6.0 ROOF
Construct wooden roofing frame with long $25.00 $15400.00
6.1 span metal roofing system complete. SY 616
Provide and install complete plastic gutter
system with 4" drain and connect to $10.00 $1520.00
6.2 proposed "U" shape concrete drain Lf 152
SUB TOTAL $16,920.00
7.0 FINISHINING
Provide terrazzo tiles on all floors as floor $15.00 $6,420.00
7.1 finishing 12" x 12" SY 428
Provide ceramic wall tiles walls in labs. up to
18" above countertops and floors of rest
7.2 room including 5'-0" high on restrooms walls. SF 628 $10.00 $6,280.00
Clean existing walls and mend all masonry Lump $500.00 $500.00
7.3 damage. Sum 1
7.4 Provide 1"3 cement mix to plaster new walls SY 776 $10.00 $7760.00
Provide 1/4" ceiling system to all ceiling and
under boxing using 2x4, 2x6, and all
including ceiling strips, decorative material $20.00 $12320.00
7.5 corner molding . SY 616
SUB TOTAL $33,530.00
8.0 DOORS
Provide steel doors using 5/" square bars in
angle irons with hinges, using European/
American standard locks These Door are for
emergency door of labs as shown. (3'-0" x $500.00 $1000.00
8.1 7'-0") D/1 A Set 2
Provide wooden frame door, with glass,
paint with cylinder lock, (European or
8.2 American Standard) brass hinges, wood Set 3 $300.00 $900.00
2
molding as shown (6-0"x 7'-0") D/2
Provide solid wood panel doors,
varnish/paint with cylinder lock, (European or $250.00 $250.00
American Standard) brass hinges, wood
8.3 molding as shown (6'-0" x 7'-0") D/3 Set 1
Provide solid wood panel doors as shown in
drawings, varnished with cylinder lock $175.00 $875.00
(European or American Standard) with brass
hinges, wood molding etc. Double (3'-0" x 7'-
8.4 0") D/4 Set 5
Provide wood and glass door with locks ,
brass hinges, etc as shown in drawings (3'- $200.00 $800.00
8.5 0" x 7'-0") D/5 Set 4
Provide doors with louvers as vents. Single $200.00 $600.00
8.6 (3'-0" x 7'-0") D/6 Set 3
Provide doors with louvers as vents. Single $200.00 $600.00
8.7 (3'-0" x 7'-0") D/7 Set 3
SUB TOTAL $5025.00
9.0 WINDOWS
Provide louver and sliding glass windows as $300.00 $7500.00
9.1 indicated in drawings (9'-0" x 4'-0") W/1 Set 25
Provide windows as indicated in dwgs. (9'-0" $150.00 $1350.00
9.2 x 2'-6") W/2 Set 9
Provide windows as indicated in dwgs. (4'-0" $150.00 $450.00
9.3 x 4'-6") W/5 Set 3
Provide louver and sliding glass windows as $100.00 $300.00
9.4 indicated in drawings (2'-6" x 2'-6") W/7 Set 3
Provide windows as indicated in dwgs. (6'-0" $150.00 $900.00
9.5 x 2'-6") Jalousie louvers W/9 Set 6
NOTE; The cost for windows must
include rogue bars using 5/8" square bar
system
SUB TOTAL $10,500.00
3
12.1 Provide water closet complete Set 3 $65.00 $195.00
12.2 Provide wash basin complete Set 3 $55.00 $165.00
Provide shower complete and shower head $150.00 $450.00
12.3 in lab shower in lab Set 3
Allow a sum for in-coming water and waste Lump $750.00 $750.00
12.4 disposal system Sum 1
Lump $2500.00 $2500.00
12.5 Allow a sum for septic tank and manholes Sum 1
Sub total $4060.00
10.0 MISCELLENOUS
Lump $500.00 $500.00
10.1 Allow a sum for shelves of the store rooms Sum 1
Allow a sum for the cabinet in the lab. with
granite tops and ceramic lab sinks and lab $700.00 $2100.00
10.2 faucets. (Must be approved by arch. Set 4
Allow a sum for the floor board and curtain Lump $500.00 $500.00
