You are on page 1of 3

AMD SAMPLING CHART - BALANGAN PROJECT

Ply by ply AMD Sampling Protcol

IB Thickness (m) Litho Ply Sample No.

SO
BHWE
0.50 not sampled

3.20 MS

5.00 ply-01 XXX001AMD-01

0.19 XM
Interburden-01

1.60 MS
9.00

4.00 MS ply-02 XXX001AMD-02

5.00 SS
Interburden-02

7.80 ply-03 XXX001AMD-03

2.80 SS
Inter
2.80 SS

3.00 MS ply-04 XXX001AMD-04


Interburden-03

0.30 XM ply-05 XXX001AMD-05

2.50 MS ply-06 XXX001AMD-06

CO
AMD SAMPLING & ANALYSIS PROTOCOL

AMD SAMPLING PROTOCOL

Clean Interburden Interburden with Carbonaceous Mudstone bedding

Rest Interburden ≤ 3 meter Rest Interburden > 3 meter Carbonaceous Mudstone ≤ 0.2 meter Carbonaceous Mudstone > 0.2 meter

CO CO CO CO

5.00 ply-01 5.00 ply-01 5.00 ply-01 5.00 ply-01


MS MS
ply-02 5.00 ply-02 5.00 ply-02 5.00 ply-02
5.00 MS 0.19
MS ply-03

5.00 ply-03 5.00 5.00 ply-04


5.00 ply-03 MS ply-03
MS
2.50 2.50
3.20 ply-04 3.20 ply-05
CO CO
CO CO

AMD ANALYSIS PROTOCOL

Net Acid Generation (NAG) Analysis Acid Base Account (ABA) Analysis

NAG pH Total Sulfur

NAG pH 4.5 Maximum Potential Acidity (MPA)

NAG pH 7.0 Acid Neutralising Capacity (ANC)

pH 1:2 Net Acid Producing Potential (NAPP)

EC 1:2 ANC/MPA Ratio

AMD Classification

Note : AMD Sampling interval must adjust by Geophysical Logging

You might also like