area toko m' 28.00 200,000.00 5,600,000.00 0.491
6 Talang galvalum teras depan m' 16.50 100,000.00 1,650,000.00 0.145
7 Waterproofing dak atap m2 12.58 70,000.00 880,250.00 0.077
8 Pekerjaan ornament ACP area façade + rangka hollom2 22.35 tidak termasuk 0.000
9 Pekerjaan Lettering " SENTRAL PAPERA SOLO'' ls 1.00 0.00 0.00 0.000
98,692,425.00 0.000
0.000
0.000
565,163,726.50
0.000
0.000
I. LANTAI I 0.000
i. INSTALASI SANITAIR 0.000
a. PIPA AIR BERSIH 0.000
1 Pemipaan Air Bersih PVC Ø 1" (Inlet) m' 16.49 40,000.00 659,520.00 0.058
2 Pemipaan Air Bersih PVC Ø 1" (Outlet) m' 12.00 40,000.00 480,000.00 0.042
3 Pemipaan Air Bersih PVC Ø 3/4" m' 99.66 25,000.00 2,491,500.00 0.219
4 Pemipaan Air Panas PEX Ø 1/2 m' 9.60 50,000.00 480,000.00 0.042
b. PIPA AIR KOTOR 0.000
1 Pemipaan Air Kotor PVC Ø 3" m' 80.65 70,000.00 5,645,640.00 0.495
2 Pemipaan Air Kotor PVC Ø 4" m' 78.98 90,000.00 7,108,200.00 0.624
3 Pemipaan Air Tinja PVC Ø 4" m' 68.15 90,000.00 6,133,500.00 0.538
4 Pekerjaan Septictank unit 1.00 3,000,000.00 3,000,000.00 0.263
ii. PENDUKUNG
Bor Sumur sampaiSANITAIR
Kedalaman Air Bersih & 0.000
1 Instalasi Pipa Casing PVC AW titik 1.00 3,000,000.00 3,000,000.00 0.263
2 Mesin Pompa Tarikan Air, bh 1.00 2,000,000.00 2,000,000.00 0.176
3 Pek. Kloset Monoblock + Accecories, toto bh 5.00 3,000,000.00 15,000,000.00 1.316
4 Pek. Kloset jongkok + Accecories, toto bh 2.00 500,000.00 1,000,000.00 0.088
5 Pek. Wastafel Toto bh 4.00 1,200,000.00 4,800,000.00 0.421
6 Pek. Shower + Kran bh 3.00 1,200,000.00 3,600,000.00 0.316
7 Pek. Zink meja dapur 1 lubang bh 2.00 500,000.00 1,000,000.00 0.088
8 Pasangan Kran Meja Dapur bh 2.00 200,000.00 400,000.00 0.035
9 Pasangan Kran Ø1/2" + Accecories, ex. Lokal bh 7.00 100,000.00 700,000.00 0.061
### Pasangan Floor Drain, ex. TOTO bh 7.00 300,000.00 2,100,000.00 0.184
### Pas. Bak kontrol bh 5.00 3,000,000.00 15,000,000.00 1.316
### Buis beton saluran depan m' 16.50 125,000.00 2,062,500.00 0.181
### Cor tutup saluran 0.000
a. Beton sitemix m3 1.65 0.00 0.00 0.000
b. Bekisting m2 8.25 0.00 0.00 0.000
c. Besi Ø 8 kg 145.69 0.00 0.00 20.000
0.000
76,660,860.00 0.000
II. LANTAI II 0.000
i. INSTALASI SANITAIR 0.000
a. PIPA AIR BERSIH 0.000
1 Pemipaan Air Bersih PVC Ø 1" (Inlet) m' 40,000.00 0.00 0.000
1 Pemipaan Air Bersih PVC Ø 1" (Outlet) m' 25,000.00 0.00 0.000
2 Pemipaan Air Bersih PVC Ø 3/4" m' 25,000.00 0.00 0.000
b. PIPA AIR KOTOR 0.000
1 Pemipaan Air Kotor PVC Ø 4" m' 90,000.00 0.00 0.000
2 Pemipaan Air Tinja PVC Ø 4" m' 90,000.00 0.00 0.000
ii. PENDUKUNG SANITAIR 0.000
1 Pek. Kloset Monoblock + Accecories, toto bh 3,000,000.00 0.00 0.000
2 Pek. Wastafel Toto bh 1,200,000.00 0.00 0.000
3 Pasangan Kran Ø1/2" + Accecories, ex. Lokal bh 100,000.00 0.00 0.000
4 Pasangan Floor Drain, ex. Toto bh 300,000.00 0.00 0.000
1 Pasangan Roof Drain, Talang bh 6.00 80,000.00 480,000.00 0.042
2 Water Torn+Dudukan ±1000 ltr bh 1.00 2,500,000.00 2,500,000.00 0.219
3 Water Torn+Dudukan ±500 ltr utk toko bh 1.00 1,500,000.00 1,500,000.00 0.132
4 Mesin Pompa Dorong + Otomatis bh 1.00 1,500,000.00 1,500,000.00 0.132
5,980,000.00 0.000
0.000
0.000
I. LANTAI I 0.000
i. INSTALASI 0.000
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy
Sub Pekerjaan : Struktur