10.3 boxes sum 1
Allow a sum for concrete gutters as shown $5.00 $1235.00
10.4 as surface drain system Lt 247
SUB TOTAL $4,335.00
4.0 ROOF
Construct wooden roofing frame with long $25.00 $3800.00
4.1 span metal roofing system complete SY 152
Provide and install complete plastic gutter
system with 4" drain and connect to $10.00 $390.00
4.2 proposed "U" shape concrete drain Lf 39
Sub total $7905,00
5.0 FINISHINING
Provide terrazzo tiles on all floors as floor $15.00 $2205.00
5.1 finishing 12" x 12" SY 147
Provide ceramic wall tiles walls in labs up to
18" above countertops and floors of rest
5.2 room including 5'-0" high on restrooms walls. SF 192 $10.00 $1920.00
5.3 Provide 1"3 cement mix to plaster new walls SY 654 $10.00 $6540.00
Provide 1/4" ceiling system to all ceiling and
under boxing using 2x4, 2x6, and all material
including ceiling strips, decorative corner $20.00 $3040.00
5.4 molding. SY 152
Sub total $13,705.00
6.0 DOORS
Provide steel doors using 5/" square bars in
angle irons with hinges, using European/
American standard locks as shown. (6'-0" x $500.00 $1000.00
6.1 7'-0") D/1 Set 2
Provide solid wood panel doors as shown in
drawings, varnished with cylinder lock
(European or American Standard) with brass
hinges, wood molding etc. Double (3'-0" x 7'- 200.00 $400.00
6.2 0") D/4 Set 2
6.3 Provide wood and glass door with locks , Set 1
5
brass hinges, etc as shown in drawings (3'- $200.00 $200.00
0" x 7'-0") D/5
Sub total $1600.00
7.0 WINDOWS
Provide windows as indicated in dwgs. (9'-0" $125.00 $500.00
7.1 x 2'-6") W/2 Set 4
NOTE; The cost for windows must
include rogue bars using 5/8" square bar
system. This is for the entire building.
Sub total $500.00
11.0 MISCELLENOUS
Allow a sum for shelves of the soil storage Lump $500.00 $500.00
11.1 room Sum 1
Allow a sum for the cabinet in the lab with $750.00 $1500.00
10.3 granite tops and ceramic lab sink/ faucet Set 2
Allow a sum for the floor board and curtain Lump $500.00 $500.00
10.4 boxes Sum 1
Sub total $2,500.00
6
III. COMPUTER LABORATORY
ITEM DESCRIPTION UNIT QTY. RATE EXTENSION
1.0 EXCAVATION/ EARTH WORK
Excavate area as shown in working
drawings remove all vegetation, and a top
soil about 6" and prepare for construction of $20.00 $4000.00
1.1 the foundation system CY 200
Excavate foundation trench as shown in $15.00 $705.00
1.2 foundation plans and details. CY 47
Backfill excavated area with Laterite and or $10.00 $1,020.00
1.3 approved backfill material CY 102
Backfill area within foundation wall to receive $10.00 $510.00
1.4 mass concrete floor slab 12" compact CY 51
Sub total $6,235.00
4.0 ROOF
Construct wooden roofing frame with long $25.00 $4,025.00
4.1 span metal roofing system complete. SY 161
system with 4" drain and connect to $10.00 $470.00
4.2 proposed "U" shape concrete drain Lf 47
SUB TOTAL $4,495.00
5.0 FINISHINING
Provide terrazzo tiles on all floors as floor $15.00 $2520.00
5.1 finishing. 12" x 12" SY 168
Provide ceramic wall tiles walls in $10.00 $3,000.00
5.2 RESTROOMS and floors. SF 300
5.3 Provide 1"3 cement mix to plaster new walls SY 916 $10.00 $9,160.00
5.4 Provide 1/4" ceiling system to all ceiling and SY 161
7
under boxing using 2x4, 2x6, and all material
including ceiling strips, decorative corner $20.00 $3,220.00
molding.
