TABLE OF CONTENTS
4.2.8.2 Lot KP1/6A-2/PT/1/15/A39B/1 – Matasia, Kabete and Syokimau 66/11kV Substations ............... 22
4.2.8.2.1 Matasia 66/11kV Substation .................................................................................................... 22
4.2.8.2.2 Kabete 66/11kV Substation ..................................................................................................... 23
4.2.8.2.3 Syokimau 66/11kV Substation................................................................................................. 25
4.2.8.3 Lot KP1/6A-2/PT/1/15/A39B/2 – Gigiri, Cianda and Steel Billets 66/11kV Substations ................ 27
4.2.8.3.1 Gigiri 66/11kV Substation ........................................................................................................ 27
4.2.8.3.2 Cianda 66/11kV Substation ..................................................................................................... 28
4.2.8.3.3 Steel Billets 66/11kV Substation .............................................................................................. 30
4.2.8.4 Lot KP1/6A-2/PT/1/15/A39C – Mangu 132/66kV and Kamburu 132/33kV Substations................ 32
4.2.8.4.1 Mangu 132/66kV Substation works ......................................................................................... 32
4.2.8.4.2 Kamburu 132/33kV Substation works ..................................................................................... 34
4.2.8.5 Lot KP1/6A-2/PT/1/15/A39D – Naivasha and Makutano 132/33kV Substations .......................... 36
4.2.8.5.1 Naivasha 132/33kV Substation works ..................................................................................... 36
4.2.8.5.2 Makutano 132/33kV Substation works .................................................................................... 38
..........................................................................................................................................................
If the Specifications and/or Drawings do not contain particulars of materials or goods, which
are necessary for the proper and safe completion, operation, and maintenance of the
equipment in question, all such materials shall be deemed to be included in the supply.
In the event of any conflict between the Drawings and the Specifications, the latter shall
prevail.
In the event of any conflict between scaled dimensions and figures on the Drawings, the
figures shall prevail.
Should the Bidder find discrepancies in or omissions from these Specifications or from the
other Documents, or should he be in doubt as to their meaning, he should immediately
contact the Project Manager for interpretation, clarification or correction thereof before
submitting his Bid. Such action shall, however, in no case be considered as a cause for
altering the closing date of the Bid.
The scope of work for equipment shall cover engineering design, manufacture, testing
before shipment and packing sea worthy or otherwise as required, delivery CIP site, of all
equipment as specified in the preceding chapters.
For substations contracted on turnkey basis the substation contractor shall be responsible for
design, material supply, transport, erection, and installation and commissioning as well as
having the full responsibility for civil works including design and construction of
transformer foundations and control building.
The Contractor shall design and construct the transformer foundations with oil collection pit,
oil trap and fire damper consisting of crushed stones laying on a galvanised steel grating.
Loose equipment for the Employer’s rehabilitation shall be complete with documentation
and ancillaries like programs, licences and programming tools.
KPLC has a SCADA (Supervisory, Control & Data Acquisition) system that is controlled
from the Regional Control Centres& the National Control Centre. The National Control
Centre (NCC) is at Juja Rd and controls the entire transmission network & substations (ie
some 66kV, all 132kV, all 220kV & soon to be introduced 400kV stations.)
There are 4 regional control centres in total. These are located in the following locations;
Juja Rd (Nairobi region), Rabai (Coast region), Lessos (West Kenya region) & Kiganjo (Mt
Kenya region). These Regional Control Centres monitor & control the 11KV, 33kV & 66kV
Distribution networks &substations in their specific regions.
The Control Centres all run ABB’s Network Manager WS500 which is the software used for
monitoring & Control of all the incorporated substations. The Communication protocol
currently supported by KPLCs front end servers is ABBs PCU 400, for data telegram
exchange with Remote Terminal Units (RTUs). Whereas, the Station Control Management
Systems (SCMS) in the substations in its SCADA system are IEC 60870-5-101&IEC
60870-5-104.
connection between the gantries, to the busbars and to and between the apparatus.
f. 1 (one) set of current transformers
g. 1 (one) set of voltage transformers
h. 1 (one) set of surge diverters
i. 1 (one) set of steel structures for support
j. 1 (one) set of control/protection panel
k. 1 (one) bay control unit with display and measuring functions
l. 1 (one) multifunctional protection unit as per 4.1.2.4.2.1
m. 1 (one) lock-out trip relay with electrical/hand reset facilities
n. 1 (one) lot of necessary interposing relays, MCB’s, terminal blocks and wiring to form
a complete operative bay control. The control scheme shall be prepared for SCADA
operation.
