You are on page 1of 80

TENDER DOCUMENTS

MAIN WORKS

VOLUME 3
BILL OF QUANTITIES

CONSULTANT
NAGA Architect,
Designers and Planners
P.O. Box: 73033
Dubai, UAE
#REF!

#REF!
#REF!

PREAMBLES & METHOD OF MEASUREMENT

GENERALLY

A The rates for each item must be comprehensive and must include for complying with the specifications,
drawings and all obligations under the Contract including all matters and things necessarfor the proper construction,
completion and maintenance of the Works. No claims for additional payment will be allowed for any error or
misunderstanding by the Contractor of the Work involved. The Bill of Quantities shall be read in conjunction with the
Conditions of Contract, Specifications and Drawings and the Contractor shall provide against the bill rates or in the
prices for the full scope of work covered by the Contract, no claim or variations shall be considered on account of the
Contractor’s failure to comply with this provision.

B The rates for each item must allow for complying in all respects with the requirements of the specifications and
drawings and requirement of Local Authorities and must include for, but are not limited to all of the following :

i) Cutting and the consequent wastage for work in girths, width or heights, and for all short lengths.
Providing working drawings, shop drawings, revisions until approved, etc. and for obtaining the
ii) Engineer’s approval.
iii) Maintenance till handing over to the employer.
iv) Labour and all associated costs.
v) Materials, goods and all associated costs.
vi) Fitting and fixing materials and goods in position.
vii) Provision of plant, scaffolding, equipment and tools.
viii) Temporary Works.
ix) Protection of the Works.
x) Establishment and overhead charges and profit.
xi) Complying with all obligations imposed by the Contract.
xii) All applicable taxes, duties, charges, Government levies, landing charges and transport.
xiii) Obtaining approval of materials.
Manufactured items and work methods including the provision of all drawings, manufacturer’s
xiv) specifications, literature, samples and copies of manufacturing standards.

C The tenderer should submit together with his tender, the breakdown of the tendered rates in the Rate Analysis
Schedule at the end of the Bill Of Quantities. Further, the Contractor will be required to provide the Engineer with a
full and detailed Rate Breakdown before issuing Letter of Intent of being so requested. The breakdown is to show
the actual calculations of the Preliminaries, Labour, Plant and Materials costs for the Works, build-up of measured
rates with on-costs and overheads and any other allowances used to arrive at the Tender Price.

D Variations - The rates inserted in the Bills of Quantities with the application of the adjustment item will be used
to value any variations to the Works, whether omissions or additions.

E Lump sum values shall not be inserted where unit rates are applicable and the Tenderer shall ensure that
identical items occurring in separate bills are not priced at different rates, unless this is the deliberate intention.

Page 1 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT


GENERALLY (Cont’d)
A Where quantities are indicated as "Provisional", such items shall only be carried out by the Contractor upon
receipt of separate written instruction from the Engineer and will be re-measured inccordance with the these
measurement rules based on the work done at site. The Contract Price shall be adjusted accordingly.

A1 Provisional items in the BOQ may be expended totally, in part or not at all as directed by the Engineer. The
Contractor will have no entitlement to any claim including loss of profit in the event that any or all provisional items
are omitted in part or in its entirely.

B The Tenderer shall not be entitled for any overheads, profits, builders work, etc. of any kind, witrespect to the
items which are deleted.

C The Tenderer shall not be entitled for any overheads and profit on fees, charges, deposit paid to thvarious Local
Authorities in connection with temporary service connections. Building Permit, etc.

D The quantities inserted against items in the Bill of Quantities are estimated quantities for the Works for the
purpose of Tender evaluation and the Tenderer shall be deemed to have checked and verified such quantities in the
compilation of his Tender Price prior to the submission of his Tender. Upon the award of the Contract, the priced Bill
of Quantities shall be used solely for evaluating interim payments due to the Contractor, and as a schedule of rates
for establishing the value of variations.

E The Contractor shall not use the Bill of Quantities for the purpose of ordering materials or arranging Subcontracts.
References to these activities shall be the Specifications and Drawings and instructions issued by the Engineer.

F All items in the Bill of Quantities shall be deemed to have a monetary value, whether priced or unpriced. In the
absence of a unit rate or price against any item, the cost shall be deemed to have been included elsewhere within
the Contract Price and the work ascribed to that item shall be executed by the Contractor without any additional
payment.

G Written annotations of any nature that are inserted against items in lieu of a monetary value shall, without
exception, be deemed to mean that the cost of that item is “included” elsewhere within the Contract and the work
ascribed to that item shall be executed by the Contractor, at no additional cost.

H The descriptions in the Bill of Quantities may be incomplete and the Tenderer is referred to the Drawings and
Specifications for complete information in respect of all the relevant descriptions, quality, dimensions, capacities,
design parameters and the like.

Method of Measurement
J The quantities in the Bill of Quantities have been prepared generally in accordance with the Principles of
Measurement (International) for Works of Construction dated June 1979 published by the Royal Institution of
Chartered Surveyors, 12, Great George Street, Parliament Square, London SW1P 3AD, U.K. amended to suit local
practice and conditions. The description of each item (which description shall imply references to any headings, sub-
headings, preambles or other clauses or items which shall apply) shall be held to include all materials, workmanship,
plant and equipment including all taxes, duties, charges, all Government levies, landing charges, transport, profit and
overheads and all other incidental costs to complete the Works.

K These preambles are to be read in conjunction with the item descriptions in the Bill of Quantities.
L As described means as described in the Specifications.

Page 2 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

GENERALLY (Cont’d)

Abbreviations

In the Specification and Bill of Quantities the following abbreviations have the meanings hereby assigned to them :

B.S. means the specification issued by the British Standards Institution (B.S.I.)
C.P. means the code of practice issued by the B.S.I.
AASHTO means the specification issued by the American Association of State Highways & Transportation
Officials
ASTM means the specification issued by the American Society for Testing & Materials.
AC Asbestos Cement
B.S. British Standards
Cont’d Continued
DEPT, Dept. Department
dia. diameter
Drg. Drawing
E.O. Extra Over
F.C. Fibre Cement
GRP Glass Fibre Reinforced Plastics
GRC Glass Reinforced Concrete
HDPE High Density Polyethylene
HP Horse Power
ISO International Standards Organization
Kg Kilograms
Kw/hr Kilowatt per hour
L.S. Lump Sum
m meter
mm millimeter
m3, cu.m. Cubic meter
m2, sq.m. Square meter
MDPE Medium Density Polyethylene
Mic. Micron
Min.,min Minimum
MDD Maximum Dry Density
MH Manhole
no. number

Page 3 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

GENERALLY (Cont’d)

Abbreviations, cont’d.

nos. numbers
O.P.C. Ordinary Portland Cement
PE Polyethylene
P.Q. Provisional Quantity
P.S. Provisional Sum
PVC Polyvinyl Chloride
Qty. Quantity
RHS Rectangular Hollow Section
Spec. Specifications
S.R.C. Sulphate Resisting Cement
t, tons tonne
thk. thick
uPVC Unplasticised Polyvinyl Chloride
W Width
P.C. Rate Prime cost rate
M&E Mechanical & Electrical
> Greater than
> Equal to or Greater than
< Less than
< Equal to or Less than
= Equal to

Preambles

A All measurements are net and the rates shall include for all laps, waste, working space and trade or traditional
allowances.

Discrepancies

B In the event of there being any discrepancies between details on Drawings, descriptions in Specifications and
descriptions in the Bill of Quantities then the rates and pricing shall be deemed to relate to the documents order of
precedence set out in the Form of Agreement. Any discrepancy arising in terms of these Preambles and the items
contained within the Bill of Quantities must be brought to the attention of the Engineer for his clarification prior to
the submission of Tender. In case the clarifications are not asked by the contractor before submitting the tender, the
decision shall be at the sole discretion of the Engineer.
#REF!

PREAMBLES & METHOD OF MEASUREMENT


Page 4 of 22
Preambles and Method of Measurement

GENERALLY (Cont’d)

Fix Only Items

A The expression "fix only" used in the Bill of Quantities means that the Contractor shall provide the following facilities:

i) Fixing as defined in Clause GP7.2 of POM(I).


Supplying full size templates, giving and marking dimensions and taking responsibility for their
accuracy. Provide full detailed quantities along with measurement sheets and marked up drawings
ii)
for the purposes of procurement in a timely manner.  The Contractor shall be responsible for the full
consequences of incorrect quantities.
iii) Taking delivery, unloading, hoisting, storing, protecting, handling, distribution and placing in position
and assembling as required.

iv) Casing up and protection, including clearing away protection on completion of the Works, including
that of Subcontractors.

v) The full cost of replacement of any items which are damaged, broken, lost or stolen after the
acceptance of the items from the supplier or Employer and until handing over the complete Works.

vi) Other necessary and usual facilities and documentation.

vii) Necessary supports, brackets, fixings, etc. including all associated civil works and builders’ works.

viii) The Engineer shall specify these items including all accessories, which are required to complete the
installation as detailed in drawings, specification or Bills of quantities. The details of the materials,
supplier's information and delivery details shall be issued to the Contractor when they are finalized.
However, Contractor shall be responsible for quantification and informing the Engineer.

ix) The Contractor's rate will include for wastage, cutting, breakages and maintenance stock. The
Contractor's rate to include for spares as required in accordance with specifications.

Supply Only Items

B The expression "supply only" used in the Bill of Quantities means that the Contractor is to provide for everything as
defined in Clause GP4.1 of POM(I) in connection with such items except for labour.
C The Contractor's rate will include for wastage, cutting, breakages and maintenance stock and spares as required in
accordance with specifications.
#REF!

PREAMBLES & METHOD OF MEASUREMENT


Page 5 of 22
Preambles and Method of Measurement

GENERALLY (Cont’d)

Prime Cost Rates

A Certain rates within the Bill of Quantities may include Prime Cost Rates and the material specification and fixing
details will be described. The Tenderer shall include against each heading the necessary additions, overhead and
profit required to provide the final rate which the Tenderer must complete and carry to the relative place within the
Bill of Quantities.

B Where Prime Cost Items are included in the Bill of Quantities, the Tenderer shall include in the bill rates for all costs
associated with the purchase of the materials including obtaining quotations and samples, taking delivery, unloading,
storing, replacing goods damaged, broken, lost or stolen, waste, fixing in position, and all overheads and profit.

B1 Adjustment to the Contract Price with respect to the Prime Cost Rates shall be done in accordance with Clause 58.2
of the Conditions of Contract.

C At the time the Engineer has approved the materials to be used on the Works covered by a Prime Cost Item, the BOQ
quantity multiplied by the finalized rate shall be considered by making necessary adjustments to prime cost rates
only.

D Should the materials covered by a Prime Cost Item be omitted from the Contract no payment against that Item
including fixing charges, overheads, profits shall be made to the Contractor.

E The discount offered by the contractor will not apply to the prime cost items as stated in the Contract Document.

F The Contractor's rate will include for wastage, cutting, breakages and Maintenance stock.

G When the metal and timber doors and aluminium doors are P.C. rate items, the Contractor will provide and fix sub
frames for the same in his tender.

H The Contractor is to include in his L.S. price for all PC items the wastage and additional quantity for maintenance as
required in accordance with specifications.
#REF!