AGUSTUS SEPTEMBER OKTOBER


HARGA SATUAN HARGA TOTAL HARGA SUB TOTAL BOBOT
NO MACAM PEKERJAAN SAT VOL
(%)
Rp. Rp. Rp. 1 2 3 4 1 2 3 4 1 2 3
1 Pasang KWh 2200 V ls 1.00 2,500,000.00 2,500,000.00 0.219
2 Pasang KWh 5500 V ls 1.00 7,800,000.00 7,800,000.00 0.684
3 Box Panel/MCB ls 1.00 2,000,000.00 2,000,000.00 0.176
4 Instalasi Lampu, NYM 2x1,5 mm titik 66.00 150,000.00 9,900,000.00 0.869
5 Instalasi Stop Kontak, NYM 3x2.5mm titik 20.00 175,000.00 3,500,000.00 0.307
6 Instalasi Stop Kontak AC, NYM 3x2.5mm titik 4.00 175,000.00 700,000.00 0.061
7 Instalasi Exhautst Fan, NYM 2x1,5 mm titik 4.00 150,000.00 600,000.00 0.053
8 Instalasi Kabel Antena (Coaxial RG 6) titik 4.00 175,000.00 700,000.00 0.061
9 Instalasi Kabel LAN (Cat 6) titik 1.00 0.000
0.000
ii. FIXTURE 0.000
1 Pasangan Saklar Tunggal + Imbodos bh 5.00 55,000.00 275,000.00 0.024
2 Pasangan Saklar Ganda + Imbodos bh 22.00 55,000.00 1,210,000.00 0.106
3 Pasangan Saklar Hotel bh 90,150.00 0.00 0.000
3 Pasangan Stop Kontak + Imbodos bh 20.00 55,000.00 1,100,000.00 0.097
10.000
4 Pasangan Stop Kontak AC bh 4.00 90,000.00 360,000.00 0.032
5 Pasangan Stop Kontak Waterproof bh 95,450.00 0.00 0.000
5 Pasangan Downlight Inbow bh 48.00 100,000.00 4,800,000.00 0.421
6 Pasangan Downlight Outbow bh 6.00 100,000.00 600,000.00 0.053
7 Pasangan Lampu Spotlight Outdoor bh 12.00 150,000.00 1,800,000.00 0.158
8 Pasangan Lampu Gantung bh 850,000.00 0.00 0.000
9 Pasangan Lampu Strip LED m' 36,666.67 0.00 0.000
### Pasangan Lampu Pagar T5 90 cm (14 W) bh 75,833.33 0.00 0.000
9 Pek. Pasang Ceiling Exhaust Fan 8" bh 4.00 500,000.00 2,000,000.00 0.176
### Pek. Pasang Outlet Antena bh 4.00 50,000.00 200,000.00 0.018
### Pek. Pasang Outlet Data bh 141,666.67 0.00 0.000
### Pasangan Lampu strip led m' 44.62 35,000.00 1,561,700.00 0.137
41,606,700.00 0.000
II. LANTAI II 0.000
i. INSTALASI 0.000
1 Box Panel/MCB Ls 1.00 100,000.00 100,000.00 0.009
2 Instalasi Lampu, NYM 2x1,5 mm titik 15.00 150,000.00 2,250,000.00 0.197
3 Instalasi Stop Kontak, NYM 3x2.5mm titik 2.00 175,000.00 350,000.00 0.031
3 Instalasi Stop Kontak AC, NYM 3x2.5mm titik 175,000.00 0.00 0.000
4 Instalasi Exhautst Fan, NYM 2x1,5 mm titik 1.00 150,000.00 150,000.00 0.013
5 Instalasi Kabel Antena (Coaxial RG 6) titik 175,000.00 0.00 0.000
6 Instalasi Kabel LAN (Cat 6) titik 0.00 0.00 0.000
0.000
ii. FIXTURE 0.000
1 Pasangan Saklar Tunggal + Imbodos bh 55,000.00 0.00 0.000
1 Pasangan Saklar Ganda + Imbodos bh 4.00 55,000.00 220,000.00 0.019
2 Pasangan Saklar Hotel bh 90,150.00 0.00 0.000
2 Pasangan Stop Kontak + Imbodos bh 2.00 50,000.00 100,000.00 0.009
3 Pasangan Stop Kontak AC bh 150,000.00 0.00 0.000
4 Pasangan Stop Kontak Waterproof bh 95,450.00 0.00 0.000
3 Pasangan Downlight Inbow bh 1.00 100,000.00 100,000.00 0.009
4 Pasangan Downlight Outbow bh 100,000.00 0.00 0.000
5 Pasangan Lampu Spotlight Outdoor bh 150,000.00 0.00 0.000
4 Pasangan Lampu Gantung bh 14.00 300,000.00 4,200,000.00 0.369
5 Pasangan Lampu Strip LED m' 36,666.67 0.00 0.000
6 Pek. Pasang Ceiling Exhaust Fan 8" bh 692,307.69 0.00 0.000
7 Pek. Pasang Outlet Antena bh 92,500.00 0.00 0.000
8 Pek. Pasang Outlet Data bh 141,666.67 0.00 0.000
5 Pek. Pasang Ceiling Exhaust Fan 8" bh 1.00 500,000.00 500,000.00 0.044
0.000
7,970,000.00 TOTAL 100.0001 0.0002 0.000
3 0.829
4 2.314
5 2.015
6 1.573
7 0.566
8 0.895
9 0.970
10 0.842
11 1.02512 13 14 15
RENCANA 0.000 0.000 0.829 3.143 5.159 6.732 7.297 8.192 9.162 10.004 11.029
### REALISASI 0.000 0.000 0.000 0 4.000 8.223
ER NOVEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI KET

