STANDARD DESIGNS AND GUIDELINES FOR

GREEN INFRASTRUCTURE PRACTICES

UPDATED: MAY 13, 2022


TABLE OF CONTENTS

SHEET TITLE SHEET TITLE


COVER SHEET GI-136 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
TOC-01 TABLE OF CONTENTS GI-137 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
TOC-02 TABLE OF CONTENTS (CONT.) GI-138 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1A - WITH STONE COLUMNS
N-01 GENERAL NOTES GI-139 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1A - WITH STONE COLUMNS
GI-140 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1C - WITH STORMWATER CHAMBER
GI-100 STANDARDS FOR RIGHT-OF-WAY GREEN INFRASTRUCTURE PRACTICES GI-141 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1C - WITH STORMWATER CHAMBER
GI-142 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
GI-101 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1
GI-143 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
GI-102 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1
GI-144 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2A - WITH STONE COLUMNS
GI-103 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1A - WITH STONE COLUMNS
GI-145 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2A - WITH STONE COLUMNS
GI-104 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1A - WITH STONE COLUMNS
GI-146 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2C - WITH STORMWATER CHAMBER
GI-105 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1B - WITH STORMWATER INLET
GI-147 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2C - WITH STORMWATER CHAMBER
GI-106 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1B - WITH STORMWATER INLET
GI-148 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
GI-107 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER
GI-149 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
GI-108 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER
GI-150 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3A - WITH STONE COLUMN
GI-109 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2
GI-151 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3A - WITH STONE COLUMN
GI-110 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2
GI-152 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
GI-111 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2A - WITH STONE COLUMNS
GI-153 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
GI-112 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2A - WITH STONE COLUMNS
GI-154 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1A - WITH STONE COLUMNS
GI-113 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2B - WITH STORMWATER INLET
GI-155 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1A - WITH STONE COLUMNS
GI-114 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2B - WITH STORMWATER INLET
GI-156 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1C - WITH STORMWATER CHAMBER
GI-115 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
GI-157 STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1C - WITH STORMWATER CHAMBER
GI-116 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
GI-158 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2
GI-117 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3
GI-159 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2
GI-118 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3
GI-160 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2A - WITH STONE COLUMNS
GI-119 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMN
GI-161 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2A - WITH STONE COLUMNS
GI-120 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMN
GI-162 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2C - WITH STORMWATER CHAMBER
GI-121 STANDARD FOR R.O.W. RAIN GARDEN TYPE 1, TYPE 2, AND TYPE 3
GI-163 STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2C - WITH STORMWATER CHAMBER
GI-122 DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
GI-164 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
GI-123 STONE COLUMN SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALE
GI-165 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
GI-124 SURFACE GRADING PLANS FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
GI-166 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3A - WITH STONE COLUMN
GI-125 STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. BIOSWALE
GI-167 STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3A - WITH STONE COLUMN
GI-125A STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. BIOSWALE
GI-168 STANDARD FOR R.O.W. INFILTRATION BASIN WITH COMBINATION OF CONCRETE & GRASS TOP
GI-126 STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
GI-169 STANDARD FOR R.O.W. INFILTRATION BASIN WITH COMBINATION OF CONCRETE & GRASS TOP
GI-127 STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
GI-170 R.O.W. INFILTRATION BASINS STEEL FACE CURB OPENING DETAILS
GI-128 STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
GI-171 R.O.W. INFILTRATION BASINS STEEL FACE CURB OPENING DETAILS
GI-129 STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
GI-172 DIMENSIONS SCHEDULE FOR VARIABLE SIZE R.O.W. INFILTRATION BASINS
GI-130 STANDARD FOR 11'x3'-6" R.O.W. GREENSTRIP TYPE 3
GI-173 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D
GI-131 STANDARD FOR 11'x3'-6" R.O.W. GREENSTRIP TYPE 3
GI-174 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D
GI-132 SURFACE GRADING & DIMENSION SCHEDULE PLANS FOR R.O.W. GREENSTRIPS
GI-175 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS
GI-133 STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. GREENSTRIPS
GI-176 STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS
GI-134 INTENTIONALLY LEFT BLANK
GI-135 STANDARD FOR R.O.W. STORMWATER SEEPAGE BASIN WITH TYPE 2 CATCH BASIN
TABLE OF CONTENTS
SHEET TITLE SHEET TITLE
CONT.
GI-307 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS LAYOUT
GI-177 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D GI-308 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS LAYOUT
GI-178 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D GI-309 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 3 LAYOUT
GI-179 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS GI-310 R.O.W. STORMWATER GREENSTREET (ROWSGS) BIOFILTER INLET LAYOUT
GI-180 STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS GI-311 R.O.W. STORMWATER GREENSTREET (ROWSGS) MEDIAN BIOFILTER INLET LAYOUT
GI-181 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D GI-312 R.O.W. STORMWATER GREENSTREET (ROWSGS) CONCRETE AND GRATE PEDESTRIAN PATHWAYS
GI-182 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D
GI-183 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN GI-400 RIGHT-OF-WAY POROUS PAVEMENT GREEN INFRASTRUCTURE GUIDELINES
GI-184 STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN
GI-401 STANDARD FOR 4' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS WITH DRAINAGE CELLS
GI-185 R.O.W. BIOSWALE TYPE D STORMWATER INLET SECTIONS & DETAILS
GI-402 STANDARD FOR 4' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS WITH DRAINAGE CELLS AND
GI-186 DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALE TYPE D
STONE COLUMNS
GI-403 STANDARD FOR 2' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS WITH DRAINAGE CELLS
GI-200 MISCELLANEOUS DETAILS FOR RIGHT-OF-WAY GREEN INFRASTRUCTURE PRACTICES
GI-404 STANDARD FOR 2' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS WITH DRAINAGE CELLS AND
GI-201 STANDARD FOR ROWB/ROWGS/ROWRG INLET & OUTLET STONE COLUMNS
GI-202 STANDARD FOR STORMWATER INLET GI-405 R.O.W. PRECAST POROUS CONCRETE PANELS - CASTING DETAILS
GI-203 STANDARD FOR PRECAST STORMWATER INLET GI-406 R.O.W. PRECAST POROUS CONCRETE PANELS - OBSERVATION WELL
GI-204 STANDARD R.O.W. SECTIONS AND DETAILS GI-407 R.O.W. PRECAST POROUS CONCRETE PANELS - UTILITY CROSSING DETAILS
GI-205 STANDARD R.O.W. SECTIONS AND DETAILS GI-408 R.O.W. PRECAST POROUS CONCRETE PANELS - SECTIONS AND DETAILS
GI-206 STANDARD DETAILS FOR R.O.W. STORMWATER SEEPAGE BASIN GI-409 R.O.W. PRECAST POROUS CONCRETE PANELS - SECTIONS AND DETAILS
GI-207 STANDARD R.O.W. SECTIONS AND DETAILS - GABION LAYOUT
GI-208 STANDARD FOR R.O.W INFILTRATION BASIN INLET WITH PRECAST CONCRETE CHAMBER
GI-500 PLANTING PLANS FOR RIGHT-OF-WAY GREEN INFRASTRUCTURE PRACTICES
GI-209 R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS - CONCRETE TOP
GI-209A R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS - GRASS TOP GI-501A STANDARD PLANTING LAYOUT FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
GI-209B R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS GI-501B STANDARD PLANTING SCHEDULE FOR WET AND DRY R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
GI-209C STANDARD FOR R.O.W INFILTRATION BASIN INLET WITH PRECAST CONCRETE CHAMBER & GI-501C STANDARD PLANTING SCHEDULE FOR R.O.W. COMBINATION WET/DRY BIOSWALES AND R.O.W.
CAST IRON GRATE RAIN GARDENS
GI-209D STANDARD FOR R.O.W INFILTRATION BASIN INLET WITH PRECAST CONCRETE CHAMBER & GI-501D STANDARD PLANTING LAYOUT FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
CAST IRON GRATE GI-502 STANDARD PLANTING SCHEDULE AND LAYOUT FOR R.O.W. GREENSTRIPS
GI-210 STANDARD R.O.W. INFILTRATION BASIN OBSERVATION WELL GI-503A STANDARD PLANTING SCHEDULE & LAYOUT FOR TYPE D R.O.W. INDUSTRIAL SUN BIOSWALES
GI-211 STANDARD R.O.W. INFILTRATION BASIN DEBRIS SCREEN GI-503B STANDARD PLANTING SCHEDULE & LAYOUT FOR TYPE D R.O.W. INDUSTRIAL SHADE BIOSWALES
GI-212 STANDARD R.O.W. INFILTRATION BASIN INLET SCREEN BOX GI-503C STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. INDUSTRIAL MIXED BIOSWALES
GI-213 STANDARD FOR R.O.W. BIOSWALE TYPE D OBSERVATION WELL GI-503D STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. RESIDENTIAL SUN BIOSWALES
GI-503E STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. RESIDENTIAL SHADE BIOSWALES
GI-503F STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. RESIDENTIAL MIXED BIOSWALES
GI-300 GUIDELINES FOR RIGHT-OF-WAY GREEN INFRASTRUCTURE
GI-503G STANDARD PLANTING LAYOUT FOR TYPE D R.O.W. BIOSWALES
STORMWATER GREENSTREET PRACTICES
GI-301 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1 LAYOUT GI-600 STEEL GUARDS STANDARDS FOR RIGHT-OF-WAY GREEN INFRASTRUCTURE PRACTICES
GI-302 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1 LAYOUT
GI-601 STANDARD FOR R.O.W. GI - TYPE 'B' WELDED STEEL GUARD
GI-303 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1A-WITH STONE COLUMNS LAYOUT
GI-602 STANDARD FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
GI-304 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1A-WITH STONE COLUMNS LAYOUT
GI-603 STANDARD DETAILS FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
GI-305 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2 LAYOUT
GI-604 DIMENSION SCHEDULE FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
GI-306 R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2 LAYOUT
GI-605 STEEL TREE GUARD MOUNT & EDUCATIONAL SIGN
GI-606 STEEL TREE GUARD MOUNT & EDUCATIONAL SIGN
GENERAL NOTES
GENERAL GREEN INFRASTRUCTURE NOTES
1. CONTRACTOR TO REFER TO STANDARDS FOR GREEN INFRASTRUCTURE DETAILS FOR THE CONSTRUCTION OF ALL RIGHT-OF-WAY GI PRACTICES.

2. CONTRACTOR SHALL STAKE LOCATION OF RIGHT-OF-WAY GI PRACTICES FOR APPROVAL BY ENGINEER PRIOR TO EXCAVATION WORK.

3. NO CHANGES SHALL BE MADE TO THE DESIGN OR LAYOUT WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER. LAYOUT THE WORK AS PER NORTHING AND EASTING
COORDINATES AND GI PRACTICE DIMENSIONS SHOWN ON PLANS AND FIELD VERIFY. WRITTEN ASSET DIMENSIONS SHALL GOVERN. DO NOT SCALE DISTANCES OR ASSET
DIMENSIONS FOR LAYOUT PURPOSES.

4. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE. WHENEVER AN ADJACENT FLAG HAS A
WIDTH OF LESS THAN OR EQUAL TO 36", THE CONTRACTOR SHALL REPLACE ONE ADDITIONAL FULL FLAG BEYOND. ALL REPLACEMENTS SHALL BE IN FULL COMPLIANCE WITH
THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.

5. CONSTRUCTION JOINTS TO MATCH EXISTING SIDEWALK AS MUCH AS POSSIBLE.

6. DO NOT SCORE WITHIN 18" OF HEADERS OR INLET/OUTLET SURFACE OPENINGS.

7. EXPANSION JOINTS AND FILLER PER NYC DOT HIGHWAY SPECIFICATIONS.

8. THE CONTRACTOR SHALL BE PREPARED TO CUT, CAP AND/OR REROUTE IRRIGATION LINES FOUND IN THE FIELD AS REQUIRED TO SUIT THE INSTALLATION OF GREEN
INFRASTRUCTURE.

9. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COMPLIANCE
WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.

10. AUTHORIZED PARKING - FOR ANY GREEN INFRASTRUCTURE PRACTICE THAT WILL IMPACT AUTHORIZED PARKING SPACES TO THE CONSTRUCTION OF GREEN
INFRASTRUCTURE PRACTICES, THE CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE DEPARTMENT OF TRANSPORTATION (NYCDOT) AUTHORIZED PARKING AND
SPECIAL USE UNIT AT LEAST TWO WEEKS IN ADVANCE OF CONSTRUCTION. CONTACT PERSON: MERISA GILMAN, SENIOR PROGRAM MANAGER, 212-839-3240,
MGILMAN@DOT.NYC.GOV

11. TREES (WHEN APPLICABLE):


a. THE CONTRACTOR SHALL OBTAIN THE NECESSARY TREE PLANTING PERMIT FROM THE NYC DEPARTMENT OF PARKS AND RECREATION (DPR) PRIOR TO THE START OF
WORK. ALL NECESSARY TREE PLANTING SHALL BE SUPERVISED BY CERTIFIED ARBORISTS.
b. NO TREE SHALL BE REMOVED BY THE CONTRACTOR UNTIL SPECIFICALLY ORDERED IN WRITING TO DO SO BY THE ENGINEER AND WITH APPROVAL FROM DPR
c. TREES SHALL BE STAKED AS PER DPR STANDARD DETAILS OF CONSTRUCTION. TREE STAKES ARE TO BE REMOVED BY THE CONTRACTOR NOT LESS THAN ONE YEAR
AFTER PLANTING.
d. REPLACEMENT TREES SHALL BE PLANTED WITHIN THE PROJECT AS DIRECTED BY THE ENGINEER IN ACCORDANCE WITH STANDARD HIGHWAY SPECIFICATIONS.

12. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
CONSULTATION WITH THE CERTIFIED ARBORIST.

13. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI PRACTICE.
GI-100
STANDARDS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1
- NO CONNECTION TO SEWERS

SEE DRAWING GI-501A, B, C & D FOR


PROPERTY LINE
C B A TYPICAL PLANTING PLANS EXISTING
LOCATION OF BIOSWALE 20'-0" REFER TO DETAILS ON THIS AND NEXT PAGE SIDEWALK
VARIES OR AS PER DESIGN
CURB LINE

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW

BIOSWALE BIOSWALE
OUTLET INLET
C B A PLAN

EQ EQ

12"x5" CONCRETE STRIP 3-SIDED STEEL


1" CONCRETE STRIP TO 12"x5" CONCRETE STRIP EROSION CONTROL
WITH 1% - 2% TREE GUARD, 12"x5" CONCRETE TREE PLANTING -
CONTINUOUS CROSS 1'-6" 1" SEE GI-601, STRIP WHEN DIRECTED FOLLOW CURB TAPER WITH 1% - 2% MATTING (TYP.)
SLOPE TOWARDS TO CURB GI-602, GI-603 & 3"-THICK LEVELING TOP OF CURB CONTINUOUS CROSS EXPANSION JOINT
SIDEWALK SLOPE TOWARDS
PLANTED AREA GI-604 COURSE (TYP.) DROP CURB [INLET] AND FILLER (TYP.)
PLANTED AREA
DROP CURB 6" SIDEWALK TOP OF GUTTER SIDEWALK
[OUTLET] ROADWAY LOW (BEYOND)
PLANTED POINT ROADWAY
ROADWAY PITCH PLANTED
AREA
AREA
1'-3"

+
ENGINEERED
9"

B
SOIL ENGINEERED
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE SOIL CONCRETE HEADER
REINFORCED REINFORCED (3) SIDES (TYP.)
8" THICK CAST-IN-PLACE
CONCRETE APRON CONCRETE APRON
REINFORCED UNDISTURBED
12" WIDE GABION FILLED CONCRETE GUTTER 12" WIDE GABION SOIL
WITH CLEAN CLEAN
CLEAN FILLED WITH CLEAN CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE OPEN-GRADED

A
OPEN-GRADED OPEN-GRADED STONE OPEN-GRADED CONCRETE
STONE BASE
WRAP GABION IN STONE BASE (TYP.) STONE BASE ENCASEMENT PLACED
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5'-0" OR AS PER DESIGN GEOTEXTILE
5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
(TOP AND SIDES ONLY)

SECTION C-C SECTION B-B SECTION A-A


AT BIOSWALE OUTLET AT MIDSECTION [LOWEST POINT] AT BIOSWALE INLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER DEPTH SCHEDULE
UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE ROWB A B
CAST-IN-PLACE. WITH TREE 2'-6" 2'-0"
NO TREE 3'-0" 1'-6"
P.E. 05-13-2022
DEPTH SCHEDULE MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-122 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE JOINT AT MID-SPAN
L-SHAPED EDGING
SEE GI-501A, B, C & D FOR WITH MINIMUM 9" STAKES
TYPICAL PLANTING PLANS SEE DRAWING GI-204
SURFACE GRADING AS
PER DRAWING GI-124

5'-0" OR AS PER DESIGN


SIDEWALK CONCRETE HEADER
LOW POINT STEEL TREE GUARD
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 +
SET 3" BELOW
(3-SIDES TYP.) SEE DRAWING
GI-601, GI-602, GI-603 & GI-604
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT CONTROL
FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO DEVICE AT INLET, REFER TO
OUTLET INVERT MATCH CONTRACT PLANS GI-501D
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-0"

TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT


1'-6"

2'-0" 10" 18" 2'-2"

FLOW
+
[OUTLET] [INLET]

15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"

EXISTING EXISTING CURB

PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT D ROADWAY D LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE
APRON APRON

PLAN

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1A - WITH STONE COLUMNS
PROPERTY LINE
- NO CONNECTION TO SEWERS
5'-0"
OR AS PER DESIGN
SEE DRAWING GI-501A, B, C & D FOR TYPICAL CONCRETE STRIP TAPER 1% - 2% CONTINUOUS EROSION CONTROL
. BIOSWALE 20'-0"
A PLANTING PLANS
EXISTING
SIDEWALK
TO FOLLOW CURB TAPER CROSS SLOPE TOWARDS MATTING
LOCATION OF
REFER TO DETAILS ON THIS AND NEXT PAGE TOP OF CURB PLANTED AREA EXPANSION JOINT AND
VARIES OR AS PER DESIGN
4'-6" EQ EQ 4'-6" DROP CURB [INLET] L-SHAPED EDGING WITH FILLER (TYP.)
MIN. 9" STAKES, SEE 1" SIDEWALK
EXISTING TOP OF GUTTER
CATCH BASIN (BEYOND) GI-204 6"
DESIGN
5'-0" OR

B B
AS PER

CURB LINE
ROADWAY PLANTED
PITCH
AREA

1'-3"
FLOW

BIOSWALE BIOSWALE
OUTLET INLET 9"
A PLAN ENGINEERED CONCRETE
WWM 6x6 - W8xW8 SOIL HEADER (3) SIDES

STONE COLUMN CAP 8" THICK CAST-IN-PLACE


REINFORCED

SHALL BE PERFORATED
3-SIDED STEEL TREE GUARD, SEE GI-601, EROSION CONTROL MATTING 1" CONCRETE APRON
AND PLACED UNDER
GI-602, GI-203 & GI-604 GRADE TO ALLOW FOR 3" DEEP UNDISTURBED SOIL STEEL SPIKE IN 4" DIA.
THE GEOTEXTILE 6"
DEPRESSION, SEE DRAWING FABRIC (TYP). CONCRETE
12" WIDE GABION FILLED
GI-124 ENCASEMENT PLACED
WITH CLEAN OPEN-GRADED
STONE WRAPPED IN IN ENGINEERED SOIL

1'-3"
+ 3" GEOTEXTILE (TOP AND
SIDES ONLY)
12"
TOP OF STONE
(TYP.)

9" COLUMN CAP BELOW


B

INTERFACE OF
ENGINEERED SOIL
EQ EQ

DEPTH OF PVC PIPE PER DESIGN PLANS


AND STONE BASE.
CLEAN OPEN-GRADED
CAP TO BE
STONE BASE WRAPPED IN
PERFORATED
GEOTEXTILE, TOP AND
STONE FILLED PERFORATED
A

SIDES ONLY
12" DIAMETER PVC PIPE
WRAPPED ALL AROUND
PERMEABLE SOIL WITH GEOTEXTILE FABRIC.

CLEAN OPEN-GRADED TEMPORARY, 18" MAXIMUM


STONE BASE UNDISTURBED SOIL DIAMETER CASING
WRAPPED WITH GEOTEXTILE AUGERED INTO PERMEABLE

PERMEABLE SOIL LAYER


(TOP AND SIDES ONLY) LAYER

PENETRATION INTO
PERMEABLE SOIL LAYER
GRANULAR FILL TO FILL THE

PENETRATION INTO
ANNULAR SPACE BETWEEN THE
GRANULAR FILL TO FILL THE STONE COLUMN AND THE HOLE
ANNULAR SPACE BETWEEN TEMPORARY, 18"
THE STONE COLUMN PIPE MAXIMUM DIAMETER CLEAN OPEN-GRADED
AND THE HOLE PERMEABLE SOIL STONE
CASING AUGERED INTO
LAYER
PERMEABLE LAYER BOTTOM OF COLUMN TO BE
STONE FILLED PERFORATED 12"
DIAMETER PVC PIPE WRAPPED OPEN
OPEN BOTTOM
ALL AROUND WITH GEOTEXTILE (TYP.)
FABRIC (TYP.)

SECTION B-B ℄
NOTES: SECTION A-A
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES AT BIOSWALE STONE COLUMN
IMPERMEABLE LINER UNDERNEATH. DEPTH SCHEDULE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING
ROWB A B
TAPERS TO BE CAST-IN-PLACE.
WITH TREE 2'-6" 2'-0" P.E. 05-13-2022
NO TREE 3'-0" 1'-6" MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION

DEPTH SCHEDULE
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS

20'-0" OR AS PER DESIGN


SEE GI-122 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE JOINT AT MID-SPAN
L-SHAPED EDGING
SEE GI-501A, B, C & D FOR WITH MINIMUM 9" STAKES
TYPICAL PLANTING PLANS SEE DRAWING GI-204
4'-6" EQ EQ 4'-6" SURFACE GRADING AS
PER DRAWING GI-124

EQ
SIDEWALK 5'-0" OR AS PER DESIGN CONCRETE HEADER
STONE LOW POINT SET 3" MIDDLE STONE COLUMN STONE
COLUMN BELOW OUTLET ONLY IN ROW BIOSWALE COLUMN STEEL TREE GUARD
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207
INVERT
+ WITHOUT TREE (3-SIDES TYP.) SEE DRAWING
GI-601, GI-602, GI-603 & GI-604
CONCRETE TAPER TO FOR SEDIMENT CONTROL

EQ
FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO DEVICE AT INLET, REFER TO
OUTLET INVERT MATCH CONTRACT PLANS GI-501D
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-0"

TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT


1'-6"

2'-0" 10" 18" 2'-2"

FLOW
+
[OUTLET] [INLET]

15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"

EXISTING EXISTING CURB

PITCH
CONCRETE GUTTER
TO MATCH EXISTING TO REMAIN
ASPHALT
PAVEMENT
D ROADWAY
D
LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY

REINFORCED CONCRETE
PLAN REINFORCED CONCRETE
FIELD CONDITIONS AND SITE ENGINEER

APRON APRON

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
PROPERTY
LINE

LOCATION OF BIOSWALE 20'-0"


VARIES, SEE PLAN OR AS PER DESIGN SEE DRAWING GI-501A, B, C & D FOR TYPICAL
EXISTING
PLANTING PLANS
SIDEWALK
REFER TO DETAILS ON THIS AND NEXT PAGE
C B

DESIGN
5'-0" OR
AS PER
CURB LINE

EXISTING FLOW
CATCH BASIN
BIOSWALE BIOSWALE
OUTLET INLET
STORM WATER INLET
C B SEE DRAWINGS GI-202 OR
PLAN GI-203

5'-0" 5'-0"
CONCRETE STRIP TO OR AS PER DESIGN PLANTED AREA, SEE PLANTING OR AS PER DESIGN
FOLLOW CURB TAPER PLANS (NO TREE PERMITTED) 1% - 2% CONTINUOUS
1% - 2% CONTINUOUS
TOP OF CURB CROSS SLOPE 3-SIDED STEEL TREE CURB TO MATCH CROSS SLOPE TOWARDS PLANTED AREA, SEE
TOWARDS PLANTED GUARD, SEE GI-601, GI-602, CONTRACT PLANS PLANTED AREA PLANTING PLANS (NO
DROP CURB [INLET]
TOP OF GUTTER AREA GI-603 & GI-604 DROP CURB TREE PERMITTED)
(BEYOND) EROSION CONTROL [OUTLET] EROSION CONTROL
CLEANOUT, 6" MATTING WWM 6x6-W8xW8 MATTING
SEE ROADWAY CLEANOUT,
ROADWAY GI-204
PITCH SEE GI-204

1'-3"

HT. VARIES
WWM 6x6-W8xW8
9"
CONCRETE HEADER 8" THICK CAST-IN-PLACE
CONCRETE HEADER
(3 SIDES) REINFORCED
(3) SIDES
CONCRETE APRON
ENGINEERED SOIL 12"x5" CONCRETE STRIP
WRAP STONE IN L-SHAPED EDGING WITH
8" THICK CAST-IN-PLACE CLEAN UNDISTURBED SOIL
GEOTEXTILE (TOP MIN. 9" STAKES (TYP.)
2'-6"
REINFORCED CONCRETE CLEAN OPEN-GRADED
AND SIDES ONLY) ENGINEERED SOIL
APRON OPEN-GRADED 12" WIDE GABION FILLED
1
STONE BASE 8" SOLID HDPE PIPE
12" WIDE GABION FILLED STONE BASE 22 2 ° INJECTION WITH CLEAN
MOLDED ELBOW OPEN-GRADED STONE 8" PERFORATED HDPE
WITH CLEAN PIPE RISER WRAPED
OPEN-GRADED STONE WRAP GABION IN WRAP GABION IN WITH GEOTEXTILE
8" SOLID DUAL WALL HDPE GEOTEXTILE (TOP AND GEOTEXTILE (TOP AND
PIPE SEE DETAIL ON SIDES ONLY) SIDES ONLY)
DRAWING GI-204
SECTION B-B SECTION C-C
AT BIOSWALE INLET AT BIOSWALE OUTLET

NOTES:
1. NO STAKE SHALL BE DRIVEN INTO HDPE DUAL WALL PIPE.
2. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
3. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-122 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE JOINT AT MID-SPAN
L-SHAPED EDGING
SEE GI-501A, B, C & D FOR WITH MINIMUM 9" STAKES
TYPICAL PLANTING PLANS SEE DRAWING GI-204
CLEANOUT; CLEANOUT;
SURFACE GRADING AS
REFER TO DETAILS 8" DIA. PERFORATED REFER TO
22 12° BEND PER DRAWING GI-124

EQ
GI-204 HDPE PIPE WRAPPED DETAILS GI-204

5'-0" OR AS PER DESIGN


SIDEWALK CONCRETE HEADER
WITH GEOTEXTILE
LOW POINT STEEL TREE GUARD
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 + (3-SIDES TYP.) SEE DRAWING
GI-601, GI-602, GI-603 & GI-604
SET 3" BELOW
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT CONTROL

EQ
FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO DEVICE AT INLET, REFER TO
OUTLET INVERT MATCH CONTRACT PLANS GI-501D SOLID PIPE TO
NEW CURB TYPE TO MATCH
CONTRACT PLANS STORMWATER INLET,
SEE PLANS AND DETAILS
EXISTING CURB
1'-0"

TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT


1'-6"

2'-0" 10" 18" 2'-2"

FLOW
+
[OUTLET] [INLET]

15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"

EXISTING EXISTING CURB

PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT D ROADWAY D LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE
APRON PLAN APRON

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER CHAMBER - NO CONNECTION TO SEWERS

SEE DRAWING GI-501A, B, C & D FOR TYPICAL


PROPERTY LINE
C B A PLANTING PLANS EXISTING
REFER TO DETAILS ON THIS AND NEXT PAGE SIDEWALK
LOCATION OF BIOSWALE 20'-0"
CURB LINE VARIES OR AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW

BIOSWALE BIOSWALE
OUTLET INLET
C B A

PLAN
3-SIDED STEEL TREE
GUARD, SEE GI-601, PLANTED AREA, SEE 1"
12"x5" CONCRETE STRIP PLANTING PLANS (NO CONCRETE STRIP TO 12"x5" CONCRETE EROSION CONTROL
GI-602, GI-603 & GI-604 12"x5" CONCRETE
WITH 1% - 2% TREE PERMITTED) FOLLOW CURB TAPER STRIP WITH 1% - 2% MATTING (TYP.)
STRIP
CONTINUOUS CROSS 1'-6" CONTINUOUS CROSS
TOP OF CURB EXPANSION JOINT
SLOPE TOWARDS TO CURB 3"-THICK LEVELING SLOPE TOWARDS
DROP CURB [INLET] AND FILLER (TYP.)
PLANTED AREA SIDEWALK COURSE (TYP.) SIDEWALK PLANTED AREA
TOP OF GUTTER 6" SIDEWALK
DROP CURB
[OUTLET] ROADWAY (BEYOND)
ROADWAY PLANTED LOW ROADWAY PLANTED
PITCH
AREA POINT AREA

1'-3"
+

1'-6"
ENGINEERED ENGINEERED ENGINEERED
SOIL SOIL SOIL 9"

6"
6"

6"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE CONCRETE
REINFORCED 8" THICK CAST-IN-PLACE REINFORCED HEADER (3) SIDES (TYP.)
CONCRETE APRON REINFORCED CONCRETE APRON UNDISTURBED
12" WIDE GABION FILLED 4" MINIMUM CONCRETE GUTTER

3'-0"
12" WIDE GABION SOIL
WITH CLEAN STONE FILLED WITH CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE COVER OPEN-GRADED STONE CONCRETE
HDPE STORMWATER
WRAP GABION IN CHAMBER CAPPED AT (TYP.) ENCASEMENT PLACED
GEOTEXTILE (TOP AND BOTH ENDS, SEE L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) GI-204 WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5" MINIMUM

GEOTEXTILE
BEDDING

5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN


(TOP AND SIDES ONLY)

SECTION C-C SECTION B-B SECTION A-A


AT BIOSWALE OUTLET AT MIDSECTION [LOWEST POINT] AT BIOSWALE INLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE. P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-122 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE JOINT AT MID-SPAN
L-SHAPED EDGING
SEE GI-501A, B, C & D FOR WITH MINIMUM 9" STAKES
TYPICAL PLANTING PLANS SEE DRAWING GI-204
1'-0" 1'-0" SURFACE GRADING AS
PER DRAWING GI-124

5'-0" OR AS PER DESIGN


SIDEWALK CONCRETE HEADER
LOW POINT STEEL TREE GUARD
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 +
SET 3" BELOW
(3-SIDES TYP.) SEE DRAWING
GI-601, GI-602, GI-603 & GI-604
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT CONTROL
FOLLOW CURB LINE (TYP.) OUTLET NEW CURB TYPE TO DEVICE AT INLET, REFER TO
INVERT MATCH CONTRACT PLANS GI-501D
NEW CURB TYPE TO MATCH
STORMWATER CHAMBER CAPPED AT
CONTRACT PLANS
BOTH ENDS; SEE SCHEDULE ON
EXISTING CURB GI-204
1'-0"

TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT


1'-6"

2'-0" 10" 18" 2'-2"

FLOW
+
[OUTLET] [INLET]

15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"

EXISTING EXISTING CURB

PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT D ROADWAY D LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY
PLAN FIELD CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE
APRON APRON

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2
- NO CONNECTION TO SEWERS

SEE DRAWING GI-501A, B, C & D FOR


PROPERTY LINE
C B A TYPICAL PLANTING PLANS EXISTING
REFER TO DETAILS ON THIS AND NEXT PAGE SIDEWALK
LOCATION OF BIOSWALE 15'-0"
CURB LINE VARIES OR AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET

C B A PLAN

EQ EQ

12"x5" CONCRETE STRIP 3-SIDED STEEL


1" CONCRETE STRIP TO 12"x5" CONCRETE STRIP EROSION CONTROL
WITH 1% - 2% TREE GUARD, 12"x5" CONCRETE TREE PLANTING -
CONTINUOUS CROSS 1'-6" 1" SEE GI-601, STRIP WHEN DIRECTED FOLLOW CURB TAPER WITH 1% - 2% MATTING (TYP.)
SLOPE TOWARDS TO CURB GI-602, GI-603 & 3"-THICK LEVELING TOP OF CURB CONTINUOUS CROSS EXPANSION JOINT
SIDEWALK SLOPE TOWARDS
PLANTED AREA GI-604 COURSE (TYP.) DROP CURB [INLET] AND FILLER (TYP.)
PLANTED AREA
DROP CURB 6" SIDEWALK TOP OF GUTTER SIDEWALK
[OUTLET] ROADWAY LOW (BEYOND)
PLANTED POINT ROADWAY
ROADWAY PITCH PLANTED
AREA
AREA
1'-3"

+
ENGINEERED
9"

B
SOIL ENGINEERED
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE SOIL CONCRETE HEADER
REINFORCED REINFORCED (3) SIDES (TYP.)
8" THICK CAST-IN-PLACE
CONCRETE APRON CONCRETE APRON
REINFORCED UNDISTURBED
12" WIDE GABION FILLED CONCRETE GUTTER 12" WIDE GABION SOIL
WITH CLEAN CLEAN
CLEAN FILLED WITH CLEAN CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE OPEN-GRADED

A
OPEN-GRADED OPEN-GRADED STONE OPEN-GRADED CONCRETE
STONE BASE
WRAP GABION IN STONE BASE (TYP.) STONE BASE ENCASEMENT PLACED
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5'-0" OR AS PER DESIGN GEOTEXTILE
5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
(TOP AND SIDES ONLY)

SECTION C-C SECTION B-B SECTION A-A


AT BIOSWALE OUTLET AT MIDSECTION [LOWEST POINT] AT BIOSWALE INLET

NOTES: DEPTH SCHEDULE


1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER ROWB A B
UNDERNEATH. WITH TREE 2'-6" 2'-0"
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE P.E. 05-13-2022
CAST-IN-PLACE. NO TREE 3'-0" 1'-6"
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
PLACE EXPANSION
SEE GI-122 FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DIMENSIONS SCHEDULE

SEE GI-501A, B, C & D FOR


TYPICAL PLANTING PLANS
SURFACE GRADING AS
PER DRAWING GI-124

5'-0" OR AS PER DESIGN


SIDEWALK CONCRETE HEADER
LOW POINT STEEL TREE GUARDS
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 +
SET 3" BELOW
(3-SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT L-SHAPED EDGING
FOLLOW CURB LINE (TYP.) WITH MINIMUM 9" STAKES
CONTROL DEVICE AT
OUTLET INVERT SEE DRAWING GI-204
NEW CURB TYPE TO MATCH INLET, REFER TO GI-501D
CONTRACT PLANS
EXISTING CURB
1'-0"
1'-6"

TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT

2'-0" 10" 18" 2'-2"

FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]

15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"

EXISTING TO REMAIN

PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT CONCRETE GUTTER LIMIT OF NEW CURB TO EXTEND
PAVEMENT D ROADWAY D BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
PROPERTY LINE 5'-0"
OR AS PER DESIGN
CONCRETE STRIP TAPER 1% - 2% CONTINUOUS EROSION CONTROL
A TO FOLLOW CURB TAPER CROSS SLOPE TOWARDS MATTING
LOCATION OF BIOSWALE 15'-0" SEE DRAWING GI-501A, B, C & D FOR TYPICAL TOP OF CURB PLANTED AREA EXPANSION JOINT AND
EXISTING
VARIES OR AS PER DESIGN PLANTING PLANS L-SHAPED EDGING WITH FILLER (TYP.)
3'-6" 3'-6" SIDEWALK DROP CURB [INLET]
REFER TO DETAILS ON THIS AND NEXT MIN. 9" STAKES, SEE 1" SIDEWALK
PAGE TOP OF GUTTER
(BEYOND) GI-204 6"
CURB LINE
B DESIGN B ROADWAY
5'-0" OR
AS PER
PITCH PLANTED
EXISTING
AREA
CATCH BASIN

1'-3"
BIOSWALE BIOSWALE FLOW
OUTLET INLET 9"
ENGINEERED CONCRETE
A PLAN WWM 6x6 - W8xW8 SOIL HEADER (3) SIDES
8" THICK CAST-IN-PLACE
REINFORCED

3-SIDED STEEL TREE GUARD, SEE GI-601, EROSION CONTROL MATTING
CONCRETE APRON
GI-602, GI-603 & GI-604 GRADE TO ALLOW FOR 3" DEEP
1" UNDISTURBED SOIL STEEL SPIKE IN 4" DIA.
CLEAN OPEN-GRADED STONE DEPRESSION, SEE DRAWING GI-124
12" WIDE GABION FILLED CONCRETE
BASE WRAPPED WITH GEOTEXTILE 6"
WITH CLEAN OPEN-GRADED ENCASEMENT PLACED
(TOP AND SIDES ONLY)
STONE WRAPPED IN IN ENGINEERED SOIL
12"
+ 3" (TYP.)

1'-3"
GEOTEXTILE (TOP AND
SIDES ONLY) TOP OF STONE
COLUMN CAP BELOW
9"
B

INTERFACE OF
ENGINEERED SOIL
EQ EQ

DEPTH OF PVC PIPE PER DESIGN PLANS


AND STONE BASE.
CLEAN OPEN-GRADED
CAP TO BE
STONE BASE WRAPPED IN
UNDISTURBED SOIL PERFORATED
GEOTEXTILE, TOP AND
SIDES ONLY STONE FILLED PERFORATED
A

12" DIAMETER PVC PIPE


WRAPPED ALL AROUND
PERMEABLE SOIL WITH GEOTEXTILE FABRIC.
TEMPORARY, 18" MAXIMUM
STONE COLUMN CAP SHALL BE DIAMETER CASING
PERFORATED AND PLACED AUGERED INTO PERMEABLE

PERMEABLE SOIL LAYER


UNDER THE GEOTEXTILE LAYER

PENETRATION INTO
FABRIC (TYP). GRANULAR FILL TO FILL THE
PERMEABLE SOIL LAYER ANNULAR SPACE BETWEEN THE
PENETRATION INTO

GRANULAR FILL TO FILL THE PERMEABLE SOIL STONE COLUMN AND THE HOLE
ANNULAR SPACE BETWEEN LAYER
CLEAN OPEN-GRADED
THE STONE COLUMN PIPE
TEMPORARY, 18" MAXIMUM STONE
AND THE HOLE
DIAMETER CASING AUGERED
BOTTOM OF COLUMN TO BE
STONE FILLED PERFORATED 12" INTO PERMEABLE LAYER OPEN
DIAMETER PVC PIPE WRAPPED OPEN BOTTOM
ALL AROUND WITH GEOTEXTILE (TYP.)
FABRIC (TYP.)

