To : Motortrade
Subject : Unit Price Quotation per Item of Work
Project Address : Puerto Princesa City, Palawan
II. DEMOLITION
Existing 4.5mm thk. Fiber cement board Ceiling including metal studs. m² 73.30 0.00
Existing acoustic board Ceiling including t-runner frame. m² 82.50 0.00
Existing 4” CHB interior wall. m² 175.89 0.00
Existing 6” CHB exterior wall. m² 175.89 0.00
Existing Double Wall partition with metal studs frame. m² 87.95 0.00
Flooring ( Chipping ) - existing ceramic tiles. m² 117.26 0.00
Existing 30cm x 30cm x 2mm vinyl flooring. m² 73.29 0.00
Existing Ordinary Glass Panel with existing frame . m² 175.89 0.00
SUB-TOTAL 0.00 0.00
III. MASONRY
Construction of 6”x8”x16 exterior CHB wall (Plastering not included) m² 979.38 0.00 m² 391.75 0.00
Construction of 4”x8”x16 interior CHB wall (Plastering not included) m² 619.10 0.00 m² 247.64 0.00
Plastering (2 face) m² 409.50 0.00 m² 203.80 0.00
Plastering (1 face) m² 204.75 0.00 m² 101.90 0.00
Concreting (1:2:4) m³ 0.00
Steel reinforcement fabrication kgs 62.05 kgs 24.82
Steel reinforcement installation kgs 2.66 kgs 8.42
Page 1 of 5 West Blue Builders
Formworks fabrication m² 263.24 m² 105.30
Formworks & staging installation m² 176.55 m² 70.62
Pouring of concrete m³ 4,600.00 m³ 1,840.00
Stripping of formworks m² m² 33.43
Slab on Fill @ 100mm thk. m³ 6,286.50 0.00 m³ 2,549.21 0.00
Retouching @ demolished part m² 160.00 0.00 m² 440.00 0.00
SUB-TOTAL 0.00 0.00 0.00
Supply and installation of 5/8 x 2'x4' Daiken acoustic board on T-Runner m² 576.47 0.00 m² 247.50 0.00
V. CARPENTRY
Supply and installation of 4.5mm fiber cement board double wall partition
m² 838.59 0.00 m² 1,174.02 0.00
on 35mm x 64mm 3.0m metal stud ga.24.
Supply and installation of wooden hallow-core flush door set 7,718.75 0.00 set 2,701.56 0.00
Supply and installation of wooden hallow-core flush door with .60mts. X
set 8,366.25 0.00 set 2,928.19 0.00
.60mts. Ordinary glass viewing window
Fabrication of 3/4” thk. Ordinary plywood open Shelves (.4 x .60x2.40m)
set 6,210.00 0.00 set 2,173.50
1.50m from FFL. to bottom of shelves
SUB-TOTAL 0.00 0.00 0.00
VIII. TOPPING
Smooth Finished at 2”thk. m² 330.75 0.00 m² 132.30 0.00
TOTAL 0.00
#DIV/0! /sq. m.
Submitted by :
Ser Felix A. Brin
Owner/Manager
West Blue Builders