PREAMBLES & METHOD OF MEASUREMENT


Page 6 of 22
Preambles and Method of Measurement

GENERALLY (Cont’d)

Pricing of Materials

The pricing of materials shall take, account of the following:

i) Pricing Preambles and Specifications shall apply reciprocally between Sections of the works unless
otherwise described.

ii) Materials shall be of the quality specified unless otherwise directed by the Engineer.

iii) All materials shall be transported, handled, stored and fixed in accordance with the printed
instructions or recommendations of their Manufactures or supplier.

iv) Protection of completed work, all casing and temporary coverings and making good, cleaning and
polishing and clearing away upon the completion.

v) The prices shall be comprehensive and must include for complying in all respects with the Instruction
to the Tenderers, Condition of Contract, Specification and Drawings and for all matters and thing
necessary for the proper construction, completion and maintenance of whole work involved. No
claims for additional payment will be allowed for any error or misunderstanding by Contractor of
work involved.
vi) Where the word "allow” is used, the cost of the item shall be responsibility of the Contractor.

vii) Contractor is responsible for storing the material either on project site or at any other appropriate
place (it is found fit with prior concurrence from the engineer / Client) as per manufactures and
suppliers specification. All such storages, material shifting, loading, unloading, re-shifting etc. shall be
the responsibility of contractor at their risk and cost and client shall be not charged for the same.

Page 7 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

PRELIMINARIES

Bill Items for Site Offices, Plant, Workshop and Site Laboratory Facilities

A Payment for the establishment of these items will be lump sum which will be made only after the completion of all
facilities. Breakdown of all lump-sum amounts to be submitted together with the Tender Submission.

B Payment for the maintenance of these items will be in monthly installments.

C Payment for the removal of these items will be by lump sum which will be made only after the completion of their
removal. The removal of the Site Office for the Engineer shall be three months after the issuance of Taking Over
Certificate.

Bill Items for Contractor’s Site Management, Site Protection, etc.

D Payment for these Bill Items shall be in monthly installments.

E These installments can be suspended, reduced or deleted from any Contract Payment, if, in the opinion of the
Engineer, the Contractor is not fulfilling his obligations.

F The rate inserted for General Protection of the site shall include for the cost to maintain access to areas adjacent to
the work site.

G The item for Traffic safety and control shall include the cost of all temporary traffic diversions and traffic
management necessary to complete the works. The item shall include for liaison with the Police and any other local
authority as necessary and conforming to their requirements for safety.

Bill items for Traffic Safety, Temporary Diversions and Cleaning of Site

H Temporary works, diversions, site cleaning, etc. and other items not otherwise covered in this preamble or otherwise
detailed in this Bills of Quantities will be cost related items and will be paid as a percentage of work completed to
total value of work.

Bill items for Surveying Equipment

J Payment for the establishment of this surveying equipment will be by lump sum and it will be made only after the
delivery of all the equipment specified. Payment for items maintained will be in monthly installments.

Bill item for Providing Assistance to the Engineer

K Payment for this item shall be in monthly installments and is deemed to cover all costs in providing assistance to the
Engineer by the Contractor as stated in the Contract.

Page 8 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

PRELIMINARIES

Bill item for Project Sign Boards

A Payment for Project Sign boards shall include for erection, maintenance, removal within the month of substantial
completion and reinstatement of ground to its original state.

Bill item for Progress Photographs

B Payment for progress photographs will be by set of monthly progress photographs as defined in the Specification.

Bill item for Conditions of Contract

C Payment for this item will be by monthly installments and shall cover all costs and expenses including overhead and
profits incurred by the Contractor in carrying out the requirements of the Conditions of Contract not otherwise
included in the Bill of Quantities. Breakdown of all lump-sum amounts to be submitted together with the Tender
Submission.

D Items for which the measurement unit is in days, such items shall be measured for the actual period for which
facilities, services, etc., are provided in accordance with the construction programme. Measurement will commence
only after the completion of the Mobilization period and on the day as approved by the Engineer in agreement for
the facilities, services etc., when fully provided.

E These installments can be suspended, reduced or deleted from any contract Payment, if, in the opinion of the
Engineer, the Contractor is not fulfilling his obligations.

SITE WORK

F All quantities for excavation have been measured nett with no allowance for increase in bulk or working space.

G The tenderer shall allow in his rates for excavation for excavating in any material including rock, running silt, running
sand, commencing excavation at any depth, excavating below the normal water table, excavating around existing
services and mains, supporting the vertical sides of excavations, working space and filling soft spots.

H Rates for all excavation shall include for keeping excavations free from water by whatever means. Rates shall also
include excavating by whatever means are necessary including hand excavation in any kind of ground, overbreak
including filling with mass concrete to the levels required by the Engineer, trimming or grading ground to produce
level surfaces or surfaces to falls or slopes and ramming and compacting sides and bottoms of excavations and
supports to sides.

Page 9 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

SITE WORK (Cont'd)

A Rates for disposal of excavated material shall include for any necessary double handling and the provision of a tip, if
necessary, including and charges in connection therewith.

B Rates for imported fillings, graded gravel fillings, etc., shall include for purchase and transport of filling materials,
levelling and compacting as required by the Specification, grading to slopes and falls, special compacting to form
vertical or battering faces and forming sinkings.

C The rates for trenched for pipes shall include for disposal and backfilling.

D The rates for drains, inspection chambers, etc., are to allow for testing, unless measured separately in the General
Requirements.

E Rates for drain pipes generally are to include for all short lengths, back stops, wooden plugs and retaining and
alignment pegs required in laying and for the extra involved over normal trench excavating in hand packing and
tamping selected fine material around the lower half of the pipes to buttress them against the side of the trench.
Rates are to include for leaving all pipes clean and clear.

F Pipes are measured nett as laid and are to include for all drain fittings (for diameters below 60 mm) on all types of
drain pipes, extra joints of all types, cuttings, waste, etc., for laying in trenches of any depth, and building in to sides
of inspection chambers.

G Rates for drain fittings on all types of drain pipes are to include for extra joints of all types and cutting and waste on
all pipes.

H Rates for accessories shall include for concrete surrounds and any additional excavation and disposal.

DEMOLITION

J Demolition shall include for carting away to location as directed by the Engineer or handing over to the Employer.

K The rates for demolition shall also include for making good of surface after demolition is complete.

L The rates for remove and stacking shall include for carefully storing the removed material in a secure place until it is
reused.

CONCRETE WORK

A Construction joints have not been measured but are to be included in the rates for concrete slabs, beams, columns
and walls, etc. The position of all construction joints shall be agreed with the Engineer.

Page 10 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

CONCRETE WORK (Cont'd)

A The rates for blinding concrete beds shall include for leveling and compacting the ground under and for formwork to
the edges.

B The rates for concrete shall include for mixing, hoisting to any heights, or lowering to any depth, compaction by
vibrators if required, curing, hacking surfaces for key, keys, kickers, forming and grouting mortices, making good
concrete in connection with holes and mortices, curing and protecting concrete surfaces and all surface treatment to
unset concrete.

C Rates for concrete casing to stanchions shall include expanded metal lathing and angel beads.
D The rates for concrete shall include for joint sealing between concrete and plaster.

E The rates for concrete shall include for concrete test cubes and testing costs.

F No cutting away of concrete shall be carried out without the approval of the Engineer. The Contractor should
ascertain from the Engineer the total number of locations of items to be formed in and cast into in-situ and precast
concrete including those which are not specifically shown on the Drawings. All remedial Works shall be carried out at
the Contractor's expense.

G The rates for bar reinforcement shall include for the fixing of bars of any diameter, extra material in laps,
straightening as necessary, cutting to length, positioning and protecting starter bars, cleaning, wire brushing, bending
to the required shapes, supports, tying wire, distance pieces, chairs, couplers, block spacers and for welding of bars
to form mesh reinforcement.

H The rates for rod/bar reinforcement shall include for the cost of calculating and preparing all bar bending schedules
to the approval of the Engineer. Bending schedules are to be prepared in accordance with BS 4466.

J The rates for fabric reinforcement are to include for straightening before fixing steel binding wire and approved
distance pieces, cutting, bending and notching around obstructions, supporting in position and for all overlaps and
cutting and notching.

K The rates for shuttering shall include for all props, struts, stays, wedges, bolts, all cutting labours at the intersections,
overlaps, passings at angles, shortening struts and re-strutting, cutting and fitting around projections and pipes,
grooves of any sectional area, all stops, chamfers, splayed angles, shutter or mould oil, strutting and supporting
shuttering to any height and for easing, striking and removal.

L The rates for concrete shall include the Control of Concrete temperature as specified.

M Shuttering to sides of walls, parapets or the like shall include the areas for returns, ends, projections, reveals,
rebates, grooves, recesses or the like.

N The rates for precast concrete shall include for all reinforcement and for all moulds, square, rounded and mitred
angels, holes or notching for pipes, forming of fair face, hacking, forming keys, lifting hooks, struts, supports, etc.,
and hoisting, setting and bedding in position.

Page 11 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

MASONRY

A The rates for block work are to include for all lintels, cuttings, forming chases, grooves, building to any height off
slabs or beams, raking out joints or hacking surfaces to form key, bedding and pointing frames, etc., building in door
and window frames and the like, building in or cutting and pinning in ends of lintels, steps, timbers, steel sections and
the like, mortices and making good in connection with building in cutting and pinning in, holes and mortices.

B The rates for blockwork shall include for all expansion joint with compressible filler and joint sealant or fire sealant
where shown on the drawings.

C The rates for blockwork shall include for stainless steel anchor channels and masonry ties at horizontal abutments of
beams and vertical abutments of columns.

D The rates for hollow blockwork shall include for filling blocks solid with in-situ concrete and steel bar reinforcement
where shown on the drawings and for providing solid course of blockwork at sill level of all openings and bearings of
all in-situ concrete and the top of all free-standing walls and for stiffener columns.

E The rates for cavity walls shall include for stainless steel vertical twist ties and any infill material as indicated on the
drawings or in the specifications.

METAL WORK

F The rates for structural metal work shall include for the following:

i)
Fabrication, delivery to site and erection.
ii)
Allowance for rolling margin.
iii)
The weight of weld metal in welded constructions.
iv)
Members of any length.
v)
Cutting to size and shape and joints in the running length.
vi) Notches, holes, slots, mitres, ends and for all drilling and splay cut ends.
vii) Grinding to a smooth finish, unless otherwise required.
viii)
Rates for galvanizing or similarly treated work are to in­clude for the treatment of all ends to the
approval of the Engineer.
ix) Rates for Structural Metalwork shall include for shop priming and the like.
x)
Rates for protective treatment and decoration, whether applied at shop or Site, shall include for
touching up on Site, making good erection damage and the like.

All items in "Structural Metalwork" shall equally apply to Non-Structural Metalwork.

Page 12 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

METAL WORK (cont’d)

A The rates for all steelwork and metalwork shall include for ends, angles, intersections, ramps on frames, handrails,
bearers, stays and the like, assembling and jointing, together components, all holes for pipes, tubes, bars, cables,
conduits and the like and all other holes, countersunk holes, tapped holes, slots and the like. The rates for steelwork
shall include for all stanchions and rafter restraints, gussets and end plates.

B The rates for bolts and countersunk bolts shall include for holes and countersunk holes.

C Rates for ungalvanised steel shall include for one coat of rust proof primer applied at the works or immediately upon
delivery to site.

WOODWORK

D The rates for all woodwork shall include for all raking, curved or splayed cutting, mitres and ends to all members, for
all joints in members over 200mm wide or for obtaining timbers in one width notchings, sinkings, rounded curves,
splayed edges, extra timber in joints, horns, all dowels, cramps, holes for pipes, tubes, bars, cables, conduits, ducting,
non-corroding nails and screws, trunking and the like.

E Woodwork shall be deemed to include for joinery shop/factory applied stain, varnish, lacquer, paint and the like,
protective and decorative finishes. No claim will be allowed in the event that the Contractor elects for any alternative
finishing system in order to satisfy the Specification.

THERMAL & MOISTURE PROTECTION

F The rates for waterproof membrane and insulation slabs shall include for testing, cutting, notching, bending and
lapping, seams, holes for pipes, standards and the like, angles, ends, turning into grooves and forming outlets,
skirtings, upstands, aprons, gutters and channels and forming small openings.