4.2.4.2 FeederBay
1 (one) complete bay shall be equipped with:
Note: 11KV Capacitor bank switchgear shall be equipped with the necessary protection and
control relays for Capacitor banks. .
(b) 1 (one) lot of 11 kV cable terminations for transformer and switchgear connection
(c) 1 (one) lot of support structures for lightning arresters and transformer connection
(d) 1 (one) lot of 11 kV cable from switchgear to auxiliary transformer
(e) 1 (one) lot of 11 kV cable terminations for auxiliary transformer and switchgear
connection
(f) 1 (one) lot of support structures for auxiliary transformer.
To the extent the internal control and interlocking system for the equipment supplied is not
included for that particular equipment, it shall be included herein. All interconnections
The control system specified hereunder shall include all necessary equipment for control,
protection, metering and signalling. The system shall include all instruments, meters,
switches, position indicators, inscriptions and mimic diagrams, protective and auxiliary
relays, terminal blocks, internal wiring and any other equipment required to form a complete
installation.
Drawings showing the control system, protection units and the boards as they are proposed
shall be supplied with the Bid.
The space needed for the boards should not exceed the available space.
Information defining the internal local control communication protocol shall be submitted
with the Bid.
Complete sets of schematic diagrams for control, protection, indication, metering, signalling,
alarms, etc. shall be supplied as part of the project and shall be subject to the Project
Manager's approval.
The requirements as to submission of diagrams, drawings and other documents with the Bid
and after award of Contract are stated in the standard form of contract.
(a) For New substations: 1 (one) lot complete system (equipment and soft ware), with
communication gateway, data concentrator etc. for interface to a regional (RCC)
SCADA system and to the national (NCC) SCADA system.
(b) For existing Substations with SAS/RTU in operation. One complete (lot) extension of
the SAS/RTU to accommodate the additional switchgear. This shall include Hardware
and software and necessary Engineering.
4.2.10.3 Telecommunications
a) In order for the SCADA data to be transferred to the Regional control centres, the
bidder shall design and commission an appropriate communication system based on
Fibre, PLC, Radio or other approved communication media for data and speech
requirement.
Equipment supplied shall be digital and latest technology and shall comply to the latest
ITU-T, IEC, ITU-R, IEEE and ETSI standards.
The scope as described shall include detailed system design, manufacture, supply, installation, testing,
commissioning, remedying of defects, maintaining the works during the defects liability period and
any incidental work necessary for the proper completion of the work in accordance with this contract.
Scope shall include integration of STM-4, to the existing KPLC Network Management System. In
some cases there shall be need to upgrade existing Telecommunication equipment in order to achieve
data and speech routing to Regional and National control centres. Survey and necessary preparation
works on existing systems, Equipment and substations to achieve specified functionality shall be in
the scope of supply. Contractors shall be required to submit for approval detailed design of system
before manufacture.
The STM 4 equipment shall include Tele-protection modules (4 Command), High Speed Ethernet
modules and 1+1 protection.
Necessary upgrade of communication and SCADA Front Ends (PCUs) equipment at terminal stations
and at Control centres shall achieve complete Data and Speech to RCC/NCC shall be included in
scope.
All communication equipment supplied under this project shall be type approved by the regulator,
Communication Commission of Kenya (CCK) and the Kenya Bureau of Standards (KBS) where
applicable. It is the responsibility of the contractor to obtain these necessary approvals.
The type of required communication link shall be detailed in scope of supply for individual stations.
(a) 1 (one) circuit breaker, manual operated, minimum 200 A, for the feeder from the station
supply transformer.
(b) 2 (two) current transformers 200/1/1 A with two cores, one core for measuring and one
for protection.
(c) 1 (one) constant time overcurrent relay.
(d) 1 (one) earth fault relay.
(e) 1 (one) A-meter function with selector switch.
(f) 1 (one) V-meter function with selector switch.
(g) 1 (one) lot of feeder circuit breakers with electro-BAHnetic and thermal releases. The
breaker ratings shall be chosen to suit the different consumers to be connected. 20% of
the breakers of each size shall be spare and readily mounted.
The boards shall be completely equipped with busbars, circuit breakers, miniature circuit
breakers etc. Contactors, motor starters, instruments, operating switches, push buttons,
indicating lamps, etc., shall be included whenever required. 20% of the breakers of each size
shall be spare and readily mounted.
