SB1

2.30

2.30

2.30
0.80

0.80

0.80
7.30

7.30

7.30
DEPTH AS PER ELECTRICAL DRAWING

DEPTH AS PER ELECTRICAL DRAWING


GENERAL NOTES :
SB1A
F2

TRENCH BASE

TRENCH BASE

TRENCH BASE

TRENCH BASE
TX PLINTH BASE

TX PLINTH BASE

SB3

SB1A
4.20

4.20

4.20
SB3

NOTE: 1. FOOTINGS ARE TO BE CENTERED TO THE COLUMNS IF NOT MENTIONED THE LOCATION
FOUNDATION - COLUMN AND AXES 2. PRIOR TO START FOUNDATION CHECK WITH THE UNDERGROUND STRUCTURES AND SERVICES
SCALE 1:100 NOTE: 1. TRENCH WALLS BELOW BEAMS TO BE INTEGRATED WITH BEAM
3. BLINDING CONCRETE TO BE PROVIDED AS PER GENERAL NOTES
4. PROVIDE THE FOOTING BELOW TRENCH FOUNDATION WHERE INTERFERES

FOUNDATION - DETAILS
SCALE 1:100

B4 B4
2.30

2.30
0.80

0.80
B4
7.30

7.30
220 mm THICK SLAB
with Y16@150m m Bottom mesh
& Y16@150 m m Top mesh
(ALL FLOOR AREA)
4.20

4.20
B4 B4 B4

GROUND FLOOR - COLUMN AND AXES


3. THE BEAM HEIGHT MAY BE CHANGED ACCORDING TO THE REQUIREMENT SCALE 1:100

Foundation Footings.F2 & F3 - 400 17.774 m² 7.109 m³


Neck Columns.Lift - 1.50 1.193 m² 1.79 m³
Excavation.Excavation - 1.35 139.851 m² 188.799 m³
Excavation.Excavation Lift - 0.75 139.851 m² 104.888 m³
SUB STATION - STRUCTURAL DETAILS Ground Beam.SB1&SB2 - 1350 12.419 m² 16.766 m³
Ground Beam.GB3,GB4&GB6 - 600 6.283 m² 3.77 m³
117 / M A
Columns.Ground Columns - 4.50 1.107 m² 4.98 m³
S.O.G.S.O.G - 150 MM 64.631 m² 0
Beams.B4 - 600 11.482 m² 6.889 m³
Slabs.S2 - 250 14.978 m² 3.744 m³
AHMED HUSSIN
Slabs.S4 - 220 89.433 m² 19.675 m³ 3808

Foundation Footings.Substation Footing - 1450 2.525 m² 3.661 m³