G The rates shall also include for warranty as required in accordance with specifications

H The rates for gutters shall include for angles, ends, seams passings at ends and outlets.

J The rates for damp proof courses shall include for laps passing at angles and intersections and for additional mortar
in bedding.

K The rates for insulation shall also include for taped joints as specified.

L For Tile finishes refer to FINISHES.

Page 13 of 22
Preambles and Method of Measurement
#REF!

PREAMBLES & METHOD OF MEASUREMENT

WALL CLADDING

A The areas given are measured net without addition for laps or seams. Cutting, lapping and sealing shall be
understood to be included in the rates and prices entered.

B Perforating and sealing around pipes, standards and the like shall be understood to be included in the rates and
prices entered.

C Expansion joints, flashing trims, soakers, waterproofing, fillers and seals, and the detail requirements at eaves,
valleys, ridges, corners, windows at the junctions with other constructions shall be understood to be included in the
rates and prices entered.

DOORS AND WINDOWS

D Rates for doors and windows shall include for :

i) Singularly or in multiple leaves.


ii) All labours and lippings to edges.

iii) Loose beads to glazing openings.


iv) Sub frames, frames, architraves, special features, glazing to glazed openings and the like.

v) The rates shall further include for rebates, chamfers, grooves, scribed edges, rounded edges and the
like and shall include for all cross grain and stopped work and for all stops, ends, angles and mitres.

E Rates for glazing shall include for the following:

i) Panes of any size.


ii) All straight raking, curved and circular cutting and all consequent wastage.
iii) Patterned and wired glass shall include aligning adjacent panes.

iv) Wash leather bedding strips in conjunction with timber beads.

v) Glazing fillets shall include pinning to wood or clipping to metal unless otherwise stated.

vi) Patent glazing shall include accessories and shall be fixed with screws or by the method required by
the system used, hardwood framing shall be measured separately.

vii) Glazing shall include blocks, setting blocks, locating blocks, distance pieces, with any accessories for
fixing identified separately.

viii) Cleaning off protective wax coating in rebates prior to glazing aluminium windows, screens and
doors.

ix) Glazing to aluminium shall include setting in continuous PVC gaskets and retaining by snap-fit glazing
beads.

Page 14 of 22
Preambles and Method of Measurement

DOORS AND WINDOWS (Cont'd)


#REF!

PREAMBLES & METHOD OF MEASUREMENT

A Rates for ironmongery shall include:

i) Matching screws, fixing and forming mortices, sinkings in floors and the like.

ii) Master and sub-master key systems as required.

iii) Removal of ironmongery after first fixing to enable decoration, refixing and adjusting.

iv) Testing, easing and adjusting including oiling and leaving in perfect working order.

v) Adhering strictly to mastering and sub-mastering schemes.

vi) Supplying and labelling at least two keys for each and every lock and handing to the Engineer.

vii) Master key if required by the Specification or Drawings.

B The rates for doors are to include for fitting and hanging any type.

FINISHES

C The rates for all finishings shall include for preparing surfaces for finishings or backings, for working at or up to any
height, and all narrow widths, small areas and all cuttings.

D The rates for all finishings shall include for all dubbing out to walls and columns necessary to produce an even
surface preparatory to the application of the finishing coat.

E The rate for all finishing to soffits shall include for level and sloping soffits.

F
The rates for all finishings to block walls are to include for plasterwork to face of concrete columns, lintels, etc.

G
The rates for in-situ plain sheet, tile, slab or block finishing shall include for fair edges, rebated edges, splayed edges,
rounded edges, arises, quirks, grooves, flutes and the like; all ends and angles or risers and edges of landing ends,
angles, ramps to strings and ends of steps; all fair joints or fair cutting, making good cutting and fitting around pipes,
bars, cables, conduits, ducting, trunking, sanitary fittings and the like; dishing to gullies and outlets, mortices, sinkings
and ends, angles, ramps, outlets and intersections to skirtings, flush, raised or sunk bands, sills, dividing strips, control
joints, channels, kerbs and the like.

H The rates for in-situ finishings shall also include for all internal and external angles, fair, rounded and chamfered
edges, arises, chamfered external angles and coved internal angle.

Page 15 of 22
Preambles and Method of Measurement

FINISHES (Cont'd)
#REF!

PREAMBLES & METHOD OF MEASUREMENT

A The rates for beds and backings shall include for forming keys. The rates for finishes, backings, screeds, etc. will also
include for expansion joints, control joints and the like as Specified.

B
The rates for plastering to vertical surfaces shall include for providing expanded metal lathing of the required width
wherever concrete and blockwork surfaces meet. The rates for backings, plastering, renderings, shall include for all
metal plaster stops, angles and beads and additional stops to form grooves in surfaces.

C
The rates for ceramic wall tiling shall include for a hollow rounded fillet at the junction with other wall finishes.

D The rates for painting shall include for working to or at any height; internal or external work; all narrow widths;
rubbing down between coats; priming; work in multi-colours; cutting to line; opening edges of doors and work on
additional surfaces exposed by such opening edges; hooks, bolts and clips to sheeting and pipe clips, saddles and
holderbats and the like and for removing ironmongery and refixing on completion. The rates for painting on wood
shall include for work on hardwood/softwood and for knotting. The rates for painting on manufactured boards and
wood shall include for surface filling. The rates for sprayed painting to horizontal soffits shall include for painting all
pipes, ducts, fittings, etc., as no allowance has been made in the measured items for this equipment.

E
The rates for suspended ceiling tiles and panels and the like shall include for chamfering all cut edges; cutting around
light fittings, grills and diffusers or the like. Rates shall also be deemed to include any depth between the soffit of the
slab to which the ceiling is suspended and the finished level. All suspended ceilings are measured flat on plan,
verticals to bulkheads or the like shall be measured separately. All linear items shall include for angles, ends and the
like.

F The rates for suspended ceiling tiles and panels and the like shall included for the suspension system and any
specified decorative accessories.

MECHANICAL ENGINEERING INSTALLATIONS

G The rates and prices for plant, equipment and installations are to be all inclusive of supply, installation, testing,
commissioning and all associated builders work required for the full operation of such plant, equipment and
installations, to comply in all respects with the Specifications, Bill of Quantities, Drawings and to the complete
satisfaction of Local Authorities and the Engineer.

H Builder’s Work shall include for all secondary steelwork supports for plant, equipment, trunking and the like not
specifically shown or indicated on the drawings.

J The rates for trenches for pipes shall include for disposal and backfilling.

K The rates for drains, inspection chambers, etc., are to allow for testing.

Page 16 of 22
Preambles and Method of Measurement

MECHANICAL ENGINEERING INSTALLATIONS (Cont'd)


#REF!

PREAMBLES & METHOD OF MEASUREMENT

A Rates for pipes and ducts generally are to include for all cuttings, short lengths, back stops, couplers, wooden plugs
and retaining and alignment pegs required in laying and for the extra involved over normal trench excavating in hand
packing and tamping selected fine material around the lower half of the pipes to buttress them against the side of
the trench. Rates are to include for leaving all pipes clean and clear.

B Pipes are measured nett as laid and are to include for all fittings on all types of pipes, extra joints of all types,
cuttings, waste, fixing with approved holderbats or pipe clips, sleeves through walls, thrust blocks, etc., for laying in
trenches of any depth, and building in to sides of inspection chambers.

C Rates for fittings on all types of drain pipes are to include for extra joints of all types and cutting and waste on all
pipes.

D Rates for accessories shall include for concrete surrounds and any additional excavation and disposal.

E Prices and rates for ductwork shall include for all bends, hangers, vanes, Splitters, dampers, accessories flexible
connections, joints, waste, seams, stiffeners, bracing, access doors, sleeves, acoustic sleeves and all items include in
the sections of the specifications.

F Prices and rates for insulation shall include for insulation to all fittings, flange boxes, valve boxes, etc and around all
supports.

G Prices and rates for door transfer grilles shall be deemed to include for forming of holes, fixings and making good.

H The total cost for the services shall include for the detail design, together with the preparation of all necessary
calculations and workshop drawings which, together with all manufacturing data shall be submitted to the
Consultant for approval before purchase, manufacture or installation.

J The Contractor shall include for supply of manufacturers’ recommended spares as required in accordance with the
specifications for all engineering installations and shall submit the details of spares to be provided by the Contractor
on the schedule of recommended spares, including other relevant details.

K The rates for sanitary fittings and the like, unless otherwise described, shall be deemed to include all accessories,
assembling component parts including suitable bedding compounds, all necessary plugging and brass screwing, fixing
accessories, joints to water services with straight or bent proprietary connectors, joints to waste soils or drain pipes
with approved proprietary connectors, cleaning off all protective wrappers and leaving ready for use and leaving taps
and valves greased, clean and in full working order.

L The rates for the mechanical installations shall include allowances for training, labels, special tools, protective
painting and decorative painting, liaison and coordination with Local Authorities.

Page 17 of 22
Preambles and Method of Measurement

ELECTRICAL ENGINEERING INSTALLATIONS


#REF!

PREAMBLES & METHOD OF MEASUREMENT

A The rates and prices for plant, equipment and installations are to be all inclusive of supply, installation, testing,
commissioning and all associated builders work required for the full operation of such plant, equipment and
installations, to comply in all respects with the Specifications, Bill of Quantities, Drawings and to the complete
satisfaction of Local Authorities and the Engineer.

B Prices and rates shall include for the following:

i) Marking positions of holes, mortices, chases, etc.


ii) Cutting and pinning ends of supports to structures.
iii) Painting as required.
iv) Fixings, including all steelwork, supports, slips holderbats and hanges.
v) Joints, bolts, washers, nuts, junctions and everything necessary for the satisfactory jointing of pipes
or ducts to each other, to items of equipment or connecting ducts to voids, shafts etc.

vi) All waste, cuttings, short lengths etc.


vii) Labels, nameplates, belt guards and all accessories called for in the specification.
viii) Rates for conduit are to include for all necessary accessories including conduit Boxes
ix) Pipe sleeves through walls.
x) Draw wires in empty conduits.

C Cable trunking and tray items are to include for complete installation as required.

D Rates for cable terminations are to include for terminations are to include for Termination glands, lock nuts, drilling
entries into equipment, lugs, earth tags, spreader boxes, etc. where applicable.

E All items containing equipment, accessories and fittings shall include for earth Terminals and bonding as necessary.

F Rates for main voltage sub-circuits shall include for each continuity conductor.

G Rates for main and sub-main distribution boards shall include for all spares as Specified.

H The total cost for the services shall include for the detail design, together with the preparation of all necessary
calculations and workshop drawings which, together with all manufacturing data shall be submitted to the
Consultant for approval before purchase, manufacture or installation.

J The cable and conduit to sub-main circuits are to be enumerated and any vertical or horizontal cable required for
connections, loops, etc. at equipment, appliances, control gear or the like will be deemed to be included.

K The Contractor shall include for supply of manufacturers’ recommended spares as required in accordance with the
specifications for all engineering installations and shall submit the details of spares to be provided by the Contractor
on the schedule of recommended spares, including other relevant details.

Page 18 of 22
Preambles and Method of Measurement

PROVISIONAL SUMS
#REF!

PREAMBLES & METHOD OF MEASUREMENT

A Provisional Sums are included in a separate Bill Section.

B Provisional Sums shall only be expended upon the instructions of the Engineer.

C The Provisional Sums given in the Bills of Quantities may be used in whole or in part, or not at all, on the instruction
of the Engineer.

D If the Employer decides not to use one or more of the Provisional Sums, the entire Provisional Sums including the
overheads and profits, attendance and builders works will be deleted. No compensation will be due to the Contractor
for such deletion.

