Professional Documents
Culture Documents
Scope of Work:
1. Dismantling of dilapidated wooden floors
2. Replacement of floor joist using 2”x4” good lumber
3. Installation of new ¾” thk. marine plywood flooring
4. Replacement of busted neon light signage (back-to-back)
5. Installation of 30cmx30cm vinyl tiles
6. Repair of drawer guide
Materials Breakdown:
2 pcs – ¾” marine plywood @ 1,800 P 3,600.00
10 pcs – 2x4x8 kiln dried lumber @ 659 P 6,590.00
50 pcs – 30cmx30cm vinyl tiles @ 38 P 1,900.00
1 gal – contact cement @ 1,280 P 1,280.00
2 sets – neon strip lights signage with AC driver @ 2,200 P 4,400.00
1 box – 3” black screws @ 300 P 300.00
1 box – 2” black screws @ 200 P 200.00
2 pcs – grinding disk @ 180 P 360.00
5 pcs – cutting disk @ 25 P 125.00
2 kgs – stofa rugs @ 35 P 70.00
8 pcs – sacks @ 6 P 48.00
Materials: P18,873.00
Labor: P 9,436.50
Direct Cost: P28,309.50
OCM & Profit: P 9,908.32
PROJECT COST: P38,217.82
Thank you very much for your trust and confidence in dealing with us and we hope that our quotation
meets your satisfaction and standards.