SECTION B-B

SECTION A-A
NOTES: AT BIOSWALE STONE COLUMN
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES
IMPERMEABLE LINER UNDERNEATH. DEPTH SCHEDULE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING ROWB A B
TAPERS TO BE CAST-IN-PLACE. WITH TREE 2'-6" 2'-0" P.E. 05-13-2022
NO TREE 3'-0" 1'-6" MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION

DEPTH SCHEDULE
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
PLACE EXPANSION
SEE GI-122 FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DIMENSIONS SCHEDULE

SEE GI-501A, B, C & D FOR


TYPICAL PLANTING PLANS
SURFACE GRADING AS
3'-6" 3'-6" PER DRAWING GI-124
STONE COLUMNS

5'-0" OR AS PER DESIGN

EQ
SIDEWALK CONCRETE HEADER
LOW POINT STEEL TREE GUARDS
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 +
SET 3" BELOW
(3-SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT L-SHAPED EDGING

EQ
FOLLOW CURB LINE (TYP.) WITH MINIMUM 9" STAKES
CONTROL DEVICE AT
OUTLET SEE DRAWING GI-204
NEW CURB TYPE TO MATCH INLET, REFER TO GI-501D
CONTRACT PLANS INVERT

EXISTING CURB

1'-0"
1'-6"
TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT

2'-0" 10" 18" 2'-2"

FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]

15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"

EXISTING TO REMAIN

PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT
PAVEMENT
D ROADWAY CONCRETE GUTTER D LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
PROPERTY
LINE

LOCATION OF BIOSWALE 15'-0" SEE DRAWING GI-501A, B, C & D FOR TYPICAL EXISTING
VARIES, SEE PLAN OR AS PER DESIGN PLANTING PLANS SIDEWALK
C B REFER TO DETAILS ON THIS AND NEXT PAGE

DESIGN
5'-0" OR
AS PER
FLOW

EXISTING STORM WATER INLET


CATCH BASIN BIOSWALE BIOSWALE SEE DRAWINGS GI-202 OR
OUTLET INLET GI-203

C B
PLAN
5'-0" 5'-0"
CONCRETE STRIP TO OR AS PER DESIGN PLANTED AREA, SEE PLANTING OR AS PER DESIGN
FOLLOW CURB TAPER PLANS (NO TREE PERMITTED) 1% - 2% CONTINUOUS
1% - 2% CONTINUOUS
TOP OF CURB CROSS SLOPE 3-SIDED STEEL TREE CURB TO MATCH CROSS SLOPE TOWARDS PLANTED AREA, SEE
TOWARDS PLANTED GUARD, SEE GI-601, GI-602, CONTRACT PLANS PLANTED AREA PLANTING PLANS (NO
DROP CURB [INLET]
TOP OF GUTTER AREA GI-603 & GI-604 DROP CURB TREE PERMITTED)
(BEYOND) EROSION CONTROL [OUTLET] EROSION CONTROL
CLEANOUT, 6" MATTING WWM 6x6-W8xW8 MATTING
SEE ROADWAY CLEANOUT,
ROADWAY GI-204
PITCH SEE GI-204

1'-3"

HT. VARIES
WWM 6x6-W8xW8
9"
CONCRETE HEADER 8" THICK CAST-IN-PLACE
CONCRETE HEADER
(3 SIDES) REINFORCED
(3) SIDES
CONCRETE APRON
ENGINEERED SOIL 12"x5" CONCRETE STRIP
WRAP STONE IN L-SHAPED EDGING WITH
8" THICK CAST-IN-PLACE CLEAN UNDISTURBED SOIL
GEOTEXTILE (TOP MIN. 9" STAKES (TYP.)
REINFORCED CONCRETE CLEAN AND SIDES ONLY) 2'-6" OPEN-GRADED ENGINEERED SOIL
APRON OPEN-GRADED 12" WIDE GABION FILLED
STONE BASE 8" SOLID HDPE PIPE
12" WIDE GABION FILLED STONE BASE 22 12 ° INJECTION WITH CLEAN
MOLDED ELBOW OPEN-GRADED STONE 8" PERFORATED HDPE
WITH CLEAN PIPE RISER WRAPED
OPEN-GRADED STONE WRAP GABION IN WRAP GABION IN WITH GEOTEXTILE
8" SOLID DUAL WALL HDPE GEOTEXTILE (TOP AND GEOTEXTILE (TOP AND
PIPE SEE DETAIL ON SIDES ONLY) SIDES ONLY)
DRAWING GI-204
SECTION B-B SECTION C-C
AT BIOSWALE INLET AT BIOSWALE OUTLET

NOTES:
1. NO STAKE SHALL BE DRIVEN INTO HDPE DUAL WALL PIPE.
2. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
3. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
PLACE EXPANSION
SEE GI-122 FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DIMENSIONS SCHEDULE

SEE GI-501A, B, C & D FOR SOLID PIPE TO STORMWATER INLET, SEE


TYPICAL PLANTING PLANS PLANS AND DETAILS
22 12° BEND SURFACE GRADING AS
8" DIA. PERFORATED
REFER TO PER DRAWING GI-124

EQ
HDPE PIPE WRAPPED

5'-0" OR AS PER DESIGN


SIDEWALK WITH GEOTEXTILE DETAIL GI-204 CONCRETE HEADER
LOW POINT STEEL TREE GUARDS
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 + (3-SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
SET 3" BELOW
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT L-SHAPED EDGING

EQ
FOLLOW CURB LINE (TYP.) OUTLET INVERT WITH MINIMUM 9" STAKES
CONTROL DEVICE AT
SEE DRAWING GI-204
NEW CURB TYPE TO MATCH INLET, REFER TO GI-501D
CONTRACT PLANS
EXISTING CURB

1'-0"
1'-6"
TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT

2'-0" 10" 18" 2'-2"

FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]

15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"

EXISTING TO REMAIN

PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT CONCRETE GUTTER LIMIT OF NEW CURB TO EXTEND
PAVEMENT D ROADWAY D BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS

SEE DRAWING GI-501A, B, C & D FOR TYPICAL


PROPERTY LINE
C B A PLANTING PLANS EXISTING
REFER TO DETAILS ON THIS AND NEXT PAGE SIDEWALK
LOCATION OF BIOSWALE 15'-0"
CURB LINE VARIES OR AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET

C B A PLAN

3-SIDED STEEL TREE


GUARD, SEE GI-601, PLANTED AREA, SEE 1"
12"x5" CONCRETE STRIP PLANTING PLANS (NO CONCRETE STRIP TO 12"x5" CONCRETE EROSION CONTROL
GI-602, GI-603 & GI-604 12"x5" CONCRETE
WITH 1% - 2% TREE PERMITTED) FOLLOW CURB TAPER STRIP WITH 1% - 2% MATTING (TYP.)
STRIP
CONTINUOUS CROSS 1'-6" CONTINUOUS CROSS
TOP OF CURB EXPANSION JOINT
SLOPE TOWARDS TO CURB 3"-THICK LEVELING SLOPE TOWARDS
DROP CURB [INLET] AND FILLER (TYP.)
PLANTED AREA SIDEWALK COURSE (TYP.) SIDEWALK PLANTED AREA
TOP OF GUTTER 6" SIDEWALK
DROP CURB
[OUTLET] ROADWAY (BEYOND)
ROADWAY PLANTED LOW ROADWAY PLANTED
PITCH
AREA POINT AREA

1'-3"
+

1'-6"
ENGINEERED ENGINEERED ENGINEERED
SOIL SOIL SOIL 9"

6"
6"

6"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE CONCRETE
REINFORCED 8" THICK CAST-IN-PLACE REINFORCED HEADER (3) SIDES (TYP.)
CONCRETE APRON REINFORCED CONCRETE APRON UNDISTURBED
12" WIDE GABION FILLED 4" MINIMUM CONCRETE GUTTER

3'-0"
12" WIDE GABION SOIL
WITH CLEAN STONE FILLED WITH CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE COVER OPEN-GRADED STONE CONCRETE
HDPE STORMWATER
WRAP GABION IN CHAMBER CAPPED AT (TYP.) ENCASEMENT PLACED
GEOTEXTILE (TOP AND BOTH ENDS, SEE L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) GI-204 WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5" MINIMUM

GEOTEXTILE
BEDDING

5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN


(TOP AND SIDES ONLY)

SECTION C-C SECTION B-B SECTION A-A


AT BIOSWALE OUTLET AT MIDSECTION [LOWEST POINT] AT BIOSWALE INLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE. 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
PLACE EXPANSION
SEE GI-122 FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DIMENSIONS SCHEDULE
STORMWATER CHAMBER CAPPED AT
SEE GI-501A, B, C & D FOR BOTH ENDS; SEE SCHEDULE ON GI-204
TYPICAL PLANTING PLANS
SURFACE GRADING AS
PER DRAWING GI-124

5'-0" OR AS PER DESIGN


SIDEWALK CONCRETE HEADER
LOW POINT STEEL TREE GUARDS
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 1'-0" +
SET 3" BELOW
1'-0"
(3-SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT L-SHAPED EDGING
FOLLOW CURB LINE (TYP.) WITH MINIMUM 9" STAKES
CONTROL DEVICE AT
OUTLET INVERT SEE DRAWING GI-204
NEW CURB TYPE TO MATCH INLET, REFER TO GI-501D
CONTRACT PLANS
EXISTING CURB
1'-0"
1'-6"

TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT

2'-0" 10" 18" 2'-2"

FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]

15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"

EXISTING TO REMAIN

PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT
PAVEMENT
D ROADWAY CONCRETE GUTTER D LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3
- NO CONNECTION TO SEWERS

C A SEE DRAWING GI-501A, B, C & D FOR TYPICAL


PLANTING PLANS EXISTING
PROPERTY LINE B REFER TO DETAILS ON THIS AND NEXT PAGE SIDEWALK
LOCATION OF BIOSWALE 10'-0" OR
CURB LINE VARIES AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET B INLET
C A

EQ EQ

12"x5" CONCRETE STRIP 3-SIDED STEEL


1"
WITH 1% - 2% TREE GUARD, 12"x5" CONCRETE TREE PLANTING - CONCRETE STRIP TO 12"x5" CONCRETE STRIP EROSION CONTROL
CONTINUOUS CROSS 1'-6" 1" SEE GI-601, STRIP WHEN DIRECTED FOLLOW CURB TAPER WITH 1% - 2% MATTING (TYP.)
SLOPE TOWARDS TO CURB GI-602, GI-603 & TOP OF CURB CONTINUOUS CROSS EXPANSION JOINT
3"-THICK LEVELING SLOPE TOWARDS
PLANTED AREA GI-604 SIDEWALK DROP CURB [INLET] AND FILLER (TYP.)
COURSE (TYP.) PLANTED AREA
DROP CURB 6" SIDEWALK TOP OF GUTTER SIDEWALK
1"
[OUTLET] ROADWAY LOW (BEYOND)
PLANTED POINT ROADWAY
ROADWAY PITCH PLANTED
AREA
AREA
1'-3"

+
ENGINEERED
9"

B
SOIL ENGINEERED
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 SOIL
8" THICK CAST-IN-PLACE CONCRETE HEADER
REINFORCED 8" THICK CAST-IN-PLACE REINFORCED (3) SIDES (TYP.)
CONCRETE APRON REINFORCED CONCRETE APRON UNDISTURBED
12" WIDE GABION FILLED CONCRETE APRON
12" WIDE GABION SOIL
WITH CLEAN L-SHAPED EDGING WITH
CLEAN FILLED WITH CLEAN CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE MINIMUM 9" STAKES, CLEAN

A
OPEN-GRADED OPEN-GRADED STONE OPEN-GRADED CONCRETE
SEE DRAWING GI-204 OPEN-GRADED
WRAP GABION IN STONE BASE (TYP.) STONE BASE ENCASEMENT PLACED
WRAP GABION IN STONE BASE
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) GEOTEXTILE (TOP AND
WITH MIN. 9" STAKES (TYP.)
SIDES ONLY)
(TYP.), SEE GI-204 WRAP STONE IN
12" WIDE GABION
5'-0" OR AS PER DESIGN GEOTEXTILE
FILLED WITH CLEAN 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
(TOP AND SIDES ONLY)
OPEN-GRADED STONE

SECTION C-C SECTION B-B SECTION A-A


AT BIOSWALE OUTLET AT MIDSECTION [LOWEST POINT] AT BIOSWALE INLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER
UNDERNEATH.
DEPTH SCHEDULE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE ROWB A B
CAST-IN-PLACE. WITH TREE 2'-6" 2'-0"
NO TREE 3'-0" 1'-6" P.E. 05-13-2022
MANAGING DIRECTOR, DATE
DEPTH SCHEDULE GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3
- NO CONNECTION TO SEWERS
10'-0" OR AS PER DESIGN
SEE GI-122 FOR
DIMENSIONS SCHEDULE EXPANSION JOINT
(TYP.)
SEE GI-501A, B, C & D FOR
SURFACE GRADING AS PER
TYPICAL PLANTING PLANS
DRAWING GI-124
CONCRETE HEADER
SIDEWALK STEEL TREE GUARDS
(3-SIDES TYP.) SEE DRAWING

5'-0" OR AS PER DESIGN


GI-601, GI-602, GI-603 & GI-604
GABION WALL BELOW LOW POINT
CONCRETE STRIP, SEE GI-207
+
SET 3" BELOW
FOR SEDIMENT CONTROL DEVICE
AT INLET, REFER TO GI-501D
NEW CURB TYPE TO OUTLET INVERT
CONCRETE TAPER TO MATCH CONTRACT 5"-THICK
FOLLOW CURB LINE (TYP.) CONCRETE STRIP L-SHAPED EDGING
PLANS
WITH MINIMUM 9" STAKES
NEW CURB TYPE TO MATCH OUTLET SEE DRAWING GI-204
CONTRACT PLANS INVERT
REINFORCED CONCRETE
EXISTING CURB INLET APRON

1'-0"
TO REMAIN EXPANSION JOINT

2'-0" 10" 18" 2'-2"

FLOW +
[OUTLET]
[INLET] FLOW
EXISTING CURB

15% - 20%
1'-6"

PITCH
TO REMAIN
EXISTING

PITCH
TO MATCH EXISTING
ASPHALT
PAVEMENT
D ROADWAY D LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED
8"-THICK CONCRETE BY FIELD CONDITIONS AND SITE
5'-4" ENGINEER
APRON

PLAN

EXTENT OF NEW EXTENT OF NEW CURB


CURB VARIES PER TOP OF CURB, BEYOND VARIES PER FIELD
FIELD CONDITIONS JOINT (TYP.) CONDITION
HEADER (BEYOND) 2'-0" 10" 18" 2'-2" HEADER (BEYOND)
TO HEADER TO HEADER
HEIGHT OF ADJACENT HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
WITH CONCRETE APRON 1 PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 2 APRON
8"

8"
5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE INLET APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMN
PROPERTY LINE - NO CONNECTION TO SEWERS
5'-0"
CONCRETE STRIP TO OR AS PER DESIGN
SEE DRAWING GI-501A, B, C & D FOR TYPICAL EXISTING
FOLLOW CURB TAPER ℄ 1'-6"
LOCATION OF BIOSWALE A 10'-0" OR PLANTING PLANS SIDEWALK
TOP OF CURB
1% - 2% CONTINUOUS
DROP CURB [INLET] 1/2" EXPANSION JOINT AND
VARIES AS PER DESIGN REFER TO DETAILS ON THIS AND NEXT PAGE CROSS SLOPE FILLER PER NYC DOT HIGHWAY

1'-6"
TOP OF GUTTER TOWARDS PLANTED
1'-6" SPEC. SECTION 2.15 (TYP.)
(BEYOND) AREA 1"
SIDEWALK
B DESIGN B ROADWAY
5'-0" OR
AS PER

PITCH
SEE TABLE PLANTED
AREA

BIOSWALE FLOW
CURB LINE OUTLET BIOSWALE
EXISTING INLET
CATCH BASIN A ENGINEERED
PLAN SOIL CONCRETE
HEADER (3) SIDES
WWM 6x6 - W8xW8

1'-6"
℄ 8" THICK CAST-IN-PLACE
EROSION CONTROL REINFORCED
3-SIDED STEEL TREE GUARD,
MATTING CONCRETE APRON
SEE GI-601, GI-602, GI-603 & STEEL SPIKE IN 4" DIA.
GRADE TO ALLOW FOR 3" 1" UNDISTURBED SOIL
GI-604 CONCRETE
DEEP DEPRESSION, SEE 12"
6" L-SHAPED EDGING WITH ENCASEMENT PLACED
DRAWING GI-124

DEPTH OF PVC PIPE PER DESIGN PLANS


MIN. 9" STAKES, SE GI-204 IN ENGINEERED SOIL
12" WIDE GABION FILLED
+ 1"-3" (TYP.)

1'-3"
WITH CLEAN OPEN-GRADED
TOP OF STONE COLUMN
STONE WRAPPED IN
CAP BELOW INTERFACE
9" GEOTEXTILE (TOP AND
B

OF ENGINEERED SOIL
SIDES ONLY)
AND STONE BASE. CAP
TO BE PERFORATED
CLEAN OPEN-GRADED STONE FILLED PERFORATED
UNDISTURBED SOIL
STONE BASE WRAPPED IN 12" DIAMETER PVC PIPE
CLEAN OPEN-GRADED GEOTEXTILE, TOP AND WRAPPED ALL AROUND
A

STONE COLUMN CAP SHALL BE STONE SIDES ONLY WITH GEOTEXTILE FABRIC
PERFORATED AND PLACED BASE WRAPPED WITH
UNDER THE GEOTEXTILE GEOTEXTILE (TOP AND PERMEABLE SOIL
FABRIC (TYP). SIDES ONLY)
TEMPORARY, 18" MAXIMUM
PERMEABLE SOIL DIAMETER CASING AUGERED

PERMEABLE SOIL LAYER


LAYER INTO PERMEABLE LAYER

PENETRATION INTO
GRANULAR FILL TO FILL THE
PERMEABLE SOIL LAYER

ANNULAR SPACE BETWEEN


PENETRATION INTO

THE STONE COLUMN PIPE


GRANULAR FILL TO FILL THE AND THE HOLE
ANNULAR SPACE BETWEEN
THE STONE COLUMN PIPE TEMPORARY, 18" CLEAN OPEN-GRADED STONE
AND THE HOLE MAXIMUM DIAMETER BOTTOM OF COLUMN
CASING AUGERED INTO TO BE OPEN
STONE FILLED PERFORATED 12" PERMEABLE LAYER
DIAMETER PVC PIPE WRAPPED OPEN BOTTOM
ALL AROUND WITH GEOTEXTILE (TYP.)
FABRIC (TYP.)

SECTION B-B SECTION A-A
AT BIOSWALE STONE COLUMN
DEPTH SCHEDULE
NOTES: ROWB A B
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES
WITH TREE 2'-6" 2'-0" P.E. 05-13-2022
IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING NO TREE 3'-0" 1'-6" MANAGING DIRECTOR, DATE
TAPERS TO BE CAST-IN-PLACE. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION

DEPTH SCHEDULE
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMN
- NO CONNECTION TO SEWERS
10'-0" OR AS PER DESIGN
SEE GI-122 FOR
DIMENSIONS SCHEDULE EXPANSION JOINT
(TYP.)
SEE GI-501A, B, C & D FOR
SURFACE GRADING AS PER
TYPICAL PLANTING PLANS
DRAWING GI-124
STONE COLUMN
CONCRETE HEADER

1'-6"
SIDEWALK STEEL TREE GUARDS
(3-SIDES TYP.) SEE DRAWING

5'-0" OR AS PER DESIGN


GI-601, GI-602, GI-603 & GI-604
GABION WALL BELOW LOW POINT
CONCRETE STRIP, SEE GI-207 1'-6" +
SET 3" BELOW
FOR SEDIMENT CONTROL DEVICE
AT INLET, REFER TO GI-501D
OUTLET INVERT
CONCRETE TAPER TO NEW CURB TYPE TO 5"-THICK
FOLLOW CURB LINE (TYP.) MATCH CONTRACT CONCRETE STRIP L-SHAPED EDGING
PLANS WITH MINIMUM 9" STAKES
NEW CURB TYPE TO MATCH OUTLET SEE DRAWING GI-204
CONTRACT PLANS INVERT REINFORCED CONCRETE
EXISTING CURB INLET APRON

1'-0"
TO REMAIN EXPANSION JOINT

2'-0" 10" 18" 2'-2"

FLOW +
[OUTLET]
[INLET] FLOW

15% - 20%
EXISTING CURB
1'-6"

PITCH
TO REMAIN
EXISTING

PITCH
ASPHALT D TO MATCH EXISTING
ROADWAY
D LIMIT OF NEW CURB TO EXTEND
PAVEMENT BEYOND THE ROWB AS DETERMINED
8"-THICK CONCRETE BY FIELD CONDITIONS AND SITE
5'-4" ENGINEER
APRON

PLAN
EXTENT OF NEW EXTENT OF NEW CURB
CURB VARIES PER TOP OF CURB, BEYOND VARIES PER FIELD
FIELD CONDITIONS JOINT (TYP.) CONDITION
HEADER (BEYOND) 2'-0" 10" 18" 2'-2" HEADER (BEYOND)
TO HEADER TO HEADER
HEIGHT OF ADJACENT HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
WITH CONCRETE APRON 1 PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 2 APRON
8"

8"
5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE INLET APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. RAIN GARDEN TYPE1, TYPE 2, AND TYPE 3
- NO CONNECTION TO SEWERS

SEE DRAWING GI-501A, B, C & D FOR TYPICAL


PROPERTY LINE
C B A PLANTING PLANS EXISTING
REFER TO DETAILS ON THIS PAGE SIDEWALK
LOCATION OF R.O.W. L
CURB LINE RAIN GARDEN VARIES

W
EXISTING
CATCH BASIN
R.O.W. R.O.W. FLOW
OUTLET INLET

C B A
PLAN

3-SIDED STEEL TREE PLANTED AREA, CONCRETE STRIP TO 12"x5" CONCRETE STRIP
12"x5" CONCRETE STRIP GUARD, SEE GI-601, SEE PLANTING FOLLOW CURB TAPER WITH 1% - 2% CONTINUOUS
WITH 1% - 2% GI-602, GI-603 & GI-604 PLANS (NO TREE TOP OF CURB CROSS SLOPE TOWARDS EXPANSION JOINT AND
CONTINUOUS CROSS 1'-6" 12"x5" CONCRETE FILLER (TYP.)
PERMITTED) PLANTED AREA
SLOPE TOWARDS TO CURB STRIP DROP CURB [INLET]
SIDEWALK SIDEWALK
PLANTED AREA 3"-THICK LEVELING TOP OF GUTTER
DROP CURB COURSE (TYP.) LOW POINT (BEYOND)
[OUTLET] ROADWAY 6"
ROADWAY PLANTED AREA ROADWAY PITCH PLANTED AREA

1'-3"
+

18"
ENGINEERED ENGINEERED ENGINEERED
SOIL SOIL SOIL 9"

8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE CONCRETE
REINFORCED 8" THICK CAST-IN-PLACE CLEAN REINFORCED HEADER (3) SIDES (TYP.)
CONCRETE APRON CLEAN CLEAN
OPEN-GRADED REINFORCED OPEN-GRADED CONCRETE APRON OPEN-GRADED

18"
UNDISTURBED
12" WIDE GABION FILLED STONE BASE CONCRETE GUTTER STONE BASE 12" WIDE GABION STONE BASE SOIL
WITH CLEAN WRAP STONE IN FILLED WITH CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE GEOTEXTILE OPEN-GRADED STONE CONCRETE
WRAP GABION IN (TOP AND SIDES ONLY) (TYP.) ENCASEMENT PLACED
W W W
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) SECTION C-C SECTION B-B WITH MIN. 9" STAKES SECTION A-A (TYP.)
AT R.O.W. OUTLET AT MIDSECTION [LOWEST POINT] (TYP.), SEE GI-204 AT R.O.W. INLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE. 05-13-2022
P.E.
3. PLAN LAYOUT DIMENSIONS AND PLANTING PLAN AS PER GI-122 FOR THE R.O.W.
RAIN GARDEN TYPE SPECIFIED. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
- NO CONNECTION TO SEWERS
L

SEE GI-124 FOR


GRADING

SIDEWALK

W
OUTLET INVERT

EXISTING CURB
TO REMAIN

2'-0" 10" 18" 2'-2"

FLOW
+
[OUTLET] [INLET]

15% - 20%
PITCH FLOW
1'-6"

EXISTING

PITCH
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY

4'-4" TYPE 1/ TYPE 2 5'-4"


L

R.O.W. BIOSWALE OR RAIN GARDEN DETAILS PLANTING PLAN SEE GI-124 FOR
GRADING
LENGTH (L), WIDTH (W),
TYPE PAGE NUMBER
1FT. INCREMENT 6 IN. INCREMENT SIDEWALK

17' ≤ L ≤ 20' 4'-0" TO 6'-0" TYPE 1

W
13' ≤ L ≤ 16' 4'-0" TO 6'-0" TYPE 2 GI-501A-C
OUTLET
INVERT
10' ≤ L ≤ 12' 4'-0" TO 6'-0" TYPE 3
EXISTING CURB
DIMENSION AND PLANTING PLAN SCHEDULE

1'-6"
TO REMAIN

NOTES:
2'-0" 10" 18" 2'-2"
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. BIOSWALE OR R.O.W. RAIN GARDEN TYPE SPECIFIED.
FLOW +
[OUTLET] [INLET] FLOW

10% - 20%
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR WILL CONFIRM THE LEVELS OF THE R.O.W. BIOSWALE OR R.O.W. RAIN GARDEN TO PITCH

1'-6"
PREVENT FLOODING.

PITCH
EXISTING TO MATCH EXISTING
3. DOT APPROVAL REQUIRED FOR ALL WIDTHS GREATER THAN 5'. ASPHALT ROADWAY
PAVEMENT
4. PLANTING QUANTITIES AND PLANS FOR VARIABLE WIDTH R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS AS PER THE PAGE NUMBERS 5'-4"
SPECIFIED, DISTRIBUTED EVENLY.

5. TREES SPECIES AS DIRECTED BY DPR. TREES ARE ONLY PERMITTED IN R.O.W. BIOSWALES WITH AN ENGINEERED SOIL LAYER 24"
TYPE 3
DEEP. P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STONE COLUMN SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALE
- NO CONNECTION TO SEWERS
L

STONE COLUMNS
A EQ EQ A

EQ
SIDEWALK
W
THIRD COLUMN (IF

EQ
SPECIFIED)
OUTLET INVERT

FLOW
+
[OUTLET] [INLET]

15% - 20%
PITCH FLOW
8"-THICK REINFORCED
EXISTING

PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY

TYPE 1/ TYPE 2
L

STONE COLUMN
R.O.W. BIOSWALE DETAILS
DETAILS

A
LENGTH (L), WIDTH (W), NUMBER OF
TYPE A
1FT. INCREMENT 6 IN. INCREMENT COLUMNS
SIDEWALK
17' ≤ L ≤ 20' 4'-0" TO 6'-0" TYPE 1 3 4'-6"
A

W
13' ≤ L ≤ 16' 4'-0" TO 6'-0" TYPE 2 2 3'-6"
STONE
10' ≤ L ≤ 12' 4'-0" TO 6'-0" TYPE 3 1 1'-6" COLUMN OUTLET
INVERT

DIMENSION SCHEDULE

NOTES:
1. STANDARD STONE COLUMN CROSS SECTIONAL DETAILS AS SPECIFIED.
FLOW +
[OUTLET] [INLET] FLOW

15% - 20%
2. THIRD STONE COLUMN LOCATED IN CENTER OF ROWB. PITCH
EXISTING

PITCH
3. ROWB WITH THREE STONE COLUMNS WILL NOT CONTAIN A TREE. TO MATCH EXISTING
ASPHALT ROADWAY
4. TOP OF STONE COLUMN COVER BELOW INTERFACE OF ENGINEERED SOIL AND STONE BASE. PAVEMENT
5. DEPTH OF BOTTOM OF STONE COLUMNS SHALL BE MEASURED FROM SURFACE GRADE.
TYPE 3
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
SURFACE GRADING PLANS FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
- NO CONNECTION TO SEWERS

CONTOU R (TYP.)
SIDEWALK R (TYP.) CONTOU
RETENTION AREA
+
LOW POINT

W
SET 3" BELOW
OUTLET INVERT FOR SEDIMENT CONTROL
DEVICE AT INLET, REFER
TO GI-501D
EXISTING CURB
TO REMAIN

[OUTLET] [INLET]
+

15% - 20%
FLOW FLOW
PITCH

PITCH
TO MATCH EXISTING
ROADWAY

OUTLET INVERT AT GRADING PLAN TYPE 1 & TYPE 2


BOTTOM OF CURB FOR ALL ROWB WITH
L = 13' OR GREATER
L

CO R
N
(T TO T OU )
SIDEWALK YP UR N P .
.) CO (TY
RETENTION AREA
+
LOW POINT
W

SET 3" BELOW


OUTLET INVERT FOR SEDIMENT CONTROL
DEVICE AT INLET, REFER
TO GI-501D
EXISTING CURB
TO REMAIN

[OUTLET] [INLET]
+

15% - 20%
FLOW FLOW
NOTES: PITCH

PITCH
1. ALL SURFACE GRADING TO TAPER TO MATCH EXISTING
TOWARDS THE LOW POINT. ROADWAY

2. CONTOUR LINES SHOWN ON THIS


OUTLET INVERT AT
GRADING PLAN TYPE 3
DRAWING ARE SCHEMATIC ONLY AND FOR ALL ROWB L = LESS THAN 13'
DEPEND ON THE STREET GRADE. BOTTOM OF CURB

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. BIOSWALE
- NO CONNECTION TO SEWERS

CONCRETE 5"-THICK CAST-IN-PLACE


PROPERTY LINE WALKWAY CONCRETE WALKWAY EXISTING
5'-0" SIDEWALK
LOCATION OF BIOSWALE FOOTER
CLEAR
VARIES
CURB LINE SPACE

ROWB ROWB
A A
EXISTING
CATCH BASIN FLOW
OUTLET INLET OUTLET INLET

DETAIL E

PLAN

5'-0"

6" 4'-0" 6" 3-SIDED STEEL TREE


3-SIDED STEEL TREE ROWB - SIZE EROSION CONCRETE WALKWAY GUARD, SEE GI-601,
5"-THICK
GUARDS, SEE GI-601, VARIES CONTROL FOOTER GI-602, GI-603, &
CAST-IN-PLACE
GI-602, GI-603 & GI-604 MATTING GI-604 5'-0"
CONCRETE
SIDEWALK WALKWAY ROWB - SIZE VARIES
CONCRETE CONCRETE
SIDEWALK WALKWAY FOOTER EXPANSION WALKWAY FOOTER
3"-THICK
JOINT (TYP.)
LEVELING
COURSE
PLANTED PLANTED
AREA AREA 5"-THICK HEADER
CAST-IN-PLACE
21"

21"

CONCRETE WALKWAY
6"

TREE GUARD (TYP.) 1" OUTLET


12" INVERT
IMPERMEABLE

5'-0"
CONCRETE HEADER
LINER
(3) SIDES NEW CURB

1"
CLEAN OPEN-GRADED STONE
+

2'-6"
WRAP STONE IN WRAPPED IN GEOTEXTILE (TOP [INLET] [OUTLET]

PITCH
GEOTEXTILE (TOP AND SIDES ONLY) PITCH
AND SIDES ONLY)
FLOW
CONCRETE
GUTTER
DETAIL E
LENGTH AS PER DESIGN
CONCRETE WALKWAY
SECTION A-A

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. BIOSWALE
- NO CONNECTION TO SEWERS

5"-THICK CAST-IN-PLACE
PROPERTY LINE
C B A CONCRETE WALKWAY EXISTING
CONCRETE 5'-0" STEEL TREE GUARD (3 SIDES TYP.) SIDEWALK
LOCATION OF BIOSWALE
WALKWAY CLEAR
VARIES
CURB LINE FOOTER SPACE

ROWB ROWB

EXISTING
CATCH BASIN FLOW
OUTLET INLET OUTLET INLET

C B A

PLAN

1% - 2% CONTINUOUS
5'-0" OR AS PER DESIGN
CROSS SLOPE
5"-THICK CONCRETE STRIP 5'-0" OR PER DESIGN
TOWARDS PLANTED
CAST-IN-PLACE TO FOLLOW CURB
AREA 3-SIDED STEEL TREE IMPERMEABLE CONCRETE WALKWAY TAPER 1% - 2% CONTINUOUS EROSION CONTROL
CURB TO MATCH GUARD, SEE GI-601, LINER
1'-6" 1" EXPANSION JOINT TOP OF CURB CROSS SLOPE MATTING
CONTRACT PLANS GI-602, GI-603 & GI-604 3"-THICK
TO CURB AND FILLER (TYP.) DROP CURB [INLET] TOWARDS PLANTED EXPANSION JOINT
DROP CURB SIDEWALK LEVELING AREA
1"
1" SIDEWALK TOP OF GUTTER
[OUTLET] COURSE 6"
(BEYOND)
ROADWAY PLANTED ROADWAY ROADWAY PLANTED
AREA PITCH AREA

1'-3"
ENTIRE BIOSWALE
9"
ENGINEERED

5'-0" DEPTH
ENGINEERED
SOIL SOIL
8" REINFORCED UNDISTURBED 8" REINFORCED
CONCRETE APRON 8" REINFORCED CONCRETE APRON CONCRETE
SOIL
CONCRETE HEADER (3) SIDES
L-SHAPED EDGING WITH STEEL SPIKE IN 4" DIA. CLEAN OPEN-GRADED 12" GABION
MIN. 9" STAKES (TYP.), CLEAN CONCRETE GUTTER STONE BASE WRAPPED CLEAN
SEE GI-204 OPEN-GRADED ENCASEMENT CONCRETE IN GEOTEXTILE (TOP OPEN-GRADED
STONE BASE PLACED IN WALKWAY FOOTER AND SIDES ONLY) STONE BASE WRAP STONE IN
ENGINEERED SOIL (BEYOND) GEOTEXTILE
(TYP.) (TOP AND SIDES ONLY)
HDPE BARRIER TO
5'-0" OR AS PER DESIGN BE INSTALLED
ONLY WHEN
REQUIRED, SEE
SECTION C-C SECTION B-B GI-204 SECTION A-A
AT OUTLET AT WALKWAY AT INLET

NOTE:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
- NO CONNECTION TO SEWERS

SEE DRAWINGS GI-502 FOR TYPICAL PLANTING


PROPERTY LINE C B A PLANS
LOCATION OF GREENSTRIP 20'-0" REFER TO DETAILS ON THIS AND NEXT PAGE EXISTING
VARIES OR AS PER DESIGN SIDEWALK
CURB LINE

3'-6"
EXISTING
CATCH BASIN FLOW
OUTLET INLET
(TYP.) (TYP.)
C B A
PLAN

CONCRETE STRIP TO 1% - 2% CONTINUOUS CROSS


1% - 2% CONTINUOUS 3-SIDED STEEL TREE 12"x5" CONCRETE SEE PLANTING FOLLOW CURB TAPER SLOPE TOWARDS PLANTED AREA
CROSS SLOPE GUARD, SEE GI-601, STRIP PLANS GI-502
TOWARDS PLANTED GI-602, 603 & GI-604 TOP OF CURB EROSION
EXPANSION JOINT AND
ROADWAY SIDEWALK DROP CURB [INLET] CONTROL
AREA FILLER(TYP.)

3 1/2"
SIDEWALK MATTING 1"
DROP CURB 1" TOP OF GUTTER 6" SIDEWALK
1" (BEYOND)
[OUTLET]

4 1/2"
ROADWAY PLANTED ROADWAY PLANTED

5"
PITCH
AREA
6"

AREA

1'-3"
ENGINEERED
ENGINEERED ENGINEERED
SOIL
SOIL SOIL 9"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 WWM 6x6-W8xW8
CONCRETE

5'-0"
REINFORCED CONCRETE 8" THICK CAST-IN-PLACE 8" THICK CAST-IN-PLACE HEADER (3) SIDES
CONCRETE APRON HEADER (3) SIDES REINFORCED REINFORCED
12"x5" CONCRETE UNDISTURBED CONCRETE GUTTER CLEAN CONCRETE APRON CLEAN
CLEAN STEEL SPIKE IN 4"

3'-0"
STRIP SOIL L-SHAPED EDGING WITH OPEN-GRADED UNDISTURBED SOIL OPEN-GRADED
OPEN-GRADED DIA. CONCRETE
12" WIDE GABION FILLED STEEL SPIKE IN 4" DIA. MINIMUM 9" STAKES, STONE BASE 3"-THICK LEVELING STONE BASE
STONE BASE ENCASEMENT
WITH CLEAN CONCRETE ENCASEMENT SEE DRAWING GI-204 COURSE PLACED IN
OPEN-GRADED STONE PLACED IN ENGINEERED WRAP GABION IN 12" WIDE GABION FILLED ENGINEERED SOIL
WRAP GABION IN SOIL (TYP.) GEOTEXTILE (TOP AND (TYP.)
WITH CLEAN
GEOTEXTILE (TOP AND SIDES ONLY) OPEN-GRADED STONE
SIDES ONLY) WRAP STONE IN
12" WIDE GABION 3'-6" 3'-6"
L-SHAPED EDGING GEOTEXTILE
3'-6" FILLED WITH CLEAN WITH MIN. 9" STAKES, (TOP AND SIDES
OPEN-GRADED STONE SEE GI-204 ONLY)
SECTION C-C SECTION B-B SECTION A-A
AT MIDSECTION [LOWEST POINT] AT GREENSTRIP INLET
AT GREENSTRIP OUTLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER
UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE 05-13-2022
P.E.
CAST-IN-PLACE.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
- NO CONNECTION TO SEWERS

20'-0" OR AS PER DESIGN


SEE GI-132 FOR
PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE
JOINT AT MID-SPAN
SEE GI-502 FOR TYPICAL
SURFACE GRADING AS PER
PLANTING PLANS
DRAWING GI-132
CONCRETE HEADER
SIDEWALK
STEEL TREE GUARD
(3 SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
CONCRETE TAPER TO
FOR SEDIMENT L-SHAPED EDGING WITH MINIMUM
3'-6"

FOLLOW CURB LINE (TYP.)


