2.30
2.30
2.30
0.80
0.80
0.80
7.30
7.30
7.30
DEPTH AS PER ELECTRICAL DRAWING
TRENCH BASE
TRENCH BASE
TRENCH BASE
TRENCH BASE
TX PLINTH BASE
TX PLINTH BASE
SB3
SB1A
4.20
4.20
4.20
SB3
NOTE: 1. FOOTINGS ARE TO BE CENTERED TO THE COLUMNS IF NOT MENTIONED THE LOCATION
FOUNDATION - COLUMN AND AXES 2. PRIOR TO START FOUNDATION CHECK WITH THE UNDERGROUND STRUCTURES AND SERVICES
SCALE 1:100 NOTE: 1. TRENCH WALLS BELOW BEAMS TO BE INTEGRATED WITH BEAM
3. BLINDING CONCRETE TO BE PROVIDED AS PER GENERAL NOTES
4. PROVIDE THE FOOTING BELOW TRENCH FOUNDATION WHERE INTERFERES
FOUNDATION - DETAILS
SCALE 1:100
B4 B4
2.30
2.30
0.80
0.80
B4
7.30
7.30
220 mm THICK SLAB
with Y16@150m m Bottom mesh
& Y16@150 m m Top mesh
(ALL FLOOR AREA)
4.20
4.20
B4 B4 B4
WAREHOUSE & SHOW ROOM & OFFICE BUILDING & LABOR ACCOMMODATION BUILDING
DEC. 2017
SCALE 1:25
AS SPECIFIED
A1