4.2.11.3 Cables
(a) 1 (one) lot of all necessary armoured power and control cables for supply to the main
distribution board and to the sub-distribution boards, panels and equipment except for
the cables for lighting and small power which are included in the civil Goods under
separate contract.
4.2.12.1 Battery
i. (1 (one) 110 V battery. Capacity at least 200 Ah/10h for substations with more than 10
MVA installation of transformer capacity
ii. The 48V batteries shall be included in the bid for communication equipment and the
RTU. The battery shall be at least 100A/10Ah
The capacities to be recommended by the Bidder, based upon the calculated consumption
considering a fully developed substation.
Batteries shall be installed in separate room with EX proof ventilation fan (for 110 V
batteries only).
4.2.12.2 Charger
(a) 1 (one) DC charger for the 110 V battery.
(b) 1 (one) DC charger for the 48 V Battery.
The chargers shall be complete with instruments, breakers on AC and DC side, and
protection.
4.2.12.3 Switchboard
1 (one) switchboard 110 V DC.
20% of the breakers of any size shall be spare and readily mounted.
The boards shall be completely equipped with busbars, miniature circuit breakers, fuses, etc.
Contactors, motor starters, instruments, operating switches, push buttons, indicating lamps,
under-voltage relays with alarm contact, etc., shall be included whenever needed.
4.2.12.6 Cables
(a) 1 (one) lot of all necessary DC power supply cables, including wiring to the apparatus
in the switchyard.
All the conduits and protection tubes, wherever cables may deteriorate or where cable laying
may otherwise present difficulties.
4.2.3 Training in control (SAS), Telecommunication and protection system (LS-008a, 008b)
The training includes travel for the 4 (four) KPLC engineers as well as all course material
and other expenses shall be catered by the Contractor. The training shall be held at the
manufacturer's place. The training shall cover design, application, testing, commissioning
and maintenance of the relevant digital control and protection systems. The training course
shall have a minimum of 2 (two) weeks duration for SAS and Protection and one week for
communication. The cost of per diem and accommodation shall be met by KPLC.
Circuit breakers
Protection and control system
Transformers
Indoor switchgear
Power Cables
Instrument transformers
Disconnectors/ Isolators
SAS
Telecommunications Equipment
FAT shall be carried out as prescribed in the particular technical specifications of the
equipment. The cost of per diem and accommodation shall be met by KPLC.
o Introduce a 10,000 liter water tank on a plinth with water harvesting, piping and
pumping. Replace the gutters complete with new fascia board. Replace the
overhead tank with a 1000 liter tank.
Reposition the gate to realign with the new substation road; repaint the gate to Kenya Power
standard colors; reposition pedestrian gate on the side of the guard house; provide adequate
signage.
Road works improvements
o Rehabilitate the existing concrete substation road to a class 25 of concrete and
marry with new road extension.
o Provide a new substation road to the new transformer platform and switchgear
room to cabro standard with parking.
o Provide metal cover for existing manhole or reposition the same.
o Reconstruct the access road from the main road to the gate providing for drainage
culverts.
Refurbish the cable trenches and replace all the existing trench covers.
Repair the broken boundary fence.
Design new drainage system for the substation including drainage for access road
The new transformer shall be collected from Naivasha 132/33kV substation. The bidder shall
test, disassemble, transport, assemble and test the transformer.
