You are on page 1of 3

Penggunaan Unit Alat Berat TIC

No Tanggal Shift Unit Model Code Unit Operator HM Awal HM Akhir Total HM
1 9-May-23 Siang Shantui SS 22 DZ-01 Asnan 587.9 589.1 1.2
2 13-May-23 Siang Shantui SS 22 DZ-01 Sukarjo 646.2 647.6 1.4
3 22-May-23 Siang XCMG XE 215 C EX-03 Putra 714.9 717.3 2.4
4 7-Jun-23 Siang XCMG XE 215 C EX-03 Sukarjo 986.2 987.1 0.9
5 25-Jul-23 Siang XCMG XE 215 C EX-03 Sukarjo 1133.5 1137.2 3.7
6 24-Jul-23 Siang Shantui SS 22 DZ-01 Endrik 1186.4 1194.5 8.1
7 22-Jul-23 Siang XCMG XE 215 C EX-03 Sukarjo 1103.5 1107.4 3.9

8 21-Jul-23 Siang XCMG XE 215 C EX-03 Sukarjo 1099.1 1102.1 3

No Descriptions Total HM Fuel Cons Operator Total


1 Penggunaan Unit Excavator XCMG XE 215 C 13.9 183.6 2.4 Rp 6,975,400
2 Penggunaan Unit Dozzer Shantui SS 22 10.7 321 9.3 Rp 9,253,000
Total Rp 16,228,400
EX DZ
18 30
Fuel Keterangan Rp 310,000 Rp 410,000
36 Rental TIC (general) OPT Rp 40,000 Unit Model
42 Pelebaran jalan FUEL Rp 14,000 Shantui SS 22
43.2 Rental TIC (general) XCMG XE 215 C
16.2 Prepare jalan Hauling Total Result
200 General jalan hauling (TIC)
243 Maintenance jalan hauling (TIC) Sum of Total HM
Cooling down batubara Stock ROM
70.2 dan pelebaran jalan hauling Unit Model
Cooling down batubara Stock ROM
54 dan Ground test TIC Shantui SS 22
XCMG XE 215 C
Total Result
Total
Rp 6,975,400
Rp 9,253,000
Rp 16,228,400
Data
Sum of Total HM Sum of Fuel
10.7 321
13.9 383.6
24.6 704.6

Operator

Asnan Endrik Putra Total Result

1.2 8.1 9.3


2.4 2.4
1.2 8.1 2.4 11.7

You might also like