4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
Chart Title
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

0.002
0.009 0.009 0.009
0.007 0.007 0.007 0.007

0.302 0.302 0.302 0.302

0.055 0.055 0.055 0.055


0.020 0.020 0.020 0.020
0.157 0.157 0.157 0.157

0.013 0.013 0.013 0.013


0.012 0.012 0.012 0.012
0.062 0.062 0.062 0.062

0.007 0.007 0.007 0.007 0.007


0.025 0.025 0.025 0.025 0.025
0.011 0.011 0.011 0.011 0.011
0.014 0.014 0.014 0.014 0.014
ER NOVEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI KET

4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

0.011 0.011 0.011 0.011 0.011


0.023 0.023 0.023 0.023 0.023
0.010 0.010 0.010 0.010 0.010
0.021 0.021 0.021 0.021 0.021

0.035 0.035 0.035 0.035 0.035 0.035 0.035


0.065 0.065 0.065 0.065 0.065 0.065 0.065
0.046 0.046 0.046 0.046 0.046 0.046 0.046
0.058 0.058 0.058 0.058 0.058 0.058 0.058

0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042


0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058
0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039
0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088

0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022


0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069
0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036

0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029


0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058
0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024
0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049

0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031


0.056 0.056 0.056 0.056 0.056 0.056 0.056 0.056
0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040
0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050

0.015 0.015 0.015


0.020 0.020 0.020
0.025 0.025 0.025

0.046 0.046 0.046 0.046 0.046


0.093 0.093 0.093 0.093 0.093
0.038 0.038 0.038 0.038 0.038
0.078 0.078 0.078 0.078 0.078
ER NOVEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI KET

4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

0.043 0.043 0.043 0.043 0.043


0.060 0.060 0.060 0.060 0.060
0.066 0.066 0.066 0.066 0.066
0.151 0.151 0.151 0.151 0.151

0.121 0.121 0.121 0.121 0.121


0.138 0.138 0.138 0.138 0.138
0.159 0.159 0.159 0.159 0.159

0.008 0.008 0.008 0.008 0.008


0.011 0.011 0.011 0.011 0.011
0.015 0.015 0.015 0.015 0.015

0.029 0.029 0.029 0.029


0.040 0.040 0.040 0.040
0.049 0.049 0.049 0.049

0.044 0.044 0.044 0.044


0.060 0.060 0.060 0.060
0.040 0.040 0.040 0.040
0.091 0.091 0.091 0.091

0.408 0.408 0.408 0.408 0.408


1.185 1.185 1.185 1.185 1.185
0.303 0.303 0.303 0.303 0.303

0.155 0.155 0.155 0.155


0.064 0.064 0.064 0.064
0.066 0.066
0.053 0.053
0.049 0.049 0.049
0.320 0.320 0.320

1.022 1.022 1.022 1.022


0.712 0.712 0.712 0.712
0.000 0.000 0.000 0.000
0.196 0.196 0.196 0.196
0.039 0.039 0.039 0.039

0.039 0.039 0.039 0.039


0.010 0.010 0.010 0.010

0.049 0.049
0.333 0.333 0.333
0.408 0.408 0.408 0.408 0.408
0.226 0.226
0.131 0.131 0.131 0.131
0.143 0.143
0.548 0.548 0.548
0.015 0.015 0.015
0.035 0.035 0.035 0.035
0.016 0.016 0.016
0.160 0.160 0.160 0.160
0.027 0.027 0.027
0.020 0.020 0.020
0.021 0.021
0.483 0.483 0.483
0.088 0.088
0.037 0.037 0.037

0.302 0.302 0.302 0.302


0.040 0.040 0.040 0.040
0.098 0.098 0.098 0.098
0.000 0.000 0.000 0.000

0.019 0.019 0.019


0.003 0.003 0.003
0.000 0.000 0.000
0.076 0.076 0.076
0.039 0.039 0.039
0.005 0.005 0.005

0.277 0.277 0.277 0.277


0.062 0.062 0.062 0.062
0.041 0.041 0.041 0.041

0.069 0.069 0.069 0.069


0.065 0.065 0.065 0.065
0.511 0.511 0.511 0.511
0.149 0.149 0.149 0.149
0.049 0.049 0.049 0.049

0.263 0.263 0.263

0.088 0.088 0.088

0.293 0.293 0.293


0.219 0.219 0.219

0.059 0.059 0.059


0.059 0.059 0.059
0.094 0.094 0.094
0.102 0.102 0.102
0.091 0.091 0.091
0.088 0.088 0.088
0.176 0.176 0.176
ER NOVEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI KET

4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
0.112 0.112 0.112
0.483 0.483 0.483

0.107 0.107 0.107 0.107


0.105 0.105 0.105 0.105
0.000 0.000
0.000 0.000

0.371 0.371 0.371 0.371 0.371


0.313 0.313 0.313 0.313 0.313
0.000 0.000 0.000 0.000 0.000
0.114 0.114 0.114 0.114

0.008 0.008 0.008 0.008


0.000 0.000 0.000 0.000
0.029 0.029 0.029 0.029

0.071 0.071 0.071


0.011 0.011 0.011
0.031 0.031 0.031 0.031
0.064 0.064 0.064 0.064
0.125 0.125 0.125 0.125
0.000 0.000 0.000 0.000
0.000 0.000

