12 ¼” Bi-directional, 3 Points RGDR, with Baker Auto Trak,
Challenging vertical well Features Application • Perth Basin, Onshore Western Australia • 12 ¼” sections – Vertical Section • Drilling Interval: 1630m MD – 3862m MD, → 2232m • Incl. In/Out: 0.06º/0.78º •Ave. ROP: 20.92m/hr • BHA: Baker AutoTrak RSS •Lithology: Upper section Interbedded Sandstone with Siltstone, lower section predominantly shale with some streaks of coal formation. • Mud Properties: 10.5ppg WBM • String Revolutions: 960 KREVs (*Based on Depth Based data)
Offset Well Challenges & Drilling Risks
Benefits • Offset well with stabilisers on drill string got stuck and fishing operation failed. The 12 ¼’’ RGDR was included as upper stabilizer • Concerns over hole stability and differential sticking. into the BHA. As result: • Severe stick slip vibrations caused damages to Motor and MWD • Lost BHA which incurred extra cost for sidetrack well operation. • 12 ¼” section drilled in a SINGLE Run operation. • Highly interbedded abrasive Sandstone with Siltstone formation. • No STUCK PIPE, NO LIH, NO SIDETRACK • 4x drill bits runs required to complete the 12 ¼’’ section. • Smooth POOH & casing running operation