ATTENDANCE ON PROVISIONAL SUM ITEMS

This item will include the following:

i) Providing space for the Nominated Sub-contractors for their own Site facilities (offices, stores, etc.),
scaffolding, power, water, hoisting, lifting, cradles for façade works, etc.

ii) Liaison and co-ordination with the Engineer, sub-contractor, etc.

iii) Water and power will be provided to the nominated sub-contractors for installation, testing and
commissioning. The points of drawing power and water will be agreed with the sub-contractors.

iv) Crainage for equipment and materials of the nominated sub-contractors (except chillers) (if
necessary).

v) Provision, installing, dismantling and removal of scaffolding (as required by the nominated sub-
contractors). Tubular free standing scaffolding to the elevator contractor’s requirement and working
platform is also included.

vi) Use of general construction plant and temporary works.

vii) The clearing away of all rubbish, waste and debris on a regular basis from collection

viii) The provision of electrical power for the nominated subcontractor’s works, including all lighting and
3-phase or heavy supplies which may be required.

Page 19 of 22
Preambles and Method of Measurement

ATTENDANCE ON PROVISIONAL SUM ITEMS (Cont'd)


#REF!

PREAMBLES & METHOD OF MEASUREMENT

ix) The provision of all fuel necessary for the testing and commissioning of the Subcontract works.

x) The general co-ordination and integration of all the nominated subcontract works into the general
Programme.

xi) The provision of all temporary access already fixed or placed in position on the site for the use of
workmen and the delivery of materials.

xii) The design co-ordination and necessary liaison related thereto.

xiii) The programming of the nominated subcontract works and the necessary co-ordination to comply
with the Contractor’s overall programme.

xiv) Supplying full size setting out templates and giving and marking dimensions and taking responsibility
for their accuracy.

xv) Obtaining any necessary security passes, access approvals, identity cards and the like for all
nominated subcontractor’s personnel.

xvi) The necessary builders works for civil & MEP are included in the Contractors scope of works including special
cradle/platform as required.

GENERAL BUILDER'S WORK IN CONNECTION

A General Builders work in connection will include cutting, chasing, forming and closing openings in walls, floors,
beams, ceilings, bulkheads, access panels in false ceiling for all works etc., and making good of the same and the like
items. Boxouts and frames are also included. Protective and decorative painting is to be included if not included
elsewhere. Provision for lifting, storage and scaffolding is to be included if not included elsewhere. For kitchen
cabinets, wardrobes, etc. it will include for concrete up stands, steel supports, frames, brackets and the like. For lifts,
sill projections/angle supports at landings are to be included here.

B Specific Builders work in connection will include excavation, cutting, filling, providing openings, making good the
openings for ducts, sleeves, supports, bases, pads and plinths for plant and equipment and the like items. Only
vibrator isolators and metallic frames for inertia bases are to be supplied by the M & E subcontractor.

Page 20 of 22
Preambles and Method of Measurement

GENERAL BUILDER'S WORK IN CONNECTION (Cont'd)

C Specific Builders work for air-conditioning installation will also include frames and openings in doors, walls or
partitions for installation of grills, louveres, etc. and similar items.
#REF!

PREAMBLES & METHOD OF MEASUREMENT

D Specific Builders work for electrical, fire alarm and fire detection installation will also include for trenching (for
cables) and related items.

E Specific Builders work for drainage, plumbing and fire fighting installation will also include for trenching, excavations,
backfilling, manholes, septic tank, soakaways, beds, surrounds, and the like items.

F Specific Builders work for conveyance system, window cleaning equipment and refuse chute systems will also include
for steelwork supports, guide rails and the like items.

G Sealing of service shafts after installation of services with concrete or as specified.

H All civil works related with manholes, sumps, channels, concrete tanks, etc., including benching, GRP (or other
specified) lining, etc. Manholes covers and frames and channel gratings and frames will be supplied by the M & E
sub-contractor.

J All civil works related with floating floors.

K All civil works associated with DEWA substation including trenches and transformer bases and all incoming /
outgoing ducts and cable manholes.

L Secondary steelwork required for support of services.

M All necessary excavation, bedding, backfilling, etc. required by Local Authorities.

EXTERNAL WORKS

N Where external works are analogous to other sections of the work e.g. excavation concrete etc., the clauses
elsewhere shall apply equally to this section of the work.

O Base and Sub-base - rates shall include for depositing spreading grading rolling compacting all fill in layers. Provide
materials and attendance for all sampling and testing.

P Kerbing - Rates shall include for all excavation and disposal of surplus material construction of concrete bed and
backing supply and laying of precast concrete kerbs either straight or curved, finishing including painting, curing and
protecting building in any gratings and frames.

Q Paved Areas (Footpaths and Roadways) - Rates shall include excavation laying compaction of bedding material supply
and laying of paving slabs including all cutting to fit around manhole covers and the like. Rates shall also include for
forming patterns and designs in the paving stones all as detailed.

Page 21 of 22
Preambles and Method of Measurement

PROPRIETORY MATERIALS
#REF!

PREAMBLES & METHOD OF MEASUREMENT


A Where manufacturers names or proprietary material names are given against certain items in the Bills of Quantities
the rates and prices inserted shall be for those specified materials

PROVISIONAL SUMS

B General and Specific Builders Work for provisional sums will be priced as lump sums and will not be adjusted due to
the difference in the value of the provisional sum expended from the provisional sum stated in the Bills of Quantities.

ADJUSTMENT ITEM

C The adjustment Item, if any, shall apply to all items (excluding Provisional Sums) unless clearly indicated otherwise.

D The adjustment item shall not be a lump sum but a percentage of the total tendered sum excluding Provisional Sums
or a percentage of the total for the items indicated. The adjustment item shall be applied to all applicable item rates
and sums entered in the Tender Summary (including any addenda). The Contract shall be signed with the inclusion
of the adjusted rates and sums. The adjusted rates and sums shall be applied during ad measurement and for the
valuation of variations.

Page 22 of 22
Preambles and Method of Measurement
#REF!

BILL No. 1
#REF!
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

General Notes on Preliminaries

These Preliminaries are applicable to the Whole of the Works. If the


Tenderer wishes to price any of the items contained herein then each
item, Clause or Subclause must be individually priced. The Tenderer
shall not enter any lump sums covering more than one or all items,
Clauses or Subclauses. Where any item, Clause or Subclause of the
Preliminaries has not been priced, it will be deemed that the value is
included in the rates for measured items elsewhere in the Bills of
Quantities.

Form of Tender

The Contractor shall describe and list below and price herein any
A obligation contained in - Form of Tender and Appendices for which Item
he has not allowed elsewhere and wishes to price separately.

Form of Agreement

The Contractor shall describe and list below and price herein any
B obligations contained in - Form of Agreement for which he has not Item
allowed elsewhere and wishes to price separately.

Conditions of Contract

The Contractor shall describe and list below and price herein any
C obligations contained in Conditions of Contract for which he has not Item
allowed elsewhere and wishes to price separately.
a. Cost of All Risk Insurance (As per Subclause 21.1 of Part II-
Conditions of Particular Application)
b. Workmen Compensation Policy
c. Cost of Third Party Insurance
d. Cost of Performance Bond
e. Any other obligations

Carried to Collection
Page 1 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Drawings
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)
The Contractor shall describe and list below and price herein any
A obligations contained in Drawings for which he has not allowed Item
elsewhere and wishes to price separately.

Specifications
The Contractor shall describe and list below and price herein any
B obligation contained in Specifications for which he has not allowed Item
elsewhere and wishes to price separately.

Preambles
The Contractor shall describe and list below and price herein any
C obligation contained in Preambles Clauses for which he has not Item
allowed elsewhere and wishes to price separately.

Bills of Quantities

The Contractor shall describe and list below and price herein any
D obligations contained in the Bills of Quantities for which he has not Item
allowed elsewhere and wishes to price separately.

Access to the Site

Access to the Site maybe obtained by prior arrangement with the


E Item
Engineer as specified and shown on the Drawings

Use of Site

The Site shall not be used for any purpose other than the execution
F Item
of the Contract.

Carried to Collection
Page 2 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Site Administration

The Contractor shall provide sufficient staff and equipment to


perform the administrative duties involved in executing the Contract.
A Such staff shall be properly qualified to perform their respective Item
duties and shall not be removed from the Site or replaced without
the prior permission of the Engineer for his approval.
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

Security

The Contractor shall protect the Site and works from unauthorized
entry and fire and shall control his labour force to prevent nuisance
B or trespass unto adjacent property, control the labour force to Item
ensure that they do not cause a nuisance or trespass unto adjacent
property.

Safety, Health and Welfare of Work People

The Contractor and all persons employed by him on Site shall comply
C with all acts, orders, laws and regualtions concerning the safety, Item
health or welfare of workpeople
The provisions of this Clause shall apply to and be binding upon any
D Item
Sub-Contractor or Supplier employed by the Contractor.

First Aid

The Contractor shall provide a temporary first aid post properly


equipped and manned by a competent person. The facility shall
E Item
display a large red crescent and prominent lettering "FIRST AID" in
English and Arabic, in red on a white background.

Transport of Work People

Vermin
The Contractor shall take all necessary precautions to prevent the
establishment of pests and vermin within the buildings and
environment by means of regular inspections and measures to be
F Item
adopted to ensure the Site and its environs are kept free from debris
and waste materials likely to encourage establishment of such pests
and vermin.

Carried to Collection
Page 3 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Construction Plant and Tools

Small Plants and Tools


The Contractor shall provide small constructional plant, lifting
equipment, transport facilities, tools and services, including provision
of protective clothing and safety equipments required for the proper
execution and completion of the Works.

Only modern, properly maintained equipments of the appropriate


capacity and suitability for the duty required, shall be used for the
Works. The Contractor shall immediately replace at his own cost all
items or equipments that become defective for the required duties

A Establishment Item
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS


Rate Amount
ITEM DESCRIPTION Unit Quantity (SR) (SR)

B Maintenance Days

C Removal and making good the Site Item

Scaffolding
Provide all necessary scaffoldings for the plants and tools required to
complete the Whole of the Works

D Establishment Item

E Maintenance Days

F Removal and making good the Site Item

Cranes and Lifting Plants


The Contractor to provide all cranes with a lifting capacity of 1tonne
or over, to be fitted with an approved safe load indicator

G Establishment Item

H Maintenance Days

J Removal and making good the Site Item

Carried to Collection
Page 4 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Construction Plant and Tools (cont'd)

Plant Required for Specific Trades

A Establishment Item

B Maintenance Days

C Removal and making good the Site Item

Employer's Facilities

Offices Facilities for the Engineer and his Representative

Provide and maintain throughout the period of construction, fully air-


conditioned temporary office accomodation for the sole use of the
Employer and his representatives including new office furnitures and
equipment and related facilities as mentioned in the specifications
and drawings. Remove and make good the site on completion of the
work (allow Provisional item 3000 SR per month )
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

D Establishment Item

E Maintenance Days

F Removal and making good the Site Item

Stationery
The Contractor shall provide all stationery inclusive of paper, pencils,
G tapes, all office supplies for the Employer's representatives including Item
papers for the photocopies and fax.

Carried to Collection
Page 5 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Employer's Facilities (cont'd)

Site Survey and Setting Out

Topographical survey
As soon as the Contract has been signed, the Contractor shall check
and confirm the accuracy of the existing ground levels that are shown
A Item
on the drawings. A Permanent Datum Point must be established
during this operation to the approval of the Engineer.

Surveying Equipment
The Contractor shall provide and keep on site an adequate supply of
surveying instruments for the proper execution of the Works. The
B instruments shall all be in proper adjustment and always kept in Item
perfect working order and they shall be immediately available for use
by the Engineer whenever required, together with all necessary
assistance.

