Professional Documents
Culture Documents
TOTALIZER
FQI 4. BIRD SCREEN AND GOOSENECK VENT BY TANK
0034 VENDOR AS PER SAUDI ARAMCO SPECIFICATION
AND TO BE CORROSION RESISTANT MATERIAL.
12"-POT-0506-20FE0U
(NOTE-14) H 11. PROVIDED ACCESS, LADDER OR PLATFORM.
LI
12. TEST LINE.
0031
L
LL 13. FOR SPECIFICATION FOR CONTROL SYSTEM
FW PUMP CONTROLLER REFER TO RE-617063.
LI
0031 14. LOW LEVEL IN STORAGE TANK TO ACTIVATE
N13 RAD AUDIBLE AND VIRTUAL ALARM FIRE PUMP
LIT CONTROL PANEL.
NOTE-7
F 0031
LG (NOTE-5) 15. CLAMP ON TYPE ULTRASONIC FLOW METER
0032 MW3 TWO PROBES SHALL BE CLAMPED ON THE
24" (NOTE-4) 4" PIPE 5D STRAIGHT LENGTH SHOULD BE
8" MW4
4" N6 N7 N8 MAINTAINED IN THE UPSTREAM OF FLOW
24"
8" NOTE-3,5 METER.
MW2
MW1
24"
24"
N4 REFERENCE DRAWINGS
4"-FW-0523-1CS1U
DRAIN MASTER PLAN RA-614081
L0
FOUNDATION PFD FIRE WATER PUMP STATION RA-636789-001
D PFD FIRE WATER PUMP STATION RA-636789-001
PFD FIRE WATER ZONE A RA-635725-001
ANTI VORTEX
PLATE PFD FIRE WATER ZONE B RA-635755-001
(TYP.) PFD FIRE WATER ZONE C RA-635785-001
PFD FIRE WATER ZONE D2 RA-635815-001
PFD FIRE WATER TUXEDO RA-635815-002
NOTE 9
D
NTS
25-00053-0006-777
MK AS/UFA
04/21/20 04/21/20
STORAGE 3
2272 M
CAPACITY PIPING & INSTRUMENT DIAGRAM PID
FIRE WATER STORAGE AND PUMPING
DIAMETER 18 M
SHIPBUILDING