0.080 0.080 0.080 0.080


0.001 0.001 0.001 0.001
0.133 0.133 0.133 0.133

0.286 0.286 0.286

0.011 0.011

0.000 0.000
0.000 0.000
0.000 0.000

0.000 0.000
0.088 0.088 0.088
0.108 0.108 0.108
0.146 0.146 0.146

0.943 0.943 0.943


2.303 2.303
0.148 0.148
0.107 0.107
0.246 0.246
0.072 0.072
0.026 0.026 0.026
0.000 0.000
0.000 0.000 0.000

0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050
0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062
0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054
0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026

0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042
0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
ER NOVEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI KET

4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087
0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016

0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037 0.037

Row 423 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
12 1.21413 1.21214 1.21215 1.20316 0.574 17 0.766 18 0.766 19 0.739 20 0.512 21 0.512 22 0.512 23 0.512 240.512 250.929 260.929 1.072
27 9.249
28 9.995
29 9.290
30 6.863
31 4.268
32 2.866
33 3.681
34 4.566
35 4.429
36 5.147
37 2.874
38 6.161
39 4.597
40 1.581
41 0.018
42 0.018 0.018 0.000
12.243 13.455 14.667 15.869 16.444 17.210 17.976 18.715 19.227 19.739 20.250 20.762 21.273 22.202 23.131 24.203 33.452 43.447 52.737 59.599 63.867 66.733 70.415 74.980 79.409 84.556 87.430 93.591 98.188 99.769 99.788 99.806 100 0.000
REKAPITULASI PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN
(%) (%) (%) (%)

I. PEKERJAAN STRUKTUR 38.40 0.00 7.28 7.28

II. PEKERJAAN ARSITEKTUR 49.63 0.00 0.00 0.00

III. PEKERJAAN PLUMBING 7.61 0.00 0.26 0.26

IV. PEKERJAAN ELECTRICAL 4.35 0.00 0.68 0.68

100.00 0.00 8.22 8.22


PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL KET
(%)
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
I. PEKERJAAN PERSIAPAN
1 Gudang Bahan Ls 1.00 0.176 0.00 0.00 0.00 1.00 100.00 0.176 1.00 100.00 0.18 SELESAI
2 Pagar Sementara Proyek m' 16.50 0.174 0.00 0.00 0.000 16.5 100.00 0.174 16.50 100.00 0.17 SELESAI
3 Pengukuran & bouwplank m' 90.00 0.158 0.00 0.00 0.000 80 88.89 0.140 80.00 88.89 0.14 PROGRESS
4 Keamanan Proyek Ls 1.00 0.220 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Air kerja Ls 1.00 0.263 0.00 0.00 0.000 0.025 2.50 0.007 0.03 2.50 0.01 PROGRESS
7 Listrik kerja Ls 1.00 0.263 0.00 0.00 0.000 0.025 2.50 0.007 0.03 2.50 0.01 PROGRESS
8 Pembersiahn Lokasi, Potong rumput, dll Ls 1.00 0.307 0.00 0.00 0.000 0.9 90.00 0.277 0.90 90.00 0.28 PROGRESS

II. PEKERJAAN TANAH


1 Galian tanah pondasi
a. Footplat 50x50 m3 8.64
a. Footplat 120x120x30 m3 44.82 0.275 0.00 0.00 0.000 25 55.78 0.154 25.00 55.78 0.15 PROGRESS
c. Footplat 125x125 m3
b. Footplat 50x50x25 m3 18.47 0.114 0.00 0.00 0.000 11.2 60.65 0.069 11.20 60.65 0.07 PROGRESS
2 Galian tanah pondasi batu kali m3 81.52 0.501 0.00 0.00 0.000 44.1 54.10 0.271 44.10 54.10 0.27 PROGRESS
3 Galian Sloof m3 24.87 0.153 0.00 0.00 0.000 10.00 40.20 0.061 10.00 40.20 0.06 PROGRESS
4 Urugan tanah kembali m3 74.79 0.131 0.00 0.00 0.000 18.06 24.15 0.032 18.06 24.15 0.03 PROGRESS
5 Urugan pasir bawah pondasi , T. 10 cm
a. Footplat 80x80 m3
a. Footplat 120x120x30 m3 2.70 0.047 0.00 0.00 0.000 0.504 18.64 0.009 0.50 18.64 0.01 PROGRESS
b. Footplat 50x50x25 m3 0.97 0.017 0.00 0.00 0.000 0.088 9.00 0.002 0.09 9.00 0.00 PROGRESS
c. Sloof 15x20 m3 3.69 0.065 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Sloof 20x30 m3 2.66 0.047 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
Urugan tanah peninggian bangunan
6 m3 412.50
t=120cm + pemadatan 2.028 0.00 0.00 0.000 ### 95.00 1.927 391.88 95.00 1.93 PROGRESS