Site Transportation
The Contractor shall provide Vehicles to the Engineers and his
representatives as per Specification Section 015000 and also shall
provide one pick-up with driver for testing of materials. (Including
Petrol, Maintenance and Repairs)
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

C Establishment Item

D Maintenance Days

E Removal and making good the Site Item

Progress Photographs
The Contractor shall provide the Engineer each month with thirty
coloured progress photographs showing work in progress on the site
from viewpoints selected by the Engineer. In addition two copies of
each progress photograph in post card size shall be provided with a
F Item
description of the viewpoint and the date of the taking written or
stamped in ink on the back. A copy of all the above photographs
together with the soft copies shall be forwarded to the Employer at
the same time.

Carried to Collection
Page 6 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Employer's Facilities (cont'd)

Project Close-out Report


Contractor shall prepare a final close-out report as specified
A Set of Cost Control Report Item
The Contractor shall provide all sets of drawings in accordance with
B Item
Specification

Site Sign Boards


The Contractor shall provide flood lit site signboards as per the
specifications and drawings and to the approval of the Engineer. No
other notice or advertisements on or around the Site will be
permitted unless approved in writing by the Engineer

C Establishment Item

D Maintenance Days

E Removal and making good the Site Item

Site Meeting
The Contractor will attend with adequate representation Site
F Meetings and all other meetings to which the Engineer has given Item
instruction to attend

The Contractor will further undertake to inform and present to


G attend meetings any representatives for those Subcontractors, Item
Suppliers, under his direct control, if so requested by the Engineer
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)
The Engineer will chair and be responsible for the taking and
H Item
distribution of the Minutes

The Contractor will ensure that all meetings with his Subcontractors
J are held just prior to the Site Meetings to ensure accurate reporting Item
on prgress, informations.

Attendance Upon Employer's Representative Staff


K Provide a full time office attendance for the sole use of the Day
Employer's Representatives as specified

L Provide daily cleaning attendance as specified Day

Carried to Collection
Page 7 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Employer's Facilities (cont'd)

Climatic Conditions
The Contractor shall provide all instruments as required by the
Specifications and keep an accurate record of:

A Daily maximum and minimum air temperature including overnight Day


and make a weekly statement with 2 copies to the Engineer

B Number of hours per day in which works are prevented by inclement Day
weather (flood, etc)

Contractor's Facilities

Site Facilities for Contractor's Staff


The Contractor shall provide adequately airconditioned temporary
offices, messrooms, sanitary accommodation, welfare facilities, site
drinking water facilities and the like for the use of all persons
employed on the Works including Subcontractors

C Establishment Item

D Maintenance Days

E Removal and making good the Site Item

Provide and maintain temporary sheds for the storage of materials,


tools, and tackle the use of all persons employed on the Site
including Subcontractors. Those used for the storage of cement and
other perishable materials and the like are to have raised floors

F Establishment Item

G Maintenance Days
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS


Rate Amount
ITEM DESCRIPTION Unit Quantity (SR) (SR)

H Removal and making good the Site Item

Carried to Collection
Page 8 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Contractor's Facilities (cont'd)

Temporary Latrines and Ablutions

The Contractor shall provide, maintain and subsequently remove on


completion of the Contract, sufficient latrines and ablutions to the
approval of the Engineer for his own staff and labour and for the use
A of all other labour employed on the Site. These facilities shall include Item
construction of septic tanks which shall have sufficient capacity for
the peak labour force required on the Site. The position of these
facilities shall be approved by the Engineer.

Temporary Fencing, Including Hoardings, Screens, Roofs and


Guardrails
The Contractor shall provide temporary fencing, hoardings, fans,
planked footways, guardrails, gantries and the like as may be
necessary for protecting the public or occupants for the proper
execution of the Works and for meeting the requirements of any
service or other authority, to the approval of the Engineer, as per
specifications and drawings

B Establishment Item

C Maintenance Days

D Removal and making good the Site Item

Temporary Roads
The Contractor shall prepare and maintain such temporary roads as
may be necessary from the Site to the nearest highway and also
within the Site and shall obtain the necessary Municipality approvals.
The roads shall be positioned in accordance with the Engineer's
instructions and shall be kept free for access at all times.

E Establishment Item

F Maintenance Days

G Removal and making good the Site Item


SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

Carried to Collection
Page 9 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Contractor's Facilities (cont'd)

Temporary Roads(cont'd)
The Engineer's requirements in respect of roads, car parks, pavings or
the like, are for the anticipated traffic that will use the finished areas.
If the Contractor decides to use such areas either in their complete or
partially complete state and if, in the opinion of the Engineer, as a
result of such usage the construction has been so affected to impair
the finished final function, the work required in reinstating and
bringing up to standard is to be performed at the Contractor's
expense.

A Establishment Item

B Maintenance Days

C Removal and making good the Site Item

Temporary Telephone
Provide and maintain a telephone service to the administrative office
and to the offices of such other of the Contractor's Site Staff and
Domestic or Nominated Subcontractors as may be necessary for the
full period of the works and pay all charges and expense with the
payment of all rental and call charges incurred by Nominated
Subcontractors being recovered from the aforesaid Nominated
Subcontractor

D Establishment Item

E Maintenance Days

F Removal and making good the Site Item

Carried to Collection
Page 10 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Contractor's Facilities (cont'd)

Electrical Power and Lighting

The Contractor shall arrange and provide for an adequate temporary


supply of all necessary electrical power and lighting of the Works
including paying all charges for the consumption of electricity or
supplying, operating and maintaining generators at his own expense
until handing over the Works.

The Contractor is to give all requisite notices, arrange for the


necessary connections and installation of meters, pay all fees and
charges in connection therewith and all charges for current used.
The method of distribution of electric supplies around the site, the
type of equipment used, safety measures, reduced voltage
requirements, planning and programming shall conform with the
requirements of the local authority. Any interruption of electricity
supply is at the Contractor's risk and it is his responsibility to effect all
temporary suppliers necessary.

G Establishment Item

H Maintenance Days

J Removal and making good the Site Item

Water for the Works


The Contractor shall arrange for an adequate temporary supply of
water for the Works, suitable for all purposes, until handing over and
shall pay all charges for the consumption of water used. The
Contractor will be responsible for supplying and maintaining
equipment including any necessary pumps, storage tanks,
distribution pipework, all required for the execution of the Works.
He is to clear away this temporary work on completion and make
good all work disturbed.

K Establishment Item

L Maintenance Days

M Removal and making good the Site Item

Carried to Collection
Page 11 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Contractor's Facilities (cont'd)


SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

Labour Camp
A Labour Camp is not permitted on Site. Watchmen and security
A Item
staff only may be accommodated.

Working with Other Contractors


The Contractor is understood to be aware that he will not have the
B sole use of the Site and is understood to have allowed for working Item
with other Contractors as required under the Contract.

Supervision & Coordination of Other Works


As stated in the Scope of Works in the Instructions to Tenderers, the
Contractor shall be fully responsible for supervising the works of
C Item
other Contractors, Sub-Contractors and nominated Sub-Contractors
hereafter called other parties employed on the site.

The Contractor shall be responsible for ensuring that Works carried


D out by other parties are in full compliance with the relevant Item
Specifications and Tender Documents.

The Contractor shall also be responsible for co-ordinating the works


of other parties with each other and with his own works to ensure
E Item
compliance with individual approved programmes and the approved
overall programme for the works.

The Contractor shall provide staff suitably qualified to supervise each


F section of the works or works of other parties to ensure full Item
compliance with the Specifications and the Tender Documents.

The Contractor shall submit a Curriculum Vitae for the Engineer's


G approval for each member of staff to be employed on the project for Item
supervision of the Works and the Works of other parties.

Carried to Collection
Page 12 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Contractor's Facilities (cont'd)

Supervision & Coordination of Other Works(cont'd)

If during the course of the Works, the Contractor finds that works
carried out by another party are not in compliance with the
A Specification or the Tender Documents, he shall report the matter to Item
the Engineer giving a full and detailed account to enable the Engineer
to provide a remedy in compliance with the Conditions of Contract.
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

Should the Contractor fail in his duty to bring to the attention of the
Engineer works carried out by another party which are not in
B compliance with the Specifications or the Tender Documents then Item
the Contractor shall bear the consequences and pay any penalty as
required by the Tender Documents.

The Contractor shall allow for all "Charges" such as General and
C Special Attendances required in connection with the Sub Contractors Item
identified in the Tender Documents.

Temporary Works

The Contractor is responsible for the design, construction,


maintenance and removal of all temporary works. The Contractor is
to submit to the Engineer his proposals for all temporary works for
D approval. The Engineer's approval will in no way relieve the Item
Contractor of his responsibility for the safety of the Works,
operatives, adjoining property, structure or services and compliance
with appropriate regulations and Codes of Practice.

Traffic Diversion
The Contractor shall take all necessary precautions and provide all
E necessary traffic diversions including watching, lighting, temporary Item
barriers, temporary signals, all to the approval of the Engineer

Carried to Collection
Page 13 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Sundry Items

Tests
The Contractor shall allow for all tests required by the Specification
A to be carried out including providing all necessary materials and Item
samples.

The Contractor shall obtain and pay for all necessary permits,
B inspection and tests for the proper installation of his work as may be Item
required by the specification.

Testing of the Works


The Contractor shall provide such labour, materials, equipments and
transport as the Engineer may require assisting him in carrying out
C Item
tests, checks on workmanship, setting out measurements of the
works all in accordance with the Specifications

Provide water, fuel and electricity necessary for testing the plumbing
D Item
and engineering installations
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

Samples
When so required by the Engineer, samples of goods or materials are
E to be provided at the Contractor's expense. The following procedure Item
is to be adopted:-

a. All samples are to be delivered to the Engineer's Office.


b. Duplicate final approved samples are to be provided for the
Engineer, one for office use and one for the Site
c. Samples are to be provided promptly and allow the Engineer
adequate time for for inspection so as not to delay the Works

Each sample is to be properly labelled with these details.

i) Name and quality of material


ii) Manufacturer's name
iii) Project title
iv) Contractor's name
v) Date of submission
vi) Specification reference

Carried to Collection
Page 14 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Sundry Items (cont'd)

Labour and Materials


The Contractor shall provide such labour, materials and transport as
the Engineer's Representative may require to assist him in carrying
A Item
out tests and checks on materials and workmanship and setting out
and measurement of the Works.

Protecting the Works from Inclement Weather


Provide for carefully covering up and protecting the works or any
B adjoining property exposed by these works from inclement weather Item
or severe weather conditions

Provide for properly curing all cement-based construction in order to


C keep shrinkage cracks to a minimum and to ensure that cement Item
becomes fully set.

Protection
Adequate protection against any form of damage or deterioration
shall be provided for all sections of the Works. This shall include
D Item
protective tapes, casings, guard rails and the like, which shall be
provided if necessary.
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

Particular care shall be taken to mask self finished surfaces during the
application of adjacent in-situ work and windows and doors during
the application of sprayed finishes. In pursuance of his obligations
under the Conditions of Contract, the Contractor shall, wherever
E required or directed by the Engineer, cover up and protect the Works Item
from the weather and from damage by his own or other workmen
performing subsequent operations. He shall provide all necessary
dust sheets, barriers and guard rails and clear away same at
completion.

Cleaning the Works


On completion of the Contract, the building will be completely
F cleared and swept clean, all debris arising is to be removed from Site Item
to the complete satisfaction of the Engineer.

Carried to Collection
Page 15 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Sundry Items (cont'd)

Clearing away Rubbish


Allow for clearing away rubbish at regular intervals during the
A progress of the Work and at completion and for leaving the Site and Item
perimeter tidy at completion.

Traffic Regulations
The Contractor is to observe all traffic regulations, including those
regarding the loading or unloading of or waiting by vehicles on the
B public highway and the contract sum is deemed to include for strict Item
compliance therewith. All access roads are to be maintained clean at
all times.

