Professional Documents
Culture Documents
Continuous Improvement
Continuous Improvement
現
現
現
現
現
現
現
現
現
現
現
現
前
Continuous Improvement
Continuous Improvement
Continuous Improvement
–
Continuous Improvement
–
Continuous Improvement
Continuous Improvement
Continuous Improvement
Continuous Improvement
20
▪
1) ENR(2011), The Top 225 International Contractors ; ENR(2017), The Top 250 International Contractors.
21
• •
• •
• •
• •
• •
• •
• •
• •
23
▪
24
▪
25
▪
26
2.
▪
✓
▪
✓
27
2.
28
▪
29
▪
✓
30
31
▪
▪
▪
✓
•
•
✓
•
•
▪
▪
▪
✓
▪
✓
✓
▪
✓
✓
•
➢
➢
➢
•
➢
✓
•
▪
✓
▪
✓
✓
✓
✓
Tools and Techniques
✓
Tools and Techniques
✓
Tools and Techniques
✓
▪
▪
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
▪
✓
✓
▪
▪
▪
▪
✓
✓
▪
✓
✓
▪
✓
▪
✓
▪
✓
Tools and Techniques
▪
✓
✓
✓
✓
▪
▪
▪
▪
▪
✓
✓
✓
▪
✓
▪
✓
▪
✓
▪ 프로젝트 전체 기간을 CPM이론에 의하여 Critical Path을 계산
▪ 만약 작업 간의 관계는 독립(Statistical independent)로 가정이고, 활동(Activity)이 30개
이상으로 가정한다면,
–
Tools and Techniques
▪
✓
✓
✓
✓
✓
✓
▪
✓
✓
✓
✓
✓
✓
▪
▪
▪
▪
▪
▪
▪
▪
✓
✓
✓
✓
✓
✓
✓
▪
✓
✓
▪
✓
✓
✓
✓
✓
✓
✓
✓
▪
✓
✓
▪
✓
✓
✓
✓
✓
✓
✓
✓
Tools and Techniques
▪
✓
✓
✓
✓
✓
▪
✓
▪
✓
✓
✓
✓
✓
✓
✓
✓
▪
Q&A
110
111
112