Ambo Town Internal Asphalt Road project Date 30-1

Date RFI NO Activity description


1/4/2021 16-Apr-21 Asbuilt reading for final base course layer RHS
2/4/2021 43/April/2021 Asbuilt reading for final base course layer LHS
2/4/2021 46/April/2021 Asbuilt reading for final base course layer RHS
5/4/2021 90/April/2021 Asbuilt reading for final base course layer LHS
8/4/2021 115/April/2021 Asbuilt reading for final base course layer RHS
10/4/2021 141/April/2021 Asbuilt reading for final base course layer RHS
1/4/2021 9-Apr-21 Layout checking for manhole wall RHS&LHS
1/4/2021 9-Apr-21 Elevation checking for manhole wall RHS&LHS
3/4/2021 54/April/2021 Elevation checking for manhole Exacavation RHS
24/4/2021 274/April/2021 Elevation checking for manhole Exacavation RHS
25/4/2021 288/April/2021 Elevation checking for manhole Lean concreteRHS
25/4/2021 291/April/2021 Elevation checking for manhole pad concreteRHS
3/4/2021 56/April/2021 Elevation checking for manholelean concrete RHS
3/4/2021 58/April/2021 Elevation checking for manhole Pad concrete RHS
3/4/2021 60/April/2021 Elevation checking for manhole wall concrete RHS
9/4/2021 124/April/2021 Elevation checking for Excavation of RC pipe RHS
9/4/2021 127/April/2021 Elevation checking for Invertof RC pipe RHS
13/4/2021 166/April/2021 Elevation checking for Excavation of RC pipe RHS(Rock exca)
17/4/2021 204/April/2021 Elevation checking for Excavation of RC pipe LHS
18/4/2021 224/April/2021 Elevation checking for invert of RC pipe LHS
2/4/2021 22-Apr-21 Elevation checking for Retaining wall Excavation( Tele RHS)
2/4/2021 24-Apr-21 Elevation checking for Retaining wall Lean concre (tele RHS)
6/4/2021 96/April/2021 Elevation checking for Retaining wall pad concre (tele lHS)
2/4/2021 29-Apr-21 Elevation Checking For wing wall Extension lean concrete(TEL LHS)
2/4/2021 32/April/2021 Elevation Checking For wing wall Extension Pad concrete(TEL LHS)
2/4/2021 34/April/2021 Elevation checking for shear wall Lean concrete LHS
7/4/2021 37/April/2021 Elevation checking for shear wall pad concrete LHS
26/4/2021 303/April/2021 Elevation checking for Excavation of RC pipe RHS
26/4/2021 306/April/2021 Elevation checking for invert of RC pipe RHS
29/4/2021 345/April/2021 Elevation checking for manhole Exacavation LHS
29/4/2021 347/April/2021 Elevation checking for manholelean concrete LHS
26/4/2021 310/April/2021 Asbuilt reading for full width final sub base carriage way
11/4/2021 103/April/2021 Elevation checking for Invertof RC pipe RHS
12/4/2021 151/April/2021 Asbuilt Reading for width 3rd layer capping
13/4/2021 160/April/2021 Asbuilt reading for full width sub base carriage way
13/4/2021 168/April/2021 Elevation checking for Excavation of RC pipe
13/4/2021 182/April/2021 Asbuilt reading for full width sub base carriage way
14/4/2021 184/April/2021 Elevation checking for Excavation of RC pipe RHS(Rock exca)
191/4/2021 191/April/2021 Asbuilt reading for full width sub base carriage way
16/4/2021 198/April/2021 Asbuilt Reading for width 3rd layer capping
17/4/2021 208/April/2021 Elevation checking for manhole lean C-10 concrete casting RHS
17/4/2021 210/April/2021 Elevation checking for manhole Pad C-25 concrete casting RHS
17/4/2021 212/April/2021 Elevation checking for manhole wall C-25 concrete casting RHS
17/4/2021 214/April/2021 Elevation checking for manhole Exacavation RHS
23/4/2021 255/April/2021 Elevation checking for manhole lean C-10 concrete casting RHS
23/4/2021 255/April/2021 Elevation checking for manhole lean C-10 concrete casting LHS
23/4/2021 258/April/2021 Elevation checking for manhole pad C-10 concrete casting RHS
23/4/2021 258/April/2021 Elevation checking for manhole pad C-10 concrete casting LHS
23/4/2021 268/April/2021 Elevation checking for manhole wall C-10 concrete casting RHS
24/4/2021 278/April/2021 Elevation checking for manhole wall C-10 concrete casting LHS
21/4/2021 245/April/2021 Asbuilt reading for final base course layer RHS
26/4/2021 315/April/2021 Asbuilt reading for final base course layer RHS
27/4/2021 324/April/2021 Asbuilt reading for final base course layer LHS
Date 30-1-2021
STN REMARK
0+600 0+750 seg2
0+180 0+410 seg2
0+410 0+600 seg2
0+070 0+180 seg2
0+410 0+600 seg2
0+070 0+180 seg2
1+340 1+620 1B
1+340 1+620 1B
1+600.592 1+677.763 1B
0+705.751 0+819.504 1B
0+705.751 0+748.259 1B
0+705.751 0+748.259 1B
1+600.592 1+677.763 1B
1+600.592 1+677.763 1B
1+600.592 1+677.763 1B
0+680 0+840 1B
0+680 0+840 1B
0+720 0+770 1B
0+680 0+830 1B
0+680 0+830 1B
0+860 0+890 1B
0+860 0+890 1B
0+891 0+901 1B
0+909.135 0+923.135 1B
0+909.135 0+923.135 1B
1+040 1+060 1B
1+040 1+060 1B
0+820 0+890 1B
0+820 0+890 1B
0+680 0+860 1B
0+680 0+860 1B
1+400 1+680 1B
0+540 o+580 1A
0+380 0+640 1A
0+360 0+500 1A
0+580 0+640 1A
0+500 0+640 1A
0+600 0+640 1A
0+500 0+640 1A
0+560 0+640 1A
O+557.046 0+578.431 1A
O+557.046 0+578.431 1A
O+557.046 0+578.431 1A
1+600.907 1+622.652 1A
O+600.907 0+622.652 1A
O+529.631 1A
O+600.907 0+622.652 1A
O+529.631 1A
O+600.907 0+622.652 1A
O+529.631 1A
0+030 0+440 1A
o+440 0+640 1A
o+320 0+480 1A