Petroleum Regulations
The Contractor is to comply with any petroleum regulations in force.
C Allow for attendance on the works carried out by statutory Item
authorities

A no-smoking rule must be strictly enforced around the area used for
storage of petrol and petroleum products and the Contractor will be
D required to provide all notices to ensure that the safety regulations Item
are conformed with regarding no-smoking and no naked lights within
15 metres of the area.

Building Permit
The Contractor shall be responsible for obtaining the Building Permit
E from the Municipality including the payment of all necessary Item
municipal fees.
No Objection Certificates
F The Contractor shall be responsible for obtaining No Objection Item
Certificates from all relevant services and other authorities.
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

As-Built Drawings
G Allow for providing two sets of hard copy and soft copy of "As Built" Item
drawings as specified.

Allow for providing maintenance and operation manuals and


H Item
warranties as specified.

Carried to Collection
Page 16 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Sundry Items (cont'd)


Shop Drawings
A The Contractor shall prepare and submit "shop" drawings as Item
specified.

Records

During the progress of the Works, the Contractor shall keep at his
own cost, records of all details and dimensions of the Works as
B Item
constructed and shall at any time submit such of the records to the
Engineer as he may require.

In addition to those records which are specifically required by the


Specification to be kept (e.g. test cubes of concrete, air
temperatures, etc.,) a Site record shall be kept of the completion
dates of the various works in each trade, with particular reference to
C Item
work which requires time for drying out, such as solid backgrounds
which receive in-situ screeds and finishings, including the completion
times of the individual layers of such application. These records shall
be provided at a minimum of one monthly intervals.

Accidents
The Contractor shall promptly report to the Engineer any accident
whatsoever and he shall make the necessary arrangements to obtain
D medical help and transport to a hospital. A full statement, giving full Item
details of the accident and statements of witnesses, shall be
submitted to the Engineer.

If any claim is made by any one against the Contractor or any Sub-
E Contractor, the Contractor shall promptly report the facts in writing Item
to the Engineer giving full details of the claim.

Labour Procurement
The Contractor shall allow for procuring all labour required to
F execute the Works and shall pay all charges in connection with the Item
employment and discharge of such labour.
SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

Carried to Collection
Page 17 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

Sundry Items (cont'd)

Local Authority Workmen


Allow for giving access to workmen employed by the local or other
A Item
authorities and providing them with attendance as required.

Provisional Sums
The Contractor shall be deemed to have allowed here for any other
B special preliminaries requirements or general and specific builder's Item
works, if elsewhere, not specifically stated with relation to all works
listed under the Provisional Sum section of the Contract.

Insurances
The Contractor should allow for insurance in accordance with the
C requirements of Subclause 21.1 of Part II - Conditions of Particular Item
Application

Programme
In accordance with Clause 14 of the Conditions of Contract the
Contractor shall prepare a comprehensive constructionprogramme
D setting out the schedule for completion of the Works including that Item
of all Subcontractors and identifying all critical activities. Submit 4
copies.
Record actual progress at monthly intervals against scheduled
E activities. Item
Submit a delivery programme for all imported materials.
F Submit 4 copies. Item

Submit a complete schedule of Contractor's drawings indicating


G Item
necessary approval dates.

H Submit at weekly intervals a schedule of information required. Item


Submit 4 copies.

Carried to Collection
Page 18 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS


SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS


Rate Amount
ITEM DESCRIPTION Unit Quantity
(SR) (SR)
Sundry Items (cont'd)

Hold site meetings at weekly intervals. Submit at these meetings a


detailed report of progress, information requirements, delivery
A Item
schedules & drawing approvals or other such items requested by
the Engineer

Monitor progress of design work, working drawings of all


B Item
Subcontractors & Suppliers.

Make visits as necessary to the work places of the Subcontractors


C and Suppliers to inspect quality, progress and delivery in relation to Item
the detailed design programme and report regularly to the Engineer

Statutory Approvals, Charges and Service Connections


The Contractor shall be responsible for obtaining all approvals and
consents necessary from Statutory Authorities, the Municipality and
D Item
Government Departments as required in the performance of this
contract and for paying all costs and charges in connection therewith.

Any other Conditions or Items


The Contractor shall separately list and price below any other
E Item
Conditions or Items considered to have a monetary value.

MECHANICAL GENERAL REQUIRMENTS

Allow for Starting up, testing,pressure tests, commissioning,balancing


and system operation for all above systems including labelling as
F required all in accordance with specifications and drawings, and to Item
satisfication of the client and concerned statuatory authority
requirements.

NB: Contractor to verify the design and capacities before ordering the
equipment with no extra cost to the Client.

G Allow for Drawings,Manuals & approvals. Item

Carried to Collection
Page 19 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

MECHANICAL GENERAL REQUIRMENTS (cont'd)

A Allow for training Item

B Allow for labels, special tools, protective painting, decorative Item


painting.

C Allow for liason and coordination with local authorities. Item


SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)
ELECTRICAL GENERAL REQUIRMENTS

Allow for permits, fees, inspection associated with the electrical


A Item
installations by utility and statutory authorities

Allow for all protective and decorative painting and cleaning of pipes,
B Item
fittings and equipments.

Allow for setting out works, marking positions of holes,mortices


C Item
chases or the like.

Allow for Testing and commissioning and production of test


D Item
certificates.

Allow for identification labels, plates, charts and identification of


E Item
plant, equipment, cable, switches and the likes.

F Allow for provision of operating and maintenance manuals. Item

G Allow for providing shop drawings and coordinated shop drawings. Item

Allow for instructing selected employer's personnel on all the aspects


H Item
of the system and equipment.

J Allow for all builder works in relation to electrical installations. Item

K Allow for sealent for electrical services. Item

Carried to Collection
Page 20 of 21 - SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS

BILL NO. 01 (SECTION A - PRELIMINARIES AND GENERAL REQUIREMENTS)

COLLECTION

From Page No. 1

From Page No. 2

From Page No. 3

From Page No. 4

From Page No. 5

From Page No. 6

From Page No. 7


SECTION A - GENERAL REQUIREMENTS

Bill No. 01 SECTION A - GENERAL REQUIREMENTS

ITEM DESCRIPTION Unit Quantity Rate Amount


(SR) (SR)

From Page No. 8

From Page No. 9

From Page No. 10

From Page No. 11

From Page No. 12

From Page No. 13

From Page No. 14

From Page No. 15

From Page No. 16

From Page No. 17

From Page No. 18

From Page No. 19

From Page No. 20

Total of Bill No. 01, SECTION A - GENERAL REQUIREMENTS (Page 21 of 21)


CARRIED TO MAIN SUMMARY
#REF!
type 1

Bill No. 2.4


SECTION E - METAL WORKS
SECTION E - METAL WORKS
type 1
Bill No. 2.4 SECTION E - METAL WORKS
Rate Amount
Item Description Unit FINAL QTY
(SR) (SR)

SECTION E - METAL WORKS

Aluminum Pergola
Design, Supply & Install aluminum pergola comprising of
aluminum frame connected to a rigid steel support tubular
aluminum with a wood grain finishes as per drawings and
specifications

A Parking Pergola ; size 6240 x2880 mm No. 1.00 -

Handrails and Railings

Glass Railing with Stainless Steel Tubular Handrail


Supply and Install Moder Steel crosswire handrail to Staircase; with
all necessary fixing accessories; complete as shown on Drawings
and as specified on the specifications.
B 100mm Modern Steel Crosswire Handrail to Staircase m 15.00 -

Carried to Collection
0.00
Page 1 of 3 - SECTION E - METAL WORKS
SECTION E - METAL WORKS
type 1
Bill No. 2.4 SECTION E - METAL WORKS
Rate Amount
Item Description Unit FINAL QTY
(SR) (SR)

SECTION E - METAL WORKS

Tender Adjustments
The Contractor shall list and price below the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities. Any such
items listed below shall be deemed to be included

A ___________________________ Item

B ___________________________ Item

C ___________________________ Item

D ___________________________ Item

Carried to Collection
Page 2 of 3 -SECTION E - METAL WORKS
SECTION E - METAL WORKS
type 1
Bill No. 2.4 SECTION E - METAL WORKS
Rate Amount
Item Description Unit FINAL QTY (SR) (SR)

BILL NO. 2.4 (SECTION E - METAL WORKS)

COLLECTION

From Page No. 1 0.00

From Page No. 2 0.00

Total of Bill No. 2.4, SECTION E - METAL WORKS (Page 3 of 3)


0.00
CARRIED TO MAIN SUMMARY
type 1
‫الريم‬

Bill No. 2.5


SECTION G - THERMAL & MOISTURE PROTECTION
type 1
‫الريم‬
Bill No SECTION G - THERMAL & MOISTURE PROTECTION

Rate Amount
Item Description FINAL QTY (SR) (SR)

SECTION G - THERMAL & MOISTURE PROTECTION

Sub Structure

A 200 micron polyethelene sheet vapour barrier under slab on grade, 138.00 excluded
grade beams and setting plain concrete on foundation.

Supply and apply two layers of bituminous coating; complete all as


B shown on drawing and specification, horizontally and vertically to 173.00 excluded
foundations and water tank.

Sundries

C 150 deep isolation joints including 12mm thick flex cell board with 1.00 excluded
joint filler.

Roofing system (System details to be Approved)

Waterproofing detail to roof; all in accordance with the drawing and


D specifications. (FOAM CONCRETE+1 LAYER MEMBRANE )ATER 111.00 -
PROOF+1 LAYER G)
Waterproofing detail to Balcony; all in accordance with the drawing
F and specifications. 9.00 -

Waterproofing detail to Parapet walls; all in accordance with the


G drawing and specifications. 92.00 -

Wet Areas
Waterproofing detail to wet areas and balconies all in accordance
with drawings and specifications.
E Wet Areas / FlowerBox on Top of Pump Room 22.00 -

Carried to Collection
0.00
Page 1 of 3 - SECTION G - THERMAL & MOISTURE PROTECTION
type 1
‫الريم‬
Bill No SECTION G - THERMAL & MOISTURE PROTECTION

Rate Amount
Item Description FINAL QTY
(SR) (SR)

SECTION G - THERMAL & MOISTURE PROTECTION

Tender Adjustments

The Contractor shall list and price below the items and quantities of
addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the Specifications
or shown on the Drawings and for which either expressed or implied
provision is required and which are not covered by the items or the
rates in the Bill of Quantities. Any such items listed below shall be
deemed to be included

D ___________________________

Carried to Collection
Page 2 of 3 -SECTION G - THERMAL & MOISTURE PROTECTION

BILL NO. 2.5 (SECTION G - THERMAL & MOISTURE PROTECTION)

COLLECTION

From Page No. 1 0.00

From Page No. 2


type 1
‫الريم‬
Bill No SECTION G - THERMAL & MOISTURE PROTECTION

Rate Amount
Item Description FINAL QTY
(SR) (SR)

Total Bill No. 2.5 for SECTION G - THERMAL & MOISTURE PROTECTION (Page 3
of 3) 0.00
CARRIED TO SUMMARY
type 1
#REF!