CONTROL DEVICE AT 9" STAKES SEE DRAWING GI-204;
GABION WALL BELOW OUTLET
INVERT INLET, REFER TO GI-502
CONCRETE STRIP, SEE GI-207
EXISTING CURB TO NEW CURB TYPE TO
REMAIN 5"-THICK CONCRETE STRIP MATCH CONTRACT PLANS

2'-0" 10" 18" 2'-2"

FLOW
+
[OUTLET] [INLET]
FLOW

15% - 20%
PITCH EXISTING CURB
8"-THICK REINFORCED
1'-6"

EXISTING TO REMAIN

PITCH
ASPHALT TO MATCH EXISTING
CONCRETE GUTTER D EXPANSION JOINT - LIMIT OF NEW
PAVEMENT D ROADWAY CURB TO EXTEND BEYOND THE
ROWGS AS DETERMINED BY FIELD
4'-4" 5'-4" CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE INLET
APRON APRON
PLAN

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
- NO CONNECTION TO SEWERS

SEE DRAWINGS GI-502 FOR TYPICAL PLANTING


C B A PLANS
PROPERTY LINE
LOCATION OF GREEN STRIP 15'-0" REFER TO DETAILS ON THIS AND NEXT PAGE EXISTING
VARIES OR AS PER DESIGN SIDEWALK
CURB LINE

3'-6"
EXISTING
CATCH BASIN FLOW
OUTLET INLET
(TYP.) (TYP.)
C B A

PLAN

CONCRETE STRIP TO 1% - 2% CONTINUOUS CROSS


1% - 2% CONTINUOUS 3-SIDED STEEL TREE 12"x5" CONCRETE SEE PLANTING FOLLOW CURB TAPER SLOPE TOWARDS PLANTED AREA
CROSS SLOPE GUARD, SEE GI-601, STRIP PLANS GI-502
TOWARDS PLANTED GI-602, 603 & GI-604 TOP OF CURB EROSION
EXPANSION JOINT AND
ROADWAY SIDEWALK DROP CURB [INLET] CONTROL
AREA FILLER(TYP.)

3 1/2"
SIDEWALK MATTING 1"
DROP CURB 1" TOP OF GUTTER 6" SIDEWALK
1" (BEYOND)
[OUTLET]

4 1/2"
ROADWAY PLANTED ROADWAY PLANTED

5"
PITCH
AREA AREA
6"

1'-3"
ENGINEERED
ENGINEERED ENGINEERED
SOIL
SOIL SOIL 9"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 WWM 6x6-W8xW8
CONCRETE

5'-0"
REINFORCED CONCRETE 8" THICK CAST-IN-PLACE 8" THICK CAST-IN-PLACE HEADER (3) SIDES
CONCRETE APRON HEADER (3) SIDES REINFORCED REINFORCED
12"x5" CONCRETE UNDISTURBED CONCRETE GUTTER CLEAN CONCRETE APRON CLEAN
CLEAN STEEL SPIKE IN 4"

3'-0"
STRIP SOIL L-SHAPED EDGING WITH OPEN-GRADED UNDISTURBED SOIL OPEN-GRADED
OPEN-GRADED DIA. CONCRETE
12" WIDE GABION FILLED STEEL SPIKE IN 4" DIA. MINIMUM 9" STAKES, STONE BASE 3"-THICK LEVELING STONE BASE
STONE BASE ENCASEMENT
WITH CLEAN CONCRETE ENCASEMENT SEE DRAWING GI-204 COURSE PLACED IN
OPEN-GRADED STONE PLACED IN ENGINEERED WRAP GABION IN 12" WIDE GABION FILLED ENGINEERED SOIL
WRAP GABION IN SOIL (TYP.) GEOTEXTILE (TOP AND (TYP.)
WITH CLEAN
GEOTEXTILE (TOP AND SIDES ONLY) OPEN-GRADED STONE
SIDES ONLY) WRAP STONE IN
12" WIDE GABION 3'-6" 3'-6"
L-SHAPED EDGING GEOTEXTILE
3'-6" FILLED WITH CLEAN WITH MIN. 9" STAKES, (TOP AND SIDES
OPEN-GRADED STONE SEE GI-204 ONLY)
SECTION C-C SECTION B-B SECTION A-A
AT MIDSECTION [LOWEST POINT] AT GREENSTRIP INLET
AT GREENSTRIP OUTLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER
UNDERNEATH. 05-13-2022
P.E.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE
CAST-IN-PLACE. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
SEE GI-132 FOR PLACE EXPANSION
DIMENSIONS SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
SEE GI-502 FOR TYPICAL SURFACE GRADING AS PER
PLANTING PLANS DRAWING GI-132
CONCRETE HEADER
SIDEWALK STEEL TREE GUARD
(3 SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
CONCRETE TAPER TO
FOR SEDIMENT L-SHAPED EDGING WITH MINIMUM

3'-6"
FOLLOW CURB LINE (TYP.)
CONTROL DEVICE AT 9" STAKES SEE DRAWING GI-204;
GABION WALL BELOW OUTLET
INVERT INLET, REFER TO GI-502
CONCRETE STRIP, SEE GI-207
EXISTING CURB TO NEW CURB TYPE TO
REMAIN 5"-THICK CONCRETE STRIP

1'-6"
MATCH CONTRACT PLANS

10" 18" 2'-2"

FLOW +
[OUTLET] [INLET] FLOW
EXISTING CURB

15% - 20%
PITCH
1'-6"
EXISTING 8"-THICK REINFORCED TO REMAIN

PITCH
ASPHALT TO MATCH EXISTING CONCRETE GUTTER EXPANSION JOINT - LIMIT OF NEW
PAVEMENT
D ROADWAY D CURB TO EXTEND BEYOND THE
ROWGS AS DETERMINED BY FIELD
4'-4" 5'-4" CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE INLET
APRON APRON
PLAN

EXTENT OF NEW CURB VARIES TOP OF CURB, EXTENT OF NEW CURB


PER FIELD CONDITIONS BEYOND VARIES PER FIELD CONDITION
18" 2'-2"
HEADER (BEYOND) 2'-0" 10" EXPANSION JOINT (TYP.) HEADER (BEYOND)
TO HEADER
HEIGHT OF ADJACENT TO HEADER HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
1 ADJACENT 8"-THICK,
WITH CONCRETE APRON PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 18"-WIDE CONCRETE 2 APRON
GUTTER, TOP FLUSH
8"

8"
WITH APRONS

4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 11' x 3'-6" R.O.W. GREENSTRIP TYPE 3
- NO CONNECTION TO SEWERS

C A SEE DRAWINGS GI-502 FOR TYPICAL PLANTING


PLANS
B REFER TO DETAILS ON THIS AND NEXT PAGE EXISTING
PROPERTY LINE LOCATION OF GREEN STRIP 11'-0"
VARIES OR AS PER DESIGN SIDEWALK
CURB LINE

3'-6"
EXISTING
CATCH BASIN FLOW
OUTLET
B INLET
(TYP.) (TYP.)
C A

PLAN

1% - 2% CONTINUOUS 3-SIDED STEEL TREE CONCRETE STRIP TO 1% - 2% CONTINUOUS CROSS


CROSS SLOPE GUARD, SEE GI-601, 12"x5" CONCRETE SEE PLANTING FOLLOW CURB TAPER SLOPE TOWARDS PLANTED AREA
TOWARDS PLANTED GI-602, 603 & GI-604 STRIP PLANS GI-502 TOP OF CURB EROSION
EXPANSION JOINT AND
AREA SIDEWALK ROADWAY SIDEWALK DROP CURB [INLET] CONTROL
FILLER(TYP.)

3 1/2"
MATTING 1"
DROP CURB TOP OF GUTTER
1" 1" 6" SIDEWALK
[OUTLET] (BEYOND)

4 1/2"
ROADWAY PLANTED ROADWAY PLANTED

5"
PITCH
6"

AREA AREA

1'-3"
ENGINEERED
ENGINEERED ENGINEERED
SOIL
SOIL SOIL 9"
8" THICK CAST-IN-PLACE
WWM 6x6-W8xW8 WWM 6x6-W8xW8
REINFORCED CONCRETE CONCRETE

5'-0"
CONCRETE APRON HEADER (3) SIDES 8" THICK CAST-IN-PLACE 8" THICK CAST-IN-PLACE HEADER (3) SIDES
REINFORCED REINFORCED
12"x5" CONCRETE UNDISTURBED
CLEAN CONCRETE APRON CLEAN CONCRETE APRON CLEAN
STRIP SOIL STEEL SPIKE IN 4"

3'-0"
OPEN-GRADED L-SHAPED EDGING WITH OPEN-GRADED UNDISTURBED SOIL OPEN-GRADED
12" WIDE GABION FILLED STEEL SPIKE IN 4" DIA. DIA. CONCRETE
STONE BASE MINIMUM 9" STAKES, STONE BASE 3"-THICK LEVELING STONE BASE
WITH CLEAN CONCRETE ENCASEMENT ENCASEMENT
SEE DRAWING GI-204 COURSE PLACED IN
OPEN-GRADED STONE PLACED IN ENGINEERED
SOIL (TYP.) WRAP GABION IN 12" WIDE GABION FILLED ENGINEERED SOIL
WRAP GABION IN
GEOTEXTILE (TOP AND WITH CLEAN (TYP.)
GEOTEXTILE (TOP AND
SIDES ONLY) OPEN-GRADED STONE
SIDES ONLY) WRAP STONE IN
12" WIDE GABION 3'-6" 3'-6"
3'-6" L-SHAPED EDGING GEOTEXTILE
FILLED WITH CLEAN WITH MIN. 9" STAKES, (TOP AND SIDES
OPEN-GRADED STONE SEE GI-204 ONLY)
SECTION C-C SECTION B-B SECTION A-A
AT GREENSTRIP OUTLET AT MIDSECTION [LOWEST POINT] AT GREENSTRIP INLET

NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER P.E. 05-13-2022
UNDERNEATH. MANAGING DIRECTOR, DATE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE.
STANDARD FOR 11' x 3'-6" R.O.W. GREENSTRIP TYPE 3
- NO CONNECTION TO SEWERS

SEE GI-132 FOR 11'-0" OR AS PER DESIGN CONCRETE HEADER


DIMENSIONS SCHEDULE
EXPANSION JOINT
SEE GI-502 FOR TYPICAL
PLANTING PLANS SURFACE GRADING AS PER
DRAWING GI-132
FOR SEDIMENT CONTROL DEVICE
SIDEWALK AT INLET, REFER TO GI-502
STEEL TREE GUARD (3 SIDES TYP.)
CONCRETE TAPER TO SEE GI-601, GI-602, GI-603 & GI-604
FOLLOW CURB LINE (TYP.) L-SHAPED EDGING WITH MNIMUM
9" STAKES SEE DRAWING GI-204

3'-6"
OUTLET 5"x12" CONCRETE STRIP (TYP.)
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 INVERT NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB

1'-6"
TO REMAIN

2'-0" 10" 18" 2'-2"

FLOW
+
[OUTLET] [INLET]
FLOW EXISTING CURB TO REMAIN

15% -20%
1'-6"
PITCH

PITCH
EXPANSION JOINT - LIMIT OF NEW
D TO MATCH EXISTING D CURB TO EXTEND BEYOND THE
ROADWAY
ROWGS AS DETERMINED BY FIELD
CONDITIONS AND SITE ENGINEER
5'-4"
REINFORCED CONCRETE REINFORCED CONCRETE INLET
APRON APRON
PLAN

EXTENT OF NEW EXTENT OF NEW CURB


CURB VARIES PER TOP OF CURB, BEYOND VARIES PER FIELD
FIELD CONDITIONS JOINT (TYP.) CONDITION
HEADER (BEYOND) 2'-0" 10" 18" 2'-2" HEADER (BEYOND)
TO HEADER TO HEADER
HEIGHT OF ADJACENT HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
WITH CONCRETE APRON 1 PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 2 APRON
8"

8"
5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE INLET APRON

SECTION D-D

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
SURFACE GRADING & DIMENSION SCHEDULE PLANS FOR R.O.W. GREENSTRIPS
- NO CONNECTION TO SEWERS
L

SIDEWALK

GRADING

GRADING
3'-6"
OUTLET
INVERT

FLOW
+
[OUTLET] [INLET]
FLOW

15% -20%
PITCH
EXISTING

PITCH
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY

GRADING NOTES:
TYPE 1 & TYPE 2 GRADING PLAN
1. ALL SURFACE GRADING TO TAPER TOWARDS THE LOW POINT.
2. CONTOUR LINES SHOWN ON THIS DRAWING ARE SCHEMATIC
ONLY AND DEPEND ON THE STREET GRADE.
L

R.O.W. GREEN STRIP PLANTING PLAN SIDEWALK

LENGTH (L),

GRADING

GRADING
WIDTH TYPE PAGE NUMBER
1FT. INCREMENT

3'-6"
17' ≤ L ≤ 20' TYPE 1

13' ≤ L ≤ 16' 3'-6" TYPE 2 GI-502


OUTLET
INVERT
11' ≤ L ≤ 12' TYPE 3

DIMENSION AND PLANTING PLAN SCHEDULE


FLOW
+
[OUTLET] [INLET]

15% - 20%
FLOW
DIMENSION AND PLANTING NOTES: PITCH

PITCH
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. GREENSTRIP TYPE TO MATCH EXISTING
SPECIFIED. ROADWAY

TYPE 3 GRADING PLAN

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. GREENSTRIPS
- NO CONNECTION TO SEWERS

PRECAST CONCRETE WALKWAY WITH


PRECAST CONCRETE COVER
PROPERTY LINE B EXISTING
LOCATION VARIES 5'-0" STEEL TREE GUARD (3 SIDES TYP.)
SIDEWALK
CLEAR 8"-THICK CONCRETE GUTTER (TYP.)
CURB LINE
SPACE CONCRETE STRIP
A A
CONCRETE APRON (TYP.)
EXISTING
CATCH BASIN FLOW
OUTLET INLET OUTLET INLET
(TYP.) (TYP.)
B

PLAN

3'-6" 3-SIDED STEEL ROWGS - SIZE ROWGS - SIZE 3-SIDED STEEL TREE
5'-0"
5"-THICK PRECAST TREE GUARD, SEE VARIES VARIES GUARD, SEE GI-601,
CONCRETE COVER GI-601, GI-602, GI-602, GI-603 & GI-604
3" GI-603 & GI-604 5"-THICK PRECAST
EXPANSION JOINT
CONCRETE COVER
(TYP.)
SIDEWALK 1" 3"-THICK LEVELING 1" SIDEWALK
DETAIL C SIDEWALK 6"
COURSE

3"

3"
5"
PLANTED AREA PLANTED AREA

5"
1'-3"

6"
PITCH
1'-4"

9" 9" IMPERMEABLE 9"


CONCRETE LINER
8"-THICK REINFORCED
HEADER (3)
CONCRETE GUTTER REINFORCED SIDES CLEAN OPEN-GRADED
OPEN GRADED

3'-0"
LEVELING COURSE CONCRETE CULVERT STONE WRAPPED IN
STONE BASE WRAP STONE
IMPERMEABLE LINER GEOTEXTILE (TOP AND
12" GABION FILLED WITH IN GEOTEXTILE
CLEAN OPEN-GRADED SIDES ONLY)
(TOP AND
STONE HDPE BARRIER TO BE
SIDES ONLY)
INSTALLED ONLY WHEN
WRAP STONE IN REQUIRED, SEE GI-204
GEOTEXTILE
(TOP AND SIDES ONLY)
SECTION B-B 2'-6"
SECTION A-A
AT PEDESTRIAN PATHWAY
6" 6"
5"-THICK PRECAST
3" 3"
CONCRETE COVER
NOTES:
1. CAST-IN-PLACE CONCRETE REQUIRES IMPERMEABLE LINER REINFORCED
CONCRETE CULVERT
5"

UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE
1'-4"

6"

CAST-IN-PLACE.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
DETAIL C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
INTENTIONALLY LEFT BLANK
STANDARD FOR R.O.W. STORMWATER SEEPAGE BASIN WITH TYPE 2 CATCH BASIN
- NO CONNECTION TO SEWERS

DIST. TO CENTER LINE OF MANHOLE
PROPERTY LINE
2'-0" MIN. SIDEWALK PLACEMENT
OPTION. SEE NOTE 1 EXISTING
R.O.W. STORMWATER
12" Ø DUCTILE IRON CATCH SIDEWALK
SEEPAGE BASIN. SEE BASIN CONNECTION
GI-206 FOR SCHEDULE 2'-0" MIN.
CURB LINE . DIST. TO CENTER LINE OF MANHOLE

ROADWAY PLACEMENT 3'-6"
OPTION. SEE NOTE 1 DEP STANDARD TYPE
2 CATCH BASIN

EXISTING FLOW
CATCH BASIN

A A
DEP STANDARD 36" Ø EXISTING SIDEWALK
MANHOLE CASTING OR ROADWAY
PLAN

6" MIN
5/8" MIN.
TOP OF COVER FLUSHED D
WITH EXISTING SURFACE 10"

TWO COURSES OF BRICK PRECAST CONCRETE D

6"
LAID RADIALLY CIRCULAR SLAB COVER
SEE DETAIL A DRAWING 1'-0"
GI-206
10"

3'-0"

4"

4"
12" Ø DUCTILE IRON
6"

tw PIPE CATCH BASIN

2'-0"

1'-0"
6" MIN.
CONNECTION
12" MAX.
2'-0"

12"

VARIES 3'-0" PRECAST SOLID


CONCRETE RING
WWM 6x12 W0.8xW0.4 tw DRAIN OPENING WWM 6x12 W0.8xW0.4

6" MIN
tw
5/8" x 6"
D WRAP STONE IN
GEOTEXTILE (TOP ELEVATION SECTION ELEVATION SECTION
AND SIDES ONLY)
PRECAST PRECAST SOLID CONCRETE RING PRECAST PERFORATED CONCRETE RING
PERFORATED
VARIES

CONCRETE RING
NOTES:
(TYP.)
1. THE LOCATION OF THE ROW SEEPAGE BASIN SHALL BE SUCH THAT THE OPENING IN THE TOP SLAB TOGETHER WITH FRAME AND COVER SHALL BE
ENTIRELY IN THE ROADWAY AREA OR ENTIRELY IN THE SIDEWALK AREA.
2'-0" MIN. 2'-0" MIN.
2. ALL SLABS AND RINGS SHALL BE PLACED ON A ONE HALF (1/2) INCH THICK FULL BED OF FRESH MORTAR.
3. SEEPAGE BASIN SOLID RING AND SEEPAGE RING REINFORCING COMPLIES WITH AREA REQUIREMENTS OF ASTM C478. EXCEPT THAT ALL WALL SECTIONS
SHALL BE REINFORCED WITH WWM 6x12 W0.8xW0.4 PLACED IN CENTER OF WALL. IN SOLID RING 1-#4 HOOP SHALL BE PLACED AROUND ALL CAST PIPE
PRECAST REINFORCED OPENINGS. (THE 1-#4 HOOP WILL BE REQUIRED AT CORED OPENINGS FOR BASIN CONNECTIONS IN SOLID RINGS.) (ALL VALUES OF AREA OF STEEL (AS)
CONCRETE CIRCULAR ARE IN SQUARE INCHES AND ARE A MINIMUM.)
FOOTING RING SEE 4. PRECAST PIPE OPENINGS AND CORED OPENINGS FOR CATCH BASIN CONNECTION WILL BE PLACED IN SOLID RING ONLY. NO CORED OPENING WILL BE
DETAIL B DRAWING ALLOWED IN SEEPAGE RINGS.
10"

GI-206 5. CORED OPENINGS IN SOLID RING WILL BE PERMITTED FOR UP TO 12" DIA. DUCTILE IRON CATCH BASIN CONNECTION ONLY.
6. PIPE OPENINGS WILL NOT BE PERMITTED THROUGH JOINTS. DISTANCE FROM TOP OR BOTTOM OF ANY SOLID RING SECTION SHALL BE A MINIMUM OF 6"
2'- 0" OPEN GRADED FOR CORED OPENINGS FOR BASIN CONNECTIONS.
1'-0" 1'-0" STONE BELOW 7. CONCRETE DESIGN MIX = 5,000 PSI (MIN. 28 DAY STRENGTH=4,000 PSI; MAX. W/C=0.47). REBARS - FS = 60,000 PSI. WWM - FS=65,000 PSI.
2'-0"

FOOTING 8. OPENINGS FOR SPACING AND HANDLING WILL BE ALLOWED IN UPPER PORTION OF SOLID RING. HOWEVER, THE CONTRACTOR SHALL FILL ALL SUCH
d OPENINGS WITH NON SHRINK GROUT IMMEDIATELY AFTER INSTALLATION.
UNDISTURBED SOIL 9. IN NO CASE SHALL THE AREA OF THE DRAIN OPENING BE LESS THAN 3.0 SQ. IN.
10. THE CONTRACTOR SHALL HAND COMPACT THE OPEN GRADED STONE BENEATH THE CIRCULAR FOOTING PRIOR TO SETTING THE FOOTING IN PLACE.

P.E. 05-13-2022
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
- NO CONNECTION TO SEWERS

REFER TO DETAILS ON THIS AND NEXT PAGE

PROPERTY LINE C B A EXISTING


SIDEWALK
LOCATION VARIES 20'-0"
OR AS PER DESIGN
CURB LINE

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

C B A
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
PLAN
FASTENER, SEE GI-209 & 5"-THICK CONCRETE TOP
GI-209B OR GI-209C & IMPERMEABLE LINER
GI-209D
3"-THICK LEVELING CAST IRON CLEANOUT -
4" CURB PIECE AND IMPERMEABLE TOP OF COVER FLUSH
COURSE
#4 REBAR ACROSS IMPERMEABLE LINER 5"-THICK CONCRETE LINER WITH TOP OF SURFACE
1'-0"
OPENING, SEE CAST IRON EXPANSION JOINT TOP
GI-170 & GI-171 3"-THICK LEVELING VERTICAL 8" INSIDE
CLEANOUT, SEE AND FILLER
COURSE (TYP.) DIAMETER SOLID
GI-204 SIDEWALK
TOP OF ROAD BEYOND SIDEWALK STEEL FACE 6" 1'-0" HDPE PIPE
6"
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY
ROADWAY
1'-3"

6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"

8" REINFORCED
3'-6"

REINFORCED CONSTANT SLOPE CONCRETE 3"-THICK LEVELING

5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"

CONCRETE GUTTER CLEAN CLEAN


DROP CURB [INLET], MORTAR WRAP STONE IN
UNDISTURBED SOIL OPEN-GRADED OPEN-GRADED
SLOPE POURED IN PLACE, AROUND PIPE GEOTEXTILE STONE BASE STONE BASE
CURB TO MEET PRECAST CLEAN (TOP AND SIDES ONLY) 8" INSIDE DIA. UNDISTURBED SOIL
CHAMBER OPEN-GRADED VERTICAL 8" INSIDE PERFORATED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE DIAMETER SOLID HDPE PIPE GEOTEXTILE (TOP PERFORATED HDPE
4"

BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
4" 1'-0" 4" PIPE (TYP.)
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE 5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER MANAGING DIRECTOR, DATE
REQUIREMENTS. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
- NO CONNECTION TO SEWERS

8" DIAMETER DUAL WALL HDPE 5"-THICK CONCRETE TOP OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN

CONSTANT SLOPE 6"


STEEL OR
CAST IRON
SIDEWALK GRATE
STEEL FACE 2'-0"
8" DIAMETER DUAL WALL HDPE
OPENING, SEE FABRICATED 90° BEND
GI-170 & GI-171 CLEANOUT
8" INSIDE DIAMETER
(TYP.) STEEL FACE CURB COVER
PERFORATED HDPE PIPE
(TYP.)
1'-8"

2'-10" EXPANSION JOINT.


EXISTING CURB D 2'-4" D CONSTANT SLOPE
EXISTING CURB
TO REMAIN 2'-0" TO REMAIN
2'-0"

6"
+
[INLET]
10% -20%

FLOW 8"-THICK REINFORCED


1'-6"

EXISTING EXTEND THE NEW STEEL FACE 24" MIN.


PITCH

ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE


FLOW LIMIT OF THE NEW CONCRETE CURB
PAVEMENT
AS DETERMINED BY FIELD CONDITIONS
13" 36" AND SITE ENGINEER
PLAN
REINFORCED CONCRETE
APRON

TOP OF STEEL OR CAST


3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH
CONCRETE APRON PITCH SCHEDULE CHAMBER, GRATE &
TOP OF SURFACE 4" 4" FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH
5"-THICK CONCRETE TOP
2.5 TO < 3 20% TO ≥ 17% 3" 3"
1'-6" IMPERMEABLE LINER
3 TO < 3.5 17% TO ≥ 14% 3" THICK LEVELING COURSE
L2"x2"x1/4" BELOW METAL
3.5 TO < 4 14% TO ≥ 11% GRATE ANCHORED TO

4'-3"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
4 TO 4.5 11% TO ≥ 10% OPENING FOR 8" INSIDE PERFORATED PIPE.
DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
> 4.5 10% PIPE (TYP.) CHAMBER
WWM 6x6-W8xW8 CLEAN OPEN-GRADED
LONGITUDINAL STREET SLOPE STONE

4"
TYPICAL PERFORATED LEVELING COURSE
≤ 5% 10% MIN DEBRIS SCREEN FOR 8"
INSIDE DIA PIPE, SEE
≥ 5% 12% MIN GI-211

* 2" MINIMUM OPENING TO BE MAINTAINED


UNLESS ADDITIONAL DIRECTION SHOWN ON
SECTION D-D 05-13-2022
P.E.
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP FOR PRECAST CONCRETE

TYPE 1A - WITH STONE COLUMNS 5"-THICK CONCRETE TOP


CHAMBER, GRATE &
FASTENER, SEE GI-209 &
GI-209B OR GI-209C &
- NO CONNECTION TO SEWERS IMPERMEABLE LINER
GI-209D
3"-THICK LEVELING MORTAR AROUND PIPE
1/2" EXPANSION JOINT COURSE
PROPERTY LINE 4" CURB PIECE AND
AND FILLER PER NYC CAST IRON #4 REBAR ACROSS
DOT HIGHWAY SPEC. CLEANOUT, SEE OPENING, SEE
SECTION 2.15 (TYP.) GI-204 GI-170 & GI-171
1'-0"
REFER TO DETAILS ON THIS AND NEXT PAGE TOP OF GUTTER BEYOND

. VARIES
A
20'-0"
SIDEWALK 10% MIN - 20% MAX PITCH
LOCATION
OR AS PER DESIGN ROADWAY
4'-6" EQ EQ 4'-6" EXISTING
SIDEWALK
DESIGN
5'-0" OR
AS PER

CURB LINE
B B
WWM 6X6-W8XW8
FLOW REINFORCED
CONCRETE
EXISTING CONSTANT SLOPE CONCRETE APRON
INLET HEADER (3) SIDES

3'-6"
CATCH BASIN DROP CURB [INLET],
CLEAN

2'-10"
SLOPE POURED IN PLACE,
A OPEN-GRADED
CURB TO MEET PRECAST
WRAP STONE IN GEOTEXTILE
STONE BASE ℄ CHAMBER
(TOP AND SIDES ONLY) INLET SCREEN BOX
PLAN SUPPORT BRACKET, SEE
8" DIAMETER

1'-6"
GI-212
OPENING FOR 8" INSIDE TOP OF STEEL OR CAST IRON GRATE CAST IRON PERFORATED HDPE

4"
12" PERFORATED DEBRIS

DEPTH OF PVC PIPE PER DESIGN PLANS


DIAMETER PERFORATED FLUSH WITH TOP OF SURFACE CLEANOUT, PIPE (TYP.)
2'-0" SCREEN, SEE GI-211
SIDEWALK PIPE 3'-6" DEBRIS SCREEN, 3"-THICK LEVELING COURSE SEE GI-204
OPENING FOR 8" INSIDE
ADJUST PIPE TO ALLOW IMPERMEABLE LINER (TYP.) DIAMETER PIPE
4" 4" FOR SCREEN (TYP.)
WWM 6X6-W8XW8
EQ EQ
. . STONE COLUMN CAP LEVELING COURSE
1'-6" TO BE PERFORATED STONE FILLED PERFORATED
12" DIAMETER PVC PIPE
WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
CONSTANT SLOPE PERMEABLE SOIL
MORTAR AROUND PIPE
2'-10"

UNDISTURBED 4" 8" INSIDE DIA. PERFORATED HDPE TEMPORARY, 18" MAXIMUM
4"
SOIL PRECAST CONCRETE CHAMBER PIPE. MAINTAIN CONSTANT SLOPE DIAMETER CASING TO
PERFORATED TOWARDS CHAMBER MINIMUM 5'-0" AUGERED

PERMEABLE SOIL LAYER


4"

DEBRIS SCREEN, INTO PERMEABLE LAYER

PENETRATION INTO
1'-6"

1'-6"

1'-6"
SEE GI-211
GRANULAR FILL TO FILL THE
ANNULAR SPACE BETWEEN THE
WWM 6x6-W8xW8
STONE COLUMN PIPE AND HOLE
OPEN-GRADED STONE
LEVELING COURSE CLEAN OPEN-GRADED
STONE BASE BOTTOM OF COLUMN
PRECAST CONCRETE
WRAPPED WITH TO BE OPEN
CHAMBER
PERMEABLE SOIL LAYER
PENETRATION INTO GEOTEXTILE (TOP AND
SIDES ONLY)

GRANULAR FILL TO FILL THE TEMPORARY, 18"


ANNULAR SPACE BETWEEN MAXIMUM DIAMETER PERMEABLE SOIL

THE STONE COLUMN PIPE CASING AUGERED INTO
PERMEABLE LAYER
LAYER SECTION A-A
AND THE HOLE AT INFILTRATION BASIN STONE COLUMN
OPEN BOTTOM
STONE FILLED PERFORATED 12"
DIAMETER PVC PIPE WRAPPED
ALL AROUND WITH GEOTEXTILE
P.E. 05-13-2022
FABRIC (TYP.)
SECTION B-B MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE 5"-THICK CONCRETE TOP OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

6"
1'-0"
PRECAST 4'-6" EQ EQ 4'-6"
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN

EQ
CONSTANT SLOPE 6"
STEEL OR
CAST IRON
SIDEWALK GRATE
STEEL FACE 2'-0"
8" DIAMETER DUAL WALL HDPE
OPENING, SEE FABRICATED 90° BEND
GI-170 & GI-171 CLEANOUT
STONE 8" INSIDE DIAMETER
(TYP.) STEEL FACE CURB COVER
PERFORATED HDPE PIPE

EQ
COLUMN (TYP.)
(TYP.)
1'-8"

2'-10" EXPANSION JOINT.


CONSTANT SLOPE
EXISTING CURB EXISTING CURB
TO REMAIN
C 2'-4" C 2'-0" TO REMAIN
2'-0"

6"
+
[INLET]
10% -20%

FLOW 8"-THICK REINFORCED


1'-6"

EXISTING EXTEND THE NEW STEEL FACE 24" MIN.


PITCH

ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE


FLOW LIMIT OF THE NEW CONCRETE CURB
PAVEMENT
AS DETERMINED BY FIELD CONDITIONS
13" 36" AND SITE ENGINEER
PLAN
REINFORCED CONCRETE
APRON

CONCRETE APRON PITCH SCHEDULE


TOP OF STEEL OR CAST
3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH NOTES:
CURB REVEAL (INCHES) APRON PITCH CHAMBER, GRATE &
TOP OF SURFACE 4" 4" FASTENER, SEE GI-209 &
SIDEWALK
2.5 TO < 3 20% TO ≥ 17% GI-209B OR GI-209C & GI-209D 1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE
STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL
5"-THICK CONCRETE TOP OPEN GRADED STONE.
3 TO < 3.5 17% TO ≥ 14% 3" 3"
1'-6" IMPERMEABLE LINER 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 &
3.5 TO < 4 14% TO ≥ 11% GI-171
3" THICK LEVELING COURSE
L2"x2"x1/4" BELOW METAL
4 TO 4.5 11% TO ≥ 10% 3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE
GRATE ANCHORED TO
SPECIFICATIONS FOR IMPERMEABLE LINER REQUIREMENTS.
4'-3"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
> 4.5 10% PERFORATED PIPE.
OPENING FOR 8" INSIDE
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"

LONGITUDINAL STREET SLOPE CHAMBER


PIPE (TYP.)
WWM 6x6-W8xW8 CLEAN OPEN-GRADED
≤ 5% 10% MIN STONE
4"

TYPICAL PERFORATED LEVELING COURSE


≥ 5% 12% MIN DEBRIS SCREEN FOR 8"
INSIDE DIA PIPE, SEE
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON GI-211
P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
SECTION C-C MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS

REFER TO DETAILS ON THIS AND NEXT PAGE

PROPERTY LINE C B A EXISTING


SIDEWALK
LOCATION VARIES 20'-0"
OR AS PER DESIGN
CURB LINE

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

FOR PRECAST CONCRETE C B A


CHAMBER, GRATE AND
FASTENER, SEE GI-209 & 5"-THICK CONCRETE TOP
GI-209B OR GI-209C & IMPERMEABLE LINER PLAN
GI-209D
3"-THICK LEVELING CAST IRON CLEANOUT -
4" CURB PIECE AND IMPERMEABLE TOP OF COVER FLUSH
COURSE
#4 REBAR ACROSS IMPERMEABLE LINER 5"-THICK CONCRETE LINER WITH TOP OF SURFACE
1'-0"
OPENING, SEE CAST IRON EXPANSION JOINT TOP
GI-170 & GI-171 3"-THICK LEVELING VERTICAL 8" INSIDE
CLEANOUT, SEE AND FILLER
COURSE (TYP.) DIAMETER SOLID
GI-204 SIDEWALK
TOP OF ROAD BEYOND SIDEWALK STEEL FACE 6" 1'-0" HDPE PIPE
6"
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY
ROADWAY
1'-3"

6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"

8" REINFORCED
3'-6"

REINFORCED CONSTANT SLOPE CONCRETE 3"-THICK LEVELING

5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"

CONCRETE GUTTER
DROP CURB [INLET], MORTAR WRAP STONE IN
SLOPE POURED IN PLACE, AROUND PIPE GEOTEXTILE UNDISTURBED SOIL CLEAN OPEN-GRADED
CURB TO MEET PRECAST (TOP AND SIDES ONLY) 8" INSIDE DIA. STONE BASE UNDISTURBED SOIL
CLEAN
CHAMBER OPEN-GRADED VERTICAL 8" INSIDE PERFORATED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE DIAMETER SOLID HDPE PIPE GEOTEXTILE (TOP PERFORATED HDPE
4"

BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
1'-0"

5" MINIMUM
4" 4" PIPE (TYP.) CLEAN OPEN-GRADED

BEDDING
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
STONE BASE
LEVELING COURSE 5'-0" OR AS PER DESIGN
HDPE STORMWATER
SECTION C-C CHAMBER, SEE NOTE 4 SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171

3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER P.E. 05-13-2022
REQUIREMENTS.
MANAGING DIRECTOR, DATE
4. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
5"-THICK CONCRETE TOP

6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN

CONSTANT SLOPE 6"


STEEL OR
CAST IRON
SIDEWALK GRATE STORMWATER CHAMBER CLEANOUT
CAPPED AT BOTH ENDS; SEE (TYP.) 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
DRAWING GI-204
OPENING, SEE FABRICATED 90° BEND
GI-170 & GI-171 8" INSIDE DIAMETER
PERFORATED HDPE PIPE STEEL FACE CURB COVER
(TYP.)
1'-8"

2'-10" EXPANSION JOINT.


CONSTANT SLOPE
EXISTING CURB
TO REMAIN
D 2'-4" D 2'-0"
EXISTING CURB
TO REMAIN
2'-0" 1'-0"

6"
+
[INLET]
10% -20%

FLOW 8"-THICK REINFORCED


1'-6"

EXISTING EXTEND THE NEW STEEL FACE 24" MIN.


PITCH

ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE


FLOW LIMIT OF THE NEW CONCRETE CURB
PAVEMENT
AS DETERMINED BY FIELD CONDITIONS
13" 36" AND SITE ENGINEER
PLAN
REINFORCED CONCRETE
APRON
TOP OF STEEL OR CAST
3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH
CHAMBER, GRATE &
TOP OF SURFACE 4" 4"
CONCRETE APRON PITCH SCHEDULE FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH 5"-THICK CONCRETE TOP
3" 3"
2.5 TO < 3 20% TO ≥ 17% 1'-6" IMPERMEABLE LINER
3" THICK LEVELING COURSE
3 TO < 3.5 17% TO ≥ 14% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO

4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE

4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
- NO CONNECTION TO SEWERS

PROPERTY LINE C B A REFER TO DETAILS ON


EXISTING
SIDEWALK
LOCATION VARIES 15'-0" THIS AND NEXT PAGE
OR AS PER DESIGN
CURB LINE

EXISTING
CATCH BASIN FLOW
INLET

C B A
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
5"-THICK CONCRETE TOP
PLAN
FASTENER, SEE GI-209 &
GI-209B OR GI-209C & IMPERMEABLE LINER
GI-209D
3"-THICK LEVELING CAST IRON CLEANOUT -
4" CURB PIECE AND IMPERMEABLE TOP OF COVER FLUSH
COURSE
#4 REBAR ACROSS IMPERMEABLE LINER 5"-THICK CONCRETE LINER WITH TOP OF SURFACE
1'-0"
OPENING, SEE CAST IRON EXPANSION JOINT TOP
GI-170 & GI-171 3"-THICK LEVELING VERTICAL 8" INSIDE
CLEANOUT, SEE AND FILLER
COURSE (TYP.) DIAMETER SOLID
GI-204 SIDEWALK
TOP OF ROAD BEYOND SIDEWALK STEEL FACE 6" 1'-0" HDPE PIPE
6"
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY
ROADWAY
1'-3"

6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"

8" REINFORCED
3'-6"

REINFORCED CONSTANT SLOPE CONCRETE 3"-THICK LEVELING

5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"

CONCRETE GUTTER CLEAN CLEAN


DROP CURB [INLET], MORTAR WRAP STONE IN
UNDISTURBED SOIL OPEN-GRADED OPEN-GRADED
SLOPE POURED IN PLACE, AROUND PIPE GEOTEXTILE STONE BASE STONE BASE
CURB TO MEET PRECAST CLEAN (TOP AND SIDES ONLY) 8" INSIDE DIA. UNDISTURBED SOIL
CHAMBER OPEN-GRADED VERTICAL 8" INSIDE PERFORATED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE DIAMETER SOLID HDPE PIPE GEOTEXTILE (TOP PERFORATED HDPE
4"

BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
4" 1'-0" 4" PIPE (TYP.)
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE 5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171
P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER MANAGING DIRECTOR, DATE
REQUIREMENTS. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
- NO CONNECTION TO SEWERS

8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN


FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION 5"-THICK
DIMENSION SCHEDULE JOINT AT MID-SPAN CONCRETE TOP EXPANSION JOINT (TYP.)