III. PEKERJAAN PONDASI


1 Lantai kerja t. 5 cm bawah Footplat
a. Footplat 120x120 m2 21.97 0.096 0.00 0.00 0.000 0.576 2.62 0.003 0.58 2.62 0.00 PROGRESS
b. Footplat 50x50 m2 12.25 0.054 0.00 0.00 0.000 0.1 0.82 0.000 0.10 0.82 0.00 PROGRESS
2 Stros pile
a. Galian strous pile m' 180.00 1.106 0.00 0.00 0.000 ### 100.00 1.106 180.00 100.00 1.11 SELESAI
b. Beton m2 9.42 0.414 0.00 0.00 0.000 9.42 100.00 0.414 9.42 100.00 0.41 SELESAI
c. Besi D8 kg 297.21 0.365 0.00 0.00 0.000 ### 100.00 0.365 297.21 100.00 0.37 SELESAI
c. Besi D13 kg 999.76 1.229 0.00 0.00 0.000 ### 100.00 1.229 999.76 100.00 1.23 SELESAI
3 Pondasi batukali
a. Pondasi batukali uk 30/60/80 m3 76.55 3.025 0.00 0.00 0.000 10.50 13.72 0.415 10.50 13.72 0.41 PROGRESS
4 Cor Footplat
I. Footplat 80x80 tb, 20
a. Beton sitemix m3
b. Bekisting m2
c. Besi D13 kg
d. Besi Ø8 kg
I. Footplat 120x120 tb, 30
a. Beton sitemix m3 6.91 0.442 0.00 0.00 0.000 1.50 21.70 0.096 1.50 21.70 0.10 PROGRESS
b. Bekisting m2 23.04 0.162 0.00 0.00 0.000 6 26.04 0.042 6.00 26.04 0.04 PROGRESS
c. Besi D13 kg 1,019.76 1.254 0.00 0.00 0.000 144.8 14.20 0.178 144.81 14.20 0.18 PROGRESS
II. Footplat 50x50 tb, 25
a. Beton sitemix m3 1.69 0.108 0.00 0.00 0.000 0.30 17.78 0.019 0.30 17.78 0.02 PROGRESS
b. Bekisting m2 13.50 0.095 0.00 0.00 0.000 2.4 17.78 0.017 2.40 17.78 0.02 PROGRESS
c. Besi D13 kg 404.90 0.498 0.00 0.00 0.000 21.54 5.32 0.026 21.54 5.32 0.03 PROGRESS
5 Cor Kolom Pedestal
I. Kolom Pedestal 15x20
a. Beton sitemix m3 0.97 0.060 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 22.68 0.199 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi D13 kg 74.75 0.092 0.00 0.00 0.000 11 14.72 0.014 11.00 14.72 0.01 PROGRESS
d. Besi Ø8 kg 89.85 0.110 0.00 0.00 0.000 12 13.36 0.015 12.00 13.36 0.01 PROGRESS
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL KET
(%)
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
II. Kolom Pedestal 20x30
a. Beton sitemix m3 1.44 0.092 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 21.12 0.185 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi D13 kg 67.01 0.082 0.00 0.00 0.000 11 16.41 0.014 11.00 16.41 0.01 PROGRESS
d. Besi Ø8 kg 139.47 0.171 0.00 0.00 0.000 15 10.76 0.018 15.00 10.76 0.02 PROGRESS
5 Cor Sloof
I. Sloof uk 15x20
a. Beton sitemix m3 4.43 0.283 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 59.04 0.518 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø8 kg 302.70 0.372 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D10 kg 375.80 0.462 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
I. Sloof uk 20x30
a. Beton sitemix m3 5.30 0.339 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 53.04 0.466 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø8 kg 251.30 0.309 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 575.84 0.708 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

IV. PEKERJAAN STRUKTUR ATAS LANTAI I


1 Cor Kolom
i. Kolom uk. 15/20
a. Beton sitemix m3 2.70 0.172 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 63.00 0.553 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 196.57 0.242 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 231.82 0.285 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
ii. Kolom uk. 25/30
a. Beton sitemix m3 3.60 0.230 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 52.80 0.464 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 156.37 0.192 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 319.42 0.393 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

2 Cor Balok
iv. Balok Anak 15/20
a. Beton sitemix m3 3.84 0.245 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 51.20 0.450 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø6 kg 262.71 0.323 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 325.51 0.400 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

3 Cor dak tandon


a. Beton sitemix m3 0.70 0.045 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 7.00 0.061 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 60.42 0.074 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

4 Cor Talang
a. Beton sitemix m3
b. Bekisting m2
c. Besi Ø 8 kg

V. PEKERJAAN STRUKTUR ATAS LANTAI II


1 Cor Kolom
i. Kolom uk. 15/35
a. Beton sitemix m3
b. Bekisting m2
c. Besi Ø 8 kg
d. Besi D13 kg
ii. Kolom uk. 25/30
a. Beton sitemix m3 3.60 0.230 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 52.80 0.464 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 156.37 0.192 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 319.42 0.393 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL KET
(%)
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
2 Cor Balok Elevasi +3.00
i. Balok 20/30
a. Beton sitemix m3 3.41 0.218 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 34.07 0.299 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 268.76 0.330 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 614.74 0.756 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

3 Cor plat lantai


a. Beton sitemix m3 9.46 0.604 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 78.80 0.692 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 645.84 0.794 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

4 Cor Talang
a. Beton sitemix m3 0.62 0.040 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 6.20 0.054 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 62.19 0.076 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

5 Cor Canopy Segitiga Depan


a. Beton sitemix m3 1.83 0.117 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 18.25 0.160 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 161.11 0.198 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