Works
DNI - 401 Transformer Foundation and oil separation pit Lot 1
DNI – 402 Switchgear Building Extension and rehabilitation Lot 1
DNI – 403 Platform Works Lot 1
DNI – 404 Cable trenches Lot 1
DNI – 405 Erection and commissioning Lot 1
DNI – 406 Transformer testing, dismantling, reassembly and Lot 1
testing
DNI – 407 Transportation of new transformer Lot 1
DNI – 408 Recovery works of disused structures and Lot 1
equipment
DNI – 409 Telecoms / SCADA Installation and Lot 1
commissioning
DNI – 410 Substation Automation integration Lot 1
DNI – 411 Main gate and fence works Lot 1
DNI – 412 Access road works Lot 1
DNI – 413 Substation road works Lot 1
DNI – 414 Substation drainage works Lot 1
Substation Lighting and Lightning installation Lot 1
DNI – 415 works
DNI – 416 Earthing refurbishment Lot 1
DNI – 417 Excavation, backfilling and ballast works Lot 1
DNI – 418 Substation structures installation Lot 1
Extend the 33kV Busbar to provide one extra line bay towards the control room
Establish 2No new 33kV line bays (Bays 1 and 5)
4.2Contr A39ABCD-Section VI-SOW-subst R1 JANUARY 2015 KENYA POWER
Kenya Power and Lighting Co Ltd VI - 19 Contract A39
Distribution Reinforcement and Upgrade Technical Specifications and Drawings
Works
Transformer Foundation and oil separation pit Lot 1
MRTN-401 and firewall
Switchgear Building Extension and Lot 1
MRTN-402 rehabilitation
MRTN-403 Platform Works Lot 1
MRTN-404 Cable trenches Lot 1
MRTN-405 Erection and commissioning Lot 1
MRTN-406 Dismantling and reassembly of transformer Lot 1
and accessories to new platform
MRTN-407 Relocation of transformer to new platform Lot 1
MRTN-408 Transportation and Positioning of new Lot 1
transformer
MRTN-409 Testing, disassembly, Assembly and Testing Lot 1
of transformer
MRTN-410 33kV Busbar extension works Lot 1
The works involve construction of a new 66kV transformer bay; installation of 1No new
transformer 23 MVA, 66/11 kV complete with a control panel and tap changer panel;
The existing switchgear room will be modified and the equipment rearranged to accommodate
the additional equipment.
The lighting masts and lightning arrestor masts on wooden poles will be recovered and new steel
structure masts erected at the required locations.
Works:
MTS-401 Transformer Foundation, oil collection and oil separation pit 1
MTS-402 Switchgear Building Extension and septic tank 1 Lot
MTS -403 Platform Works 1 Lot
MTS- 404 Cable trenches 180
MTS -405 Erection and commissioning 1 Lot
MTS -406 Transportation and positioning of transformer 1 lot
MTS -407 Assembly and Testing of transformer 1 Lot
Telecommunications / SCADA installation and 1 Lot
MTS -408 commissioning
MTS -409 Automation Engineer for substation automation integration 1 Lot
MTS -410 Cable Termination works for 11kV feeders 1 Lot
MTS -411 Substation access road works 1 Lot
Substation gate, guard access, guard house modifications 1 Lot
MTS -412 and fencing
MTS -413 Substation drainage 1 Lot
MTS -414 Substation earthing improvement 1 Lot
MTS -415 Substation lighting and lightning protection systems 1 Lot
MTS -416 Substation structures installation 1 Lot
The additional 11kV feeder panels will be provided by KPLC but the contractor will be
responsible for coupling them to the existing board. The equipment will be rearranged to fit the
spaces available.
Connect the oil collection unit to the existing oil separation unit.
The existing local transformer connected to the 11kV switchboard is adequate.
New transformer to be collected from Nairobi South or Ruaraka Store.
Works:
KABT- 401 Transformer Foundation, oil collection 1
KABT- 402 Switchgear Building improvements 1 Lot
KABT- 403 Platform Works 1 Lot
KABT- 404 Cable trenches 1 Lot
KABT– 405 Erection and commissioning 1 Lot
KABT– 406 Transportation and positioning of transformer 1 Lot
KABT- 407 Assembly and testing of transformer 1 Lot
Telecommunications / SCADA installation and
KABT- 408 commissioning 1 Lot
KABT- 409 Automation Engineer for substation automation integration 1 Lot
KABT- 410 Substation drainage 1 Lot
KABT- 411 Substation earthing improvement 1 Lot
KABT- 412 Substation lighting and lightning protection systems 1 Lot