8" DIAMETER DUAL WALL HDPE OBSERVATION WELL


FABRICATED 90° BEND FLUSH WITH THE SURFACE, SEE

6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 6"
STEEL OR
SIDEWALK CAST IRON
GRATE 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
GI-170 & GI-171 PERFORATED HDPE
PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
TYP.
1'-8"

EXPANSION JOINT.
EXISTING CURB
D 2'-10" D CONSTANT SLOPE
EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
2'-0"

6"
+
[INLET]

10% -20%
FLOW FLOW
1'-6"

EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE

PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
REINFORCED PLAN AS DETERMINED BY FIELD
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER

TOP OF STEEL OR CAST


3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH
CHAMBER, GRATE &
TOP OF SURFACE 4" 4"
CONCRETE APRON PITCH SCHEDULE FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH 5"-THICK CONCRETE TOP
3" 3"
2.5 TO < 3 20% TO ≥ 17% 1'-6" IMPERMEABLE LINER
3" THICK LEVELING COURSE
3 TO < 3.5 17% TO ≥ 14% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO

4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE

4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP FOR PRECAST CONCRETE

TYPE 2A - WITH STONE COLUMNS 5"-THICK CONCRETE TOP


CHAMBER, GRATE &
FASTENER, SEE GI-209 &
- NO CONNECTION TO SEWERS IMPERMEABLE LINER
GI-209B OR GI-209C &
GI-209D
3"-THICK LEVELING MORTAR AROUND PIPE
PROPERTY LINE 1/2" EXPANSION JOINT COURSE
4" CURB PIECE AND
AND FILLER PER NYC CAST IRON #4 REBAR ACROSS
DOT HIGHWAY SPEC. CLEANOUT, SEE OPENING, SEE
SECTION 2.15 (TYP.) GI-204 GI-170 & GI-171
1'-0"
A EXISTING SIDEWALK
TOP OF GUTTER BEYOND
LOCATION VARIES 15'-0" 10% MIN - 20% MAX PITCH
REFER TO DETAILS ON
OR AS PER DESIGN SIDEWALK
3'-6" 3'-6" THIS AND NEXT PAGE
ROADWAY
DESIGN
5'-0" OR
AS PER

CURB LINE
B B
WWM 6X6-W8XW8
FLOW
REINFORCED
EXISTING CONCRETE
INLET CONSTANT SLOPE CONCRETE APRON
CATCH BASIN HEADER (3) SIDES

3'-6"
DROP CURB [INLET],
CLEAN

2'-10"
SLOPE POURED IN PLACE,
A OPEN-GRADED
CURB TO MEET PRECAST
WRAP STONE IN GEOTEXTILE
STONE BASE ℄ CHAMBER
PLAN (TOP AND SIDES ONLY) INLET SCREEN BOX
SUPPORT BRACKET, SEE
8" DIAMETER

1'-6"
TOP OF STEEL OR CAST IRON GRATE 8" INSIDE DIA. PERFORATED PIPE. MAINTAIN GI-212
OPENING FOR 8" INSIDE DIAMETER FLUSH WITH TOP OF SURFACE CONSTANT SLOPE TOWARDS CHAMBER PERFORATED HDPE

4"
12" PERFORATED DEBRIS

DEPTH OF PVC PIPE PER DESIGN PLANS


PERFORATED PIPE (TYP.) PIPE (TYP.)
3'-6" DEBRIS SCREEN. ADJUST IMPERMEABLE LINER (TYP.) SCREEN, SEE GI-211
SIDEWALK PIPE TO ALLOW FOR 3"-THICK LEVELING OPENING FOR 8" INSIDE
SCREEN (TYP.) COURSE 2'-0" DIAMETER PIPE
WWM 6X6-W8XW8
EQ EQ
. . STONE COLUMN CAP LEVELING COURSE
1'-6" TO BE PERFORATED STONE FILLED PERFORATED
12" DIAMETER PVC PIPE
WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
CAST IRON PERMEABLE SOIL
CONSTANT SLOPE
MORTAR AROUND PIPE CLEANOUT, SEE
2'-10"

UNDISTURBED SOIL 4" 4" GI-204 TEMPORARY, 18" MAXIMUM


PRECAST CONCRETE CHAMBER DIAMETER CASING TO
UNDISTURBED
PERFORATED DEBRIS MINIMUM 5'-0" AUGERED
SOIL
4"

PERMEABLE SOIL LAYER


SCREEN, SEE GI-211 INTO PERMEABLE LAYER
1'-6"

1'-6"

PENETRATION INTO
GRANULAR FILL TO FILL THE
WWM 6x6-W8xW8 ANNULAR SPACE BETWEEN THE
STONE COLUMN PIPE AND HOLE
4"

CLEAN OPEN-GRADED OPEN-GRADED STONE


STONE BASE
WRAPPED WITH GEOTEXTILE BOTTOM OF COLUMN
(TOP AND SIDES ONLY) TO BE OPEN
PERMEABLE SOIL LAYER
PENETRATION INTO

TEMPORARY, 18" MAXIMUM PERMEABLE


DIAMETER CASING AUGERED SOIL LAYER
INTO PERMEABLE LAYER
STONE FILLED PERFORATED

GRANULAR FILL TO FILL THE 12" DIAMETER PVC PIPE SECTION A-A
ANNULAR SPACE BETWEEN WRAPPED ALL AROUND WITH AT INFILTRATION BASIN STONE COLUMN
THE STONE COLUMN PIPE GEOTEXTILE FABRIC (TYP.)
AND THE HOLE
OPEN BOTTOM (TYP.)
P.E. 05-13-2022
SECTION B-B MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS

8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN


FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION 5"-THICK
DIMENSION SCHEDULE JOINT AT MID-SPAN CONCRETE TOP EXPANSION JOINT (TYP.)

8" DIAMETER DUAL WALL HDPE OBSERVATION WELL


FABRICATED 90° BEND FLUSH WITH THE SURFACE, SEE

6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE

5'-0" OR AS PER DESIGN

EQ
CHAMBER CONSTANT SLOPE 6"
STEEL OR

EQ
SIDEWALK CAST IRON
GRATE 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
3'-6" 3'-6"
GI-170 & GI-171 PERFORATED HDPE
STONE COLUMN PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
(TYP.) TYP.
1'-8"

EXPANSION JOINT.
C

EQ
C

EQ
2'-10" CONSTANT SLOPE
EXISTING CURB EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
2'-0"

6"
+
[INLET]

10% -20%
FLOW FLOW
1'-6"

EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE

PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
REINFORCED
PLAN AS DETERMINED BY FIELD
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER

CONCRETE APRON PITCH SCHEDULE TOP OF STEEL OR CAST


3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH NOTES:
CHAMBER, GRATE &
TOP OF SURFACE 4" 4"
CURB REVEAL (INCHES) APRON PITCH FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D 1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED
2.5 TO < 3 20% TO ≥ 17% STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING
5"-THICK CONCRETE TOP ADDITIONAL OPEN GRADED STONE.
3" 3"
3 TO < 3.5 17% TO ≥ 14% 1'-6" IMPERMEABLE LINER 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE
3" THICK LEVELING COURSE GI-170 & GI-171
3.5 TO < 4 14% TO ≥ 11%
L2"x2"x1/4" BELOW METAL
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE
GRATE ANCHORED TO
4 TO 4.5 11% TO ≥ 10% SPECIFICATIONS FOR IMPERMEABLE LINER REQUIREMENTS.

4'-3"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10%
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"

PIPE (TYP.) CHAMBER


LONGITUDINAL STREET SLOPE
WWM 6x6-W8xW8 CLEAN OPEN-GRADED
STONE
4"

≤ 5% 10% MIN TYPICAL PERFORATED LEVELING COURSE


DEBRIS SCREEN FOR 8"
≥ 5% 12% MIN INSIDE DIA PIPE, SEE
GI-211
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS. SECTION C-C
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS

PROPERTY LINE
C B A EXISTING
REFER TO DETAILS ON
SIDEWALK
LOCATION VARIES 15'-0" THIS AND NEXT PAGE
OR AS PER DESIGN
CURB LINE

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

C B A
FOR PRECAST CONCRETE
CHAMBER, GRATE AND PLAN
FASTENER, SEE GI-209 & 5"-THICK CONCRETE TOP
GI-209B OR GI-209C & IMPERMEABLE LINER
GI-209D
3"-THICK LEVELING CAST IRON CLEANOUT -
4" CURB PIECE AND IMPERMEABLE TOP OF COVER FLUSH
COURSE LINER
#4 REBAR ACROSS IMPERMEABLE LINER 5"-THICK CONCRETE WITH TOP OF SURFACE
1'-0"
OPENING, SEE CAST IRON EXPANSION JOINT TOP
3"-THICK LEVELING VERTICAL 8" INSIDE
GI-170 & GI-171 CLEANOUT, SEE AND FILLER
COURSE (TYP.) DIAMETER SOLID
GI-204 SIDEWALK
TOP OF ROAD BEYOND SIDEWALK STEEL FACE 6" 1'-0" HDPE PIPE
6"
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY
ROADWAY
1'-3"

6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"

8" REINFORCED
3'-6"

REINFORCED CONSTANT SLOPE CONCRETE 3"-THICK LEVELING

5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"

CONCRETE GUTTER
DROP CURB [INLET], MORTAR WRAP STONE IN
SLOPE POURED IN PLACE, AROUND PIPE GEOTEXTILE UNDISTURBED SOIL CLEAN OPEN-GRADED
CURB TO MEET PRECAST (TOP AND SIDES ONLY) 8" INSIDE DIA. STONE BASE UNDISTURBED SOIL
CLEAN
CHAMBER OPEN-GRADED VERTICAL 8" INSIDE PERFORATED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE DIAMETER SOLID HDPE PIPE GEOTEXTILE (TOP PERFORATED HDPE
4"

BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
1'-0"

5" MINIMUM
4" 4" PIPE (TYP.) CLEAN OPEN-GRADED 5'-0" OR AS PER DESIGN

BEDDING
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN
STONE BASE
LEVELING COURSE 5'-0" OR AS PER DESIGN HDPE STORMWATER
SECTION C-C CHAMBER, SEE NOTE 4 SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER
REQUIREMENTS.
P.E. 05-13-2022
4. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN 5"-THICK CONCRETE TOP
FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION
DIMENSION SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)

8" DIAMETER DUAL WALL HDPE OBSERVATION WELL


FABRICATED 90° BEND FLUSH WITH THE SURFACE, SEE

6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 6"
STEEL OR
CAST IRON STORMWATER CHAMBER
SIDEWALK CAPPED AT BOTH ENDS; SEE
GRATE 2'-0"
STEEL FACE DRAWING GI-204 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
GI-170 & GI-171 PERFORATED HDPE
1'-0" PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
1'-8" TYP.
2'-10" EXPANSION JOINT.
CONSTANT SLOPE
EXISTING CURB D 2'-4"
D 2'-0"
EXISTING CURB
TO REMAIN TO REMAIN
2'-0"

6"
+
[INLET]

10% -20%
FLOW FLOW
1'-6"

EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE

PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN
TOP OF STEEL OR CAST
3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH
CHAMBER, GRATE &
TOP OF SURFACE 4" 4"
CONCRETE APRON PITCH SCHEDULE FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH 5"-THICK CONCRETE TOP
3" 3"
2.5 TO < 3 20% TO ≥ 17% 1'-6" IMPERMEABLE LINER
3" THICK LEVELING COURSE
3 TO < 3.5 17% TO ≥ 14% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO

4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE

4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
- NO CONNECTION TO SEWERS

C A EXISTING
PROPERTY LINE B REFER TO DETAILS ON
SIDEWALK
LOCATION VARIES 10'-0" OR THIS AND NEXT PAGE
CURB LINE AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

C B A

FOR PRECAST PLAN


CONCRETE CHAMBER,
GRATE AND FASTENER 5"-THICK CONCRETE TOP
SEE GI-209 & GI-209B OR IMPERMEABLE LINER
GI-209C & GI-209D 1/2" EXPANSION JOINT CAST IRON CLEANOUT -
3"-THICK LEVELING IMPERMEABLE TOP OF COVER FLUSH
4" CURB PIECE AND AND FILLER PER NYC LINER
COURSE IMPERMEABLE LINER 5"-THICK CONCRETE WITH TOP OF SURFACE
#4 REBAR ACROSS DOT HIGHWAY SPEC.
TOP
OPENING, SEE SECTION 2.15 (TYP.) 3"-THICK LEVELING VERTICAL 8" INSIDE
GI-170 & GI-171 COURSE (TYP.) DIAMETER SOLID
SIDEWALK SIDEWALK
TOP OF ROAD BEYOND 6" STEEL FACE 6" 1'-0" HDPE PIPE
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY ROADWAY
1'-3"

1'-0"
6"
9" 1'-0"
WWM 6X6-W8XW8
4'-3"
3'-6"

REINFORCED CONSTANT SLOPE CONCRETE 8" REINFORCED


3"-THICK LEVELING

5'-0"
CONCRETE APRON HEADER (3) SIDES 8" REINFORCED CONCRETE GUTTER
COURSE (TYP.)
2'-10"

DROP CURB [INLET], WRAP STONE IN CONCRETE GUTTER CLEAN CLEAN


SLOPE POURED IN PLACE, GEOTEXTILE UNDISTURBED SOIL OPEN-GRADED OPEN-GRADED
CURB TO MEET PRECAST CLEAN (TOP AND SIDES ONLY) STONE BASE STONE BASE
8" INSIDE DIA. UNDISTURBED SOIL
CHAMBER OPEN-GRADED 8" DIAMETER PERFORATED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE PERFORATED HDPE HDPE PIPE GEOTEXTILE (TOP PERFORATED HDPE
BRACKET, SEE GI-212
4"

PIPE (TYP.)
WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8
GEOTEXTILE (TOP
PERFORATED DEBRIS AND SIDES ONLY)
SCREEN, SEE GI-211 4" 1'-0" 4"
LEVELING COURSE 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET
NOTES: AT MIDSECTION AT UPSTREAM SECTION

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER MANAGING DIRECTOR, DATE
REQUIREMENTS. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
8" DIAMETER DUAL WALL HDPE
- NO CONNECTION TO SEWERS
FABRICATED 90° TEE
10'-0" OR AS PER DESIGN
5"-THICK CONCRETE TOP
8" DIAMETER DUAL WALL HDPE EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

OBSERVATION WELL FLUSH

1'-0"
WITH THE SURFACE, SEE
PRECAST CONCRETE HEADER
GI-210
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 1'-0"
STEEL OR
CAST IRON 3'-0" CLEANOUT (TYP.)

EQ
GRATE
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)

EQ
STEEL FACE CURB COVER

1'-8"
C 2'-10"
C CONSTANT SLOPE
EXPANSION JOINT.
EXISTING CURB 2'-0" EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN

6"
+
[INLET]

10% -20%
FLOW 1'-6" FLOW EXTEND THE NEW STEEL FACE
EXISTING 8"-THICK REINFORCED

PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN

TOP OF STEEL OR CAST


3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH
CHAMBER, GRATE &
TOP OF SURFACE 4" 4"
CONCRETE APRON PITCH SCHEDULE FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH 5"-THICK CONCRETE TOP
3" 3"
2.5 TO < 3 20% TO ≥ 17% 1'-6" IMPERMEABLE LINER
3" THICK LEVELING COURSE
3 TO < 3.5 17% TO ≥ 14% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO

4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE

4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
SECTION C-C
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP FOR PRECAST CONCRETE

TYPE 3A - WITH STONE COLUMNS CHAMBER, GRATES &


FASTENER, SEE GI-209 &
- NO CONNECTION TO SEWERS 5"-THICK CONCRETE TOP GI-209B OR GI-209C &
IMPERMEABLE LINER GI-209D
MORTAR AROUND PIPE
PROPERTY LINE 3"-THICK LEVELING
1/2" EXPANSION JOINT 4" CURB PIECE AND
COURSE
AND FILLER PER NYC #4 REBAR ACROSS
DOT HIGHWAY SPEC. OPENING, SEE
SECTION 2.15 (TYP.) GI-170 & GI-171
A
LOCATION VARIES 10'-0" OR SIDEWALK TOP OF GUTTER BEYOND
REFER TO DETAILS ON EXISTING 10% MIN - 20% MAX PITCH
AS PER DESIGN
THIS AND NEXT PAGE SIDEWALK
EQ EQ ROADWAY
DESIGN
5'-0" OR
AS PER

CURB LINE
B B
WWM 6X6-W8XW8
FLOW
EXISTING REINFORCED
CONCRETE CONSTANT SLOPE
CATCH BASIN INLET CONCRETE APRON
HEADER (3) SIDES

3'-6"
CLEAN
A OPEN-GRADED
DROP CURB [INLET],
SLOPE POURED IN PLACE,
STONE BASE CURB TO MEET PRECAST
PLAN WRAP STONE IN GEOTEXTILE ℄ CHAMBER
(TOP AND SIDES ONLY) INLET SCREEN BOX
TOP OF STEEL OR CAST IRON SUPPORT BRACKET, SEE

4"
1'-6"
GRATE FLUSH WITH TOP OF 8" INSIDE DIA. PERFORATED HDPE PIPE. MAINTAIN GI-212
OPENING FOR 8" INSIDE DIAMETER SURFACE CONSTANT SLOPE TOWARDS CHAMBER PERFORATED DEBRIS
PERFORATED PIPE (TYP.) 8" DIAMETER 12" SCREEN, SEE GI-211
DEBRIS SCREEN, ADJUST IMPERMEABLE LINER (TYP.) PERFORATED HDPE
SIDEWALK PIPE TO ALLOW FOR 3"-THICK LEVELING COURSE PIPE (TYP.) OPENING FOR 8" INSIDE
4" SCREEN (TYP.) DIAMETER PIPE
1'-0"
EQ EQ WWM 6X6-W8XW8

DEPTH OF PVC PIPE PER DESIGN PLANS


. . STONE COLUMN CAP LEVELING COURSE
TO BE PERFORATED STONE FILLED PERFORATED
12" DIAMETER PVC PIPE
PERMEABLE SOIL WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
CONSTANT SLOPE CAST IRON TEMPORARY, 18" MAXIMUM
CLEANOUT, SEE DIAMETER CASING TO
2'-10"

4" MORTAR AROUND PIPE


UNDISTURBED SOIL 4" GI-204 MINIMUM 5'-0" AUGERED
PRECAST CONCRETE CHAMBER INTO PERMEABLE LAYER
UNDISTURBED
PERFORATED DEBRIS CLEAN SOIL

PERMEABLE SOIL LAYER


4"

SCREEN, SEE GI-211 OPEN-GRADED GRANULAR FILL TO FILL THE


1'-6"

PENETRATION INTO
STONE BASE CLEAN OPEN-GRADED STONE ANNULAR SPACE BETWEEN
WWM 6x6-W8xW8 BASE THE STONE COLUMN PIPE
WRAPPED WITH GEOTEXTILE AND THE HOLE
(TOP AND SIDES ONLY)
OPEN-GRADED STONE

BOTTOM OF COLUMN
TO BE OPEN
PERMEABLE SOIL LAYER
PENETRATION INTO

TEMPORARY, 18" MAXIMUM PERMEABLE SOIL


DIAMETER CASING AUGERED LAYER
INTO PERMEABLE LAYER
STONE FILLED PERFORATED

GRANULAR FILL TO FILL THE 12" DIAMETER PVC PIPE SECTION A-A
ANNULAR SPACE BETWEEN WRAPPED ALL AROUND WITH AT INFILTRATION BASIN STONE COLUMN
THE STONE COLUMN PIPE GEOTEXTILE FABRIC (TYP.)
AND THE HOLE OPEN BOTTOM
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION B-B GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 3A - WITH STONE COLUMNS
8" DIAMETER DUAL WALL HDPE - NO CONNECTION TO SEWERS
FABRICATED 90° TEE
10'-0" OR AS PER DESIGN

8" DIAMETER DUAL WALL HDPE EXPANSION JOINT (TYP.)


FABRICATED 90° BEND

5"- THICK CONCRETE TOP


OBSERVATION WELL FLUSH

1'-0"
STONE WITH THE SURFACE, SEE
PRECAST COLUMN CONCRETE HEADER
GI-210
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 1'-0"
STEEL OR

EQ
CAST IRON EQ EQ
GRATE CLEANOUT (TYP.)

EQ
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)

EQ

EQ
3'-0" STEEL FACE CURB COVER

1'-8"
C 2'-10"
C CONSTANT SLOPE
EXPANSION JOINT.
EXISTING CURB 2'-0" EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN

6"
+
[INLET]

10% -20%
FLOW FLOW

1'-6"
EXISTING EXTEND THE NEW STEEL FACE
8"-THICK REINFORCED

PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN

CONCRETE APRON PITCH SCHEDULE TOP OF STEEL OR CAST


3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH
CHAMBER, GRATE &
TOP OF SURFACE 4" 4" NOTES:
CURB REVEAL (INCHES) APRON PITCH FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D
2.5 TO < 3 20% TO ≥ 17% 1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED
5"-THICK CONCRETE TOP STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING
3" 3" ADDITIONAL OPEN GRADED STONE.
3 TO < 3.5 17% TO ≥ 14%
1'-6" IMPERMEABLE LINER
3" THICK LEVELING COURSE 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE
3.5 TO < 4 14% TO ≥ 11%
L2"x2"x1/4" BELOW METAL GI-170 & GI-171
GRATE ANCHORED TO
4 TO 4.5 11% TO ≥ 10% 3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE
4'-3"

CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER


PERFORATED PIPE. SPECIFICATIONS FOR IMPERMEABLE LINER REQUIREMENTS.
> 4.5 10% OPENING FOR 8" INSIDE
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"

PIPE (TYP.) CHAMBER


LONGITUDINAL STREET SLOPE
WWM 6x6-W8xW8 CLEAN OPEN-GRADED
STONE
4"

≤ 5% 10% MIN
TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≥ 5% 12% MIN INSIDE DIA PIPE, SEE
GI-211
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS. SECTION C-C
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
- NO CONNECTION TO SEWERS

EXISTING
PROPERTY LINE C B A REFER TO DETAILS ON SIDEWALK
LOCATION VARIES 20'-0" THIS AND NEXT PAGE
CURB LINE OR AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

C B A

PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GRASS TOP
GI-209D TOPSOIL
CAST IRON CLEANOUT -
4" CURB PIECE AND CAST IRON EXPANSION JOINT TOP OF COVER FLUSH
#4 REBAR ACROSS CLEANOUT, SEE AND FILLER (TYP.) WITH TOP OF SURFACE
GI-204 GRASS TOP
OPENING, SEE
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOP OF ROAD BEYOND 1'-0" 6" SIDEWALK STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"

1'-0"
1'-3"

9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"

CONCRETE 8" REINFORCED 8" REINFORCED


3'-6"

REINFORCED HEADER (3) SIDES

5'-0"
CONSTANT SLOPE CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"

DROP CURB [INLET] MORTAR UNDISTURBED CLEAN CLEAN TOPSOIL


SLOPE POURED IN PLACE AROUND PIPE SOIL OPEN-GRADED OPEN-GRADED
WRAP STONE IN
CURB TO MEET PRECAST STONE BASE STONE BASE UNDISTURBED SOIL
CLEAN GEOTEXTILE
CHAMBER OPEN-GRADED (TOP AND SIDES ONLY) WRAP STONE IN WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE GEOTEXTILE (TOP GEOTEXTILE (TOP PERFORATED HDPE
BRACKET, SEE GI-212
4"

8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER
PERFORATED DEBRIS PIPE (TYP.)
4" 1'-0" 4" PERFORATED HDPE
SCREEN, SEE GI-211 PIPE (TYP.) 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE
5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION GRASS TOP
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN

CONSTANT SLOPE 6"


STEEL OR
CAST IRON
SIDEWALK GRATE
STEEL FACE 2'-0"
8" DIAMETER DUAL WALL HDPE
OPENING, SEE FABRICATED 90° BEND
GI-170 & GI-171 8" INSIDE DIAMETER
PERFORATED HDPE PIPE STEEL FACE CURB COVER
(TYP.)
1'-8"

2'-10" EXPANSION JOINT.


EXISTING CURB D D
CONSTANT SLOPE
EXISTING CURB
2'-4"
TO REMAIN 2'-0" TO REMAIN
2'-0"

6"
+
[INLET]
10% -20%

FLOW 8"-THICK REINFORCED


1'-6"

EXISTING EXTEND THE NEW STEEL FACE 24" MIN.


PITCH

ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE


FLOW LIMIT OF THE NEW CONCRETE CURB
PAVEMENT
AS DETERMINED BY FIELD CONDITIONS
13" 36" AND SITE ENGINEER
PLAN
REINFORCED CONCRETE
APRON

TOP OF STEEL GRATE FLUSH 3'-6"


FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
CONCRETE APRON PITCH SCHEDULE FASTENER, SEE GI-209A &
SIDEWALK
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH GRASS TOP

2.5 TO < 3 20% TO ≥ 17% 1'-6" TOPSOIL

3 TO < 3.5 17% TO ≥ 14% L2"x2"x1/4" BELOW METAL


GRATE ANCHORED TO

4'-4"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) 4" 4" CHAMBER
> 4.5 10% WWM 6x6-W8xW8 OPEN-GRADED STONE

4"
PERFORATED DEBRIS LEVELING COURSE
LONGITUDINAL STREET SLOPE SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≤ 5% 10% MIN

≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP FOR PRECAST CONCRETE
CHAMBER, GRATE AND
TYPE 1A - WITH STONE COLUMNS FASTENER, SEE GI-209A &
GI-209B OR GI-209C &
- NO CONNECTION TO SEWERS GI-209D
PROPERTY LINE GRASS TOP MORTAR AROUND PIPE
EXPANSION TOPSOIL 4" CURB PIECE AND
JOINT AND CAST IRON #4 REBAR ACROSS
FILLER (TYP.) CLEANOUT, SEE OPENING, SEE
1'-0"
GI-204 GI-170 & GI-171

. VARIES
A 20'-0"
EXISTING
SIDEWALK TOP OF GUTTER BEYOND
LOCATION SIDEWALK
REFER TO DETAILS ON
OR AS PER DESIGN 10% MIN - 20% MAX PITCH
4'-6" EQ EQ 4'-6" THIS AND NEXT PAGE
ROADWAY
DESIGN
5'-0" OR
AS PER

CURB LINE
B B
FLOW 9" WWM 6X6-W8XW8
REINFORCED
INLET CONCRETE
EXISTING CONSTANT SLOPE CONCRETE APRON
HEADER (3) SIDES

3'-6"
CATCH BASIN CLEAN DROP CURB [INLET],
A

2'-10"
OPEN-GRADED SLOPE POURED IN PLACE,
STONE BASE CURB TO MEET PRECAST
WRAP STONE IN ℄ CHAMBER
PLAN GEOTEXTILE INLET SCREEN BOX
CONCRETE COLLAR (TOP AND SIDES ONLY) SUPPORT BRACKET,

1'-6"
OPENING FOR 8" INSIDE 3"x3" TYP. 8" INSIDE DIAMETER SEE GI-212
TOP OF STEEL OR CAST IRON GRATE 8" INSIDE DIA. PERFORATED HDPE
DIAMETER PERFORATED PIPE PERFORATED HDPE PERFORATED DEBRIS

4"
FLUSH WITH TOP OF SURFACE PIPE. MAINTAIN CONSTANT SLOPE CAST IRON CLEANOUT,

DEPTH OF PVC PIPE PER DESIGN PLANS


3'-6" SEE GI-204 PIPE. (TYP.) SCREEN, SEE GI-211
SIDEWALK DEBRIS SCREEN. ADJUST PIPE TOWARDS CHAMBER
3'-0" 2'-0" OPENING FOR 8" INSIDE
1'-0"
TO ALLOW FOR SCREEN (TYP.) GRASS TOP 12" TOPSOIL STONE COLUMN CAP DIAMETER PIPE
TO BE PERFORATED EQ EQ WWM 6X6-W8XW8
. .
LEVELING COURSE
1'-6"
STONE FILLED PERFORATED
12" DIAMETER PVC PIPE
PERMEABLE SOIL WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
CONSTANT SLOPE TEMPORARY, 18" MAXIMUM
DIAMETER CASING TO
2'-10"

UNDISTURBED 4" MORTAR


4" MINIMUM 5'-0" AUGERED
SOIL AROUND PIPE
PERFORATED INTO PERMEABLE LAYER 12"
4"

DEBRIS SCREEN,

PERMEABLE SOIL LAYER


GRANULAR FILL TO FILL THE
1'-6"

1'-6"

1'-6"
SEE GI-211

PENETRATION INTO
ANNULAR SPACE BETWEEN
THE STONE COLUMN PIPE
WWM 6x6-W8xW8
AND THE HOLE

LEVELING COURSE OPEN-GRADED STONE


CLEAN OPEN-GRADED
PRECAST CONCRETE STONE BASE WRAPPED BOTTOM OF COLUMN
CHAMBER PERMEABLE SOIL LAYER WITH GEOTEXTILE (TOP TO BE OPEN
AND SIDES ONLY)
PENETRATION INTO

GRANULAR FILL TO FILL THE TEMPORARY, 18"


ANNULAR SPACE BETWEEN MAXIMUM PERMEABLE
THE STONE COLUMN PIPE DIAMETER CASING SOIL LAYER
AND THE HOLE AUGERED INTO SECTION A-A
PERMEABLE LAYER AT INFILTRATION BASIN STONE COLUMN
STONE FILLED PERFORATED 12"
OPEN BOTTOM
DIAMETER PVC PIPE WRAPPED
(TYP.)
ALL AROUND WITH GEOTEXTILE
FABRIC (TYP.)
P.E. 05-13-2022
SECTION B-B
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION GRASS TOP
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

6"
1'-0"
PRECAST 4'-6" EQ EQ 4'-6"
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN

EQ
CONSTANT SLOPE 6"
STEEL OR
CAST IRON
SIDEWALK GRATE
STEEL FACE 2'-0"
8" DIAMETER DUAL WALL HDPE
OPENING, SEE FABRICATED 90° BEND
GI-170 & GI-171 8" INSIDE DIAMETER
STONE COLUMN STEEL FACE CURB COVER

EQ
PERFORATED HDPE PIPE
(TYP.) (TYP.)
1'-8"

2'-10" EXPANSION JOINT.


EXISTING CURB C C CONSTANT SLOPE
EXISTING CURB
2'-4"
TO REMAIN 2'-0" TO REMAIN
2'-0"

6"
+
[INLET]
10% -20%

FLOW 8"-THICK REINFORCED


1'-6"

EXISTING EXTEND THE NEW STEEL FACE 24" MIN.


PITCH

ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE


FLOW LIMIT OF THE NEW CONCRETE CURB
PAVEMENT
AS DETERMINED BY FIELD CONDITIONS
13" 36" AND SITE ENGINEER
PLAN
REINFORCED CONCRETE
APRON

CONCRETE APRON PITCH SCHEDULE TOP OF STEEL GRATE FLUSH 3'-6"


FOR PRECAST CONCRETE NOTES:
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
CURB REVEAL (INCHES) APRON PITCH SIDEWALK FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GI-209D 1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN
GRADED STONE STARTING AT THE BASE OF THE INFILTRATION BASIN
2.5 TO < 3 20% TO ≥ 17% GRASS TOP PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

3 TO < 3.5 17% TO ≥ 14% 1'-6" TOPSOIL 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE
GI-170 & GI-171
3.5 TO < 4 14% TO ≥ 11% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO

4'-4"
4 TO 4.5 11% TO ≥ 10% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"

PIPE (TYP.) 4" 4" CHAMBER


LONGITUDINAL STREET SLOPE WWM 6x6-W8xW8 OPEN-GRADED STONE
4"

PERFORATED DEBRIS LEVELING COURSE


≤ 5% 10% MIN SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS.
SECTION C-C P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS

PROPERTY LINE C B A REFER TO DETAILS ON


EXISTING
SIDEWALK
LOCATION VARIES 20'-0" THIS AND NEXT PAGE
CURB LINE OR AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

C B A

PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GRASS TOP
GI-209D TOPSOIL
CAST IRON CLEANOUT -
4" CURB PIECE AND CAST IRON EXPANSION JOINT TOP OF COVER FLUSH
#4 REBAR ACROSS CLEANOUT, SEE AND FILLER (TYP.) WITH TOP OF SURFACE
GI-204 GRASS TOP
OPENING, SEE
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOP OF ROAD BEYOND 1'-0" 6" SIDEWALK STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"

1'-0"
1'-3"

9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"

CONCRETE 8" REINFORCED 8" REINFORCED


3'-6"

REINFORCED

5'-0"
CONSTANT SLOPE HEADER (3) SIDES CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"

DROP CURB [INLET] MORTAR UNDISTURBED TOPSOIL


SLOPE POURED IN PLACE AROUND PIPE SOIL
WRAP STONE IN
CURB TO MEET PRECAST GEOTEXTILE UNDISTURBED SOIL
CHAMBER (TOP AND SIDES ONLY) WRAP STONE IN WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT GEOTEXTILE (TOP GEOTEXTILE (TOP PERFORATED HDPE
BRACKET, SEE GI-212
4"

8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER CLEAN OPEN-GRADED
PERFORATED DEBRIS PIPE (TYP.) CLEAN STONE BASE
PERFORATED HDPE

5" MINIMUM
SCREEN, SEE GI-211 4" 1'-0" 4" CLEAN OPEN-GRADED
5'-0" OR AS PER DESIGN

BEDDING
PIPE (TYP.) HDPE 5'-0" OR AS PER DESIGN
LEVELING COURSE OPEN-GRADED STONE BASE
5'-0" OR AS PER DESIGN HDPE STORMWATER STORMWATER
STONE BASE
CHAMBER, SEE NOTE 3 CHAMBER, SEE
SECTION C-C SECTION B-B NOTE 3 SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION

NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE. P.E. 05-13-2022
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 MANAGING DIRECTOR, DATE
3. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN

CONSTANT SLOPE 6"


STEEL OR
CAST IRON
STORMWATER CHAMBER
SIDEWALK GRATE
CAPPED AT BOTH ENDS; SEE
STEEL FACE 2'-0"
DRAWING GI-204 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 1'-0" GRASS TOP FABRICATED 90° BEND
GI-170 & GI-171 8" INSIDE DIAMETER
PERFORATED HDPE PIPE STEEL FACE CURB COVER
(TYP.)
1'-8"

2'-10" EXPANSION JOINT.


EXISTING CURB
D D CONSTANT SLOPE
EXISTING CURB
2'-4"
TO REMAIN 2'-0" TO REMAIN
2'-0"

6"
+
[INLET]
10% -20%

FLOW 8"-THICK REINFORCED


1'-6"

EXISTING EXTEND THE NEW STEEL FACE 24" MIN.