Bill No. 2.6


SECTION H - DOORS AND WINDOWS
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.6
Rate Amount
Item Description Unit FINAL QTY
(SR) (SR)

SECTION H - DOORS AND WINDOWS

Wooden Doors

Internal Door
Supply and fixing wood door with solid hard wood frame, fixing in
position and decorations complete as per specifications and as
shown on drawings

SA02 Single Flush Wooden Door, 700mm W x 2050mm H (supply


A No. 5.00 -
rate SAR 600 )
B SA03 Single Flush Wooden Door, 800mm W x 1950mm H (supply No. 1.00 -
rate SAR 600 )
SA04 Single Flush Wooden Door, 800mm W x 2050mm H (supply
C No. 5.00 -
rate SAR 600 )

External Door
Supply and fixing wood door with solid hard wood frame, fixing in
position and decorations complete as per specifications and as
shown on drawings

D SV01 Single Flush Wooden Door with Grooves, 900mm W x No. 1.00 -
2350mm H (supply rate SAR 1,350 )

Metal Doors
Supply and fixing metal door as shown on drawing and as per
specifications

SA05 Single Metal Louver Door. 700mm W x 900mm H (supply rate


E SAR 600 ) No. 1.00 -
F SA07 Single Metal Louver Door, 900mm W x 2250mm H (supply No. 1.00 -
rate SAR 900 )

Parking Door
Supply and install insulated double glazing fabricated from
extruded aluminum sections, super durable polyester powder
coating finish; including body tinted tempered glass, curtain walls,
framing, transoms, mullions, sills, fasteners, anchors, clips,
reinforcing members, weather stripping , sealant, weather seals,
ironmongery, fittings and fixings; complete as specified and shown
on drawings and Specifications.

GA01 Rolling Shtter Door, 2400mm W x 2500mm H (supply rate


G No. 1.00 -
SAR 4,000)

Carried to Collection 0.00


Page 1 of 4 - SECTION H - DOORS AND WINDOWS
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.6

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

Aluminum Glazed Windows


Supply and fixing aluminium windows and screen including framing
, ironmongery complete in accordance with the drawing and
specifications

DA01 Double Sliding Aluminum Window, 1400 W x 700mm H (supply rate


A SAR 1,100 ) No. 1.00 -

DA03 Double Sliding Aluminum Window, 1400 W x 1400mm H (supply


B rate SAR 1,100 ) No. 1.00 -

DE01 Double Verticle with Awing Pan Aluminum Window, 900 W x


C 2100mm H (supply rate SAR 1,100 ) No. 1.00 -

SC01 Single Awing Aluminum Window, 600 W x 900mm H (supply


D No. 4.00 -
rate SAR 480 )

E SC02 Single Awing Aluminum Window, 900 W x 1100mm H (supply No. 1.00 -
rate SAR 480 )
SC02 Single Awing Aluminum Window, 900 W x 1100mm H (supply
F No. 1.00 -
rate SAR 480 )

StoreFront
Supply and install exterior aluminum assemblies; fabricated from
extruded aluminum sections, super durable polyester powder
coating finish; including body tinted tempered glass, stor fronts,
framing, transoms, mullions, sills, fasteners, anchors, clips,
reinforcing members, weather stripping , sealant, weather seals,
ironmongery, fittings and fixings; complete as specified and shown
on drawings and specifications

SF01 ; size 1800 x 2400 mm high , Fixed Store Front with single glass door
G (supply rate SAR 2,200) No. 2.00 -

SF03 ; size 900 x 2100 mm high , single glass Store Front (supply rate SAR
H 1,000 ) No. 1.00 -

SF04 ; size 1800 x 2100 mm high , Fixed Store Front with single glass door
J (supply rate SAR 2,000 ) No. 1.00 -

Carried to Collection 0.00


Page 2 of 4 - SECTION H - DOORS AND WINDOWS
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.6
Item Description Unit FINAL QTY Rate Amount
(SR) (SR)

SECTION H - DOORS AND WINDOWS

Tender Adjustments
The Contractor shall list and price below the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities. Any such
items listed below shall be deemed to be included

A ___________________________ Item

B ___________________________ Item

C ___________________________ Item

D ___________________________ Item

Carried to Collection 0.00


Page 3 of 4 -SECTION H - DOORS AND WINDOWS
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.6

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

BILL NO. 2.6 (SECTION H - DOORS AND WINDOWS)

COLLECTION

From Page No. 1 0.00

From Page No. 2 0.00

From Page No. 3 0.00

Total of Bill No. 2.6 for SECTION H - DOORS AND WINDOWS (Page 4 of 4) 0.00
CARRIED TO SUMMARY
type 1
#REF!

Bill No. 2.7


SECTION J - FINISHES
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

SECTION J - FINISHES

FLOORS

INTERNAL FLOORS

Tiling Works

Supply and Install Porcelain Floor Tiles; type, colors and size as per
approved sample including accessories, corner trims, sand and
cement screed or adhesive and grouted and all associated works to
complete all as shown on drawings, ID Schedule and as per
specifications

A 600X600mm Porcelain tiles in foyer, majlis, living, dining, sitting,


kitchen, bedrooms, etc. (supply rate SAR 25 ) m2 125.00 -

Supply and Install Ceramic Floor Tiles; type, colors and size as per
approved sample including accessories, corner trims, sand and
cement screed or adhesive and grouted and all associated works to
complete all as shown on drawings, ID Schedule and as per
specifications

B 300X300mm non-slip ceramic tiles in bathroom, powder room &


master bathrooms. (supply rate SAR 20 ) m2 16.00 -
C 600X600mm ceramic tiles in maid's room (supply rate SAR 25 ) m2 5.00 -

WALLS

INTERNAL WALLS

Plaster
Supply and apply of cement and sand plaster including all plaster
accessories (plaster stopper, corner bead, grooves, lath), as shown
on Drawings and as per specifications.

D Plaster behind wall tiles. m2 30.00 Excluded


E Plaster behind wall paints. m 2
551.00 Excluded

Carried to Collection 0.00


Page 1 of 8 - SECTION J - FINISHES
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES
Rate Amount
Item Description Unit FINAL QTY (SR) (SR)

SECTION J - FINISHES

WALLS

INTERNAL WALLS (cont'd)

PAINT
Supply and apply of internal painting including all required coats
as shown on Drawings , specified on specifications and shown in
the finishes schedule

To Wall
A Emulsion wall paints in foyer, majlis, living, dining, sitting, kitchen,
bedrooms, etc. m2 466.00 -
B Moisture Resistant wall paints in bathroom, powder rooms, maids
bathroom & kitchen m2 85.00 -

TILING WORKS

Supply and Install Ceramic Wall Tiles; type, colors and size as per
approved sample including accessories, corner trims, sand and
cement screed or adhesive and grouted and all associated works to
complete all as shown on drawings, ID Finishes Schedule and as
per specifications
C 300x600mm ceramic wall tiles in guest & family toilets, master
bedroom, bedroom 2 & 3 bathrooms.(supply rate SAR 25 ) m2 30.00 -

Skirting
Supply and Install Porcelain Skirting Tile of various sizes, material
types and colors as per approved sample including accessories,
corner trims, sand and cement screed or adhesive and grouted;
and all associated works to complete all as shown on drawings and
as per specification

D 600x100mm high ceramic skirting in foyer, majlis, living, dining, m 126.00 -


sitting, kitchen, bedrooms, etc.(supply rate SAR 10 )

E 300x300mm high ceramic skirting in bathroom, powder room, m 11.00 -


master bathrooms & maid's bathroom. (supply rate SAR 10 )

Carried to Collection
Page 2 of 8 - SECTION J - FINISHES 0.00

SECTION J - FINISHES

CEILINGS

INTERNAL CEILINGS

PLASTER
Supply and apply of cement and sand plaster including all plaster
accessories (plaster stopper, corner bead, grooves, lath) as shown
on drawings and as per specifications

A Internal Ceiling m2 178.00 Excluded

PAINT
Supply and apply of internal painting including all required coats as
shown on drawings, ID Finishes Schedule and as per specifications

To Ceiling
B Interior Paint Semi-Gloss Paint Finish m2 166.00 -
C Interior Paint Moisture Resistant Finish m2 14.00 -
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

Carried to Collection
0.00
Page 3 of 8 - SECTION J - FINISHES
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

SECTION J - FINISHES

STAIRS

STONE WORKS

Internal Stairs
Supply of Omani Marble Tiles cut to size polished to Internal Stair
tread & riser; colors and size as per approved sample; including
accessories, corner trims, anti-slip strips, sand and cement screed
or adhesive and grouted, and all associated works to complete all
as shown on drawings and as per specifications

Supply and installation of 30mm thick Omani marble tiles for stair
A tread and 20mm thick for riser, complete with all the necessary m 48.00 -
fixing materials. (supply rate SAR 50 )

B F3, Omani marble landing, complete with all the necessary fixing m 4.00 -
materials.(supply rate SAR 50 )

C 600x100mm high Omani marble stair skirting, complete with all m 27.00 -
the necessary fixing materials.(supply rate SAR 20 )

Threshold
Supply & Installation of Marble Stone Thresholds, cut to size,
including accessories, corner trims, sand and cement screed or
adhesive and grout, and all associated works to complete, all as
shown on drawings and as per specifications

D Marble threshold for 100mm wall thickness, complete with all the m 2.00 -
necessary fixing materials.

Marble threshold for 130mm wall thickness, complete with all the
E m 4.00 -
necessary fixing materials.

F Marble threshold for 200mm wall thickness, complete with all the m 5.00 -
necessary fixing materials.

Carried to Collection
Page 4 of 8 - SECTION J - FINISHES 0.00
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES
Rate Amount
Item Description Unit FINAL QTY
(SR) (SR)

SECTION J - FINISHES

EXTERNAL FINISHES

External Floor Finishes

Supply of Omani marble tiles flooring cut to size polished to


External Stair tread & riser, colors and size as per approved
sample including accessories, corner trims, anti-slip strips, sand
and cement screed or adhesive and grout, and all associated works
to complete all as shown on drawings and as per specifications.

A Marble Tile steps (30mm thick tread, 20mm thick riser) in external m² 3.00 -
entrance steps. (supply rate SAR 60 )

B 250x250mm local terrazzo skirting in roof/upper roof floor.(supply m² 70.00 -


rate SAR 20 )

WALLS

EXTERNAL WALLS

Plaster
Supply and apply of cement and sand plaster including all plaster
accessories (plaster stopper, corner bead, grooves, lath), as shown
on Drawings and as per specifications.

D External wall plaster m2 287.00 Excluded

PAINT
Supply and apply of internal painting including all required coats
as shown on Drawings , specified on specifications and shown in
the finishes schedule

To Wall
E External wall paint m2 287.00 -

Carried to Collection
0.00
Page 5 of 8 - SECTION J - FINISHES
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES
Rate Amount
Item Description Unit FINAL QTY
(SR) (SR)

SECTION J - FINISHES

EXTERNAL FINISHES

Skirting
Supply and Install Porcelain Skirting Tile of various sizes, material
types and colors as per approved sample including accessories,
corner trims, sand and cement screed or adhesive and grouted;
and all associated works to complete all as shown on drawings and
as per specification

A 600x100mm external Porcelain Skirting Tile (supply rate SAR 10 ) m 3.00 -

250x250mm local terrazzo skirting in roof/upper roof floor.(supply


B m 77.00 -
rate SAR 10 )

CEILINGS

PLASTER
Supply and apply of cement and sand plaster including all plaster
accessories (plaster stopper, corner bead, grooves, lath) as shown
on drawings and as per specifications

C External Ceiling m2 13.00 Excluded

PAINT
Supply and apply of internal painting including all required coats as
shown on drawings, ID Finishes Schedule and as per specifications

To Ceiling
D Exterior Paint Finish m2 13.00 -

Carried to Collection 0.00


Page 6 of 8 - SECTION J - FINISHES
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

SECTION J - FINISHES

Tender Adjustments
The Contractor shall list and price below the items and quantities
of addition or deduction for any Bill of Quantity Item(s) and or any
omitted items that in his opinion are necessary for the full and
satisfactory completion of the work as described in the
Specifications or shown on the Drawings and for which either
expressed or implied provision is required and which are not
covered by the items or the rates in the Bill of Quantities. Any such
items listed below shall be deemed to be included

A ___________________________ Item

B ___________________________ Item

C ___________________________ Item

D ___________________________ Item

Carried to Collection
0.00
Page 7 of 8 - SECTION J - FINISHES
SECTION H - DOORS AND WINDOWS
#REF!
Bill No. 2.7 SECTION J - FINISHES
Rate Amount
Item Description Unit FINAL QTY (SR) (SR)

BILL NO. 2.7 (SECTION J - FINISHES)

COLLECTION

From Page No. 1 0.00

From Page No. 2 0.00

From Page No. 3 0.00

From Page No. 4 0.00

From Page No. 5 0.00

From Page No. 6 0.00

From Page No. 7 0.00

Total of Bill No. 2.7, for SECTION J - FINISHES (Page 8 of 8)


CARRIED TO MAIN SUMMARY 0.00
‫الريم‬
#REF!