V. PEKERJAAN STRUKTUR ATAS LANTAI ATAP


1 Cor Balok Elevasi +6.00
i. Balok 20/30
a. Beton sitemix m3 2.75 0.175 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 27.45 0.241 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 129.91 0.160 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
d. Besi D13 kg 296.35 0.364 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

6 Pek. Struktur Baja


a. Rangka Atap baja ringan area rumah m2 136.60 2.039 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Rangka Atap CNP 150 area toko m2 150.00 5.927 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Tangga Baja IWF mezanine + hollo 30/30 m' 5.75 1.515 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

38.405 0.000 0.000 7.275 7.275


PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT

A. LANTAI I
I. PEKERJAAN BETON PRAKTIS
1 Kolom Praktis m' 94.50 0.622 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Balok praktis m' 38.65 0.255 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Meja Dapur unit 2.00 0.132 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Meja Wastafel unit 4.00 0.105 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Topi-topi m2 5.58 0.147 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Screed bawah lantai m2 273.24 0.960 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

II. PEKERJAAN PASANGAN


1 Pasangan Bata Merah m2 503.40 4.089 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Plasteran Dinding m2 772.63 2.850 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Plasteran Beton m2
4 Acian Dinding m2 662.89 0.786 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Acian Beton ekspos m2 133.36 0.158 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

III. PEKERJAAN SPONENGAN


1 Sponeng pintu+jendela m' 176.38 0.155 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Sponeng kolom beton m' 44.18 0.039 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

IV. PEKERJAAN PENUTUP LANTAI+DINDING


1 Pek. Acian untuk pasangan vinyl m2 37.56 0.099 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pasang granit tile 60x60, m2 58.46 1.001 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pasang granit tile 60x60, m2 132.72 2.040 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pasang granit tile motif kayu m2 26.37 0.452 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pasang plint lantai m' 125.70 0.524 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

6 Keramik lantai KM 60x60 m2 16.71 0.286 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Keramik dinding KM 60x60 m2 93.69 1.645 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Keramik lantai KM 40x40 m2 5.22 0.046 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Keramik dinding KM 40x40 m2 16.05 0.141 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
10 Keramik lantai KM 40x40 m2 5.50 0.048 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
11 Pasang batu alam andesit + coating m2 20.85 0.641 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
12 Keramik dinding Meja dapur granite 60x60 m2 4.80 0.082 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
13 Top table meja dapur granite 60x60 m2 3.42 0.059 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
14 Top table meja wastafel granite 60x60 m2 2.40 0.041 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
15 Paving block tebal mtu K-250 m2 134.80 1.450 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
16 Roster beton uk. 20 x 20 cm m2 5.76 0.177 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
17 Roster beton uk. 20 x 20 cm m2 3.60 0.111 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

V. PEKERJAAN PLAFON
1 Rangka Hollow + Plafon Gipsum 9 mm m2 162.12 1.210 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Shawdowline m' 104.40 0.160 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Drop Ceiling m' 89.36 0.392 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pek. Plafond PVC m2

VI. PEKERJAAN TANGGA


1 Plasteran tangga m2 15.84
2 Acian m2 7.92
3 Sponeng tangga m'
4 Keramik tangga granite m2 12.72
5 Step noising 10x60 m' 24.00
6 Cat interior tangga m2 7.92

VII. PEKERJAAN FINISHING


1 Cat interior, ex. Jotun jotaplast m2 720.95 1.108 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Cat plafond ex. Jotun jotashield m2 162.12 0.249 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Cat Exterior ex. Jotun jotashield m2 75.30 0.165 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

VIII. PEKERJAAN BESI


1 Railing Tangga m' 5.75 0.278 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

2 Kisi kisi Hollo almunium Fasad Teras m' 35.00


0.261 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Rangka Atap + Penutup atap roftop rangka baja ri m2 55.50 2.047 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
4 Rangka Atap + Penutup atap solar tuff flat m2 8.50 0.597 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Rangka Atap + Penutup atap solar tuff gelombang m2 5.00 0.198 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
IX. PEKERJAAN KUSEN + PINTU
1 Pintu P1 unit 3.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pintu P1.a unit 6.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

3 Boven BV 2 unit

4 Boven BV 2a unit
5 Pintu besi garasi unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Pintu harmonika toko unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Pintu pagar depan unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

1 Pintu Bedroom uk. 0,9 x 2,2 m unit 3.00 0.790 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pintu KM uk. 0,8 x 2 m ( kamar mandi rumah ) unit 4.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pintu KM uk. 0,8 x 2 m ( kamar mandi toko ) unit 2.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pintu Ruang kantor uk. 0,9 x 2,2 m unit 1.00 0.263 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pintu Lipat Ruang makan uk. 3,25 x 2 m unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Pintu Ruang keluarga uk. 1,4 x 2,4 m unit 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Pintu Folding gate uk. 6,2 x 2,55 m unit 1.00 0.878 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Pintu garasi area garasi uk. 6,5 x 2,5 m unit 1.00 0.659 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Jalusi grill kayu area teras m2 6.98 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

