Objective
Creating a unique,
trusted & identified
brand in banking and
financial services
Established
Establishing a
specialization in every
universal brand in
subdomain of
banking and financial
banking and financial
services.
services
Creating proprietary
Developing a good
knowledge &
talent pool
intellectual property.
Key Responsibility Areas
1. RBI circular / Internal policy document / SOP 14. Test design
2. Process notes collection, review, implementation, availability 15. Accompany BD team during the pitch
3. Compliance with ICAI standards, RBI guidelines 16. Course identification for the top 15 people
4. Standard mechanism for knowledge transfer, handover of project, assignment 17. As a speaker
6. Presentation, brand guidelines & brand book (in compliance with ICAI, hire an 19. Qualitative KRA
expert)
20. Article and Q&A based on that article
7. Training
11. Newsletter
12. List of systems applied in banking and 6-7 lines on the system
-Understanding document
1 SOPs of relevant projects Operational department
-Analysis of the difference between what is to be done and what is followed
-Understanding document
2 RBI Circulars Knowledge Hub / Operations
-Analysis of the difference between what is to be done and what is followed
- Process note review as per SOP and RBI circulars
3 Process notes Operational department
- Timely updation reminders
-Compliance with auditing standard
4 ICAI standards Knowledge Hub - Compliance with regulatory requirements
-Peer review compliance and other requirements
- Compliance with regulatory requirements
5 RBI Guidelines Knowledge Hub / Operations
- Timely training to team on new updates to team
Apart from the above cases, there are other additional 9 projects which are part of the list but
the same was not updated in the repository list.
The below table shows the observations with respect to the department.
9 No department name
10
Understanding document
SOP or RBI circular
Not received 62 65
Received 23 20
SOP RBI
Note: in RMP RAR project only “Repeat” cases related SOP is received for all other products no SOP is received.
Either SOP
or RBI
Understanding Doc
circular
prepared
40 Docs in Axis system
No Relevant 45
cirular or Common Circular reference
SOP
received
Process Note
Out of the total 85 active projects, there are only 48 projects for which the process note
are available and that are being shared with the knowledge hub by the respective
department head. Rest 37 process notes are either not prepared or not received by the
knowledge hub.
Following are the observations that are identified while reviewing the process note :
Knowledge Hub has prepared a “Guidance on Process note review” for the basic
requirements before sending it for review.
Process Note contd..
Grossly Wrong Audit Assertions Recommendations /
Value Additions
46%
60% 50% 50%
Yes 40% Gross errors
No Recommendations 54%
No Less Errors
Less Recommendations
WCGW/ Control points/ Fraud Triangle Lack of understanding in objective and scope/
Not in align with SLA
31% 29%
Gross errors
Less Errors Gross Errors 46%
54%
No errors Less Errors
40%
SLA Master
SLA Master
Following are some major points that need to be complied with in the documentation with
respect to the engagements that we perform:
▪ The nature, timing, and extent of the procedures to be performed, described in terms that 37%
are clear, not misleading, and not subject to varying interpretations.
▪ Acknowledgement of the relevant ethical requirements with which the practitioner will Available
comply in conducting the agreed-upon procedures engagements.
No information
63%
Observation :
• The pie diagram shows the % of SLAs that are available and has been properly maintained by
the accounts team.
• SLA master (Excel sheet) has not been updated by the team of approx. 54.% of the total
available.
• There are 26 projects for which SLA details are not available with the team.
• The scope of work mentioned in the process note and the scope mentioned in SLA are not
inline.
Knowledge Hub Quality Check (KHQC)
• Ensure compliance of the team towards the firm’s policies and culture.
Requirements
Knowledge Hub will prepare the “KHQC report” for each of the projects after having a detailed review of the project.