Sub total $17,900.00
6.0 DOORS
Provide solid wood panel doors,
varnish/paint with cylinder lock, (European or
American Standard) brass hinges, wood $200.00 $200.00
6.1 molding as shown (6'-0" x 7'-0") D/3 Set 1
Provide solid wood panel doors as shown in
drawings, varnished with cylinder lock
(European or American Standard) with brass
hinges, wood molding etc. Double (3'-0" x 7'- $200.00 $400.00
6.2 0") D/4 Set 2
Provide wood and glass door with locks ,
brass hinges, etc as shown in drawings (3'- $200.00 $200.00
6.3 0" x 7'-0") D/5 Set 1
Provide doors with louvers as vents. Single $200.00 $1,200.00
6.4 (3'-0" x 7'-0") D/6 Set 6
Sub total $2000.00
7.0 WINDOWS
Provide louver and sliding glass windows as
7.1 indicated in drawings (9'-0" x 4'-0") W/1 Set 2 $150.00 $300.00
Provide windows as indicated in dwgs. (9'-0" $150.00 $600.00
7.2 x 2'-6") W/2 Set 4
Provide louver and sliding glass windows as $150.00 $150.00
7.3 indicated in drawings (6'-0" x 4'-0") W/4 Set 1
Provide windows as indicated in dwgs. (3'-0" $150.00 $900.00
7.4 x 7-6") W/6 Set 6
Provide louver and sliding glass windows as $150.00 $7,500.00
7.5 indicated in drawings (2'-6" x 2'-6") W/7 Set 5
NOTE; The cost for windows must
include rogue bars using 5/8" square bar
system.
Sub total $9,450.00
8
9.7 Wall lamp Set 5 $10.00 $50.00
Sub total $1,950.00
11.0 MISCELLENOUS
Allow a sum for the floor board and curtain Lump $500.00 $500.00
11.1 boxes Sum 1
Sub total $500.00
5.0 FINISHINING
Provide exterior tiles on mass concrete floor $15.00 $2,520.00
5.1 finishing. 12" x 12" SY 168
5.2 Provide 1"3 cement mix to plaster new walls SY 16.4 $10.00 $164.00
5.3 Provide ceramic brick as veneer finish SY 16.4 $8.00 $131.20
Fabricate galvanized railing as per drawings $10.00 $500.00
5.4 and install. SY 50
Sub total $3,315.20
8.0 MISCELLENOUS
Allow a sum to plant "Firestone Grass" to all
8.1 courtyards as indicated in the drawings. SY 50 $15.00 $750.00
Allow a sum for the construction of waiting
8.2 benches at various waiting areas. Set 7 $50.00 $350.00
Allow a sum for concrete gutters as shown
8.3 as surface drain system with cover Lt 40 $10.00 $400.00
Allow a sum for construction of all ramps Lump $1500.00 $1,500.00
8.4 incl. steel railings. sum 1
Sub total $3,000.00
4.0 ROOF
(Roof is included in concrete works Item 3.2)
5.0 FINISHINING
Provide 1"3 cement mix to plaster new walls $10.00 $1,410.00
5.1 and screed floor. SY 141
11
Sub total $1,410.00
6.0 DOORS
6.1 Provide steel door as shown 6'-0" x7'-0' Set 1 $500.00 $500.00
6.2 Provide steel door as shown 2'-10" x 7'-0" Set 1 $250.00 $250.00
Sub total $750.00
3.0 FINISHINING
Provide 1"3 cement mix to plaster new walls $10.00 $760.00
3.1 and screed floor. SY 76
Sub total $760.00
$1,291.75
ADD FOR TRANS. @10%
14
PROJECT COST SUMMARY
15