You are on page 1of 1

Splice Joint details and location to be provide

1. Splice Joint details and location to be provide.


2. Lifting Lug details and location to be provide.
3. Earthing boss detials to be provide
4. Toe plate Size to be confirm
5. Toe plate to be confirm skid are grating
6. Gueest Plate dimension to be confirm .

Resources & Energy


PROJECT NO :VEC4051
01 02.03.24 MIR YMU ADD ISSUED FOR REVIEW - -
ARABIAN INDUSTRIES MANUFACTURING LLC

GCO000CO1418
Manufacturing

1:20
HUG
A1-PDO.DWG (SP-2065)

MP SKID 98
- - - - - - - STEEL DETAILS
GD MODULAR WH MP SKID
MASTER DRAWING REVISION FRAMING PLAN, ELEVATION
NOTES REFERENCE DRAWINGS HUG 98 104071 CS 2358 00001 0001 01
& DETAILS
LAST SAVED BY SHAHBAZ.MIRKAR ON 02/03/2024 5:35 PM PLOTTED BY SHAHBAZ AHMED MIRKAR ON 3/2/2024 5:36 PM FILENAME: X:\NAS - VEC PROJECTS\NAS - VEC PROJECTS 2022\VEC4051 - RESIDUAL ENGINEERING OF MODULAR HOOK UP SKIDS- AIM\DRAWINGS\21-CIVIL\MP SKID (HUG-MP-041)\REV-01\HUG-98-104071-CS-2358-00001-0001-01.DWG

You might also like