KABT- 413 Substation structures installation 1 Lot
Works:
SYOK - 401 Transformer Foundation, oil collection and oil separation pit 1
SYOK - 402 Switchgear building rehabilitation 1 Lot
SYOK - 403 Platform Works 1 Lot
SYOK - 404 Cable trenches 1 Lot
SYOK - 405 Erection and commissioning 1 Lot
SYOK - 406 Guard house, access, toilet and screening improvements 1 Lot
SYOK - 407 Telecommunications / SCADA installation and commissioning 1 Lot
SYOK - 408 Substation automation integration 1 Lot
SYOK - 409 Transportation and positioning of transformer 1 Lot
SYOK - 410 Assembly and testing of transformer 1 Lot
SYOK - 411 Substation gate and fencing 1 Lot
SYOK - 412 Substation drainage 1 Lot
SYOK - 413 Substation earthing improvement 1 Lot
SYOK - 414 Substation lighting and lightning protection systems 1 Lot
Protection of the switchgear building roof and substation from
SYOK - 415 quarry blasts by specialized contractor (Provisional Sum) 1 Lot
SYOK - 416 Substation structures installation 1 Lot
Works:
GGR-401 Transformer foundation, oil collection and oil separation pits 1
GGR-402 Switchgear Building modification 1 Lot
GGR-403 Platform Works 1 Lot
GGR- 404 Cable trenches and ducts 1 Lot
GGR-405 Erection and commissioning 1 Lot
GGR-406 Guard house toilet, pedestrian gate and screening 1 Lot
Telecommunications / SCADA installation and 1 Lot
GGR-407 commissioning
GGR -408 Transportation and positioning of transformer 1 Lot
GGR -409 Transformer Assembly and Testing 1 Lot
GGR -410 Automation Engineer for substation automation integration 1 Lot
GGR -411 Substation drainage 1 Lot
GGR -412 Substation earthing improvement 1 Lot
GGR -413 Substation lighting and lightning protection systems 1 Lot
GGR -414 ICRAF road rehabilitation 1 Lot
GGR -415 Substation structures installation 1 Lot
Construction of a new Control room building. The available area is 14 x 15 meters. The old
control room to be retired.
Installation of new 13 panel 11kV Switchgear. The existing SF6 panels to be retired. The
existing feeders to be terminated to the new panels.
Portion of the boundary wall on two sides of the property to be extended to 2.7 meters above
the substation ground level.
Provide a new solid panel gate and pedestrian gate. Modify the guard room to provide steel
door, windows and seating forms
Replace and reposition the substation lighting and lightning protection system with steel
structures.
Replace the tap changer control panel for automation.
Provide new auxiliary supplies in the new control room.
The existing battery and battery charges to be transferred as backup to the new control room.
Connect piped water to the site. Install the water tank in the existing platform and provide
piping and pumping facilities. The new water connection account to be transferred to KPLC
upon completion of works.
Refurbishment of the substation grounds.
New transformer to be collected from Nairobi South or Ruaraka Store.
Works:
CNDA -401 Transformer Foundation, oil collection and separation pits 1
CNDA -402 Switchgear Building 1 Lot
CNDA -403 Platform Works 1 Lot
CNDA-404 Cable trenches 1 Lot
CNDA-405 Erection and commissioning 1 Lot
CNDA-406 Guard house modifications 1 Lot
CNDA-407 Telecommunications / SCADA installation and commissioning 1 lot
CNDA-408 Transportation and Positioning of transformer 1 Lot
CNDA-409 Transformer assembly and testing 1 Lot
CNDA-410 Automation Engineer for substation automation integration 1 Lot
CNDA -411 Termination works for MV power cables 1 Lot
CNDA -412 Substation drainage 1 Lot
CNDA -413 Substation earthing improvement 1 Lot
CNDA -414 Substation lighting and lightning protection systems 1 Lot
CNDA -415 Substation structures installation 1 Lot
The scope of works includes replacement of a faulty 23 MVA, 66/11 kV Transformer and
associated switchgear; Installation of a new 13 Panel 11KV switchboard and other control
equipment; Laying and terminating 630mmsq S/C 11kV cables from the transformers to the
switchgear; Recovery of the faulty transformer and associated equipment to the stores; Laying
and termination of 8No 300mmsq 3/C cables from the switchgear to the overhead lines;
Restoration of local supplies.