PITCH

ASPHALT CONCRETE GUTTER BEYOND THE INFILTRATION BASIN, THE


FLOW LIMIT OF THE NEW CONCRETE CURB
PAVEMENT
AS DETERMINED BY FIELD CONDITIONS
13" 36" AND SITE ENGINEER
PLAN
REINFORCED CONCRETE
APRON
TOP OF STEEL GRATE FLUSH 3'-6"
FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
SIDEWALK FASTENER, SEE GI-209A &
CONCRETE APRON PITCH SCHEDULE GI-209B OR GI-209C & GI-209D
GRASS TOP
CURB REVEAL (INCHES) APRON PITCH
1'-6" TOPSOIL
2.5 TO < 3 20% TO ≥ 17%
L2"x2"x1/4" BELOW METAL
3 TO < 3.5 17% TO ≥ 14% GRATE ANCHORED TO

4'-4"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
3.5 TO < 4 14% TO ≥ 11% PERFORATED PIPE.
OPENING FOR 8" INSIDE
DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
4 TO 4.5 11% TO ≥ 10% PIPE (TYP.) CHAMBER
4" 4"
WWM 6x6-W8xW8 OPEN-GRADED STONE
> 4.5 10%

4"
PERFORATED DEBRIS LEVELING COURSE
SCREEN FOR 8" INSIDE
STREET SLOPE DIA PIPE, SEE GI-211

≤ 5% 10% MIN

≥ 5% 12% MIN SECTION D-D


* 2" MINIMUM OPENING TO BE MAINTAINED P.E. 05-13-2022
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2
- NO CONNECTION TO SEWERS

PROPERTY LINE C B A REFER TO DETAILS ON


EXISTING
SIDEWALK
LOCATION VARIES 15'-0" THIS AND NEXT PAGE
OR AS PER DESIGN
CURB LINE

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

C B A

FOR PRECAST CONCRETE


PLAN
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GRASS TOP
GI-209D TOPSOIL
CAST IRON CLEANOUT -
4" CURB PIECE AND CAST IRON EXPANSION JOINT TOP OF COVER FLUSH
#4 REBAR ACROSS CLEANOUT, SEE AND FILLER (TYP.) WITH TOP OF SURFACE
GI-204 GRASS TOP
OPENING, SEE
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOP OF ROAD BEYOND 1'-0" 6" SIDEWALK STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"

1'-0"
1'-3"

9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"

CONCRETE 8" REINFORCED 8" REINFORCED


3'-6"

REINFORCED HEADER (3) SIDES

5'-0"
CONSTANT SLOPE CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"

DROP CURB [INLET] MORTAR UNDISTURBED TOPSOIL


SLOPE POURED IN PLACE AROUND PIPE SOIL
WRAP STONE IN
CURB TO MEET PRECAST CLEAN UNDISTURBED SOIL
CLEAN GEOTEXTILE CLEAN
CHAMBER OPEN-GRADED
OPEN-GRADED (TOP AND SIDES ONLY) WRAP STONE IN OPEN-GRADED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE
STONE BASE GEOTEXTILE (TOP STONE BASE GEOTEXTILE (TOP PERFORATED HDPE
BRACKET, SEE GI-212
4"

8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER
PERFORATED DEBRIS PIPE (TYP.)
4" 1'-0" 4" PERFORATED HDPE
SCREEN, SEE GI-211 PIPE (TYP.) 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE
5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2
- NO CONNECTION TO SEWERS

8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN


FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION
DIMENSION SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)

8" DIAMETER DUAL WALL HDPE OBSERVATION WELL


FABRICATED 90° BEND FLUSH WITH THE SURFACE, SEE

6"
1'-0"
GI-210
GRASS TOP
PRECAST CONCRETE HEADER
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 6"
STEEL OR
SIDEWALK CAST IRON
GRATE 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
GI-170 & GI-171 PERFORATED HDPE
PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
TYP.
1'-8"

EXPANSION JOINT.
EXISTING CURB D 2'-10"
D CONSTANT SLOPE
EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
2'-0"

6"
+
[INLET]

10% -20%
FLOW FLOW
1'-6"

EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE

PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
REINFORCED
PLAN AS DETERMINED BY FIELD
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER

TOP OF STEEL GRATE FLUSH 3'-6"


FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
SIDEWALK FASTENER, SEE GI-209A &
CONCRETE APRON PITCH SCHEDULE GI-209B OR GI-209C & GI-209D
GRASS TOP
CURB REVEAL (INCHES) APRON PITCH
1'-6" TOPSOIL
2.5 TO < 3 20% TO ≥ 17%
L2"x2"x1/4" BELOW METAL
3 TO < 3.5 17% TO ≥ 14% GRATE ANCHORED TO

4'-4"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
3.5 TO < 4 14% TO ≥ 11% PERFORATED PIPE.
OPENING FOR 8" INSIDE
DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
4 TO 4.5 11% TO ≥ 10% PIPE (TYP.) CHAMBER
4" 4"
WWM 6x6-W8xW8 OPEN-GRADED STONE
> 4.5 10%

4"
PERFORATED DEBRIS LEVELING COURSE
SCREEN FOR 8" INSIDE
STREET SLOPE DIA PIPE, SEE GI-211

≤ 5% 10% MIN

≥ 5% 12% MIN SECTION D-D


* 2" MINIMUM OPENING TO BE MAINTAINED P.E. 05-13-2022
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP FOR PRECAST CONCRETE

TYPE 2A - WITH STONE COLUMNS CHAMBER, GRATE AND


FASTENER, SEE GI-209A &
- NO CONNECTION TO SEWERS GI-209B OR GI-209C &
GI-209D
GRASS TOP MORTAR AROUND PIPE
EXPANSION TOPSOIL 4" CURB PIECE AND
PROPERTY LINE JOINT AND CAST IRON #4 REBAR ACROSS
FILLER (TYP.) CLEANOUT, SEE OPENING, SEE
1'-0"
GI-204 GI-170 & GI-171

TOP OF GUTTER BEYOND


A EXISTING
SIDEWALK
SIDEWALK
10% MIN - 20% MAX PITCH
LOCATION VARIES 15'-0"
REFER TO DETAILS ON
OR AS PER DESIGN ROADWAY
3'-6" 3'-6" THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER

CURB LINE
B B
9" WWM 6X6-W8XW8
REINFORCED
FLOW CONCRETE
CONSTANT SLOPE CONCRETE APRON
HEADER (3) SIDES

3'-6"
EXISTING INLET
CLEAN DROP CURB [INLET],

2'-10"
CATCH BASIN SLOPE POURED IN PLACE,
A OPEN-GRADED
STONE BASE CURB TO MEET PRECAST
WRAP STONE IN ℄ CHAMBER
GEOTEXTILE INLET SCREEN BOX
PLAN (TOP AND SIDES ONLY) SUPPORT BRACKET,

1'-6"
8" INSIDE DIAMETER SEE GI-212
OPENING FOR 8" INSIDE TOP OF STEEL OR CAST IRON GRATE 8" INSIDE DIA. PERFORATED HDPE PIPE. PERFORATED DEBRIS
PERFORATED HDPE

4"

DEPTH OF PVC PIPE PER DESIGN PLANS


DIAMETER PERFORATED PIPE 3'-6" FLUSH WITH TOP OF SURFACE MAINTAIN CONSTANT SLOPE TOWARDS SCREEN, SEE GI-211
PIPE. (TYP.)
SIDEWALK DEBRIS SCREEN, ADJUST PIPE TO CHAMBER 2'-0"
3'-0" CAST IRON CLEANOUT, OPENING FOR 8" INSIDE
ALLOW FOR SCREEN (TYP.) 12" TOPSOIL STONE COLUMN CAP DIAMETER PIPE
SEE GI-204
TO BE PERFORATED EQ EQ WWM 6X6-W8XW8
. . LEVELING COURSE
1'-6" STONE FILLED PERFORATED
12" DIAMETER PVC PIPE
PERMEABLE SOIL WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
TEMPORARY, 18" MAXIMUM
CONSTANT SLOPE DIAMETER CASING TO
2'-10"

UNDISTURBED 4" MORTAR MINIMUM 5'-0" AUGERED


4"
SOIL AROUND PIPE INTO PERMEABLE LAYER 12"
UNDISTURBED
PERFORATED
SOIL

PERMEABLE SOIL LAYER


4"

DEBRIS SCREEN, GRANULAR FILL TO FILL THE

PENETRATION INTO
1'-6"

1'-6"

SEE GI-211 CLEAN OPEN-GRADED ANNULAR SPACE BETWEEN


STONE BASE THE STONE COLUMN PIPE
WWM 6x6-W8xW8 WRAPPED WITH AND THE HOLE
GEOTEXTILE (TOP AND
SIDES ONLY) OPEN-GRADED STONE
LEVELING COURSE
PERMEABLE
PRECAST CONCRETE SOIL LAYER BOTTOM OF COLUMN
CHAMBER TO BE OPEN
PERMEABLE SOIL LAYER
PENETRATION INTO

GRANULAR FILL TO FILL THE TEMPORARY, 18"


ANNULAR SPACE BETWEEN MAXIMUM DIAMETER
THE STONE COLUMN PIPE CASING AUGERED INTO SECTION A-A
AND THE HOLE PERMEABLE LAYER AT INFILTRATION BASIN STONE COLUMN
STONE FILLED PERFORATED 12" OPEN BOTTOM (TYP.)
DIAMETER PVC PIPE WRAPPED
ALL AROUND WITH GEOTEXTILE 05-13-2022
P.E.
FABRIC (TYP.)
SECTION B-B MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS

8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN


FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION
GRASS TOP EXPANSION JOINT (TYP.)
DIMENSION SCHEDULE JOINT AT MID-SPAN
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° BEND FLUSH WITH THE SURFACE, SEE

6"
1'-0"
GI-210
3'-6"
PRECAST 3'-6" CONCRETE HEADER
CONCRETE

5'-0" OR AS PER DESIGN

EQ
CHAMBER CONSTANT SLOPE 6"
STEEL OR
SIDEWALK CAST IRON
GRATE 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
GI-170 & GI-171 PERFORATED HDPE
STONE COLUMN PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
(TYP.) TYP.
1'-8"

2'-10" EXPANSION JOINT.


CONSTANT SLOPE

EQ
EXISTING CURB C 2'-4" C 2'-0"
EXISTING CURB
TO REMAIN TO REMAIN
2'-0"

6"
+
[INLET]

10% -20%
FLOW FLOW
1'-6"

EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE

PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36"
PLAN CONDITIONS AND SITE
CONCRETE APRON
ENGINEER

CONCRETE APRON PITCH SCHEDULE

CURB REVEAL (INCHES) APRON PITCH TOP OF STEEL GRATE FLUSH 3'-6" NOTES:
FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
2.5 TO < 3 20% TO ≥ 17% SIDEWALK FASTENER, SEE GI-209A &
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN
GI-209B OR GI-209C & GI-209D
GRADED STONE STARTING AT THE BASE OF THE INFILTRATION
3 TO < 3.5 17% TO ≥ 14% GRASS TOP BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

3.5 TO < 4 14% TO ≥ 11% 1'-6" TOPSOIL 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR
DETAILS SEE GI-170 & GI-171
4 TO 4.5 11% TO ≥ 10% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO
4'-4"

> 4.5 10% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER


OPENING FOR 8" INSIDE PERFORATED PIPE.
STREET SLOPE
TION MATERIAL DIAMETER PERFORATED PRECAST CONCRETE
2'-10"

PIPE (TYP.) 4" 4" CHAMBER


≤ 5% 10% MIN
WWM 6x6-W8xW8 OPEN-GRADED STONE
4"

≥ 5% 12% MIN PERFORATED DEBRIS LEVELING COURSE


SCREEN FOR 8" INSIDE
* 2" MINIMUM OPENING TO BE MAINTAINED DIA PIPE, SEE GI-211
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. 05-13-2022
P.E.
SECTION C-C MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS

PROPERTY LINE
C B A EXISTING
REFER TO DETAILS ON
SIDEWALK
LOCATION VARIES 15'-0" THIS AND NEXT PAGE
CURB LINE OR AS PER DESIGN

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET

C B A

PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GRASS TOP
GI-209D TOPSOIL
CAST IRON CLEANOUT -
4" CURB PIECE AND CAST IRON EXPANSION JOINT TOP OF COVER FLUSH
#4 REBAR ACROSS CLEANOUT, SEE AND FILLER (TYP.) WITH TOP OF SURFACE
GI-204 GRASS TOP
OPENING, SEE
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOP OF ROAD BEYOND 1'-0" 6" SIDEWALK STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"

1'-0"
1'-3"

9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"

CONCRETE 8" REINFORCED 8" REINFORCED


3'-6"

REINFORCED HEADER (3) SIDES

5'-0"
CONSTANT SLOPE CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"

DROP CURB [INLET] MORTAR UNDISTURBED TOPSOIL


SLOPE POURED IN PLACE AROUND PIPE SOIL
WRAP STONE IN
CURB TO MEET PRECAST GEOTEXTILE UNDISTURBED SOIL
CHAMBER (TOP AND SIDES ONLY) WRAP STONE IN WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT GEOTEXTILE (TOP GEOTEXTILE (TOP PERFORATED HDPE
BRACKET, SEE GI-212
4"

8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER CLEAN OPEN-GRADED
PERFORATED DEBRIS PIPE (TYP.) CLEAN STONE BASE
1'-0" PERFORATED HDPE

5" MINIMUM
SCREEN, SEE GI-211 4" 4" CLEAN OPEN-GRADED
5'-0" OR AS PER DESIGN

BEDDING
PIPE (TYP.) HDPE 5'-0" OR AS PER DESIGN
LEVELING COURSE OPEN-GRADED STONE BASE
5'-0" OR AS PER DESIGN HDPE STORMWATER STORMWATER
STONE BASE
CHAMBER, SEE NOTE 3 CHAMBER, SEE
SECTION C-C SECTION B-B NOTE 3 SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION

NOTES:

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE P.E. 05-13-2022
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
MANAGING DIRECTOR, DATE
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171
3. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN
FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION GRASS TOP
DIMENSION SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)

8" DIAMETER DUAL WALL HDPE OBSERVATION WELL


FABRICATED 90° BEND FLUSH WITH THE SURFACE, SEE

6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 6"
STEEL OR
SIDEWALK CAST IRON STORMWATER CHAMBER CAPPED
GRATE AT BOTH ENDS; SEE DRAWING GI-204 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
1'-0"
GI-170 & GI-171 PERFORATED HDPE
PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
TYP.
1'-8" EXPANSION JOINT.
EXISTING CURB D 2'-10" D CONSTANT SLOPE
EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
2'-0"

6"
+
[INLET]

10% -20%
FLOW FLOW
1'-6"

EXISTING 8"-THICK REINFORCED EXTEND THE NEW STEEL FACE

PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED PLAN CONDITIONS AND SITE
CONCRETE APRON 13" 36"
ENGINEER

CONCRETE APRON PITCH SCHEDULE TOP OF STEEL GRATE FLUSH 3'-6"


FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
CURB REVEAL (INCHES) APRON PITCH SIDEWALK FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GI-209D
2.5 TO < 3 20% TO ≥ 17% GRASS TOP

3 TO < 3.5 17% TO ≥ 14% 1'-6" TOPSOIL

3.5 TO < 4 14% TO ≥ 11% L2"x2"x1/4" BELOW METAL


GRATE ANCHORED TO

4'-4"
4 TO 4.5 11% TO ≥ 10% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) 4" 4" CHAMBER
STREET SLOPE WWM 6x6-W8xW8 OPEN-GRADED STONE

4"
PERFORATED DEBRIS LEVELING COURSE
≤ 5% 10% MIN SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
- NO CONNECTION TO SEWERS

C A
PROPERTY LINE EXISTING
B SIDEWALK
LOCATION VARIES 10'-0" OR REFER TO DETAILS ON
CURB LINE AS PER DESIGN THIS AND NEXT PAGE

DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
B
C A
PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C &
GI-209D
CAST IRON CLEANOUT -
4" CURB PIECE AND TOP OF COVER FLUSH
#4 REBAR ACROSS EXPANSION JOINT WITH TOP OF SURFACE
OPENING, SEE GRASS TOP
GRASS TOP AND FILLER (TYP.)
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOPSOIL SIDEWALK
TOP OF GUTTER BEYOND 6" STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY

1'-0"
1'-3"

1'-0"
9"
6"
WWM 6X6-W8XW8 1'-0"
4'-4"

CONSTANT SLOPE
3'-6"

REINFORCED CONCRETE 8" REINFORCED 8" REINFORCED

5'-0"
CONCRETE APRON HEADER (3) SIDES CONCRETE GUTTER CONCRETE GUTTER
2'-10"

DROP CURB [INLET], WRAP STONE IN UNDISTURBED TOPSOIL


SLOPE POURED IN PLACE, GEOTEXTILE SOIL
CURB TO MEET PRECAST CLEAN (TOP AND SIDES ONLY)
UNDISTURBED SOIL
CHAMBER OPEN-GRADED 8" DIAMETER CLEAN CLEAN
WRAP STONE IN WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE PERFORATED HDPE OPEN-GRADED OPEN-GRADED
GEOTEXTILE (TOP GEOTEXTILE (TOP PERFORATED HDPE
BRACKET, SEE GI-212 STONE BASE STONE BASE
4"

PIPE (TYP.) AND SIDES ONLY) AND SIDES ONLY)


WWM 6X6-W8XW8 PIPE (TYP.)
PERFORATED DEBRIS 8" INSIDE DIAMETER
SCREEN, SEE GI-211 4" 1'-0" 4" PERFORATED HDPE
PIPE (TYP.) 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE
5'-0" OR AS SHOWN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT UPSTREAM SECTION
NOTES: AT MIDSECTION

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.

2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE
FABRICATED 90° TEE
10'-0" OR AS PER DESIGN

8" DIAMETER DUAL WALL HDPE GRASS TOP EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

OBSERVATION WELL FLUSH

1'-0"
WITH THE SURFACE, SEE
PRECAST CONCRETE HEADER
GI-210
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 1'-0"
STEEL GRATE,
SEE GI-209A & 3'-0" CLEANOUT (TYP.)

EQ
GI-209B
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)

EQ
STEEL FACE CURB COVER

1'-8"
D 2'-10" D CONSTANT SLOPE
EXPANSION JOINT.
EXISTING CURB 2'-0" EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN

+
[INLET]

10% -20%
FLOW FLOW

1'-6"
EXISTING EXTEND THE NEW STEEL FACE
8"-THICK REINFORCED

PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER

PLAN

TOP OF STEEL GRATE FLUSH 3'-6"


FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
CONCRETE APRON PITCH SCHEDULE SIDEWALK FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH GRASS TOP

2.5 TO < 3 20% TO ≥ 17% 1'-6" TOPSOIL

3 TO < 3.5 17% TO ≥ 14% L2"x2"x1/4" BELOW METAL


GRATE ANCHORED TO

4'-4"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) 4" 4" CHAMBER
> 4.5 10% WWM 6x6-W8xW8 OPEN-GRADED STONE

4"
PERFORATED DEBRIS LEVELING COURSE
STREET SLOPE SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≤ 5% 10% MIN

≥ 5% 12% MIN
SECTION D-D
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 3A - WITH STONE COLUMN FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
- NO CONNECTION TO SEWERS GI-209B OR GI-209C &
GI-209D
PROPERTY LINE MORTAR AROUND PIPE
1/2" EXPANSION JOINT
AND FILLER PER NYC 4" CURB PIECE AND
DOT HIGHWAY SPEC. #4 REBAR ACROSS
SECTION 2.15 (TYP.) OPENING, SEE
GRASS TOP
A EXISTING
TOPSOIL
GI-170 & GI-171
LOCATION VARIES 10'-0" SIDEWALK
SIDEWALK 10% MIN - 20% MAX
OR AS SHOWN
REFER TO DETAILS ON PITCH
EQ EQ
THIS AND NEXT PAGE ROADWAY
DESIGN
5'-0" OR
AS PER

CURB LINE
B B
FLOW 9" WWM 6X6-W8XW8
REINFORCED
INLET CONCRETE
CONSTANT SLOPE CONCRETE APRON
HEADER (3) SIDES
EXISTING A

3'-6"
CLEAN DROP CURB [INLET],
CATCH BASIN

2'-10"
OPEN-GRADED SLOPE POURED IN PLACE,
STONE BASE CURB TO MEET PRECAST
PLAN WRAP STONE IN ℄ CHAMBER
GEOTEXTILE
(TOP AND SIDES ONLY) INLET SCREEN BOX
SUPPORT BRACKET

1'-6"
8" DIAMETER
OPENING FOR 8" INSIDE TOP OF STEEL OR CAST IRON GRATE PERFORATED HDPE PERFORATED DEBRIS

4"
DIAMETER PERFORATED PIPE FLUSH WITH TOP OF SURFACE PIPE. (TYP.) SCREEN, SEE GI-211

DEPTH OF PVC PIPE PER DESIGN PLANS


SIDEWALK 3'-6" PERFORATED DEBRIS CAST IRON CLEANOUT, OPENING FOR 8" INSIDE
STONE COLUMN CAP
3'-0" SCREEN. ADJUST PIPE TO SEE GI-204 TO BE PERFORATED DIAMETER PIPE
ALLOW FOR SCREEN (TYP.) 1'-0"
WWM 6X6-W8XW8
. . STONE FILLED PERFORATED LEVELING COURSE
1'-6" 12" TOPSOIL 12" DIAMETER PVC PIPE
WRAPPED ALL AROUND WITH
GEOTEXTILE FABRIC.
PERMEABLE SOIL
CONSTANT SLOPE TEMPORARY 18" MAXIMUM
2'-10"

UNDISTURBED 4" MORTAR DIAMETER CASING TO


4" UNDISTURBED SOIL
SOIL AROUND PIPE 12" MINIMUM 5'-0" AUGERED
8" INSIDE DIA. PERFORATED HDPE PIPE. INTO PERMEABLE LAYER
PERFORATED

PERMEABLE SOIL LAYER


4"

MAINTAIN CONSTANT SLOPE TOWARDS GRANULAR FILL TO FILL THE


DEBRIS SCREEN,

PENETRATION INTO
1'-6"

CHAMBER ANNULAR SPACE BETWEEN


SEE GI-211
OPEN-GRADED STONE BASE THE STONE COLUMN PIPE
WWM 6x6-W8xW8 WRAPPED WITH GEOTEXTILE AND HOLE
(TOP AND SIDES ONLY) OPEN-GRADED STONE
LEVELING COURSE
BOTTOM OF COLUMN TO
PRECAST CONCRETE
BE OPEN
CHAMBER
PERMEABLE SOIL LAYER
PENETRATION INTO

TEMPORARY, 18" MAXIMUM PERMEABLE SOIL


DIAMETER CASING AUGERED LAYER
INTO PERMEABLE LAYER
STONE FILLED PERFORATED
GRANULAR FILL TO FILL THE 12" DIAMETER PVC PIPE SECTION A-A
ANNULAR SPACE BETWEEN WRAPPED ALL AROUND WITH AT INFILTRATION BASIN STONE COLUMN
THE STONE COLUMN PIPE GEOTEXTILE FABRIC (TYP.)
AND THE HOLE OPEN BOTTOM
P.E. 05-13-2022
SECTION B-B MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 3A - WITH STONE COLUMN
8" DIAMETER DUAL WALL HDPE - NO CONNECTION TO SEWERS
FABRICATED 90° TEE
10'-0" OR AS PER DESIGN

8" DIAMETER DUAL WALL HDPE GRASS TOP EXPANSION JOINT (TYP.)
FABRICATED 90° BEND

OBSERVATION WELL FLUSH

1'-0"
STONE WITH THE SURFACE, SEE
PRECAST COLUMN CONCRETE HEADER
GI-210
CONCRETE

5'-0" OR AS PER DESIGN


CHAMBER CONSTANT SLOPE 1'-0"
STEEL OR
EQ EQ

EQ
CAST IRON
CLEANOUT (TYP.)

EQ
GRATE
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)

EQ
EQ
3'-0" STEEL FACE CURB COVER

1'-8"
2'-10" EXPANSION JOINT.
EXISTING CURB
C C CONSTANT SLOPE
EXISTING CURB
2'-0" 2'-4" 2'-0"
TO REMAIN TO REMAIN

+
[INLET]

10% -20%
FLOW FLOW

1'-6"
EXISTING EXTEND THE NEW STEEL FACE
8"-THICK REINFORCED

PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER

PLAN

CONCRETE APRON PITCH SCHEDULE


TOP OF STEEL GRATE FLUSH 3'-6"
FOR PRECAST CONCRETE NOTES:
CURB REVEAL (INCHES) APRON PITCH WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
SIDEWALK FASTENER, SEE GI-209A &
2.5 TO < 3 20% TO ≥ 17% GI-209B OR GI-209C & GI-209D 1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED
STONE STARTING AT THE BASE OF THE INFILTRATION BASIN PRIOR TO ADDING
GRASS TOP
ADDITIONAL OPEN GRADED STONE.
3 TO < 3.5 17% TO ≥ 14%
1'-6" TOPSOIL 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE
3.5 TO < 4 14% TO ≥ 11% GI-170 & GI-171
L2"x2"x1/4" BELOW METAL
4 TO 4.5 11% TO ≥ 10% GRATE ANCHORED TO

4'-4"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
> 4.5 10% OPENING FOR 8" INSIDE PERFORATED PIPE.
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"

STREET SLOPE PIPE (TYP.) 4" 4" CHAMBER


WWM 6x6-W8xW8 OPEN-GRADED STONE
≤ 5% 10% MIN
4"

PERFORATED DEBRIS LEVELING COURSE


SCREEN FOR 8" INSIDE
≥ 5% 12% MIN DIA PIPE, SEE GI-211
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. P.E. 05-13-2022
SECTION C-C
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN
WITH COMBINATION OF CONCRETE & GRASS TOP
- NO CONNECTION TO SEWERS

PROPERTY LINE C B A EXISTING


CONCRETE
LOCATION VARIES LENGTH PER DESIGN CONCRETE SURFACE SIDEWALK
CURB LINE GRASS TOP

DESIGN
WIDTH
PER
EXISTING
CATCH BASIN EXISTING GRASS STRIP FLOW
INLET

C B A

FOR PRECAST CONCRETE PLAN


CHAMBER, GRATE AND
FASTENER, SEE GI-209A & 5"-THICK CONCRETE TOP #4 REBAR LONGITUDINAL (TYP.)
GI-209B OR GI-209C & IMPERMEABLE LINER CONCRETE TOP
GI-209D EXPANSION CAST IRON CLEANOUT -
LEVELING COURSE LEVELING COURSE
4" CURB PIECE AND JOINT AND TOP OF COVER FLUSH
#4 REBAR ACROSS WWM 6x6-W8xW8 FILLER (TYP.) WITH TOP OF SURFACE
OPENING, SEE GRASS TOP IMPERMEABLE LINER (TYP.) SIDEWALK GRASS TOP 8" SOLID HDPE PIPE
GI-170 & GI-171 TOPSOIL
6" VARIES
TOP OF GUTTER BEYOND STEEL FACE TOPSOIL 6" 1'-0"

5"
10% MIN - 20% MAX PITCH CURB SIDEWALK
ROADWAY
ROADWAY ROADWAY

1'-0"
3"
1'-3"

5"

3"
4 1/2"

2"
1'-0" 9"
WWM 6X6-W8XW8
4'-4"

8" REINFORCED 8" REINFORCED


REINFORCED CONSTANT SLOPE CONCRETE

5'-0"
CONCRETE GUTTER CONCRETE GUTTER
3'-6"

CONCRETE APRON HEADER (3) SIDES


2'-10"

UNDISTURBED CLEAN CLEAN


DROP CURB [INLET], WRAP STONE IN
CLEAN SOIL OPEN-GRADED OPEN-GRADED
SLOPE POURED IN PLACE, GEOTEXTILE
OPEN-GRADED STONE BASE STONE BASE
CURB TO MEET PRECAST (TOP AND SIDES ONLY) UNDISTURBED SOIL
CHAMBER STONE BASE WRAP STONE IN
8" DIAMETER WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT PERFORATED HDPE GEOTEXTILE (TOP GEOTEXTILE (TOP PERFORATED HDPE
BRACKET, SEE GI-212
4"

PIPE (TYP.) AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8
8" DIAMETER
LEVELING COURSE
4" 1'-0" 4" PERFORATED HDPE
PIPE (TYP.) 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
5'-0" OR AS SHOWN
SECTION B-B
NOTES:
SECTION C-C AT MIDSECTION SECTION A-A
AT INLET AT UPSTREAM SECTION

1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER
REQUIREMENTS
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN
WITH COMBINATION OF CONCRETE & GRASS TOP
- NO CONNECTION TO SEWERS
LENGTH AS PER DESIGN
OBSERVATION WELL

6"
CLEANOUT

1'-0"
STEEL OR CAST
IRON GRATE
6"

WIDTH AS PER DESIGN


CLEANOUT
CONCRETE TOP

2'-0"
SIDEWALK GRASS STRIP TO MATCH EDGE OF CONCRETE EXISTING GRASS STRIP
EXISTING CONDITIONS

VARIES
1'-8"

GRASS TOP
EXISTING CURB D D EXISTING CURB
TO REMAIN TO REMAIN

6"
+
[INLET]
10% - 20%

FLOW 8"-THICK REINFORCED


EXISTING
PITCH

ASPHALT CONCRETE GUTTER


FLOW
PAVEMENT

PLAN
PLAN

CONCRETE APRON PITCH SCHEDULE TOP OF STEEL GRATE FLUSH 3'-6"


FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
CURB REVEAL (INCHES) APRON PITCH SIDEWALK FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GI-209D
2.5 TO < 3 20% TO ≥ 17% GRASS TOP

3 TO < 3.5 17% TO ≥ 14% 1'-6" TOPSOIL

3.5 TO < 4 14% TO ≥ 11% L2"x2"x1/4" BELOW METAL


GRATE ANCHORED TO

4'-4"
4 TO 4.5 11% TO ≥ 10% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10% DIAMETER PERFORATED PRECAST CONCRETE

2'-10"
PIPE (TYP.) 4" 4" CHAMBER
LONGITUDINAL STREET SLOPE WWM 6x6-W8xW8 OPEN-GRADED STONE

4"
PERFORATED DEBRIS LEVELING COURSE
≤ 5% 10% MIN SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASINS STEEL FACE CURB OPENING DETAILS
- NO CONNECTION TO SEWERS

6"
6"
SURFACE TYPE
PER CONTRACT
SIDEWALK PLANS
2'-0"

NEW STEEL FACE CURB


2'-10" WITH 4" MIN. REVEAL
EXISTING CURB 2'-4" EXISTING CURB
TO REMAIN TO REMAIN

+
10% MIN -
FLOW A 20% MAX A
1'-6"

EXISTING
PITCH
ASPHALT
FLOW
PAVEMENT

13" 3'-0"
PLAN
GI-171

GI-171

GI-171

TWO #6 REBARS #4 REBAR ACROSS L6x4x3/8" SEE DETAIL NEXT


C

B
D

WITHIN 4" CURB PIECE STEEL FACE OPENING PAGE


SEE REBAR DETAIL
1'-1" 2'-4" 3'-0" STEEL FACE OPENING STEEL FACE
PE
STREET SLO 1'-6" 1'-6" CURB BEYOND
2" MIN.

6" 6" CONCRETE APRON


STEEL FACE
4"

CURB BEYOND

4"

EQ
8" THICK CONCRETE
GUTTER (TYP.)
8"

BOTTOM OF CURB

CONCRETE APRON
#4 REBAR ACROSS STEEL FACE
STEEL FACE OPENING WWM 6x6 - W8xW8 EXPANSION
OPENING, SEE NOTE 2 (TYP.) JOINT
GI-171

GI-171

GI-171
C
D

EQ
SECTION A-A 2'-4"

NOTES:
REBAR DETAIL
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W.
INFILTRATION BASIN TYPE SPECIFIED.
2. REBAR REQUIRED FOR OPENINGS GREATER OR EQUAL TO 2.5" P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASINS STEEL FACE CURB OPENING DETAILS
- NO CONNECTION TO SEWERS

L6x4x3/8" ACROSS INLET


OPENING WITH 6" BEARING ON
STEEL GRATE EACH SIDE, SEE NOTE 3
STEEL FACE CURB 4" CURB PIECE WITH
2 #6 REBAR TWO #6 REBAR
#4 REBAR FIELD #4 REBAR ACROSS
STEEL FACE, SEE

1 5/8"
WELDED TO STEEL FACE OPENING, SEE NOTE 3
NOTE 3

EQ
10% MIN TO 20%
ROADWAY 1/2" DIA. ANCHOR, MAX PITCH ROADWAY 1/2" DIA. ANCHOR,
ROADWAY

4"
SEE NOTE 4 (TYP.) SEE NOTE 1

EQ
1/2" DIA. ANCHOR,
8" REINFORCED SEE NOTE 5 (TYP.)
CONCRETE APRON 8"-THICK REINFORCED STEEL FACED CURB
CONCRETE APRON
STEEL FACED CURB
DROP CURB [INLET] SLOPE
POURED IN PLACE CURB TO
MEET PRECAST CHAMBER
SECTION D-D SECTION C-C SECTION B-B
STEEL FACE CURB DETAIL STEEL FACE CURB DETAIL
STEEL FACE CURB OPENING DETAIL

1/2" DIA. ANCHOR, 2'-4"


SEE NOTE 5 (TYP.)
L6x4x3/8"
6" BEARING 8" 8" 6" BEARING
1/2" DIA.
ANCHORS,
SEE NOTE 1
4"

4" 4"

1/2" DIA. ANCHOR, CURB OPENING


SEE NOTE 4 (TYP.) CURB
L6x4x3/8" DETAIL
NOTES:
1. 1/2" DIAMETER x 5" HEADED ANCHOR STUDS (GRANULAR OR SOLID FLUX FILLED) SHALL BE PLACED AT 1'-0" MAXIMUM, CENTER TO
CENTER- STAGGERED AS PER NYCDOT STANDARD DETAIL H-1010 ALONG FULL LENGTH OF STEEL FACING, EXCEPT FOR CURB
OPENING
2. STRUCTURAL STEEL SHALL BE ASTM DESIGNATION A36
3. SURFACE TO BE CLEANED AND PAINTED AS PER NYCDOT STANDARD HIGHWAY SPECIFICATIONS, SECTION 2.13. COLOR OF TOP COAT
SHALL BE GRAY AS APPROVED BY ENGINEER
4. 1/2" DIAMETER x 5" HEADED ANCHOR STUD (GRANULAR OR SOLID FLUX FILLED) SHALL BE PLACED AT EACH END OF L6x4x3/8", OFFSET P.E. 05-13-2022
4" FROM INLET MANAGING DIRECTOR, DATE
5. 1/2" DIAMETER x 2 1/2" HEADED ANCHOR STUD (GRANULAR OR SOLID FLUX FILLED) SHALL BE PLACED ON L6x4x3/8" ABOVE CURB
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
OPENING
DIMENSIONS SCHEDULE FOR VARIABLE SIZE R.O.W. INFILTRATION BASINS
- NO CONNECTION TO SEWERS
L

SURFACE TYPE
PER CONTRACT
SIDEWALK
W PLANS

NEW STEEL FACING CURB


WITH 4" MIN. REVEAL
EXISTING CURB EXISTING CURB
TO REMAIN TO REMAIN

+
[INLET]
10% MIN -
20% MAX
FLOW
EXISTING
PITCH
ASPHALT FLOW
PAVEMENT

TYPE 1/TYPE 2

R.O.W. INFILTRATION BASIN DIMENSIONS


SURACE TYPE
PER CONTRACT LENGTH (L), WIDTH (W),
TYPE
PLANS 1FT. INCREMENT 6 IN. INCREMENT

17' ≤ L ≤ 20' 4'-0" TO 6'-0" TYPE 1

13' ≤ L ≤ 16' 4'-0" TO 6'-0" TYPE 2


SIDEWALK
W

10' ≤ L ≤ 12' 4'-0" TO 6'-0" TYPE 3

DIMENSIONS SCHEDULE
EXISTING CURB EXISTING CURB NOTES:
TO REMAIN TO REMAIN 1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE
R.O.W. INFILTRATION BASIN TYPE SPECIFIED.

2. DOT APPROVAL REQUIRED FOR ALL WIDTHS GREATER THAN 5'.


+
[INLET]
10% MIN -
20% MAX

FLOW FLOW
PITCH

EXISTING
ASPHALT 05-13-2022
P.E.
PAVEMENT
MANAGING DIRECTOR, DATE
TYPE 3 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D
- NO CONNECTION TO SEWERS

PROPERTY
LINE

B A
EXISTING
LOCATION OF BIOSWALE 20'-0" SIDEWALK
VARIES, SEE PLAN OR AS PER DESIGN

REFER TO DETAILS ON
THIS AND NEXT PAGE

DESIGN
5'-0" OR
AS PER
CURB LINE

EXISTING INLET FLOW


CATCH BASIN
B A

1'-0" EQ EQ
TOPSOIL TREE PLANTING -
12"x5" CONCRETE WHEN DIRECTED TOPSOIL CLEANOUT,
STRIP 12"x5" CONCRETE SEE GI-204
PLANTED AREA
BRICK BASE - AS STRIP TOP LAYER,
REQUIRED TOP LAYER 2"-3" 3"-THICK LEVELING 2"-3" MULCH
LEVELING COURSE MULCH COURSE (TYP.) CONCRETE
C.I. FRAME AND GRATING AS REQUIRED ROADWAY CURB HEADER
STEEL TREE GUARD
(WITHOUT CURB PIECE), 1" (3-SIDES TYP.) SEE GI-601, SIDEWALK
SLOPE TO 12"
SEE DEP STANDARDS GI-602, GI-603 & GI-604
FRAME
2"

SE58A & SE59A 6" 6"


ROADWAY
ROADWAY 1'-0"
+

1'-3"
1"

B
9" CONCRETE 9"
8"

TYP. HEADER (3 SIDES) (TYP.)


2" CLEAR
UNDISTURBED SOIL
5-#6 @3 UNDISTURBED L-SHAPED EDGING WITH
SOIL EQ. EQ.
MINIMUM 9" STAKES,
2"

FRONT UNDISTURBED SOIL


HANDLE SEE DRAWING GI-204
STEEL PIKE IN 4" DIA.

A
5'-2"

CONCRETE ENCASEMENT
OPEN-GRADED WRAP GABION WALL IN
6" L. HOOK, SEE WRAP STONE IN 8" INSIDE DIAMETER
STONE BASE GEOTEXTILE (TOP AND
DEP STANDARDS GEOTEXTILE (TOP PERFORATED PIPE
3'-4"

SE60 SIDES ONLY)


AND SIDES ONLY) CLEAN OPEN-GRADED
12" WIDE GABION
WELDED HANDLE 8" INSIDE DIAMETER STONE BASE WRAPPED
WALL FILLED WITH
ON MODIFIED C.I. PERFORATED HDPE 5'-0" OR AS PER DESIGN IN GEOTEXTILE, TOP
MORTAR AROUND CLEAN OPEN-GRADED
HOOD, SEE DEP PIPE AND SIDES ONLY
PIPE STONE
2"

STANDARDS SE60
DEPTH SCHEDULE SECTION B-B
9"

ROWB A B
WITH TREE 3'-0" 2'-0"
8" 3'-6" 8" NO TREE 3'-6" 1'-6"
P.E. 05-13-2022
NOTE:
SECTION A-A MANAGING DIRECTOR, DATE
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-186 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSION SCHEDULE JOINT AT MID-SPAN

1'-0"
CLEANOUT,
OBSERVATION WELL, SEE GI-213
REFER TO

EQ
DETAILS GI-204
5'-0" OR AS PER DESIGN
SIDEWALK 1'-3" CONSTANT SLOPE CONCRETE HEADER
STEEL TREE GUARD (3-SIDES
1'-0" TYP.) SEE GI-601, GI-602, GI-603 &
GI-604
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 SEE GI-503A, THROUGH GI-503G

EQ
FOR TYPICAL PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-6"

TO REMAIN 12"x5" CONCRETE STRIP EXPANSION JOINT

FLOW
EXISTING 8" INSIDE DIAMETER
STORMWATER
ASPHALT PERFORATED PIPE EXISTING CURB
PAVEMENT INLET, SEE
TO REMAIN
GI-185 PITCH PITCH
LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
C C
ASPHALT TO BE
TOP OF ROADWAY C.I. FRAME AND GRATING

1'-0"
PITCHED TOWARDS

PITCH
(BEYOND) (WITHOUT CURB PIECE), PLAN THE CI GRATE.
CAST IRON FRAME SET 1" SEE DEP STANDARDS
BELOW TOP OF ROAD SE58A & SE59A
1'-0"
ROADWAY 1'-0" 1'-0"
1"

1"

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS 5'-0"
OR AS PER DESIGN
TOP LAYER,
PROPERTY 1'-2" 2"-3" MULCH
LINE 12"x5" CONCRETE CLEANOUT, SEE GI-204
STRIP EXPANSION JOINT AND
3"-THICK LEVELING FILLER (TYP.)
A EXISTING COURSE (TYP.)
. BIOSWALE
LOCATION OF 20'-0" 1"
SIDEWALK PLANTED
VARIES OR AS PER DESIGN SIDEWALK
4'-6" EQ EQ 4'-6" ROADWAY AREA
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER

B B
TOPSOIL
INLET FLOW
CURB LINE
CONCRETE
EXISTING
HEADER (3) SIDES
CATCH BASIN
A STEEL SPIKE IN 4" DIA.
UNDISTURBED SOIL
CONCRETE ENCASEMENT
PLAN L-SHAPED EDGING WITH PLACED IN SOIL LAYER
MINIMUM 9" STAKES, SEE (TYP.)