Bill No. 2.11


SECTION S - EXTERNAL WORKS
SECTION S - EXTERNAL WORKS
#REF!
Bill No. 2.11 SECTION S - EXTERNAL WORKS

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

SECTION S - EXTERNAL WORKS

Solid Boundary Walls For the Side of Villas and Townhouses

Supply, construction and erection of boundary walls, consisting


of 200mm thk block works, concrete columns (200mm x
300mm), concrete lintel/grade beams, including plastering
paint finish, all other finishes, excavation, backfilling, disposal,
dewatering (if required). expansion joints, anti-termite,
blinding, reinforcement, concrete, cold-applied bitumen,
sealant, and all other associated works as shown on drawings
and as per specifications

Common Side Boundary walls - foundation, columns, beams,


A blocks, plaster, paints, etc. Complete as per Consultant / Client m2 50.00 0.00
requirements / approval
Free Side Boundary walls - foundation, columns, beams,
B blocks, plaster, paints, etc. Complete as per Consultant / Client m2 70.00 0.00
requirements / approval
Front and Back Boundary walls - foundation, columns, beams,
C blocks, plaster, paints, etc. Complete as per Consultant / Client m2 130.00 0.00
requirements / approval.

Parking Interlock

Supply, and Install Parking Interlock with all required fixings


and layers as shown on drawings and as per specifications
D Parking Interlock m2 25.00 0.00

Carried to Collection
Page 1 of 3 - SECTION S - EXTERNAL WORKS 0.00
SECTION S - EXTERNAL WORKS
#REF!
Bill No. 2.11 SECTION S - EXTERNAL WORKS

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

SECTION S - EXTERNAL WORKS

TENDER ADJUSTMENT:
The Contractor shall list and price below the items and
quantities of addition or deduction for any Bill of Quantity
Item(s) and or any omitted items that in his opinion are
necessary for the full and satisfactory completion of the work
as described in the Specifications or shown on the Drawings
and for which either expressed or implied provision is required
and which are not covered by the items or the rates in the Bill
of Quantities. Any such items listed below shall be deemed to
be included

A ___________________________ Item

B ___________________________
Item

C ___________________________ Item

D ___________________________
Item

Carried to Collection
0.00
Page 2 of 3 - SECTION S - EXTERNAL WORKS
SECTION S - EXTERNAL WORKS
#REF!
Bill No. 2.11 SECTION S - EXTERNAL WORKS

Item Description Unit FINAL QTY Rate Amount


(SR) (SR)

BILL NO. 2.11- SECTION S - EXTERNAL WORKS

COLLECTION

From Page No. 1 0.00

From Page No. 2

Total of Bill no. 2.11- SECTION S - EXTERNAL WORKS (Page 3 of 3) 0.00


CARRIED TO MAIN SUMMARY
#REF!

BILL No. 13
DAYWORK SCHEDULE
#REF!
Bill No. 13 DAYWORK SCHEDULE (Provisional)

Item Description

A. Generally

Day works will be administered strictly in accordance with the Conditions of Contract, Clause 52 (4).

The Contractor will be paid for day works carried out during the course of the Contract while other operations are
in progress at the rates set down in this Schedule. Profit and overheads are not to be included in the actual rates
but stated as percentage addition in the item provided for same at the end of the Labor, Material and Plant
Sections of this Schedule of Rates.

The basic Rates to be inserted in the Day work Schedules shall be the Rates which the Contractor has used in
determining his Unit Rates inserted elsewhere in this Tender and Contract Document.

Time engaged in the actual works only will be allowed. In the event of labor or plant having to be brought to the
Site specially for the item of day work then a reasonable allowance may be made for travelling time, but the
allowance for travelling time is to be agreed before the Day work item is executed.

B. Rates for Labor

The day work rates quoted for labor are to be the inclusive NETT amounts payable including for use and waste of
hand tools and of all ordinary non-mechanical plant, staging, scaffoldings, tarpauline, use of electric light and
water for the Works, etc. and all special inducements for working. The rates shall also be deemed to include the
extra cost of public holidays other holidays with pay, medical costs, bonus, sick leave, termination indemnity pay
and the like. Unless specifically authorized in writing by the Engineer, non-productive overtime or special rates for
overtime will not be admissible. The cost of all supervisory staff including engineers, foremen, clerks, store men,
charge hand, etc., is to be included in the percentage addition for profit and overheads.

C. Rates for Materials


Materials used on day work shall be as specified for the Works. The rates are to include delivery to the Site.
Should materials be required for use on day works which are not included in the Schedule, the lowest current Nett
market prices shall apply, plus a reasonable allowance for collecting, loading and off loading and transporting to
the Works.

D. Rates for Plant Hire


Plant hire rates shall include for the cost of maintaining in proper working order, attendance in starting up and
shutting down, refueling and all fuel and power, oils grease and cleaning materials, replacement and / or
sharpening of tools, provision of tools and all other ancillary items including consumable spares. Idle time in
maintenance or travelling to the Site will not be allowed.

E. Pricing the Day work Schedule


The Contractor shall insert his rates for all the items in the Day work Schedule and include the total in the General
Summary.

To the above scheduled amounts shall be added a percentage by the Contractor to allow for his extra costs for
F
working plus all other profit and overheads involved.

G This entire is PROVISIONAL and the cost of the items will be paid by the Contractor only if expended.

Page 1 of 7
Bill No. 13 - Day works Schedule (Provisional Only)
#REF!
Bill No. 13 DAYWORK SCHEDULE (Provisional)
Rate Amount
Item Description Unit Quantity
(SR) (SR)

DAY WORKS

LABOUR

A Laborer unskilled Hr. 200

B Laborer skilled Hr. 100

C Concreter / Mason Hr. 100

D Tiler Hr. 50

E Carpenter Hr. 50

F Steel Fixer and Bar Bender Hr. 50

G Painter Hr. 50

H Light Duty Driver Hr. 50

J Heavy Duty Driver Hr. 50

K Light Plant Operator Hr. 50

L Heavy Plant Operator Hr. 50

M Banksman / Greaser Hr. 50

N Fitter / Pipe Fitter Hr. 50

P Drain layer Hr. 30

Addition for Profit & Overheads

Carried to Collection
Bill No. 13 - Day work Schedule (Page 2 of 7)
#REF!
Bill No. 13 DAYWORK SCHEDULE (Provisional)
Rate Amount
Item Description Unit Quantity
(SR) (SR)

MATERIALS DELIVERED TO SITE

Ordinary Portland cement tone 10

A Sulphate resisting cement tone 10

B Ready mix concrete (Grade 40) delivered to site m3 1000

C Coarse aggregate (dry) tone 10

D Fine aggregate (dry) tone 10

E Building sand m3 1000

F 200mm thick hollow concrete blocks No 5000

G 150mm - ditto No 5000

H 100mm - ditto No 5000

J Softwood, treated m3 500

K Hardwood m3 500

L High yield steel reinforcement bars (any sizes) tone 5

Addition for Profit & Overheads

Carried to Collection
Bill No. 13 - Day work Schedule (Page 3 of 7)
#REF!
Bill No. 13 DAYWORK SCHEDULE (Provisional)
Rate Amount
Item Description Unit Quantity
(SR) (SR)

MATERIALS DELIVERED TO SITE [CONT'D]

A Non structural steel members Kg 1000

B 12mm plywood sheets m2 1000

C Emulsion paint ltr 50

D Enamel paint ltr 50

E Epoxy paint ltr 50

F 60mm precast concrete inter-locking blocks m2 2000

G Marble tiles to floors m2 -

H Granite tiles to floors m2 -

J Ceramic tiles to walls m2 -

K Ceramic tiles to floors m2 -

L Gypsum board suspended ceiling m2 200

M Gypsum tile 600 x 600mm suspended ceiling m2 200

N Calcium silicate tiles 600 x 600mm suspended ceiling m2 200

Addition for Profit & Overheads

Carried to Collection
Bill No. 13 - Day work Schedule (Page 4 of 7)
#REF!
Bill No. 13 DAYWORK SCHEDULE (Provisional)
Rate Amount
Item Description Unit Quantity
(SR) (SR)

MATERIALS DELIVERED TO SITE [CONT'D]

A 50mm thick polystyrene insulation board m2 200

B 0.5mm thick waterproofing membrane m2 500

C 2mm thick waterproofing membrane m2 1000

Addition for Profit & Overheads

Carried to Collection
Bill No. 13 - Day work Schedule (Page 5 of 7)
#REF!
Bill No. 13 DAYWORK SCHEDULE (Provisional)
Rate Amount
Item Description Unit Quantity
(SR) (SR)

PLANT ON SITE

A Concrete mixer, 7 / 5 Hr. 100

B Track type tractor (D6D or equivalent) Hr. 50

C Wheel loader (966D or equivalent) Hr. 50

D Vibrating roller, self propelled Hr. 10

E Pneumatic roller Hr. 10

F Dump truck, minimum 10 tones Hr. 50

G Dump truck, minimum 20 tones Hr. 50

H Water tanker, minimum 10,000 liters (Empty) Hr. 10

J Compressor - one tool Hr. 50

K Concrete vibrator Hr. 100

L Generator, 200 KVA Hr. 50

M Crane, 40 tones Hr. 50

N Mobile crane, 25 tones Hr. 50

P Pick-up truck, 2 tone Hr. 50

Q Water pump, 2 inch. Hr. 100

R Welding machine Hr. 50

Addition for Profit & Overheads

Carried to Collection
Bill No. 13 - Day work Schedule (Page 6 of 7)
#REF!
Bill No. 13 DAYWORK SCHEDULE (Provisional)
Amount
Item Description
(SR)

Bill No. 13 - DAYWORKS SCHEDULE

COLLECTION

From Page No. 1

From Page No. 2

From Page No. 3

From Page No. 4

From Page No. 5

From Page No. 6

Total For Bill No. 13 - Day works Schedule (Page 7 of 7)


CARRIED TO MASTER SUMMARY
‫الريم‬
#REF!

MAIN SUMMARY
‫الريم‬
#REF!
BILL OF QUANTITIES

ITEM DESCRIPTION Amount No. Of Units Total Amount


(SR) (SR)

Bill No. 2.1 SECTION B- SITE PREPARATION 0.00 0.00

Bill No. 2.2 Section C - CONCRETE WORKS 0.00 0.00

Bill No. 2.3 SECTION D - MASONRY 0.00 0.00

Bill No. 2.4 SECTION E - METAL WORKS 0.00 104.00 0.00

Bill No. 2.5 SECTION G - THERMAL & MOISTURE PROTECTION 0.00 104.00 0.00

Bill No. 2.6 SECTION H - DOORS AND WINDOWS 0.00 104.00 0.00

Bill No. 2.7 SECTION J - FINISHES 0.00 104.00 0.00

Bill No. 2.8 SECTION K - ACCESSORIES 0.00 0.00

Bill No. 2.9 SECTION Q - MECHANICAL INSTALLATION 0.00 0.00

Bill No. 2.10 SECTION R - ELECTRICAL INSTALLATION 0.00 0.00

Bill No. 2.11 SECTION S - EXTERNAL WORKS 0.00 104.00 0.00

Total Amount of Main Summary Carried To Master Summary 0.00 0.00