Works:
SBL - 401 Transformer Foundation modifications, oil collection and separation pits 1 Lot
SBL - 402 Platform Works 1 Lot
SBL - 403 Cable trenches and refurbishment 1 Lot
SBL - 404 Erection and commissioning 1 Lot
Recovery of Faulty Transformer and disused equipment and delivery to 1 Lot
SBL - 405 stores
SBL - 406 Laying and termination of new feeder cables 1 Lot
SBL - 407 Transformer transportation and Positioning 1 Lot
SBL - 408 Transformer assembly and testing 1 Lot
SBL - 409 Telecommunications / SCADA installation and commissioning 1 Lot
SBL - 410 Substation structures installation 1 Lot
SBL - 411 Substation drainage 1 Lot
SBL - 412 Substation earthing improvement 1 Lot
SBL - 413 Substation lighting and lightning protection systems 1 Lot
SBL - 414 Control room rehabilitation 1 Lot
SBL - 415 ADSS Cable installation 1 Lot
Works
MAN-101 Transformer Foundation, oil collection and separation pits Lot 1
MAN-102 Transformer dismantling and reassembly Lot 1
MAN-103 Transformer relocation Lot 1
MAN-104 Platform Works Lot 1
MAN-105 Cable trenches and ducts Lot 1
MAN-106 Erection and commissioning Lot 1
MAN-107 New Guard house Lot 1
MAN-108 Substation Road and drainage works Lot 1
4.2Contr A39ABCD-Section VI-SOW-subst R1 JANUARY 2015 KENYA POWER
Kenya Power and Lighting Co Ltd VI - 34 Contract A39
Distribution Reinforcement and Upgrade Technical Specifications and Drawings
Works
KBR - 401 Transformer Foundation, oil collection and separation pits Lot 1
KBR– 402 Transportation and positioning of Power Transformer Lot 1
KBR– 403 Assembly and testing of Power Transformer Lot 1
KBR– 404 Platform works Lot 1
KBR– 405 Cable trenches and ducts Lot 1
KBR-406 Erection and commissioning Lot 1
KBR-407 33kV Busbar extension Lot 1
KBR-408 SCADA installation and commissioning Lot 1
KBR-409 Substation Drainage works Lot 1
KBR-410 Boundary fence extension Lot 1
KBR-411 132kV cable installation Lot 1
KBR-412 Control room refurbishment Lot 1
KBR-413 Earthing extension Lot 1
KBR-414 Substation lighting and lightning works Lot 1
KBR-415 Substation structures installation Lot 1
Works
Transformer Foundation, firewall, oil collection and Lot
NVS-401 separation pits 1
NVS-402 Transportation and Positioning of transformer Lot 1
NVS-403 Assembly and testing of transformer Lot 1
NVS-404 Platform works Lot 1
NVS-405 Cable trenches Lot 1
NVS-406 Erection and commissioning Lot 1
33kV Busbar reconstruction to steel structures and Lot
NVS-407 repositioning of existing local transformer 1
Telecommunications / SCADA installation and Lot
NVS-408 commissioning 1
NVS-409 Substation earthing extension Lot 1
Recovery and transportation of 3No faulty transformers Lot
NVS-410 to stores 1
NVS-411 Rehabilitation and reconstruction of switchgear room Lot 1
NVS-412 Extension of 132kV Busbar Lot 1
NVS-413 Substation drainage works Lot 1
NVS-414 Substation Road works Lot 1
4.2Contr A39ABCD-Section VI-SOW-subst R1 JANUARY 2015 KENYA POWER
Kenya Power and Lighting Co Ltd VI - 38 Contract A39
Distribution Reinforcement and Upgrade Technical Specifications and Drawings
Install a 132kV isolator to separate the 132kV Busbar and install a set of VTs
Install a 33kV bus section isolator.
Establish 3No 33kV transformer bays.
Provide lightning protection to cover the transformers and 33kV bays.
Provide an oil separation unit for the new transformer.
Install adequate substation lighting using LED technology.
Modify the LVAC board to auto changeover unit for two supplies.
Modifications to the switchgear room
o Block the vents over the main door and seal the entrance door.
o Relocate the panic door furniture to the panel room from the control room
o Install new lock to the operator access door.
o Revive the local wiring in the control room
o Install a 10,000 liter water tank complete with rain water harvesting, piping and
plumbing.
o Automate the water pumping system.
Works
MKTN-401 Transformer Foundation, oil collection and separation pits Lot 1
MKTN-402 Platform works Lot 1
MKTN-403 Cable trenches Lot 1
MKTN-404 Erection and commissioning Lot 1
MKTN-405 33kV Busbar extension Lot 1
MKTN-406 Telecommunications / SCADA installation and commissioning Lot 1
MKTN-407 Transportation and Positioning of transformer Lot 1
MKTN-408 Assembly and testing of transformer Lot 1
MKTN-409 Installation of indoor 33kV feeder metering and control panels Lot 1
MKTN-410 Extension of 132kV Busbar Lot 1
MKTN-411 Rehabilitation of switchgear room Lot 1
MKTN-412 Substation drainage works Lot 1
MKTN-413 Substation Road works Lot 1
MKTN-414 Substation lighting and lightning works Lot 1
MKTN-415 Substation structures installation Lot 1