9 Boven toilet uk. 0,85 x 0,55 m unit 4.00


0.176 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
10 Jendela bedroom uk. 1,25 x 1,6 m unit 1.00 0.176 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
11 Jendela bedroom uk. 1,00 x 1,6 m unit 2.00 0.281 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
12 Pintu jendela area taman belakang uk. (0,9x2,2)+( unit 1.00 0.307 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
13 Pintu jendela area pantry uk. (0,9x2,2)+(0,95x1,2 unit 1.00 0.274 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
14 Jendela Kantor uk. 1,00 x 1.50 m unit 2.00 0.263 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
15 Jendela Ruang keluarga uk. 1,65 x 2,4 m unit 2.00 0.527 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
16 Jendela Ruang keluarga uk. 2,4 x 1,6 m unit 1.00 0.337 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
16 Pintu pagar depan unit 1.00 1.449 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

B. LANTAI II
I. PEKERJAAN BETON PRAKTIS
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
1 Kolom Praktis m' 65.00 0.428 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Balok praktis m' 64.00 0.421 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Topi-topi m2
3 Planter Bunga m'

II. PEKERJAAN PASANGAN


1 Pasangan Bata Merah m2 228.70 1.858 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Plasteran Dinding m2 424.40 1.565 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Plasteran Beton ekspose m2
3 Acian Dinding m2 385.10 0.457 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Acian Beton ekspos m2

III. PEKERJAAN SPONENGAN


1 Sponeng pintu+jendela m' 36.20 0.032 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Sponeng beton ekspose m'
2 Tanggulan Railing Void m' 17.80 0.117 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
IV. PEKERJAAN PENUTUP LANTAI+DINDING
1 Pek. Acian untuk pasangan vinyl m2 81.39 0.214 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Keramik lantai KM 40x40 m2 2.61 0.034 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Keramik dinding KM 40x40 m2 8.03 0.123 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pasang batu alam andesit + coating m2 8.40 0.258 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Woodplank fins woodstain m2 22.88 0.502 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Roster terakota uk 20x20 m2
6 Top table meja granite 60x60 m2

VII. PEKERJAAN PENGECATAN


1 Cat interior, ex. Jotun jotaplast m2 207.70 0.319 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Cat plafond ex. Jotun jotashield m2 3.00 0.005 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Cat Exterior ex. Jotun jotashield m2 216.70 0.533 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

VIII. PEKERJAAN BESI


1 Railing Area Void mezzanine m' 17.80 0.860 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Railing Tangga & Mezzanine m'

IX. PEKERJAAN PLAFON


1 Rangka Hollow + Plafon Gipsum 9 mm m2 3.00 0.022 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Drop Ceiling m'
2 Pek. Plafond PVC m2

IX. PEKERJAAN KUSEN + JENDELA


1 Pintu P1 area mezzanine unit 2.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

2 Jendela J1 unit 1.00


0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

3 Jendela J2 unit 4.00


0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

1 Pintu Kamar uk. 0,9 x 2,2 m unit 2.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
1 Jendela area void uk. 0,85 x 1,5 m unit 3.00 0.263 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT
2 Jendela mezzanine uk. 1,85 x 2 m unit 1.00 0.325 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Jendela Facade depan unit 1.00 0.439 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

X. PEKERJAAN ATAP
1 Penutup Atap Genteng Keramik m2 136.60 2.831 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Penutup Atap UPVC ( rooftop ) m2 150.00 4.610 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Bubungan genteng keramik m' 17.35 0.296 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Nok Rooftop m' 14.00 0.215 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Talang area toko m' 28.00 0.492 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Talang galvalum teras depan m' 16.50 0.145 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Waterproofing dak atap m2 12.58 0.077 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Pekerjaan ornament ACP area façade + rangka holm2 22.35 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Pekerjaan Lettering " SENTRAL PAPERA SOLO'' ls 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

49.628 0.000 0.000 0.000


PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT

I. LANTAI I
i. INSTALASI SANITAIR
a. PIPA AIR BERSIH
1 Pemipaan Air Bersih PVC Ø 1" (Inlet) m' 16.49 0.058 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pemipaan Air Bersih PVC Ø 1" (Outlet) m' 12.00 0.042 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pemipaan Air Bersih PVC Ø 3/4" m' 99.66 0.219 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pemipaan Air Panas PEX Ø 1/2 m' 9.60 0.042 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. PIPA AIR KOTOR
1 Pemipaan Air Kotor PVC Ø 3" m' 80.65 0.496 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pemipaan Air Kotor PVC Ø 4" m' 78.98 0.624 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pemipaan Air Tinja PVC Ø 4" m' 68.15 0.539 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pekerjaan Septictank unit 1.00 0.263 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
ii. PENDUKUNG SANITAIR

1 Bor Sumur sampai Kedalaman Air Bersih & titik 1.00


Instalasi Pipa Casing PVC AW 0.263 0.00 0.00 0.000 1 100.00 0.263 1.00 100.00 0.26 SELESAI
2 Mesin Pompa Tarikan Air, bh 1.00 0.176 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pek. Kloset Monoblock + Accecories, toto bh 5.00 1.317 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pek. Kloset jongkok + Accecories, toto bh 2.00 0.088 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pek. Wastafel Toto bh 4.00 0.421 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Pek. Shower + Kran bh 3.00 0.316 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Pek. Zink meja dapur 1 lubang bh 2.00 0.088 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Pasangan Kran Meja Dapur bh 2.00 0.035 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Pasangan Kran Ø1/2" + Accecories, ex. Lokalbh 7.00 0.061 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
10 Pasangan Floor Drain, ex. TOTO bh 7.00 0.184 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
11 Pas. Bak kontrol bh 5.00 1.317 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
12 Buis beton saluran depan m' 16.50 0.181 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
13 Cor tutup saluran
a. Beton sitemix m3 1.65 0.105 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
b. Bekisting m2 8.25 0.072 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
c. Besi Ø 8 kg 145.69 0.179 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