DEPTH OF PVC PIPE PER DESIGN PLANS


DRAWING GI-204
STEEL TREE PIT GUARDS (3 SIDES TYP.) TOP OF STONE COLUMN OBSERVATION
SEE GI-601, GI-602, GI-603 & GI-604 WITH PERFORATED CAP 4" PVC SLOTTED WELL, SEE GI-213 WRAP GABION WALL IN
(TYP.) GEOTEXTILE (TOP AND 12"

1'-0"
WELL SCREEN 0.01 PVC CAP
TOP LAYER, SLOT SIZE WITH SIDES ONLY)
SOLID CLEANOUT TOP OF STONE
2"-3" MULCH TOPSOIL PVC CAP
COVER, SEE GI-204 12" WIDE GABION WALL COLUMN WITH
(TYP.) FILLED WITH OPEN-GRADED PERFORATED CAP
STONE EQ EQ (TYP.)
CLEAN OPEN-GRADED
SOLID 8" INSIDE 8" INSIDE DIAMETER STONE BASE WRAPPED IN

B
DIAMETER HDPE PERFORATED HDPE PIPE GEOTEXTILE, TOP AND
SIDES ONLY STONE FILLED PERFORATED
PIPE
12" DIAMETER PVC PIPE
WRAPPED ALL AROUND
WITH GEOTEXTILE FABRIC.
PERMEABLE SOIL
TEMPORARY 18" MAXIMUM
1'-0" DIAMETER CASING AUGERED

A
EXISTING CONSTANT SLOPE INTO PERMEABLE LAYER

PERMEABLE SOIL LAYER


SOIL

PENETRATION INTO
1'-0"

GRANULAR FILL TO FILL THE


ANNULAR SPACE BETWEEN
THE STONE COLUMN PIPE
PERFORATED AND THE HOLE
COVER OPEN-GRADED STONE

PVC CAP WITH BOTTOM OF COLUMN


PERMEABLE SOIL LAYER

OPEN-GRADED STONE BASE


PRIMER AND TO BE OPEN
PENETRATION INTO

WRAPPED WITH GEOTEXTILE


(TOP AND SIDES ONLY) SOLVENT
TEMPORARY, 18" CEMENT
GRANULAR FILL TO FILL THE MAXIMUM DIAMETER
ANNULAR SPACE BETWEEN THE CASING AUGERED PERMEABLE SOIL
STONE COLUMN PIPE AND THE HOLE INTO PERMEABLE LAYER
LAYER DEPTH SCHEDULE
SECTION A-A
STONE FILLED PERFORATED 12" AT BIOSWALE STONE COLUMN
DIAMETER PVC PIPE WRAPPED OPEN BOTTOM (TYP.) ROWB A B
ALL AROUND WITH GEOTEXTILE WITH TREE 3'-0" 2'-0"
FABRIC (TYP.) NO TREE 3'-6" 1'-6"
P.E. 05-13-2022
NOTE:
SECTION B-B MANAGING DIRECTOR, DATE
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS

CLEANOUT; 8" INSIDE DIAMETER


REFER TO PERFORATED PIPE
DETAILS GI-204 20'-0" OR AS PER DESIGN
SEE GI-186 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSION SCHEDULE JOINT AT MID-SPAN

1'-0"
STONE OBSERVATION WELL, SEE GI-213
COLUMN

EQ
5'-0" OR AS PER DESIGN

SIDEWALK CONSTANT SLOPE CONCRETE HEADER


1'-3" STONE STEEL TREE GUARD (3-SIDES

1'-2"
COLUMN 1'-0" TYP.) SEE GI-601, GI-602, GI-603 &
GI-604
GABION WALL BELOW 4'-6" EQ EQ 4'-6"
SEE GI-503A, THROUGH GI-503G

EQ
CONCRETE STRIP, SEE GI-207
FOR TYPICAL PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-6"

TO REMAIN 12"x5" CONCRETE STRIP EXPANSION JOINT

FLOW
EXISTING
STORMWATER
ASPHALT EXISTING CURB
PAVEMENT TOP OF ROADWAY C.I. FRAME AND GRATING INLET, SEE
TO REMAIN
(BEYOND) (WITHOUT CURB PIECE), GI-185 PITCH PITCH
LIMIT OF NEW CURB TO EXTEND
CAST IRON FRAME SET 1" SEE DEP STANDARDS
BEYOND THE ROWB AS DETERMINED BY
BELOW TOP OF ROAD SE58A & SE59A
FIELD CONDITIONS AND SITE ENGINEER
C C
ROADWAY 1'-0" 1'-0" ASPHALT TO BE

1'-0"
PITCHED TOWARDS

PITCH
THE CI GRATE.
1"

1"

1'-0"
PLAN

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D
- NO CONNECTION TO SEWERS
PROPERTY
LINE

B A
EXISTING
LOCATION OF BIOSWALE 15'-0" SIDEWALK
VARIES, SEE PLAN OR AS PER DESIGN
REFER TO DETAILS ON
THIS AND NEXT PAGE

DESIGN
5'-0" OR
AS PER
CURB LINE

EXISTING INLET FLOW


CATCH BASIN

B A
PLAN
1'-0" EQ EQ
TOPSOIL TREE PLANTING -
12"x5" CONCRETE WHEN DIRECTED TOPSOIL CLEANOUT,
STRIP 12"x5" CONCRETE SEE GI-204
PLANTED AREA
BRICK BASE - AS STRIP TOP LAYER,
REQUIRED TOP LAYER 2"-3" 3"-THICK LEVELING 2"-3" MULCH
LEVELING COURSE MULCH COURSE (TYP.) CONCRETE
C.I. FRAME AND GRATING AS REQUIRED ROADWAY CURB HEADER
STEEL TREE GUARD
(WITHOUT CURB PIECE), 1" (3-SIDES TYP.) SEE GI-601, SIDEWALK
SLOPE TO 12"
SEE DEP STANDARDS GI-602, GI-603 & GI-604
FRAME
2"

SE58A & SE59A 6" 6"


ROADWAY
ROADWAY 1'-0"
+

1'-3"
1"

B
9" CONCRETE 9"
8"

TYP. HEADER (3 SIDES) (TYP.)


2" CLEAR
UNDISTURBED SOIL
5-#6 @3 UNDISTURBED L-SHAPED EDGING WITH
SOIL EQ. EQ.
MINIMUM 9" STAKES,
2"

FRONT UNDISTURBED SOIL


HANDLE SEE DRAWING GI-204
STEEL PIKE IN 4" DIA.

A
5'-2"

CONCRETE ENCASEMENT
OPEN-GRADED WRAP GABION WALL IN
6" L. HOOK, SEE WRAP STONE IN 8" INSIDE DIAMETER
STONE BASE GEOTEXTILE (TOP AND
DEP STANDARDS GEOTEXTILE (TOP PERFORATED PIPE
3'-4"

SE60 SIDES ONLY)


AND SIDES ONLY) CLEAN OPEN-GRADED
12" WIDE GABION
WELDED HANDLE 8" INSIDE DIAMETER STONE BASE WRAPPED
WALL FILLED WITH
ON MODIFIED C.I. PERFORATED HDPE 5'-0" OR AS PER DESIGN IN GEOTEXTILE, TOP
MORTAR AROUND CLEAN OPEN-GRADED
HOOD, SEE DEP PIPE AND SIDES ONLY
PIPE STONE
2"

STANDARDS SE60
DEPTH SCHEDULE SECTION B-B
9"

ROWB A B
WITH TREE 3'-0" 2'-0"
8" 3'-6" 8" NO TREE 3'-6" 1'-6"
P.E. 05-13-2022
NOTE:
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D
- NO CONNECTION TO SEWERS
CLEANOUT;
REFER TO
DETAILS GI-204 15'-0" OR AS PER DESIGN
SEE GI-186 FOR DIMENSION PLACE EXPANSION
EXPANSION JOINT (TYP.)
SCHEDULE JOINT AT MID-SPAN

OBSERVATION WELL, SEE GI-213

1'-0"
CONCRETE HEADER

EQ
5'-0" OR AS PER DESIGN
SIDEWALK CONSTANT SLOPE STEEL TREE GUARD (3-SIDES
TYP.) SEE GI-601, GI-602,
GI-603 & GI-604
1'-0"
1'-3" SEE GI-503A THROUGH
GABION WALL BELOW
CONCRETE STRIP SEE GI-207 GI-503G FOR TYPICAL

EQ
PLANTING PLANS
8" INSIDE DIAMETER
NEW CURB TYPE TO MATCH
PERFORATED PIPE
CONTRACT PLANS
EXISTING CURB 12"x5" CONCRETE STRIP
TO REMAIN
1'-6"

EXPANSION JOINT

FLOW
EXISTING EXISTING CURB
ASPHALT TO REMAIN
PAVEMENT STORMWATER
INLET SEE PITCH PITCH LIMIT OF NEW CURB TO EXTEND
GI-185 BEYOND THE ROWB AS DETERMINED BY
TOP OF ROADWAY C.I. FRAME AND GRATING FIELD CONDITIONS AND SITE ENGINEER
(BEYOND) (WITHOUT CURB PIECE), C C
SEE DEP STANDARDS ASPHALT TO BE
CAST IRON FRAME SET 1"
SE58A & SE59A PITCHED TOWARDS

1'-0"
BELOW TOP OF ROAD

PITCH
THE CI GRATE.
ROADWAY 1'-0" 1'-0"

1'-0"
PLAN
1"

1"

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS 5'-0"
OR AS PER DESIGN
TOP LAYER,
PROPERTY 1'-2" 2"-3" MULCH
LINE 12"x5" CONCRETE CLEANOUT, SEE GI-204
STRIP EXPANSION JOINT AND
3"-THICK LEVELING FILLER (TYP.)
A COURSE (TYP.)
. BIOSWALE
LOCATION OF 15'-0" EXISTING 1"
SIDEWALK PLANTED
VARIES OR AS PER DESIGN ROADWAY SIDEWALK
AREA
3'-6" 3'-6"
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER

CURB LINE B B
TOPSOIL
EXISTING INLET FLOW
CATCH BASIN A CONCRETE
HEADER (3) SIDES

UNDISTURBED SOIL STEEL SPIKE IN 4" DIA.


CONCRETE ENCASEMENT
PLAN L-SHAPED EDGING WITH PLACED IN SOIL LAYER
MINIMUM 9" STAKES, SEE (TYP.)

DEPTH OF PVC PIPE PER DESIGN PLANS


DRAWING GI-204
STEEL TREE PIT GUARDS (3 SIDES TYP.) 4" PVC SLOTTED OBSERVATION
SEE GI-601, GI-602, GI-603 & GI-604 WELL SCREEN 0.01 WELL, SEE GI-213 WRAP GABION WALL IN
GEOTEXTILE (TOP AND 12"

1'-0"
SLOT SIZE WITH
PVC CAP SIDES ONLY)
SOLID CLEANOUT TOP LAYER, TOPSOIL PVC CAP TOP OF STONE
COVER, SEE GI-204 2"-3" MULCH 12" WIDE GABION WALL COLUMN WITH
(TYP.) FILLED WITH OPEN-GRADED PERFORATED CAP
STONE EQ EQ (TYP.)
CLEAN OPEN-GRADED
SOLID 8" INSIDE STONE BASE WRAPPED IN
DIAMETER HDPE PIPE GEOTEXTILE, TOP AND

B
8" INSIDE DIAMETER SIDES ONLY STONE FILLED PERFORATED
PERFORATED HDPE PIPE 12" DIAMETER PVC PIPE
WRAPPED ALL AROUND
PERMEABLE SOIL WITH GEOTEXTILE FABRIC.

TEMPORARY 18" MAXIMUM


EXISTING SOIL
DIAMETER CASING AUGERED

A
1'-0" INTO PERMEABLE LAYER

PERMEABLE SOIL LAYER


CONSTANT SLOPE

PENETRATION INTO
GRANULAR FILL TO FILL THE
1'-0"

ANNULAR SPACE BETWEEN


THE STONE COLUMN PIPE
TOP OF STONE AND THE HOLE
PERFORATED COLUMN WITH PVC CAP WITH OPEN-GRADED STONE
COVER PERFORATED CAP PRIMER AND
(TYP.) SOLVENT BOTTOM OF COLUMN
OPEN-GRADED STONE BASE CEMENT TO BE OPEN
WRAPPED WITH GEOTEXTILE
PERMEABLE SOIL LAYER

(TOP AND SIDES ONLY)


PENETRATION INTO

PERMEABLE SOIL
LAYER DEPTH SCHEDULE
GRANULAR FILL TO FILL THE
ANNULAR SPACE BETWEEN THE ROWB A B
TEMPORARY, 18" MAXIMUM
STONE COLUMN PIPE AND THE HOLE
DIAMETER CASING AUGERED WITH TREE 3'-0" 2'-0" SECTION A-A
INTO PERMEABLE LAYER NO TREE 3'-6" 1'-6" AT BIOSWALE STONE COLUMN
STONE FILLED PERFORATED 12"
DIAMETER PVC PIPE WRAPPED
OPEN BOTTOM (TYP.)
ALL AROUND WITH GEOTEXTILE
FABRIC (TYP.)
P.E. 05-13-2022
SECTION B-B MANAGING DIRECTOR, DATE
NOTE:
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" INSIDE DIAMETER
CLEANOUT; PERFORATED PIPE
REFER TO
DETAILS GI-204 15'-0" OR AS PER DESIGN
SEE GI-186 FOR DIMENSION PLACE EXPANSION
EXPANSION JOINT (TYP.)
SCHEDULE JOINT AT MID-SPAN

OBSERVATION WELL, SEE GI-213

1'-0"
CONCRETE HEADER
CONSTANT SLOPE

5'-0" OR AS PER DESIGN

EQ
SIDEWALK STEEL TREE GUARD (3-SIDES
1'-3" TYP.) SEE GI-601, GI-602,
GI-603 & GI-604
1'-0"

1'-2"
GABION WALL BELOW SEE GI-503A THROUGH
3'-6" 3'-6"

EQ
CONCRETE STRIP SEE GI-207 GI-503G FOR TYPICAL
STONE COLUMNS
PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB 12"x5" CONCRETE STRIP
TO REMAIN
1'-6"

EXPANSION JOINT

FLOW
EXISTING EXISTING CURB
ASPHALT TO REMAIN
PAVEMENT STORMWATER
INLET SEE PITCH PITCH LIMIT OF NEW CURB TO EXTEND
TOP OF ROADWAY C.I. FRAME AND GRATING GI-185 BEYOND THE ROWB AS DETERMINED BY
(BEYOND) (WITHOUT CURB PIECE), FIELD CONDITIONS AND SITE ENGINEER
CAST IRON FRAME SET 1" SEE DEP STANDARDS C C
ASPHALT TO BE
BELOW TOP OF ROAD SE58A & SE59A
PITCHED TOWARDS

1'-0"

PITCH
THE CI GRATE.
ROADWAY 1'-0" 1'-0"

1'-0"
PLAN
1"

1"

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D
- NO CONNECTION TO SEWERS
PROPERTY
LINE

B A EXISTING
SIDEWALK
LOCATION OF BIOSWALE 10'-0" OR
VARIES AS PER DESIGN
REFER TO DETAILS ON
THIS AND NEXT PAGE

DESIGN
5'-0" OR
AS PER
CURB LINE

EXISTING FLOW
CATCH BASIN

B A
PLAN

1'-0" EQ EQ
TOPSOIL TREE PLANTING -
12"x5" CONCRETE WHEN DIRECTED TOPSOIL CLEANOUT,
STRIP 12"x5" CONCRETE SEE GI-204
PLANTED AREA
BRICK BASE - AS STRIP TOP LAYER,
REQUIRED TOP LAYER 2"-3" 3"-THICK LEVELING 2"-3" MULCH
LEVELING COURSE MULCH COURSE (TYP.) CONCRETE
C.I. FRAME AND GRATING AS REQUIRED ROADWAY CURB HEADER
STEEL TREE GUARD
(WITHOUT CURB PIECE), 1" (3-SIDES TYP.) SEE GI-601, SIDEWALK
SLOPE TO 12"
SEE DEP STANDARDS GI-602, GI-603 & GI-604
FRAME
2"

SE58A & SE59A 6" 6"


ROADWAY
ROADWAY 1'-0"
+

1'-3"
1"

B
9" CONCRETE 9"
8"

TYP. HEADER (3 SIDES) (TYP.)


2" CLEAR
UNDISTURBED SOIL
5-#6 @3 UNDISTURBED L-SHAPED EDGING WITH
SOIL EQ. EQ.
MINIMUM 9" STAKES,
2"

FRONT UNDISTURBED SOIL


HANDLE SEE DRAWING GI-204
STEEL PIKE IN 4" DIA.

A
5'-2"

CONCRETE ENCASEMENT
OPEN-GRADED WRAP GABION WALL IN
6" L. HOOK, SEE WRAP STONE IN 8" INSIDE DIAMETER
STONE BASE GEOTEXTILE (TOP AND
DEP STANDARDS GEOTEXTILE (TOP PERFORATED PIPE
3'-4"

SE60 SIDES ONLY)


AND SIDES ONLY) CLEAN OPEN-GRADED
12" WIDE GABION
WELDED HANDLE 8" INSIDE DIAMETER STONE BASE WRAPPED
WALL FILLED WITH
ON MODIFIED C.I. PERFORATED HDPE 5'-0" OR AS PER DESIGN IN GEOTEXTILE, TOP
MORTAR AROUND CLEAN OPEN-GRADED
HOOD, SEE DEP PIPE AND SIDES ONLY
PIPE STONE
2"

STANDARDS SE60
DEPTH SCHEDULE SECTION B-B
9"

ROWB A B
WITH TREE 3'-0" 2'-0"
8" 3'-6" 8" NO TREE 3'-6" 1'-6"
P.E. 05-13-2022
NOTE:
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D
- NO CONNECTION TO SEWERS

CLEANOUT; 8" INSIDE DIAMETER


REFER TO PERFORATED PIPE
DETAILS GI-204 10'-0" OR AS PER DESIGN
SEE GI-186 FOR EXPANSION JOINT (TYP.)
DIMENSION SCHEDULE

1'-0"
OBSERVATION WELL, SEE GI-213

EQ
5'-0" OR AS PER DESIGN
SIDEWALK CONCRETE HEADER
STEEL TREE GUARD (3-SIDES
CONSTANT SLOPE 1'-0" TYP.) SEE GI-601, GI-602, GI-603
& GI-604
1'-3"
GABION WALL BELOW SEE GI-503A THROUGH GI-503G

EQ
CONCRETE STRIP, SEE GI-207 FOR TYPICAL PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
TO REMAIN 12"x5" CONCRETE STRIP

1'-6"
EXPANSION JOINT

FLOW
EXISTING STORMWATER EXISTING CURB
ASPHALT INLET TO REMAIN
PAVEMENT SEE GI-185
PITCH PITCH LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
TOP OF ROADWAY C.I. FRAME AND GRATING
FIELD CONDITIONS AND SITE ENGINEER
(BEYOND) (WITHOUT CURB PIECE), C C
CAST IRON FRAME SET 1" SEE DEP STANDARDS ASPHALT TO BE
BELOW TOP OF ROAD SE58A & SE59A PITCHED TOWARDS

1'-0"

PITCH
THE CI GRATE.
ROADWAY 1'-0" 1'-0"

1'-0"
PLAN
1"

1"

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN
- NO CONNECTION TO SEWERS 5'-0"
OR AS PER DESIGN
TOP LAYER,
PROPERTY 2"-3" MULCH
1'-2"
LINE
12"x5" CONCRETE CLEANOUT, SEE GI-204
STRIP EXPANSION JOINT AND
3"-THICK LEVELING FILLER (TYP.)
COURSE (TYP.)
A EXISTING
SIDEWALK
1"
LOCATION OF BIOSWALE 10'-0" OR PLANTED
ROADWAY AREA SIDEWALK
VARIES AS PER DESIGN
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER

CURB LINE
B 1'-6" B
TOPSOIL
EXISTING FLOW
CATCH BASIN
A CONCRETE
HEADER (3) SIDES

STEEL SPIKE IN 4" DIA.


PLAN UNDISTURBED SOIL
CONCRETE ENCASEMENT
L-SHAPED EDGING WITH PLACED IN SOIL LAYER
SOLID CLEANOUT COVER, 1'-6" ℄ 4" PVC SLOTTED OBSERVATION MINIMUM 9" STAKES, SEE (TYP.)
WELL SCREEN 0.01 WELL, SEE GI-213

DEPTH OF PVC PIPE PER DESIGN PLANS


SEE GI-204 (TYP.) DRAWING GI-204
SLOT SIZE WITH
STEEL TREE PIT GUARDS PVC CAP WRAP GABION WALL IN
(3 SIDES TYP.) SEE GI-601, PVC CAP
TOP LAYER, 2"-3" GEOTEXTILE (TOP AND 12"

1'-0"
GI-602, GI-603 & GI-604 MULCH SIDES ONLY)
TOP OF STONE
12" WIDE GABION WALL COLUMN WITH
FILLED WITH OPEN-GRADED PERFORATED CAP
STONE EQ EQ (TYP.)
CLEAN OPEN-GRADED

B
8" INSIDE DIAMETER
STONE BASE WRAPPED IN
PERFORATED HDPE PIPE
GEOTEXTILE, TOP AND
SIDES ONLY STONE FILLED PERFORATED
12" DIAMETER PVC PIPE
UNDISTURBED SOIL WRAPPED ALL AROUND
1'-0"
WITH GEOTEXTILE FABRIC.
PERMEABLE SOIL
SOLID 8" INSIDE

A
CONSTANT SLOPE TEMPORARY 18" MAXIMUM
DIAMETER HDPE
DIAMETER CASING AUGERED
PIPE
1'-0"

INTO PERMEABLE LAYER

PERMEABLE SOIL LAYER


PERFORATED COVER

PENETRATION INTO
GRANULAR FILL TO FILL THE
OPEN-GRADED STONE BASE ANNULAR SPACE BETWEEN
WRAPPED WITH GEOTEXTILE TOP OF STONE COUMN PVC CAP WITH THE STONE COLUMN PIPE
(TOP AND SIDES ONLY) WITH PERFORATED CAP PRIMER AND AND THE HOLE
SOLVENT
CEMENT OPEN-GRADED STONE
PERMEABLE SOIL LAYER

TEMPORARY, 18" MAXIMUM BOTTOM OF COLUMN


PENETRATION INTO

DIAMETER CASING AUGERED TO BE OPEN


INTO PERMEABLE LAYER
GRANULAR FILL TO FILL THE
ANNULAR SPACE BETWEEN THE
STONE COLUMN PIPE AND THE HOLE DEPTH SCHEDULE
STONE FILLED PERFORATED 12" OPEN BOTTOM ROWB A B SECTION A-A
DIAMETER PVC PIPE WRAPPED (TYP.) WITH TREE 3'-0" 2'-0" AT BIOSWALE STONE COLUMN
ALL AROUND WITH GEOTEXTILE NO TREE 3'-6" 1'-6"
FABRIC (TYP.)
SECTION B-B P.E. 05-13-2022
NOTE: MANAGING DIRECTOR, DATE
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN
- NO CONNECTION TO SEWERS
8" INSIDE DIAMETER
CLEANOUT;
PERFORATED PIPE
REFER TO DETAILS
GI-204 10'-0" OR AS PER DESIGN
SEE GI-186 FOR EXPANSION JOINT (TYP.)
DIMENSION SCHEDULE

1'-0"
1'-2
OBSERVATION WELL, SEE GI-213

EQ
5'-0" OR AS PER DESIGN
SIDEWALK 1'-3" CONCRETE HEADER
STEEL TREE GUARD (3-SIDES
CONSTANT SLOPE 1'-0" TYP.) SEE GI-601, GI-602, GI-603
& GI-604
GABION WALL BELOW 1'-6" SEE GI-503A THROUGH GI-503G

EQ
CONCRETE STRIP, SEE GI-207 FOR TYPICAL PLANTING PLANS
STONE
NEW CURB TYPE TO MATCH
COLUMN
CONTRACT PLANS
EXISTING CURB
TO REMAIN 12"x5" CONCRETE STRIP

1'-6"
EXPANSION JOINT

FLOW
EXISTING STORMWATER EXISTING CURB
ASPHALT INLET TO REMAIN
PAVEMENT SEE GI-185
PITCH PITCH LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
TOP OF ROADWAY C.I. FRAME AND GRATING FIELD CONDITIONS AND SITE ENGINEER
(BEYOND) (WITHOUT CURB PIECE),
C C
ASPHALT TO BE
CAST IRON FRAME SET 1" SEE DEP STANDARDS
PITCHED TOWARDS

1'-0"
BELOW TOP OF ROAD SE58A & SE59A

PITCH
THE CI GRATE.

ROADWAY 1'-0" 1'-0"


1'-0"
PLAN
1"

1"

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. BIOSWALE TYPE D STORMWATER INLET SECTIONS & DETAILS
- NO CONNECTION TO SEWERS
L

OBSERVATION WELL, SEE


GI-213

1'-0"
SIDEWALK CLEANOUT;
REFER TO
DETAILS GI-204 CONCRETE HEADER
STEEL TREE GUARD (3-SIDES TYP.)
1'-0" SEE GI-601, GI-602, GI-603 & GI-604

W
GABION WALL UNDER 1'-3"
CONCRETE STRIP, SEE
GI-207
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB

1'-0"
C C

1'-6"
TO REMAIN 5" THICK CONCRETE STRIP EXPANSION JOINT

FLOW
EXISTING 8" INSIDE DIAMETER PERFORATED PIPE, EXISTING CURB
ASPHALT SEE CORRESPONDING GI FEATURE TO REMAIN
STORMWATER
PAVEMENT FOR CORRECT PIPE PLACEMENT
INLET (ALTERNATE LIMIT OF NEW CURB TO EXTEND
WITHIN THE PRACTICE
LOCATION PER DEP BEYOND THE ROWB AS DETERMINED
APPROVAL) BY FIELD CONDITIONS AND SITE
PLAN ENGINEER

12"x5"
CONCRETE HEADER
CONCRETE CONCRETE
STRIP STORMWATER INLET
12"x5" CONCRETE HEADER
LEVELING (BRICK COURSE ABOVE
STRIP SIDEWALK
COURSE NOT SHOWN FOR
LEVELING CLARITY)
GABION
E COURSE E WALL
GABION
BRICK COURSE. 8" 4'-0" 8"
WALL
AS REQUIRED
5-#6@3" OC
5-#6@3"

8"
8"

F F
2"

1'-4"
EQ EQ
4'-10"

GABION FILLED WITH


OPEN-GRADED STONE FACE OF

3"
ROADWAY
CURB
4'-6"

OPENING FOR 8" INSIDE

2'-2"
10"
DIAMETER PIPE WITH
3'-4"

PERFORATED COVER
C.I. HOOD, SEE
8" INSIDE DIA. HDPE
DEP STANDARDS
PIPE
SE60

8"
MORTAR
AROUND PIPE CAST IRON FRAME
5'-4"
EXISTING SOIL [WITHOUT CURB PIECE] PLAN [WITH REINFORCEMENT]
AND GRATING , SEE DEP
PLAN [WITH CASTING]
9"

STANDARDS SE58A & SECTION F-F


SECTION E-E SE59A
5'-4"

SECTION C-C P.E. 05-13-2022


MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALE TYPE D
- NO CONNECTION TO SEWERS
L

SIDEWALK

W
EXISTING CURB
TO REMAIN

FLOW
EXISTING
ASPHALT
PAVEMENT

TYPE 1/TYPE 2
L

R.O.W.B TYPE D DIMENSIONS

SIDEWALK LENGTH (L), WIDTH (W),


TYPE
1FT. INCREMENT 6 IN. INCREMENT

17' ≤ L ≤ 20' 4'-0" TO 6'-0" TYPE 1


W

13' ≤ L ≤ 16' 4'-0" TO 6'-0" TYPE 2

10' ≤ L ≤ 12' 4'-0" TO 6'-0" TYPE 3


EXISTING CURB
TO REMAIN DIMENSIONS SCHEDULE
NOTE:
FLOW DOT APPROVAL REQUIRED FOR ALL WIDTHS GREATER THAN 5'.
EXISTING
ASPHALT
PAVEMENT

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
TYPE 3 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-200
MISCELLANEOUS DETAILS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD FOR ROWB/ROWGS/ROWRG INLET & OUTLET
CAST IN PLACE
20'-0" OR AS PER DESIGN CONCRETE STRIP
L-SHAPED EDGING
CONCRETE GUTTER (TYP)
SURFACE TAPERED SURFACES WITH
GRADING AS BRUSHED FINISH (TYP.)
PER DRAWING DROP CURB OUTLET ELEVATION
GI-124
5'-0" OR AS PER DESIGN

CAST-IN-PLACE CONCRETE OUTLET


LOW POINT APRON

OUTLET INVERT +
SET 3" BELOW
OUTLET INVERT
GABION BELOW
CONCRETE STRIP
L-SHAPED
EDGING (TYP.)
CAST-IN-PLACE
CONCRETE STRIP
GABION BELOW CONCRETE STRIP NEW CURB (TYP)
CONCRETE STRIP (TYP.)
10
"
CURB LINE HEADER (TYP.)
5"-THICK CONCRETE
1'-0"

[INLET] 2'-
0
1'-6"

STRIP "
2'-0" 10" 18" 2'-2"
+

15% - 20%
FLOW [OUTLET]
PITCH 8"-THICK REINFORCED FLOW
1'-6"

PITCH
TO MATCH EXISTING
CONCRETE GUTTER
A A
ROADWAY
4'-4" 5'-4"
CONCRETE
APRON LEVELING COURSE
PLAN
NEW CURB (TYP) ISOMETRIC VIEW
TAPERED SURFACES WITH OUTLET
BRUSHED FINISH (TYP.)
N.T.S.
DROP CURB INLET ELEVATION
HEADER (TYP)
CAST-IN-PLACE CONCRETE INLET
APRON WITH 15% - 20% PITCH (TYP)
EXTENT OF NEW CURB
2'- CONCRETE GUTTER (TYP) VARIES PER FIELD CONDITION
2"
18" 2'-2"
TYPICAL EXPANSION HEADER (BEYOND)
CAST-IN-PLACE TO HEADER
1'- CONCRETE STRIP JOINT HEIGHT OF ADJACENT
6"
ASPHALT PAVEMENT
ADJACENT 8"-THICK,
L-SHAPED EDGING PITCH 1 PITCH FLUSH WITH CONCRETE
18"-WIDE REINF. 2 APRON
LEVELING COURSE CONCRETE GUTTER, TOP
FLUSH WITH APRON

5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
CAST-IN-PLACE REINFORCED
CONCRETE APRON BOTTOM OF CURB

LEVELING COURSE

L-SHAPED EDGING
SECTION A-A
ISOMETRIC VIEW
INLET
N.T.S.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR STORMWATER INLET
FOR R.O.W. BIOSWALE TYPE 1B AND TYPE 2B - NO CONNECTION TO SEWERS

CURB AS PER HWY. STDS. SIDEWALK


SLOPE PAVEMENT TO
A SLOPE PAVEMENT TO CASTING FINAL GRADE (TOP OF CURB) CASTING
EXIST. RDWY. 7"
EXISTING ROADWAY
CURB BRICK, SINGLE TYP.
LAYER BRICK,
4-#6@3" SINGLE LAYER
B B

8"
1" CLEAR
6" L. HOOK, SEE
DEP STANDARDS
4'-10"

8" SOLID DUAL MORTAR AROUND SE60


WALL HDPE PIPE PIPE OUTLET
WELDED HANDLE
CAST IRON FRAME WELDED ON MODIFIED C.I.
[WITHOUT CURB PIECE] AND HANDLE ON HOOD, SEE DEP

8'-2" +/-
GRATING , SEE DEP MODIFIED STANDARDS SE60
STANDARDS SE58A & SE59B C.I. HOOD,

6'-6"
SEE DEP

4'-0" SUMP
(3'-0" MIN.)
STANDARDS
SE60 8" 4'-0" 8"
8" 3'-6" 8"

5'-4"

A
PLAN [WITH CASTING]
12"

CURB
8"

SECTION A-A SECTION B-B


2'-2"

2" NOTES:

1. LOCATION OF CURB SHALL BE AS SHOWN UNLESS OTHERWISE DIRECTED BY THE ENGINEER.


2. LOCATION AND ANGLE OF 8" HDPE OUTLET PIPE MAY BE VARIED TO SUIT FIELD CONDITIONS.
1'-4"

3. KEYED CONSTRUCTION JOINTS ARE REQUIRED BETWEEN ANY SUCCESSIVE POURS.

4-#6@3" 4. CONCRETE IS TO BE CLASS 40. REBARS-GRADE 60.


8"

8" 4'-0" 8"

PLAN [WITH REINFORCEMENTS] P.E. 05-13-2022


MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR PRECAST STORMWATER INLET
FOR R.O.W. BIOSWALE TYPE 1B AND 2B - NO CONNECTION TO SEWERS
A CAST IRON FRAME [WITHOUT
CURB PIECE] AND GRATING , SEE
DEP STANDARDS SE58A & SE59B
CURB
EXPANSION JOINT
CURB AS PER HWY. STDS.

8"
B CONC. SDWK. SLOPE PAVEMENT
B SLOPE PAVEMENT TO CASTING TO CASTING
FINAL GRADE (TOP OF CURB)
EXIST. RDWY. 7" EXIST. RDWY.
TYP.
BRICK, SINGLE REMOVABLE PRECAST TYPE-2 BRICK, SINGLE LAYER
LAYER
SLAB (SEE DETAIL a-a)
MORTAR AROUND

3'-6"

8"

8"
PIPE OUTLET
4" (TYP.)

0.5" MORTAR
LIFTING HOOK, JOINT, TYP. 6" L. HOOK, SEE DEP
TYPICAL FOR FOUR LIFTING 4" STANDARDS SE60
8" SOLID DUAL
[SEE DETAIL] HOOK WALL HDPE PIPE 1 1/2"R WELDED HANDLE
8" [SEE DETAIL] ON MODIFIED C.I.
HOOD, SEE DEP

4"
1 1/2" STANDARDS SE60
WWM-AS=0.12 B.W. 15" X 15" OPENING
8" 4'-0" 8" #6 REINF. BAR
(SEE NOTE 1)
LIFTING HOOK (SEE

3'-0"
NOTES)

6'-6"
A WWM-AS=0.12 B.W.
10" MAX.
PLAN

4'-0" SUMP
(3'-0" MIN)
8" (TYP.)

WWM-AS=0.12 B.W. 8" 4'-0" 8"

a 1 1/2"R (TYP.)

CURB 3'-6" LIFTING HOOK DETAIL KEYWAY ALL


(N.T.S.) AROUND
8"

KEYWAY ALL AROUND


2" (TYP.)
#6 REINFORCING
R3" BAR
4-#6@3"

NOTE:
1'-0"

R3"

6"
ALL STEEL LIFTING BAR
REINFORCEMENT [SEE DETAIL]
2" (TYP.) SECTION B-B
4'-10"

6" 6"
ARE #6 BARS

SECTION A-A LIFTING BAR DETAIL


[IN REMOVABLE PRECAST TYPE 2 SLAB] LIFTING BAR
3" (SEE DETAIL)
3" 4"
2'-0"

NOTES:

8"
1. LOCATION OF OPENING SHALL BE DETERMINED PRIOR TO THE MANUFACTURING OF BASIN BY FIELD MEASUREMENTS.
2. LOCATION OF CURB SHALL BE AS SHOWN UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
3. LOCATION AND ANGLE OF 8" HDPE OUTLET PIPE MAY BE VARIED TO SUIT FIELD CONDITIONS. 1" CLEAR
4. LIFTING HOOKS SHALL BE LOCATED IN THE SECTION AS PER MANUFACTURERS RECOMMENDATIONS AND GROUTED 11" 2" 2"
4" 4"
a PRIOR TO BACKFILLING. (FOUR (4) LIFTING HOOKS SHALL BE PROVIDED FOR EACH SECTION AND SHALL BE PLACED 2" 3" 2"
5'-4" SYMMETRICALLY AND IN SUCH A MANNER AS TO PROVIDE FOR THE EVEN LIFTING OF THE SECTION.)
5. LIFTING BAR TO BE CUT FLUSH TO SURFACE AFTER PLACEMENT OF PRECAST TYPE 2 SLAB. 4'-10"
6. CONCRETE IS TO BE CLASS 40 AND 5% AIR ENTRAINED. REBARS-GRADE 60. WWM-F S = 65,000 PSI.
REINFORCEMENT PLAN 7. MODIFY STANDARD CAST IRON HOOD AND HOOKS [SE60] AS PER DRAWING DETAIL a-a
[REMOVABLE PRECAST TYPE 2 SLAB] [OF REMOVABLE PRECAST TYPE 2 SLAB]

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. SECTIONS AND DETAILS
VARIES LENGTH AS SPECIFIED SOLID 45° BEND
CONCRETE HEADER
4" MIN.
COVER SIDEWALK 8" INSIDE DIAMETER
PERFORATED PIPE

7 1/2"
H
H

80 MIL HDPE
W BARRIER;
5" MIN
LENGTH OF GI
PRACTICE
EQ EQ
BOTH ENDS OF HDPE SIDE VIEW END VIEW HDPE BARRIER
STORMWATER CHAMBER TO WITH 12" TOE
BE SEALED WITH END CAPS PERFORATED
ROW GI WIDTH W H COVER (TYP.)

12"
5" MINIMUM STONE BEDDING
≥ 5' 40"-51" 25"-30"
STORMWATER INLET
≤ 4'-6" 34"-36" 16"-20.5" CROSS-SECTION
HDPE BARRIER DETAILS
DIMENSION SCHEDULE AGAINST SIDEWALK
(ONLY IF DIRECTED)
HDPE STORMWATER CHAMBER N.T.S. ROWB TYPE D TYPICAL
N.T.S. PIPE/STORMWATER INLET
COVER SOLID CLEANOUT
COVER (TYP.) SET 2"
CONNECTION
COVER
ABOVE SURFACE
SOLID CLEANOUT GRADE
GRADE COVER (TYP.)

8" SOLID DUAL WALL

ENGINEERED
DRAINAGE HOLES SOLID DRAIN
2% SLOPE HDPE PIPE TO ELBOW
(OPTIONAL) BODY

SOIL
6" (± 0.25")

9" STAKE (TYP) 45° BEND SOLID DRAIN


PERFORATED BODY SOIL LAYER
COVER WYE 22 12° ELBOW
GEOTEXTILE
FABRIC
FLOW 8" INSIDE DIA. 45° BEND
FROM INLET PERFORATED HDPE PIPE OPEN GRADED STONE 2% SLOPE
CLEAN-OUT DETAIL -TYPE B - HDPE PIPE
N.T.S.
0.15"

6" (± 0.25")
COVER
CAST IRON CLEANOUT COVER CAST IRON CLEANOUT COVER PERFORATED
(TYP.) WITH CAMLOCK LOCKING (TYP.) TO BE FLUSH WITH FLOW
DEP COVER 8" INSIDE DIA. OPEN-GRADED
8" MECHANISM TOP OF GRADE SURFACE PERFORATED PIPE STONE LAYER FROM INLET
WYE FITTING
9 7/8"
CLEAN OUT
OPENING DIMENSIONS

GRADED
STONE
OPEN
SOLID DRAIN
BODY CLEAN-OUT DETAIL- ROWB TYPE D - HDPE PIPE
L-SHAPED EDGING 90° BEND 8" INSIDE DIA. PERFORATED HDPE PIPE. N.T.S.
N.T.S.