II. LANTAI II
i. INSTALASI SANITAIR
a. PIPA AIR BERSIH
1 Pemipaan Air Bersih PVC Ø 1" (Inlet) m'
1 Pemipaan Air Bersih PVC Ø 1" (Outlet) m'
2 Pemipaan Air Bersih PVC Ø 3/4" m'
b. PIPA AIR KOTOR
1 Pemipaan Air Kotor PVC Ø 4" m'
2 Pemipaan Air Tinja PVC Ø 4" m'
ii. PENDUKUNG SANITAIR
1 Pek. Kloset Monoblock + Accecories, toto bh
2 Pek. Wastafel Toto bh
3 Pasangan Kran Ø1/2" + Accecories, ex. Lokalbh
4 Pasangan Floor Drain, ex. Toto bh
1 Pasangan Roof Drain, Talang bh 6.00 0.042 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Water Torn+Dudukan ±1000 ltr bh 1.00 0.220 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Water Torn+Dudukan ±500 ltr utk toko bh 1.00 0.132 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Mesin Pompa Dorong + Otomatis bh 1.00 0.132 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

7.614 0.000 0.263 0.263


PROGRESS MINGGUAN

Proyek : Pembangunan Rumah Tinggal 2 (Dua) Lantai


Lokasi : Mojolaban - Sukoharjo
Pemilik : Ibu Poppy

MINGGU LALU MINGGU INI S/D MINGGU INI


NO MACAM PEKERJAAN SAT VOL BOBOT (%) KET
VOL REALISASI BOBOT VOL REALISASI BOBOT VOL REALISASI BOBOT

I. LANTAI I
i. INSTALASI
1 Pasang KWh 2200 V ls 1.00 0.220 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pasang KWh 5500 V ls 1.00 0.685 0.00 0.00 0.000 1 100.00 0.685 1.00 100.00 0.68 SELESAI
3 Box Panel/MCB ls 1.00 0.176 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Instalasi Lampu, NYM 2x1,5 mm titik 66.00 0.869 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Instalasi Stop Kontak, NYM 3x2.5mm titik 20.00 0.307 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Instalasi Stop Kontak AC, NYM 3x2. titik 4.00 0.061 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Instalasi Exhautst Fan, NYM 2x1,5 m titik 4.00 0.053 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Instalasi Kabel Antena (Coaxial RG 6)titik 4.00 0.061 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
9 Instalasi Kabel LAN (Cat 6) titik 1.00 0.000 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

ii. FIXTURE
1 Pasangan Saklar Tunggal + Imbodos bh 5.00 0.024 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pasangan Saklar Ganda + Imbodos bh 22.00 0.106 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pasangan Saklar Hotel bh
3 Pasangan Stop Kontak + Imbodos bh 20.00 0.097 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pasangan Stop Kontak AC bh 4.00 0.032 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pasangan Stop Kontak Waterproof bh
5 Pasangan Downlight Inbow bh 48.00 0.421 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
6 Pasangan Downlight Outbow bh 6.00 0.053 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
7 Pasangan Lampu Spotlight Outdoor bh 12.00 0.158 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
8 Pasangan Lampu Gantung bh
9 Pasangan Lampu Strip LED m'
10 Pasangan Lampu Pagar T5 90 cm (14 bh
9 Pek. Pasang Ceiling Exhaust Fan 8" bh 4.00 0.176 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
10 Pek. Pasang Outlet Antena bh 4.00 0.018 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
11 Pek. Pasang Outlet Data bh
12 Pasangan Lampu strip led m' 44.62 0.137 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

II. LANTAI II
i. INSTALASI
1 Box Panel/MCB Ls 1.00 0.009 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Instalasi Lampu, NYM 2x1,5 mm titik 15.00 0.198 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Instalasi Stop Kontak, NYM 3x2.5mm titik 2.00 0.031 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Instalasi Stop Kontak AC, NYM 3x2. titik
4 Instalasi Exhautst Fan, NYM 2x1,5 m titik 1.00 0.013 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Instalasi Kabel Antena (Coaxial RG 6)titik
6 Instalasi Kabel LAN (Cat 6) titik

ii. FIXTURE
1 Pasangan Saklar Tunggal + Imbodos bh
1 Pasangan Saklar Ganda + Imbodos bh 4.00 0.019 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
2 Pasangan Saklar Hotel bh
2 Pasangan Stop Kontak + Imbodos bh 2.00 0.009 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
3 Pasangan Stop Kontak AC bh
4 Pasangan Stop Kontak Waterproof bh
3 Pasangan Downlight Inbow bh 1.00 0.009 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
4 Pasangan Downlight Outbow bh
5 Pasangan Lampu Spotlight Outdoor bh
4 Pasangan Lampu Gantung bh 14.00 0.369 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -
5 Pasangan Lampu Strip LED m'
6 Pek. Pasang Ceiling Exhaust Fan 8" bh
7 Pek. Pasang Outlet Antena bh
8 Pek. Pasang Outlet Data bh
5 Pek. Pasang Ceiling Exhaust Fan 8" bh 1.00 0.044 0.00 0.00 0.000 0 0.00 0.000 0.00 0.00 0.00 -

4.353 0.000 0.685 0.685