CLEAN-OUT DETAIL - ROW INFILTRATION BASIN - HDPE PIPE


N.T.S.
NOTES FOR INFILTRATION BASINS:
1. SET THE TOP OF THE SOLID CLEANOUT COVER FLUSH WITH THE SURFACE OR GRADE P.E. 05-13-2022
2. THE VERTICAL DRAIN BODY SHALL BE SOLID MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. SECTIONS AND DETAILS
STEEL TREE GUARD
CONCRETE STRIP
SURVEY MARKER, TOP
SIDEWALK WATERTIGHT
FLUSH WITH SURFACE
CURB EXPANDING FOAM
SIDEWALK SURVEY SEALANT IN HDPE
B PLANTED B MARKER, TOP SPLIT SLEEVE
AREA FLUSH WITH (THROUGH ENTIRE
SURFACE 18" SLEEVE)

WATERTIGHT EXPANDING
WATER FOAM SEALANT IN SPLIT
ENGINEERED
UTILITY 3" SOIL
A SLEEVE (THROUGH 6"
CLASS B
DUCT 3" ENTIRE SLEEVE)
CONCRETE
D 2D HEADER
COLLAR
1'-0"
A INTERFACE BETWEEN SPLIT PVC PIPE
CONCRETE CLEAN
18"
COLLAR AND HDPE
BLANK UTILITY SLEEVE
COLLAR (TYP.) OPEN-GRADED BARRIER TO BE SEALED MARKER DETAIL
STONE BASE WITH WATERPROOF CONCRETE
WRAP STONES IN STRIP
SEALANT. SEE NOTES
GEOTEXTILE (TOP
AND SIDES ONLY) 80 MIL HDPE BARRIER;
GABION (BEYOND), LENGTH OF GI
PARTIALLY SHOWN PRACTICE WITH 12"
FOR CLARITY, SEE
SECTION TOE. SEE NOTES
GI-207 HDPE
CURB
BARRIER. WATER UTILITY SOLID PVC PIPE

12"
SEE NOTES D FOR FUTURE
WATERTIGHT EXPANDING
WATER SERVICE
FOAM SEALANT BETWEEN

2D + 6"
NOTES: 6" UTILITY AND PVC SPLIT
1. HDPE BARRIER TO BE INSTALLED WHEN THERE IS AN UTILITY CROSSING ONLY IF WATER SERVICE IS 2D 2D SLEEVE (THROUGH
AND/OR WHEN THERE IS LESS THAN 10' FROM THE ASSET TO THE ENCOUNTERED: ADDITIONAL
ENTIRE SLEEVE) SOLID PVC PIPE ROADWAY
BUILDING LINE. SLEEVE TO BE CONSTRUCTED
FOR FUTURE WATER 3" TO BE CAPPED AT
2. ANY SEAMS IN THE HDPE BARRIER MUST HAVE A 1'-0" OVERLAP AND BE 3" CLASS B CONCRETE COLLAR WATER
SERVICE. SOLID PVC PIPE TO BOTH ENDS
SEALED WITH WATERTIGHT SEALANT UTILITY DUCT
3. ADDITIONAL SLEEVE SHALL BE PVC PIPE AND EXTEND OUTWARD AS BE CAPPED AT BOTH ENDS.
LOCATION TO BE MARKED ON
SHOWN ABOVE.
CONCRETE HEADER, CROSS SECTION A-A PLAN B-B
4. SPLIT PVC PIPE SHALL BE USED TO SLEEVE THE EXISTING WATER
SERVICE LINE AND SOLID PVC PIPE SHALL BE USED FOR THE SPARE DIRECTLY ABOVE PVC PIPE.
SLEEVE. WATER UTILITY CROSSING DETAIL
N.T.S.

CONCRETE STRIP STEEL TREE GUARD

CURB SIDEWALK
2D + 6"
PLANTED
AREA
HDPE
BARRIER NOTES:
D UTILITY
WATERTIGHT EXPANDING 1. HDPE BARRIER TO BE INSTALLED WHEN THERE IS
UTILITY FOAM SEALANT IN SPLIT WATERTIGHT EXPANDING FOAM AN UTILITY CROSSING AND/OR WHEN THERE IS LESS
ENGINEERED
DUCT 3" SOIL A SLEEVE (THROUGH 2D + 6" 2D
SEALANT BETWEEN UTILITY AND THAN 10' FROM THE ASSET TO THE BUILDING LINE.
3" ENTIRE SLEEVE) PVC SPLIT SLEEVE (THROUGH 2. ANY SEAMS IN THE HDPE BARRIER MUST HAVE A
D 2D ENTIRE SLEEVE) 1'-0" OVERLAP AND BE SEALED WITH WATERTIGHT
SEALANT.
1'-0" 3" 3" CLASS B CONCRETE COLLAR
A INTERFACE BETWEEN
18"
CONCRETE COLLAR AND HDPE
COLLAR (TYP.)
CLEAN
BARRIER TO BE SEALED
CROSS SECTION A-A
OPEN-GRADED
STONE BASE WITH WATERPROOF
WRAP STONES IN
SEALANT. SEE NOTES
GEOTEXTILE (TOP
AND SIDES ONLY) 80 MIL HDPE BARRIER;
GABION (BEYOND), LENGTH OF GI UTILITY CROSSING DETAIL 05-13-2022
P.E.
PARTIALLY SHOWN PRACTICE WITH 12"
FOR CLARITY, SEE
SECTION TOE. SEE NOTES N.T.S. MANAGING DIRECTOR, DATE
GI-207 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD DETAILS FOR R.O.W. STORMWATER SEEPAGE BASIN
CIRCULAR REINFORCED CONCRETE SLAB AND FOOTING

LIFTING BAR. SEE LIFTING BAR


DETAIL
3-#6@4"
DEP STANDARD 36 Ø MANHOLE
#5@6" BOTH CASTING
WAYS 2"
#4 HOOPS TOP PRECAST SEEPAGE BASIN SCHEDULE
AND BOTTOM
2" PRECAST RING TYPE HEIGHT VOLUME, CF VOLUME, GAL tw, IN
3-#8 @3" BOTTOM
D = 4'- 0" O.D.
3'-0"
SOLID 2'-0" 17.4 130 4"

LIFTING BAR PERFORATED* 3'-0" 26.2 195 4"


PRECAST CONCRETE
COVER FOR SEEPAGE (TYP.) D = 6'- 0" O.D.
BASIN
SOLID 2'-0" 45.0 337 4"

PERFORATED* 3'-0" 67.0 496 4"


D = 8'- 0" O.D.

SOLID 2'-0" 84.4 631 4"


VARIES 6" MIN.
12" MAX. PERFORATED* 3'-0" 126.7 947 4"
D d
* REFER TO THE MANUFACTURER'S SPECIFICATIONS FOR OPENING DETAILS

PLAN OF CIRCULAR SLAB PLAN OF PRECAST CIRCULAR FOOTING RING PRECAST SEEPAGE BASIN SCHEDULE

VARIES #4 HOOPS TOP MIN.. 6" PRECAST CIRCULAR PRECAST CIRCULAR THICKNESS
AND BOTTOM MAX.12" SLAB (FT) FOOTING RING (FT) (IN)
3-#6@4" BOTH
WAYS D d t

4'-0" 4'-8" 10"


t

6'-0" 6'-8" 10"


#5@6 BOTH 3-#8@3" (TYP.) 1 1/2" 2"
1'-0" 1'-0" 8'-0" 8'-8" 10"
WAYS
D d
NOTE: IN NO CASE SHALL "d" BE LESS THAN THE OUTSIDE DIAMETER
OF THE SEEPAGE BASIN

SECTION IN CIRCULAR SLAB SECTION IN PRECAST CIRCULAR FOOTING RING CIRCULAR SLAB AND FOOTING SCHEDULE
DETAIL A DETAIL B
#6 REINFORCING
3"R BAR
10"

3"R

8" 8"
P.E. 05-13-2022
LIFTING BAR DETAIL MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. SECTIONS AND DETAILS - GABION LAYOUT

TOP OF CONCRETE
STRIP FLUSH WITH
CURB TAPER
5"-THICK CONCRETE STRIP
CONCRETE CURB
[INLET]
A [OUTLET] A

PITCH
FLOW
8"-THICK REINFORCED FLOW

CONCRETE GUTTER
PITCH TO MATCH
EXISTING ROADWAY PLAN

CONCRETE STRIP GABION BELOW CONCRETE 3"-THICK LEVELING STONE


OUTLET CONCRETE STRIP STRIP CONCRETE STRIP INLET

LEVELING STONE
GABION BELOW
CONCRETE STRIP
GABION PLACED
BELOW CONCRETE
GABION FILLED WITH STRIP
CLEAN OPEN
GRADED STONE
SECTION A-A
TYPICAL GABION LAYOUT
GABION BELOW CONCRETE
CONCRETE STRIP STRIP
CONCRETE STRIP 3"-THICK LEVELING STONE
OUTLET CONCRETE STRIP INLET
6" MIN. 6" MIN.

2"
3- #4 @ 3" O.C.
3" MAX. TYP.
ENGINEERED SOIL LEVELING STONE
GABION BELOW
CONCRETE STRIP UTILITY CROSSING,
(LOCATION MAY VARY) GABION PLACED
BELOW CONCRETE
GABION FILLED WITH CLEAN OPEN GRADED
STRIP
CLEAN OPEN STONE BASE
GRADED STONE

SECTION A-A
GABION LAYOUT WITH UTILITY CROSSINGS

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN INLET WITH PRECAST CONCRETE CHAMBER
20'-0" OR AS PER DESIGN

6"
1'-0"
5'-0" OR AS PER DESIGN
6"

SIDEWALK SURFACE TYPE PER 2'-0"


CONTRACT PLANS

1'-8" 2'-10"
EXISTING CURB 2'-4" EXISTING CURB
2'-0"
TO REMAIN 2'-0" TO REMAIN

6"
+
[INLET]
1'-6"

FLOW

PITCH
EXISTING
ASPHALT FLOW
PAVEMENT
13" 36"
PLAN
CONCRETE GUTTER
(TYP.)
CONCRETE GUTTER
(TYP.) TOP OF CONCRETE CHAMBER
L6x4x3/8" FLUSH WITH SURFACE
STEEL FACED CURB L6x4x3/8"
STEEL GRATE ABOVE STEEL FACED CURB
1" INLET INVERT STEEL GRATE, TOP FLUSH
(PARTIALLY SHOWN WITH THE SURFACE
ELEVATION INLET INVERT
FOR CLARITY) (PARTIALLY SHOWN ELEVATION
CONCRETE INLET APRON FOR CLARITY)
WITH 10% - 20% PITCH CONCRETE INLET APRON
WITH 10% - 20% PITCH
OPENING FOR 8" INSIDE DIA OPENING FOR 8" INSIDE DIA
PERFORATED PIPE PERFORATED PIPE

PRECAST CONCRETE PRECAST CONCRETE


CHAMBER FOR CONCRETE TOP IB CHAMBER FOR GRASS TOP IB
4'-7"

CONCRETE HEADER CONCRETE HEADER


(TYP.) (TYP.)

ISOMETRIC VIEW ISOMETRIC VIEW


(STEEL GRATE ABOVE CHAMBER) (STEEL GRATE FLUSH WITH CHAMBER)
N.T.S N.T.S

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS - CONCRETE TOP

STEEL GRATE
SEE PART PLAN
NOT SHOWN
FOR CLARITY

FLOW

FLOW

PLAN - CONCRETE TOP

PRECAST CONCRETE
CHAMBER WITH CONCRETE
STEEL GRATE COVER TOP

L2"x2"x1/4" BELOW
1" x 3/16" BEARING BAR L2" x 2" x 1/4" CONCRETE TOP
STEEL GRATE
ANCHORED TO 1" x 3/16" CROSS BAR
STEEL GRATE NYCDEP TYP.
CHAMBER WALLS (TYP)
COVER

A A
G-CLIP FASTENER OR
APPROVED EQUAL FLUSH GRATING FASTENER WITH
WITH TOP OF GRATE RECESSED BOLT (TYP.) 45°
3/8" x 4" PLAIN STEEL STUD
WELDED TO STEEL ANGLE

+ DETAIL A-A
INLET CONCRETE TOP STEEL BAR GRATE BRACING
10% - 20%

INVERT
PITCH

PART PLAN - CONCRETE TOP


STEEL GRATE, LIFTING POINTS AND FASTENER DETAIL

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS - GRASS TOP
PRECAST CONCRETE
CHAMBER WITH GRASS
STEEL GRATE COVER TOP
L2"x2"x1/4" BELOW
STEEL GRATE
ANCHORED TO
STEEL GRATE CHAMBER WALLS (TYP.) STEEL GRATE
COVER SEE PART PLAN
NYCDEP NOT SHOWN
A A FOR CLARITY

G-CLIP FASTENER OR
APPROVED EQUAL, FLUSH
WITH TOP OF GRATE
FLOW

FLOW

+ PLAN - GRASS TOP


INLET
10% - 20%

INVERT
PITCH

GRASS TOP
1" x 3/16" L-SHAPED EDGING, TOP
1" 1" x 3/16"
BEARING BAR L2" x 2" x 1/4" FLUSH WITH SURFACE,
PART PLAN - GRASS TOP L2" x 2" x 1/4" GRASS
BEARING BAR
DIMENSIONS PER
STEEL GRATE, LIFTING POINTS AND FASTENER DETAIL 1" x 3/16" TOP 1" x 3/16"
TYP. TYP. GI-204
CROSS BAR CROSS BAR
STAKES SHALL NOT
PUNCTURE THE
GIOTEXTILE FABRIC
PRECAST CONCRETE GRATING
CHAMBER WITH FASTENER WITH
GRASS GRATING
STEEL GRATE COVER RECESSED BOLT
TOP FASTENERS WITH 45° 45°
L2"x2"x1/4" BELOW RECESSED BOLTS
STEEL GRATE 3/8" x 4" PLAIN STEEL 3/8" x 4" PLAIN STEEL
ANCHORED TO STUD WELDED TO STEEL STUD WELDED TO
STEEL GRATE NYCDEP
CHAMBER WALLS (TYP) ANGLE STEEL ANGLE
COVER DETAIL B-B
DETAIL A-A
B B STEEL BAR GRATE BRACING
STEEL BAR GRATE BRACING (PRECAST CONCRETE CHAMBER FOR GRASS TOP IB)

G-CLIP FASTENER OR
APPROVED EQUAL, FLUSH
WITH TOP OF GRATE

+
INLET
10% - 20%

INVERT
PITCH

P.E. 05-13-2022
PART PLAN - GRASS TOP MANAGING DIRECTOR, DATE
STEEL GRATE, LIFTING POINTS AND FASTENER DETAIL
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS

1" LETTERS x1/8"


EMBOSSED
1 1/2" x 5 1/2" x1/8" PLATE
WELD AND FLUSH 1 1/2"x 5 1/2" x1/8" PLATE
WELDED TO BARS AND 1/8"

3"
SMOOTHLY WELDED TO BARS
EMBOSSED LETTERS
A
L2"x2"x1/4"
NYC DEP
11/16"

NYCDEP
G-CLIP FASTENER OR
APPROVED EQUAL
SECTION A-A PLATE WITH DEP LOGO
A
B B

BEARING BAR TOP OF STEEL GRATE


3/4" PIPE SCHEDULE
CROSS BAR 40 SHOP WELDED TO CROSS BARS OF
STEEL GRATE BARS 1" X 3/16"

BEARING BARS OF
1" X 3/16"

9"
3"

DETAIL E LIFTING POINT, 3/4"


PIPE, SCHEDULE 40
LIFTING POINT DETAIL DETAIL E

D D C G-CLIP FASTENER OR
APPROVED EQUAL
BEARING BAR
CROSS BAR

L2"x2"x1/4"
1"

C 8"

SECTION B-B SECTION C-C


BEARING BAR
1" O.D. STAINLESS STEEL
WASHER FLUSH WITH TOP
OF STEEL GRATE
STAINLESS STEEL
3/8" DIA BOLT

SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN INLET WITH PRECAST CONCRETE
CHAMBER & CAST IRON GRATE
- NO CONNECTION TO SEWERS

4" 2'-10" 4"

SIDEWALK SIDE A
CAST IRON GRATE
CAST IRON

4"
SEE INLET FLUSH WITH
GRATE NOT
CHAMBER SURFACE, (NOT
SHOWN FOR A
PLAN SHOWN FOR
CLARITY

1 1/2"
CLARITY) SEE
B B SECTIONS BELOW

1'-0"
1 1/2" AND GI-209D FOR
1 1/2"

1 1/2"
A DETAILS
FLOW

FLOW

C C

4"
PLAN
ROADWAY SIDE A

INLET CHAMBER PLAN

SEE DETAIL D 6 1/2" 2'-5" 6 1/2"


OPENING FOR 8" ANCHOR TAB, SEE
INSIDE DIAMETER GI-209D FOR CAST IRON GRATE, TOP
HDPE PIPE (TYP.) DETAILS FLUSH WITH SURFACE
4" 4"
4"

4"
2 1/2" 1 1/2" 1 1/2" 2 1/2"
1'-6" ANCHOR TAB,
6"

6"
SEE GI-209D
FOR DETAILS
2- #4 REBAR

4"
ANCHOR TAB,

1 1/2"
SEE GI-209D FOR
DETAILS

6"
2- #4 REBAR
4'-8"

4x4 W4/24 WWM


2'-10"

2'-10"

(TYP.)

DETAIL D
4"

SECTION A-A SECTION B-B SECTION C-C P.E. 05-13-2022


MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN INLET WITH PRECAST CONCRETE
CHAMBER & CAST IRON GRATE
- NO CONNECTION TO SEWERS

WELD ANGLES ANCHOR TAB, FASTENING BOLT,


ON UNDERSIDE SEE ANCHOR SEE BOLT DETAIL
AND OUTSIDE TAB DETAIL
FOR ANCHOR TAB 1 1/2"
1/4"
SIDEWALK SIDE PLACEMENT, SEE

1 1/16"
PLAN VIEW AND
ANCHOR TAB
DETAIL

5 1/2"
2 1/2"

1"

1'-2 3/16"
1'-2 1/2"
TYP.

1'-3"
3/8" 1/4"

ANCHOR TAB DETAL


2 1/2"

1"
D&T 5/16" - 18 5/16" - 18 x 1 1/2" BOLT
ROADWAY SIDE 5/16" FLAT WASHER COUNTERSINK 1" DIA.
7" 7" 1 1/2" x 1 1/2" x 1/4" L
1" WIDE X 3/16" FLAT STEEL (8) FLAT

5/8"
WELDED TO FRAME UNDERSIDE OF
FRAME, SEE ANCHOR TAB DETAIL

PLAN VIEW SIDE SECTION VIEW

3'-1"
BOLT DETAIL
3'-0 1/2"
1 1/2" x 1 1/2" x 1/4" L
3'-0 3/16"
1 3/16"

1 1/2"
5/8"

15/32" 1 1/8" 1 1/4"

1/16" RADIUS FOR ANCHOR TAB


FRONT SECTION VIEW PLACEMENT, SEE
PLAN VIEW AND
ANCHOR TAB
DETAIL

NOTE:
MATERIAL - GRATE OF GRAY CAST IRON ASTM A48 CLASS 35B, FRAME OF HOT ROLLED, FABRICATED
STEEL, ASTM A36 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN OBSERVATION WELL
- NO CONNECTION TO SEWERS

E
OBSERVATION

6"
CLEANOUT, TYP. WELL

6"

2'-0"
SURFACE TYPE PER
DESIGN PLANS

+
FLOW

FLOW

PLAN E

5"-THICK CONCRETE TOP 8" INSIDE DIAMETER


PERFORATED HDPE CAST IRON CLEANOUT - GRASS TOP 8" INSIDE DIAMETER CAST IRON CLEANOUT -
IMPERMEABLE LINER
TOP OF COVER FLUSH PERFORATED HDPE TOP OF COVER FLUSH
3"-THICK LEVELING TOPSOIL
WITH TOP OF SURFACE PIPE (TYP.) WITH TOP OF SURFACE
COURSE (TYP.)
SIDEWALK NEW CURB TYPE PER SIDEWALK
NEW CURB TYPE PER THE CONTRACT PLANS
THE CONTRACT PLANS
ROADWAY ROADWAY

8" REINFORCED 8" REINFORCED


PVC CAP PVC CAP
CONCRETE GUTTER CONCRETE GUTTER
UNDISTURBED SOIL UNDISTURBED SOIL
CLEAN CLEAN
OPEN-GRADED OPEN-GRADED
WRAP STONE IN
STONE BASE 4" PVC SLOTTED WELL STONE BASE 4" PVC SLOTTED WELL
GEOTEXTILE (TOP
WRAP STONE IN SCREEN 0.01 SLOT SCREEN 0.01 SLOT
AND SIDES ONLY)
GEOTEXTILE (TOP SIZE WITH PVC CAP SIZE WITH PVC CAP
AND SIDES ONLY)

PVC CAP WITH PRIMER PVC CAP WITH PRIMER


5'-0" OR AS SHOWN AND SOLVENT 5'-0" OR AS SHOWN AND SOLVENT
CEMENT CEMENT

SECTION E-E SECTION E-E


CONCRETE TOP OBSERVATION WELL GRASS TOP OBSERVATION WELL

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. INFILTRATION BASIN DEBRIS SCREEN
RUBBER FEET

1/16" SPRING TAP

PULL HANDLE

1/8"

"NYCDEP" CUT
THROUGH FRAME

PERFORATED
DEBRIS SHIELD

"
" 1/4
3-1 /4 " (REF)
1 / 16
ϕ 9"(REF)

DEBRIS SCREEN

REFERENCE
1/
16
"

REAR
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. INFILTRATION BASIN INLET SCREEN BOX
3/16" 3-1/4" 5-1/4"
1-1/4"
NOTES:
11/16"
1. WEIGHT (EMPTY): 15 LBS. MAX. 1-3/4"
2. MATERIAL: WELDED ALUMINUM CONSTRUCTION. 1/4"
3. MOUNTING HARDWARE PROVIDED BY MANUFACTURER 2-5/8"
4. MINIMUM PERFORMANCE CHARACTERISTICS (TYP): 1/2" 1"

11"
4.1. DEBRIS CAPACITY: 0.88 CU-FT
4.2. FILTERED FLOW RATE: 1.7 CFS.
4.3. BYPASS FLOW RATE: 0.86 CFS 1/16"
5. TYPICAL INSTALLATION:
6. INSTALLATION SHOULD BE PERFORMED BY QUALIFIED 3-3/8" 11-1/2"
PERSONNEL ONLY. CAREFULLY REMOVE THE STORM GRATE.
THEN LOCATE AND MARK THE HOLES FOR EACH SUPPORT 6"
2'-5" 3/1
BRACKET (OPTIONAL TEMPLATE AVAILABLE). SECURE THE
LEFT AND RIGHT SUPPORT BRACKETS USING THE PROVIDED TYPICAL BRACKET DIMENSIONS
HARDWARE. LOWER THE INLET SCREEN BOX ONTO THE PLAN TYPICAL SCREEN CONFIGURATION
BRACKETS VERIFY THAT THE INLET SCREENBOX RESTS ~1/8" (LEFT/RIGHT ARE MIRRORED)
BELOW THE CHAMBER INLET OPENING. THEN CAREFULLY
REPLACE THE STORM GRATE.

1'-0 7/8"

10"
8"

8"

5"
INLET SCREEN BOX

2'-0 1/2" 5" 2'-0 1/2"


1/4"-20 THREAD, STEEL
FEMALE CONCRETE 2'-3" 7 3/4"
ANCHOR. INSTALLATION
DRILL BIT SIZE IS 3/8" ELEVATION ELEVATION ELEVATION
(TYP)

1-1/2"
LEFT/RIGHT SUPPORT (LIFTING SLOT)
BRACKETS

1/8"
TAB BYPASS HOOD
THIC
KNE
SS

LIFTING TABS Q
BYPASS

PRECAST CONCRETE
CHAMBER

P.E. 05-13-2022
REFERENCE VIEWS MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. BIOSWALE TYPE D OBSERVATION WELL
- NO CONNECTION TO SEWERS
A

1'-0"
OBSERVATION WELL

1'-0"

1'-3"

FLOW

PLANTED AREA
REMOVABLE OBSERVATION
WELL COVER PLAN
TOP LAYER 2"-3"
TOPSOIL OBSERVATION
WELL
MULCH A
12"x5" CONCRETE
STRIP STEEL TREE GUARD
(3-SIDES TYP.) SEE GI-601,
1'-0" 12" GI-602, GI-603 & GI-604

B
UNDISTURBED
SOIL
4" PVC SCHEDULE 40
PIPE
4" PVC SLOTTED WELL
SCREEN 0.01 SLOT
A
5'-2"

SIZE WITH PVC CAP


WRAP STONE IN
GEOTEXTILE (TOP
3'-4"

AND SIDES ONLY)

PVC CAP WITH


OPEN-GRADED PRIMER AND SOLVENT
2"

STONE BASE CEMENT


8" INSIDE DIAMETER
HDPE PIPE BEYOND DEPTH SCHEDULE
9"

ROWB A B
8" 3'-6" 8" WITH TREE 3'-0" 2'-0"
NO TREE 3'-6" 1'-6" P.E. 05-13-2022
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-300
GUIDELINES FOR RIGHT-OF-WAY
GREEN INFRASTRUCTURE
STORMWATER GREENSTREET
PRACTICES
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1 LAYOUT
- NO CONNECTION TO SEWERS

PROPERTY LINE

CURB LINE

EXISTING CONCRETE PATHWAY SEE STEEL TREE GUARDS (TYP.)


CATCH BASINS 4" x 4" NOTCHES (TYP.) - SEE GI-302 DRAWING GI-312 FOR DETAILS EXISTING
SEE DRAWING GI-601,
FOR DETAILS (TYP.) EXPANSION CONCRETE
3'L x 1'W x 2'H GABION FILLED GI-602, GI-603 & GI-604
JOINT EVERY 10' (MAX.) SIDEWALK
WITH OPEN-GRADED STONE
REINFORCED L-SHAPED EDGING
OUTLET - SEE ROWB BELOW STONE STRIP WITH
CONCRETE CULVERT WITH MINIMUM 9" BIOFILTER INLET
TYPE 1 STANDARDS L-SHAPED EDGING ON THREE
SIDES STAKES SEE SEE DRAWING GI-310
FOR DETAILS FOR DETAILS
DRAWING GI-204
TAPER UP TO 4" ABOVE
B C CONCRETE HEADER -
LOW POINT SET 3"-6" TRANSITION SECTION - EXISTING
SIDEWALK GRADE GI-302 GI-302 BELOW CULVERT 4" ABOVE SIDEWALK
GRADE EXISTING CURB TO CURB
INLET INVERT NEW HEADER

A FLOW

A
+ +

W
1' OFFSET
LOW POINT SET TAPER TO

1'-0"
4" STRIPE
B 3"-6" BELOW C ROADWAY
GI-302 OUTLET INVERT GI-302 GRADE

L
FLOW
GRADING PLAN

SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
NOTES: INVERT (EL___) CULVERT CULVERT INLET INVERT
(EL___)
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE OUTLET PITCH INLET (EL___)
WITH STORMWATER GREENSTREET CALCULATIONS. INVERT (EL___) INVERT (EL___) (EL___)

2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT.


STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". + +
3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE
DIRECTION OF THE ENGINEER.
CLEAN OPEN-GRADED STONE BASE
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.

5. PEDESTRIAN PATHWAY WHEN REQUIRED.

6. WHERE (EL___) IS INDICATED, ELEVATION TO BE SHOWN IN CONTRACT PLANS.


SECTION A-A
7. HEADER NOTCHES ARE PLACED EQUALLY SPACED 4' TO 7' APART.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1 LAYOUT
- NO CONNECTION TO SEWERS

STEEL TREE GUARDS


SEE GI-601, GI-602, GI-603
& GI-604 FOR DETAILS CONCRETE PEDESTRIAN
6" W 6" PATHWAY
CURB TYPE TO MATCH CONCRETE HEADER -
REINFORCED CONCRETE
CONTRACT PLANS EROSION CONTROL 4" ABOVE SIDEWALK CONCRETE HEADER
CULVERT COVER
MATTING GRADE
36"L x 12"W x 6"H
EPOXY BONDED STONE STRIP 1'-0" GRADE TO ALLOW SIDEWALK EXISTING NEW
ROADWAY SIDEWALK

4"

4"
FOR 3"-6" DEEP
ROADWAY
DEPRESSION

7"
7"
1'-6"

1'-7"

1'-3"
+

6"

5"
9" 9"
L-SHAPED EDGING

5"
WITH MINIMUM 9" REINFORCED CONCRETE
STAKES CULVERT
CLEAN OPEN-GRADED

12" MIN.
SEE DRAWING GI-204 (CHANNEL DEPTH VARIES)

6" MIN.
STONE BASE
3'L x 1'W x 2'H GABION WRAP STONE IN
FILLED WITH GEOTEXTILE (TOP AND
OPEN-GRADED STONE SIDES ONLY) CONCRETE PATHWAY
LEVELING COURSE
WRAP GABION IN
GEOTEXTILE (TOP AND
SIDES ONLY) ENGINEERED SOIL
18"-24" DEPTH
WRAP STONE IN
FROM LOW POINT
GEOTEXTILE
(TOP AND SIDES ONLY) SECTION B-B CLEAN OPEN-GRADED SECTION C-C
STONE BASE
UNDISTURBED SOIL AT MIDSECTION AT PEDESTRIAN PATHWAY

TOP OF HEADER
4"
BOTTOM OF NOTCH FLUSH WITH
TOP OF SIDEWALK

4"
CONCRETE HEADER
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.

2. IMPERVIOUS ROW AREA IS CALCULATED IN TDA ANALYSIS SPREADSHEET.

3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". UNDISTURBED SOIL

4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.

5. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.

6. PEDESTRIAN PATHWAY WHEN REQUIRED.

7. WHERE (EL___) IS INDICATED. ELEVATION TO BE SHOWN IN CONTRACT PLANS.


CONCRETE HEADER - NOTCH DETAILS
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1A-WITH STONE COLUMNS
LAYOUT
PROPERTY LINE - NO CONNECTION TO SEWERS

CURB LINE

EXISTING
CATCH BASINS CONCRETE PATHWAY (TYP.) EXPANSION
STONE COLUMN- EXISTING
SEE DRAWING GI-312 JOINT EVERY 10' (MAX.)
SEE GI-103 DETAILS CONCRETE
FOR DETAILS SIDEWALK
L-SHAPED EDGING
STEEL TREE GUARDS (TYP.)
WITH MINIMUM 9" BIOFILTER INLET
OUTLET - SEE ROWB SEE DRAWING GI-601,
STAKES SEE TRANSITION SECTION -
TYPE 1 STANDARDS GI-602, GI-603 & GI-604 SEE DRAWING GI-310
DRAWING GI-204 EXISTING CURB TO
FOR DETAILS FOR DETAILS
NEW HEADER
4" x 4" NOTCHES
TAPER UP TO 4" ABOVE LOW POINT SET
B C (TYP.) - SEE CONCRETE HEADER - EXISTING
SIDEWALK GRADE 3"-6" BELOW GI-304 GI-304 GI-304 FOR 4" ABOVE SIDEWALK CURB
OUTLET INVERT DETAILS GRADE

A FLOW

A
+ +

W
1' OFFSET

1'-0"
3'L x 1'W x 2'H GABION FILLED WITH TAPER TO
4" STRIPE
OPEN-GRADED STONE B C ROADWAY
BELOW STONE STRIP WITH GI-304 GI-304 GRADE
L-SHAPED EDGING ON THREE SIDES REINFORCED LOW POINT SET 3"-6"
CONCRETE BELOW CULVERT
L CULVERT INLET INVERT

FLOW

GRADING PLAN
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE CONCRETE
WITH STORMWATER GREENSTREET CALCULATIONS. SGS OUTLET LP (EL___) CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
INVERT (EL___) CULVERT CULVERT INLET INLET INVERT
(EL___)
OUTLET INVERT INVERT (EL___) (EL___)
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH (EL___)
VARIES. TOTAL DEPTH NOT TO EXCEED 60". (EL___) PITCH

3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE
DIRECTION OF THE ENGINEER. + +
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.
CLEAN OPEN-GRADED STONE BASE
5. STONE COLUMN AND/OR PEDESTRIAN PATHWAY WHEN REQUIRED.

6. WHERE (EL___) IS INDICATED, ELEVATION TO BE SHOWN IN CONTRACT PLANS.


STONE COLUMN
7. HEADER NOTCHES ARE PLACED EQUALLY SPACED 4' TO 7' APART. (TYP.)

8. 5' (MIN.) DISTANCE BETWEEN STONE COLUMNS; NUMBER OF STONE COLUMNS AS


REQUIRED BY DEP. SECTION A-A
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1A-WITH STONE COLUMNS
LAYOUT
- NO CONNECTION TO SEWERS

STEEL TREE GUARDS


SEE GI-601, GI-602, GI-603 CONCRETE PEDESTRIAN
CURB TYPE TO MATCH & GI-604 PATHWAY
CONTRACT PLANS 6" W 6" CONCRETE HEADER
CONCRETE HEADER - REINFORCED CONCRETE
36"L x 12"W x 6"H EPOXY EROSION CONTROL 4" ABOVE SIDEWALK GRADE CULVERT COVER
1'-0"
BONDED STONE STRIP MATTING NEW
EXISTING

4"

4"
ROADWAY GRADE TO ALLOW SIDEWALK SIDEWALK
ROADWAY
FOR 3"-6" DEEP

7"
7" DEPRESSION

1'-7"

1'-3"
1'-6"

6"

5"
9"
L-SHAPED EDGING WITH 9"

5"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT

12" MIN.
(CHANNEL DEPTH VARIES) CLEAN OPEN-GRADED
6" MIN.
3'L x 1'W x 2'H GABION STONE BASE
FILLED WITH WRAP STONE IN
GEOTEXTILE (TOP AND CONCRETE PATHWAY
OPEN-GRADED STONE
SIDES ONLY) LEVELING COURSE
WRAP STONE IN ENGINEERED SOIL
GEOTEXTILE 18"-24" DEPTH
(TOP AND SIDES ONLY) FROM LOW POINT
WRAP GABION IN GEOTEXTILE CLEAN OPEN-GRADED
(TOP AND SIDES ONLY) STONE BASE
TEMPORARY 18", MAXIMUM
SECTION C-C
PERMEABLE SOIL LAYER
DIAMETER CASING AUGERED AT PEDESTRIAN PATHWAY
GRANULAR FILL TO FILL THE
ANNULAR SPACE BETWEEN INTO PERMEABLE SOIL
TOP OF HEADER
THE STONE COLUMN PIPE AND OPEN BOTTOM (TYP)
THE HOLE SECTION B-B 4"
AT MIDSECTION (STONE COLUMN) BOTTOM OF NOTCH FLUSH WITH
TOP OF SIDEWALK

4"
CONCRETE HEADER
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.

2. IMPERVIOUS ROW AREA IS CALCULATED IN TDA ANALYSIS SPREADSHEET.

3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". UNDISTURBED SOIL

4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.

5. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.

6. STONE COLUMN AND/OR PEDESTRIAN PATHWAY WHEN REQUIRED.

7. WHERE (EL___) IS INDICATED. ELEVATION TO BE SHOWN IN CONTRACT PLANS.


CONCRETE HEADER - NOTCH DETAILS
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2 LAYOUT
- NO CONNECTION TO SEWERS

EXISTING
CATCH BASIN PROPERTY LINE

EXISTING CURB LINE (TYP.) EXPANSION L-SHAPED EDGING BIOFILTER INLET


JOINT EVERY 10' (MAX.) WITH MINIMUM 9" SEE DRAWING GI-310
STEEL TREE GUARDS EXISTING
CONCRETE PATHWAY STAKES SEE FOR DETAILS
TAPER UP TO 4" (TYP.) SEE DRAWING CONCRETE
SEE DRAWING GI-312 DRAWING GI-204
NEW CONCRETE ABOVE SIDEWALK GI-601, GI-602, GI-603 & SIDEWALK
FOR DETAILS
GRADE GI-604 4" x 4" NOTCHES (TYP.) - CONCRETE HEADER -
SEE GI-306 FOR 4" ABOVE SIDEWALK
3'L x 1'W x 2'H GABION FILLED REINFORCED TRANSITION SECTION -
DETAILS GRADE
PROPOSED CONCRETE EXISTING CURB TO
WITH OPEN-GRADED STONE
B C
CURB LINE BELOW STONE STRIP WITH CULVERT LOW POINT SET 3"-6" NEW HEADER EXISTING
GI-306 GI-306 BELOW CULVERT INLET CURB
L-SHAPED EDGING ON
THREE SIDES INVERT

A FLOW

+ +

W
CONCRETE NECKDOWN
RADIUS AND LOW POINT SET TAPER TO
CROSSWALK RAMPS AS OUTLET - SEE 3"-6" BELOW ROADWAY
A B C

1'-0"
REQUIRED BY DOT ROWB TYPE 1 OUTLET INVERT GRADE
STANDARDS FOR GI-306 GI-306 1' OFFSET
DETAILS L 4" STRIPE

FLOW
GRADING PLAN

SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
INVERT (EL___) CULVERT CULVERT INLET INVERT (EL___)
OUTLET INLET (EL___)
INVERT (EL___) PITCH INVERT (EL___) (EL___)

NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN
ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
+ +
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT.
STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". CLEAN OPEN-GRADED STONE BASE

3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE
DIRECTION OF THE ENGINEER.

4. IF DEEPER LOW POINT (L.P.) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED. SECTION A-A
5. PEDESTRIAN PATHWAY WHEN REQUIRED.
P.E. 05-13-2022
6. WHERE (EL___) IS INDICATED, ELEVATION TO BE SHOWN IN CONTRACT PLANS.
MANAGING DIRECTOR, DATE
7. HEADER NOTCHES ARE PLACED EQUALLY SPACED 4' TO 7' APART. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2 LAYOUT
- NO CONNECTION TO SEWERS

STEEL TREE GUARD SEE


GI-601, GI-602, GI-603 & CONCRETE PEDESTRIAN
6" W 6" GI-604 FOR DETAILS PATHWAY, TOP FLUSH WITH
CURB TYPE TO MATCH TOP OF SIDEWALK
CONTRACT PLANS CONCRETE HEADER - REINFORCED
EROSION CONTROL CONCRETE HEADER
4" ABOVE SIDEWALK CONCRETE
36"L x 12"W x 6"H EPOXY MATTING
1'-0" GRADE CULVERT COVER NEW
BONDED STONE STRIP
GRADE TO ALLOW SIDEWALK

4"
4"
SIDEWALK EXISTING
ROADWAY FOR 3"-6" DEEP
DEPRESSION ROADWAY

7"
7"
1'-6"

1'-7"

1'-3"
+

5"
9"

5"
L-SHAPED EDGING WITH 9"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT

12" MIN.
(CHANNEL DEPTH VARIES) CLEAN OPEN-GRADED

6" MIN.
3'L x 1'W x 2'H GABION STONE BASE
FILLED WITH WRAP STONE IN
OPEN-GRADED STONE GEOTEXTILE (TOP AND
SIDES ONLY) CONCRETE PATHWAY
WRAP GABION IN LEVELING COURSE
GEOTEXTILE (TOP AND
SIDES ONLY) ENGINEERED SOIL
WRAP STONE IN 18"-24" DEPTH
GEOTEXTILE FROM LOW POINT
(TOP AND SIDES ONLY)
UNDISTURBED CLEAN OPEN-GRADED
SOIL SECTION B-B STONE BASE
SECTION C-C
AT MIDSECTION AT PEDESTRIAN PATHWAY

TOP OF HEADER
4"
BOTTOM OF NOTCH FLUSH WITH
TOP OF SIDEWALK

4"
CONCRETE HEADER
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.

2. IMPERVIOUS ROW AREA IS CALCULATED IN TDA ANALYSIS SPREADSHEET.

3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". UNDISTURBED SOIL

4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.

5. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.

6. PEDESTRIAN PATHWAY WHEN REQUIRED.

7. WHERE (EL___) IS INDICATED. ELEVATION TO BE SHOWN IN CONTRACT PLANS.


CONCRETE HEADER - NOTCH DETAILS
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS
LAYOUT
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN PROPERTY LINE

EXISTING CURB LINE (TYP.) EXPANSION CONCRETE PATHWAY BIOFILTER INLET EXISTING
STEEL TREE GUARDS L-SHAPED EDGING
JOINT EVERY 10' (MAX.) SEE DRAWING GI-312 WITH MINIMUM 9" SEE DRAWING GI-310 CONCRETE
(TYP.) SEE DRAWING
FOR DETAILS STAKES SEE FOR DETAILS SIDEWALK
TAPER UP TO 4" GI-601, GI-602, GI-603
NEW CONCRETE & GI-604 DRAWING GI-204 CONCRETE HEADER -
ABOVE SIDEWALK
GRADE 4" x 4" NOTCHES (TYP.) - 4" ABOVE SIDEWALK
STONE SEE GI-308 FOR GRADE
3'L x 1'W x 2'H GABION FILLED TRANSITION SECTION -
COLUMN, SEE DETAILS EXISTING CURB TO
PROPOSED WITH OPEN-GRADED STONE C
CURB LINE B GI-103 FOR LOW POINT SET 3"-6" NEW HEADER
BELOW STONE STRIP WITH
GI-308 DETAILS GI-308 BELOW CULVERT INLET EXISTING
L-SHAPED EDGING ON
INVERT CURB
THREE SIDES

A FLOW

W
+ +

CONCRETE NECKDOWN LOW POINT SET REINFORCED TAPER TO


OUTLET - SEE 3"-6" BELOW CONCRETE CULVERT ROADWAY
RADIUS AND
A B C

1'-0"
ROWB TYPE 1 OUTLET INVERT GRADE
CROSSWALK RAMPS AS STANDARDS FOR
REQUIRED BY DOT
GI-308 GI-308 1' OFFSET
DETAILS 4" STRIPE
L
FLOW
GRADING PLAN

NOTES: SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE INVERT (EL___) PONDING CULVERT CULVERT PONDING INLET INVERT
(EL___)
WITH STORMWATER GREENSTREET CALCULATIONS. DEPTH 3"-6" OUTLET INLET INVERT DEPTH 3"-6" (EL___)
INVERT (EL___) (EL___) (EL___)
PITCH
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT.
STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".

3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD + +


CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
CLEAN OPEN-GRADED
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED. STONE BASE
5. STONE COLUMN AND/OR PEDESTRIAN PATHWAY WHEN REQUIRED.

6. WHERE (EL___) IS INDICATED, ELEVATION TO BE SHOWN IN CONTRACT PLANS.

7. HEADER NOTCHES ARE PLACED EQUALLY SPACED 4' TO 7' APART.

8. 5' (MIN.) DISTANCE BETWEEN STONE COLUMNS; NUMBER OF STONE COLUMNS AS SECTION A-A
REQUIRED BY DEP.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS
LAYOUT
- NO CONNECTION TO SEWERS

STEEL TREE GUARDS CONCRETE PEDESTRIAN


SEE GI-601, GI-602, GI-603 PATHWAY, TOP FLUSH
& GI-604 FOR DETAILS WITH TOP OF SIDEWALK
CURB TYPE TO MATCH 6" W 6"
CONTRACT PLANS CONCRETE HEADER - 4" REINFORCED CONCRETE CONCRETE HEADER
EROSION CONTROL ABOVE SIDEWALK GRADE CULVERT COVER
36"L x 12"W x 6"H EPOXY 1'-0" MATTING NEW
BONDED STONE STRIP EXISTING SIDEWALK

4"

4"
GRADE TO ALLOW SIDEWALK ROADWAY
ROADWAY FOR 3"-6" DEEP

7"
DEPRESSION

7"

1'-7"

1'-3"
1'-6"

5"
L-SHAPED EDGING WITH 9" 9"

5"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT

12" MIN.
(CHANNEL DEPTH VARIES) CLEAN OPEN-GRADED

6" MIN.
3'L x 1'W x 2'H GABION STONE BASE
FILLED WITH WRAP STONE IN
OPEN-GRADED STONE GEOTEXTILE (TOP AND
SIDES ONLY) CONCRETE PATHWAY
WRAP STONE IN LEVELING COURSE
ENGINEERED SOIL
GEOTEXTILE
18"-24" DEPTH
(TOP AND SIDES ONLY)
FROM LOW POINT
WRAP GABION IN GEOTEXTILE CLEAN OPEN-GRADED
(TOP AND SIDES ONLY) STONE BASE
PERMEABLE SOIL LAYER TEMPORARY 18", MAXIMUM SECTION C-C
GRANULAR FILL TO FILL THE DIAMETER CASING AUGERED AT PEDESTRIAN PATHWAY
ANNULAR SPACE BETWEEN INTO PERMEABLE SOIL
THE STONE COLUMN PIPE AND SECTION B-B OPEN BOTTOM (TYP)
THE HOLE
AT MIDSECTION (STONE COLUMN)
TOP OF HEADER
4"
BOTTOM OF NOTCH FLUSH WITH
NOTES: TOP OF SIDEWALK
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.

4"
CONCRETE HEADER
2. IMPERVIOUS ROW AREA IS CALCULATED IN TDA ANALYSIS SPREADSHEET.

3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".

4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
UNDISTURBED SOIL
5. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.

6. STONE COLUMN AND/OR PEDESTRIAN PATHWAY WHEN REQUIRED.

7. WHERE (EL___) IS INDICATED. ELEVATION TO BE SHOWN IN CONTRACT PLANS.

8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.
CONCRETE HEADER - NOTCH DETAILS

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 3 LAYOUT
- NO CONNECTION TO SEWERS
3'L x 1'W x 2'H GABION
FILLED WITH CLEAN CURBCUT INLET - SEE CONCRETE HEADER -
OPEN-GRADED STONE LOW POINT SET ROWB TYPE 1 FOR CURB 4" ABOVE SIDEWALK GRADE
EXISTING OUTLET - SEE ROWB
BELOW STONE STRIP 3"-6" BELOW TAPER DETAILS
CATCH BASIN TYPE 1 FOR CURB EXISTING EXISTING CURB
WITH L-SHAPED EDGING OUTLET INVERT MEDIAN BIOFILTER INLET
CURB LINE
TAPER DETAILS
ON THREE SIDES A ROADWAY
SEE DRAWING GI-311 FLOW
FOR TYPICAL DETAILS PITCH

B B
10% EXISTING

+ CONCRETE

W
MEDIAN
10%
3'-10"

1'-6"
PITCH FLOW
EXISTING (TYP.) EXPANSION
A ROADWAY JOINT EVERY 10' (MAX.)

GRADING PLAN
WEIR (EL___) SGS INLET
INVERT (EL___)
SGS OUTLET LP (EL___) (EL___)
INVERT (EL___) (EL___)

+
CLEAN OPEN-GRADED STONE BASE

6" W 6"
CURB TYPE TO MATCH
EROSION CONTROL CONTRACT PLANS SECTION B-B
CURB TYPE TO
MATTING
MATCH EXISTING 1'-0"
GRADE TO ALLOW FOR 36"L x 12"W' x 6"H EPOXY NOTES:
ROADWAY BONDED STONE STRIP 1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3"-6" DEEP DEPRESSION
6"

6"
1'-6"

2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
+ ROADWAY
1'-6"

3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
L-SHAPED EDGING WITH
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.
MINIMUM 9" STAKES
SEE DRAWING GI-204
6" MIN.

5. PEDESTRIAN PATHWAY WHEN REQUIRED.


3'L x 1'W x 2'H GABION
FILLED WITH 6. WHERE (EL___) IS INDICATED. ELEVATION TO BE SHOWN IN CONTRACT PLANS.
OPEN-GRADED STONE WRAP STONE IN WRAP GABION IN GEOTEXTILE
GEOTEXTILE (TOP AND SIDES ONLY)
(TOP AND SIDES
ONLY) ENGINEERED SOIL
UNDISTURBED 18"-24" DEPTH
SOIL SECTION A-A
FROM LOW POINT P.E. 05-13-2022
AT MIDSECTION (LOWEST POINT) CLEAN OPEN-GRADED MANAGING DIRECTOR, DATE
STONE BASE GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) BIOFILTER INLET LAYOUT
- NO CONNECTION TO SEWERS
INTERIOR CURB TYPE TO
CONCRETE B PERIMETER CURB MATCH EXISTING
SETTLEMENT 8"
STRIP - 6" 1'-0" 1'-0"
10" 10" VARIES
0%SLOPE

6"

V-NOTCHES
FLOW

VARIES
NOTES:
1. NUMBER OF BROKEN STONE BERMS MAY VARY AS REQUIRED BY DEP.
A A
VARIES

CONCRETE
APRON
GRAVEL STRIP

EXIT WEIR

0"
1'-
6"

TAPER INLET
TO DEPTH
INDICATED

BEGIN TAPER
ENTRY WEIR TO ROADWAY
8" REBAR GRADE
DOWEL B BROKEN
STONE BERM

EXTERIOR
PERIMETER
CURB
PLAN

2" BROKEN ENTRY SETTLEMENT TAPER INLET CONCRETE


TOP OF EXTERIOR NEW SIDEWALK
STONE BERM BASIN WITH CLEAN INVERT TO APRON @ VARIES
PERIMETER CURB EXTERIOR 6" 6" 6" 6"
OPEN-GRADED STONE SETTLEMENT 10% PITCH
(WITH 4" REVEAL)

4"
BASIN PERIMETER CURB
EXIT WEIR ENTRY WEIR EXISTING
TOP OF INTERIOR ASPHALT 2" BROKEN
EXISTING ROADWAY
2"
1"

STONE BERM
2"

6"
7"
2"

PERIMETER CURB
4"

1'-3"
6"
6"

LANDSCAPE INTERIOR

1'-0"
1'-3"

1'-2"
1'-0"

6"

EDGING PERIMETER CURB


UNDISTURBED

1'-0"
ENGINEERED SOIL BROKEN STONE
SOIL
GEOTEXTILE CLEAN OPEN-GRADED UNDISTURBED
GEOTEXTILE CLEAN OPEN-GRADED STONE BASE SOIL
STONE BASE
MATCH WITH
STONE DEPTH

SECTION A-A SECTION B-B

3/8" = 1'-0"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) MEDIAN BIOFILTER INLET LAYOUT
- NO CONNECTION TO SEWERS

PITCH
CURB TYPE TO 8" 6" 1'-0" 10" 1'-0" 10"
MATCH EXISTING

6"
8" REBAR DOWEL

CONCRETE
SETTLEMENT STRIP
0% SLOPE SIDEWALK CURB

NOTES:
1. NUMBER OF BROKEN STONE BERMS MAY VARY AS REQUIRED BY DEP.
A A

VARIES
V-NOTCHES CONCRETE
HEADER - 4" ABOVE
SIDEWALK GRADE
EXIT WEIR

6"
LANDSCAPE EDGING

INTERIOR PERIMETER

1'-6"
PITCH

SIDEWALK CURB ENTRY WEIR INLET - SEE ROWB


TYPE 1 FOR CURB
BROKEN STONE
B ENTRY SETTLEMENT BASIN TAPER DETAILS
BERM WITH CONCRETE PAD 3'-10"
FLOW
2" DEEP BROKEN
PLAN STONE BERM
EXTERIOR 6" 6" VARIES 6" 6" EXTERIOR
CONCRETE HEADER - 4" PERIMETER CURB PERIMETER CURB
2" BROKEN ENTRY SETTLEMENT ABOVE SIDEWALK GRADE SIDEWALK EXISTING ROADWAY
STONE BERM BASIN EXISTING ROADWAY
EXISTING SIDEWALK GRAVEL STRIP UNDISTURBED SOIL

6"
7"
BEYOND EXIT WEIR ENTRY WEIR
VARIES

1'-6"
1'-0"
TOP OF INTERIOR
2"
1"

INTERIOR
4"

PERIMETER PERIMETER CURB


6"

SIDEWALK
1'-3"

1'-2"

BROKEN STONE
1'-0"

6"

LANDSCAPE
EDGING
GEOTEXTILE FABRIC CLEAN OPEN-GRADED UNDISTURBED
ENGINEERED STONE BASE SOIL
SOIL
GEOTEXTILE CLEAN OPEN-GRADED
MATCH WITH STONE BASE
STONE DEPTH
SECTION B-B
SECTION A-A

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS)
CONCRETE AND GRATE PEDESTRIAN PATHWAYS
EXISTING SIDEWALK - NO CONNECTION TO SEWERS
CONCRETE CULVERT CONCRETE PATHWAY STEEL TREE GUARD
COVER SEE DRAWING GI-601,
REINFORCED CONCRETE
6" x 12" STONE STRIP EXPANSION JOINT GI-602, GI-603 & GI-604
CULVERT COVER
A 5" THICK PRECAST
SLOPE TRENCH TOWARDS
#3 REINFORCEMENT
CONCRETE SPACED EVENLY WITH 2" REINFORCED CONCRETE
2'-6" PLANTING (INLET) & TOWARDS

4"
PATHWAY CLEARANCE ON ALL SIDES CULVERT COVER
1'-0" STREET (OUTLET) AT 2% MIN.

6" MIN.
LEVELING COURSE 3'-0 1/2" 1 1/2" x 1 1/2" x 3/16" STEEL STEEL TREE GUARD - 6" THICK LEVELING
2'-0" ANGLE

4"
SEE DRAWING GI-601, COURSE
1/2" PRE MOLDED GI-602, GI-603 & GI-604

MATCH DETPH
VARIES
3'-0 1/2"
B B 1 1/8" 3 1/4" 3 1/4" EXPANSION JOINT
FLOW 3" 3" 6" x 12" STONE
FILLER STRIP BED
L-SHAPED EDGING

4"
WITH MINIMUM 9"
L-SHAPED EDGING
STAKES SEE WITH MINIMUM 9"

5"
DRAWING GI-204 CLEAN OPEN-GRADED
STAKES SEE
STONE BASE
DRAWING GI-204

5" 5"
PRECAST
ENGINEERED SOIL
A CONCRETE
CONCRETE CURB CULVERT GEOTEXTILE
EXISTING ROADWAY FLUSH WITH
PATHWAY CLEAN OPEN-GRADED STONE #3 REINFORCEMENT CONCRETE PATHWAY
6" 5'-0" 6" BASE SPACED EVENLY
WITH 2" CLEARANCE SECTION B-B
ON ALL SIDES
CONCRETE PATHWAY CONCRETE PATHWAY
PLAN SECTION A-A
CONCRETE CURB GALVANIZED D STEEL BAR
EXISTING METAL BAR GRATE STAINLESS STEEL FLAT HEAD
FLUSH WITH PATHWAY GRATE, BAR SIZE
SIDEWALK 1/4" TAP INTO SUPPORT BAR
2" x 2" x 1/4" ANGLE SHALL BE 1" x 3/16"
PRECAST
WITH GRATING EDGE OF PLATE 2" x 2" x 1/4" STEEL ANGLE WITH
CONCRETE PATHWAY
FASTENERS FLUSH AND TRUE GRATING FASTENERS
GALVANIZED STEEL STEEL TREE GUARD - 2" x 2" x 1/4" STEEL
L-SHAPED EDGING ANGLE WITH GRATING
GRATING FASTENERS PITCH TO DRAIN PER PLAN EXPANSION JOINT WITH JOINT SEE DRAWING GI-601,
WITH MINIMUM 9" FASTENERS
3'-0" SEALER GI-602, GI-603 & GI-604
6" x 12" STONE STRIP STAKES SEE
C DRAWING GI-204 1 1/8"
STEEL TREE GUARD - SEE GALVANIZED D STEEL
#3 REINFORCEMENT

VARIES
DRAWING GI-601, GI-602, GI603 & BAR GRATE, BAR SIZE
GI-604 SPACED EVENLY WITH 2" SHALL BE 1" x 3/16"
CLEARANCE ON ALL SIDES EDGE OF PLATE
7"

3" NEW CONCRETE SIDEWALK


6" x 12" STONE FLUSH AND TRUE
3"

STRIP BED 6" THICK LEVELING


D D COURSE
6"

L-SHAPED EDGING
VARIES

MATCH DETPH
WITH MINIMUM 9"
5"
2'-6"

FLOW GALVANIZED STEEL GRATING STAKES SEE


FASTENERS DRAWING GI-204
1/4"

CLEAN OPEN-GRADED
LEVELING COURSE ENGINEERED SOIL STONE BASE
3"

CLEAN OPEN-GRADED STONE WRAP STONE IN


BASE #3 REINFORCEMENT GEOTEXTILE (TOP
SPACED EVENLY AND SIDES ONLY)
C STEEL TREE GUARD - WITH 2" CLEARANCE
ON ALL SIDES
EXISTING
SEE DRAWING GI-601,
METAL GRATE PATHWAY METAL GRATE PATHWAY
GI-602, GI-603 & GI-604
ROADWAY
SECTION C-C SECTION D-D
6" 5'-0" 6"

METAL GRATE
PATHWAY PLAN P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-400
RIGHT-OF-WAY POROUS PAVEMENT
GREEN INFRASTRUCTURE
STANDARDS
STANDARD FOR 4' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS
WITH DRAINAGE CELLS
- NO CONNECTION TO SEWERS

PROPERTY EXISTING
DISTANCE FROM DISTANCE FROM
LINE 6" CAST-IN-PLACE OBSERVATION WELL, SIDEWALK
EDGE OF PROPERTY EDGE OF PROPERTY
CONCRETE HEADER SEE GI-406 FOR DETAILS NEW CAST-IN-PLACE
EXISTING LINE VARIES PER DESIGN LINE VARIES PER DESIGN
FLUSH WITH EXISTING 5'x4', 6"-THICK PRECAST CAST-IN-PLACE CONCRETE CURB
CURB LINE
GRADE (TYP.) POROUS CONCRETE CONCRETE DRAINAGE
5'-0" MIN. PANELS CHECK DAM CELLS
2'-0"
2'-0" 5'-0"
A B C C

4'-0"
FLOW

EXISTING
CATCH BASIN JOINT (TYP.) SEE
SEE SCHEDULE SHEET GI-409
6"

GI-408 EXPANSION JOINT (TYP).


A B SEE GENERAL NOTE 7, EXISTING
N-01 FOR SPACING ROADWAY
PLAN BETWEEN JOINTS

PRECAST POROUS
CONCRETE PANEL
PRECAST POROUS
MIN. SLOPE TO (LIFTING POINTS NOT
℄ ℄ CONCRETE PANEL
MATCH EXISTING SHOWN FOR CLARITY, SEE SCHEDULE GI-409
MIN. SLOPE TO (LIFTING INSERTS
SEE GI-408) MATCH EXISTING JOINT SEALANT,
FULL DEPTH SAWCUT NOT SHOWN FOR
1'-6" 6" 4'-0" LEVELING CAST-IN-PLACE SEE GI-408 CLARITY, SEE
REMOVE AND REPLACE CAST-IN-PLACE CHECK 6" 4'-0" 6"
COURSE DAM, 0" REVEAL. SEE CHECK DAM, 0" CLEAN OPEN GI-408)
2" ASPHALT WEARING CONCRETE HEADER; 0"
COURSE REVEAL NEW CAST-IN-PLACE GI-409 FOR SCHEDULE REVEAL. SEE GI-409 GRADED STONE 1 1/2" DIA.
NEW CAST-IN-PLACE
CONCRETE CURB FOR SCHEDULE BASE WEEP HOLE
EXISTING ASPHALT JOINT SEALANT, SEE GI-408 JOINT SEALANT, CONCRETE CURB
PAVEMENT TO REMAIN SEE GI-408 LEVELING COURSE STACKED MICROGRID, TOP
NEW SIDEWALK TO
DRAINAGE CELLS, AND SIDES OF
MATCH EXISTING CONCRETE HEADER; BIAXIAL GEOGRID
EXISTING ASPHALT OR SEE GI-409 DRAINAGE CELLS
CONCRETE BASE TO 0" REVEAL
SLOPE ONLY
REMAIN

3"
6"

6"
EQ EQ EQ EQ EQ

2'-0"
CAST-IN-PLACE

2'-0"
UNDISTURBED
1'-6"
2"

2"
CONCRETE HEADER SOIL
3"

CLEAN OPEN GRADED STONE

6"
CAST-IN-PLACE

6"

6"
BASE CONCRETE
HEADER

3"
STACKED DRAINAGE 6" 6" 6"
3"

9" 9" 9" 9"

3"
CELLS, SEE GI-409 BIAXIAL GEOGRID 6" 6" 6"
MICROGRID, TOP UNDISTURBED BENEATH THE CHECK 1 1/2" DIA. WEEP
AND SIDES ONLY SECTION A-A SOIL DAM (NOT SHOWN SECTION B-B HOLE, 4 EQUALLY SECTION C-C
FOR CLARITY) SPACED
BIAXIAL GEOGRID

P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 4' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS TYPE A
WITH DRAINAGE CELLS AND STONE COLUMNS
- NO CONNECTION TO SEWERS

PROPERTY EXISTING
DISTANCE FROM DISTANCE FROM
LINE 6" CAST-IN-PLACE OBSERVATION WELL, SIDEWALK NEW
EDGE OF PROPERTY EDGE OF PROPERTY
CONCRETE HEADER SEE GI-406 FOR DETAILS CAST-IN-PLACE
EXISTING LINE VARIES PER DESIGN
FLUSH WITH EXISTING CAST-IN-PLACE CONCRETE CURB LINE VARIES PER
CURB LINE 5'x4', 6"-THICK PRECAST
GRADE (TYP.) CONCRETE DESIGN
POROUS CONCRETE 1/8" JOINT (TYP.)
5'-0" MIN. PANELS CHECK DAM SEE GI-408
2'-0" 5'-0" A DRAINAGE 2'-0"
B B CELLS

4'-0"
FLOW

EXISTING
CATCH BASIN STONE COLUMNS, SEE SEE SCHEDULE SHEET GI-409
6"

SCHEDULE, SHEET A CAST-IN-PLACE EXPANSION JOINT (TYP).


GI-409 CONCRETE CHECK DAM SEE GENERAL NOTE 7, EXISTING
N-01 FOR SPACING ROADWAY
PLAN BETWEEN JOINTS
PRECAST POROUS
CONCRETE PANEL
CONCRETE HEADER; (LIFTING POINTS NOT
0" REVEAL
4'-0" SHOWN FOR CLARITY,
SEE GI-408) CAST-IN-PLACE CHECK
℄ ℄ ℄ 1/8" JOINT BETWEEN
FULL DEPTH SAWCUT
REMOVE AND REPLACE
℄ LEVELING
DAM, 0" REVEAL. SEE
GI-409 FOR SCHEDULE
2'-0" 2'-0" 1'-6" PRECAST POROUS
CONCRETE PANELS (TYP.)
COURSE
2" ASPHALT WEARING
COURSE MIN. SLOPE TO NEW CAST-IN-PLACE JOINT SEALANT, SEE CLEAN PRECAST POROUS
MATCH EXISTING CONCRETE CURB GI-408 OPEN-GRADED CONCRETE PANEL
EXISTING ASPHALT STONE BASE
PAVEMENT TO REMAIN NEW SIDEWALK TO CLEAN OPEN LEVELING COURSE
MATCH EXISTING GRADED STONE SLOPE
EXISTING ASPHALT OR
CONCRETE BASE

6"

6"
6"

2'-0"
DEPTH OF STONE COLUMN

2"
6"

BIAXIAL GEOGRID
PER DESIGN PLANS

6"
1'-6"
2"

6"
6"
CAST-IN-PLACE
CONCRETE HEADER
6"

3"
UNDISTURBED SOIL 1'-0" 6" 6" STACKED DRAINAGE
CLEAN 1 1/2" DIA. CELLS, SEE GI-409
OPEN-GRADED WEEP HOLE
MICROGRID, TOP
9" EQ EQ 9" STONE BASE BIAXIAL GEOGRID AND SIDES ONLY
TOP OF STONE COLUMN TEMPORARY, 18"
PERFORATED 12" DIAMETER PVC
WITH PERFORATED CAP MAXIMUM DIAMETER
PIPE WRAPPED ALL AROUND WITH
(TYP) CASING AUGERED INTO
GEOTEXTILE FABRIC
GRANULAR FILL TO FILL THE PERMEABLE LAYER
PERMEABLE SOIL LAYER ANNULAR SPACE BETWEEN THE
GRANULAR FILL TO FILL THE STONE COLUMN PIPE AND THE HOLE
CLEAN OPEN-GRADED
ANNULAR SPACE BETWEEN THE
STONE BASE
STONE COLUMN PIPE AND THE HOLE
OPEN BOTTOM, NO SECTION B-B
GEOTEXTILE FABRIC
P.E. 04-01-2022
SECTION A-A
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 2' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS
WITH DRAINAGE CELLS
- NO CONNECTION TO SEWERS

PROPERTY
DISTANCE FROM OBSERVATION WELL, DRAINAGE DISTANCE FROM
LINE EXISTING
EDGE OF PROPERTY 6" CAST-IN-PLACE EDGE OF PROPERTY
SEE GI-406 FOR DETAILS CELLS SIDEWALK
EXISTING LINE VARIES PER DESIGN CONCRETE HEADER LINE VARIES PER DESIGN
CURB LINE FLUSH WITH EXISTING 5'x2', 6"-THICK PRECAST CAST-IN-PLACE
GRADE (TYP.) NEW CAST-IN-PLACE
POROUS CONCRETE CONCRETE CHECK
5'-0" MIN. CONCRETE CURB
PANELS DAM
2'-0" B 5'-0" 2'-0"
A C C

FLOW

2'-0"
SEE SCHEDULE SHEET GI-409
6"

EXISTING 1/8" JOINT (TYP.) EXPANSION JOINT (TYP).


CATCH BASIN A SEE GI-408 B SEE GENERAL NOTE 7,
N-01 FOR SPACING
BETWEEN JOINTS EXISTING
PLAN ROADWAY

PRECAST POROUS
CONCRETE PANEL
(LIFTING POINTS NOT
MIN. SLOPE TO SHOWN FOR CLARITY, ℄ ℄
MATCH EXISTING SEE GI-408) SEE SCHEDULE GI-409

FULL DEPTH SAWCUT LEVELING JOINT SEALANT,


1'-6" 6" 2'-0" 6" COURSE SEE GI-408 PRECAST POROUS
REMOVE AND REPLACE CAST-IN-PLACE
6" 2'-0" 6" CONCRETE PANEL
2" ASPHALT WEARING NEW CAST-IN-PLACE CAST-IN-PLACE CHECK MIN. SLOPE TO CHECK DAM, 0" CLEAN OPEN
COURSE CONCRETE CURB DAM, 0" REVEAL MATCH EXISTING REVEAL. SEE GI-409 GRADED STONE 1 1/2" DIA.
FOR SCHEDULE BASE WEEP HOLE
EXISTING ASPHALT NEW SIDEWALK TO JOINT SEALANT, SEE NEW CURB
PAVEMENT TO REMAIN MATCH EXISTING GI-408 LEVELING COURSE STACKED MICROGRID, TOP
NEW SIDEWALK TO
CONCRETE HEADER; BIAXIAL GEOGRID DRAINAGE CELLS, AND SIDES OF
EXISTING ASPHALT OR MATCH EXISTING
0" REVEAL SEE GI-409 DRAINAGE CELLS
CONCRETE BASE
SLOPE ONLY
6"

6"
UNDISTURBED SOIL

2'-0"

2'-0"
UNDISTURBED EQ 9" EQ
1'-6"
2"

2"
SOIL
6"

STACKED DRAINAGE
CELLS, SEE GI-409 CAST-IN-PLACE

6"
6"

6"

6"
6"
MICROGRID, TOP CONCRETEHEADER
AND SIDES ONLY CLEAN OPEN
9" 9" 6" 6" 6"

3"
CAST-IN-PLACE 9" 9" GRADED STONE BIAXIAL GEOGRID 1 1/2" DIA. 6" 6" 6"
CONCRETE HEADER BASE BENEATH THE CHECK WEEP HOLE
BIAXIAL GEOGRID SECTION A-A DAM ( NOT SHOWN SECTION B-B SECTION C-C
FOR CLARITY)

P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 2' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS TYPE A
WITH DRAINAGE CELLS AND STONE COLUMNS
- NO CONNECTION TO SEWERS

PROPERTY
DISTANCE FROM OBSERVATION WELL, EXISTING DISTANCE FROM
LINE NEW
EDGE OF PROPERTY 6" CONCRETE HEADER SIDEWALK EDGE OF PROPERTY
SEE GI-406 FOR DETAILS CAST-IN-PLACE
EXISTING LINE VARIES PER DESIGN FLUSH WITH EXISTING LINE VARIES PER DESIGN
CONCRETE
CURB LINE GRADE (TYP.) 5'x2', 6"-THICK PRECAST DRAINAGE CURB
POROUS CONCRETE CELLS
5'-0" MIN. PANELS CAST-IN-PLACE
5'-0" CONCRETE 2'-0"
2'-0"
A B B CHECK DAM

FLOW

2'-0 1/2"
SEE SCHEDULE SHEET GI-409
6"

EXISTING STONE COLUMNS, SEE 1/8" JOINT (TYP.) EXPANSION JOINT (TYP).
CATCH BASIN SCHEDULE, SHEET A SEE GI-408 SEE GENERAL NOTE 7,
GI-409 N-01 FOR SPACING
BETWEEN JOINTS EXISTING
PLAN ROADWAY

PRECAST POROUS
CONCRETE PANEL
MIN. SLOPE TO (LIFTING POINTS NOT
MATCH EXISTING SHOWN FOR CLARITY,
1'-6" 6" 2'-0" 6"
SEE GI-408)
FULL DEPTH SAWCUT
℄ LEVELING
℄ ℄ ℄
REMOVE AND REPLACE 2'-0" 2'-0" 1'-6"
COURSE
2" ASPHALT WEARING CAST-IN-PLACE CHECK PRECAST POROUS
COURSE NEW CAST-IN-PLACE DAM, 0" REVEAL. SEE CONCRETE PANEL
CONCRETE CURB GI-409 FOR SCHEDULE
EXISTING ASPHALT LEVELING COURSE
PAVEMENT TO REMAIN NEW SIDEWALK TO JOINT SEALANT, SEE
EXISTING ASPHALT OR MATCH EXISTING GI-408 CLEAN OPEN-GRADED
CONCRETE BASE SLOPE STONE BASE

6"
6"

DEPTH OF STONE COLUMN

6"
6"

2'-0"
UNDISTURBED SOIL
PER DESIGN PLANS

2"
1'-6"
2"

BIAXIAL GEOGRID

6"
6"
6"
6"
CAST-IN-PLACE
6"

CONCRETE HEADER
9" 9" CLEAN 6" STACKED
OPEN-GRADED 1 1/2" DIA. DRAINAGE CELLS,
STONE BASE WEEP HOLE SEE GI-409
TOP OF STONE COLUMN
PERFORATED 12" DIAMETER PVC MICROGRID, TOP
WITH PERFORATED CAP
PIPE WRAPPED ALL AROUND WITH AND SIDES ONLY
(TYP) GRANULAR FILL TO FILL THE
GEOTEXTILE FABRIC ANNULAR SPACE BETWEEN THE
PERMEABLE SOIL LAYER PERMEABLE
STONE COLUMN PIPE AND THE HOLE
SOIL LAYER
GRANULAR FILL TO FILL THE TEMPORARY, 18" MAXIMUM
CLEAN OPEN-GRADED
ANNULAR SPACE BETWEEN THE DIAMETER CASING AUGERED
STONE BASE
STONE COLUMN PIPE AND THE HOLE INTO PERMEABLE LAYER
OPEN BOTTOM, NO
SECTION A-A GEOTEXTILE FABRIC SECTION B-B
P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - CASTING DETAILS

SIDEWALK SIDEWALK
NEW CURB
NEW CURB
JOINT SEALANT, SEE GI-408
2'-0" MIN. 2'-0" MIN. JOINT SEALANT, SEE 1'-0" 1'-0"
FOR DETAIL (TYP.)
GI-408 FOR DETAIL (TYP.)

PRECAST

6"

6"
POROUS
CONCRETE
PRECAST PRECAST

4'-0" OR PER DESIGN


4'-0" OR PER DESIGN
PANEL
POROUS POROUS
A A CONCRETE B B CONCRETE
PANEL PANEL

6" CONCRETE PRECAST


HEADER POROUS
CONCRETE
PANEL

6"

6"
EXISTING 6" CONCRETE EXISTING 1/2" PRE-MOLDED
CAST-IN-PLACE 1/2" PRE-MOLDED CAST-IN-PLACE
MANHOLE HEADER VALVE JOINT FILLER TO
CONCRETE. DEPTH EXISTING JOINT FILLER TO CONCRETE. DEPTH
CASTING CASTING MATCH EXISTING
AND REINFORCEMENT ROADWAY MATCH EXISTING AND REINFORCEMENT
EXISTING CONCRETE COLOR
PER DESIGN PLANS CONCRETE COLOR PER DESIGN PLANS
ROADWAY (TYP.)
(TYP.)

CASTING DETAIL - MANHOLE CASTING DETAIL - VALVE

WWM W4xW4 REINFORCEMENT


7" THICK CAST-IN-PLACE EXISTING MANHOLE WWM W4xW4 7" THICK CAST-IN-PLACE EXISTING VALVE (TYP.)
CONCRETE CASTING, SEE NOTE 1 REINFORCEMENT (TYP.) CONCRETE CASTING, SEE CLEAN OPEN-GRADED
BELOW NOTE 1 BELOW STONE BASE
JOINT SEALANT, SEE
GI-408 FOR DETAIL (TYP.) 6" 2'-0" MIN 2'-0" MIN 6"
CONCRETE HEADER JOINT SEALANT, SEE GI-408
FOR DETAIL (TYP.)

CLEAN OPEN-GRADED 1'-0" 1'-0" LEVELING
STONE BASE COURSE
PRECAST POROUS PRECAST POROUS
CONCRETE PANEL BIAXIAL CONCRETE PANEL BIAXIAL GEOGRID
GEOGRID (TYP.)
6"

6"
(TYP.)
LEVELING
1'-6"

1'-6"
COURSE

2"
1'-6" 1'-6"
STACKED
DRAINAGE CELLS,
EXISTING SEE GI-409
BACKFILL TO BE 6" 6"
MANHOLE
DETERMINED BY
ENGINEER SECTION A-A SECTION B-B

NOTES:
1. CASTINGS INCLUDE BUT NOT LIMITED TO MANHOLES, UTILITY VALVES AND UTILITY GRATES. IF CASTING
INTERRUPTS HEADER, DETAILS TO BE COORDINATED WITH UTILITY STAKEHOLDER P.E. 04-01-2022
2. IMPERMEABLE LINER REQUIRED UNDER CAST-IN-PLACE CONCRETE AT LOCATIONS WITH UTILITY VALVES MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - OBSERVATION WELL
SIDEWALK CAST-IN-PLACE
CONCRETE CHECK DAM
NEW CAST-IN-PLACE
JOINT SEALANT, SEE GI-408
1'-0" 1'-0" CONCRETE CURB CAST-IN-PLACE
FOR DETAIL (TYP.)
CONCRETE CHECK DAM
SIDEWALK
NEW CAST-IN-PLACE

6"
CONCRETE CURB
JOINT SEALANT, SEE GI-408
FOR DETAIL (TYP.) 1'-0" 1'-0" PRECAST POROUS
CONCRETE PANEL
PRECAST POROUS

6"
A A CONCRETE PANEL

B B

4'-0"

2'-0"
PRECAST PRECAST
POROUS POROUS
CONCRETE CONCRETE
PANEL PANEL

6"
6"
FLOW
FLOW
OBSERVATION 1/2" PRE-MOLDED OBSERVATION 1/2" PRE-MOLDED
7" THICK 7" THICK
WELL JOINT FILLER TO WELL JOINT FILLER TO
CAST-IN-PLACE CAST-IN-PLACE
6" CONCRETE MATCH EXISTING 6" CONCRETE MATCH EXISTING
CONCRETE EXISTING CONCRETE EXISTING
HEADER CONCRETE COLOR HEADER CONCRETE COLOR
ROADWAY (TYP.) ROADWAY (TYP.)

OBSERVATION WELL DETAIL OBSERVATION WELL DETAIL

7" THICK CAST-IN-PLACE 7" THICK CAST-IN-PLACE


CONCRETE (TYP.) OBSERVATION WELL WITH CONCRETE (TYP.)
OBSERVATION WELL WITH
WWM W4xW4 CAST IRON COVER, TOP OF CAST-IN PLACE WWM W4xW4 CAST IRON COVER, TOP OF CAST-IN PLACE
REINFORCEMENT (TYP.) COVER FLUSH WITH CONCRETE CHECK DAM REINFORCEMENT (TYP.) COVER FLUSH WITH CONCRETE CHECK DAM
SURFACE CLEAN OPEN-GRADED SURFACE CLEAN OPEN-GRADED
JOINT SEALANT, SEE GI-408 JOINT SEALANT, SEE GI-408
FOR DETAIL (TYP.) PVC CAP STONE BASE FOR DETAIL (TYP.) PVC CAP STONE BASE
PRECAST POROUS
CONCRETE PANEL
1'-0"
℄ 1'-0" 6" LEVELING
COURSE
PRECAST POROUS
CONCRETE PANEL
1'-0"
℄ 1'-0" 6" LEVELING
COURSE
BIAXIAL GEOGRID BIAXIAL GEOGRID
SLOPE (TYP.)
SLOPE (TYP.)
6"

6"
2"

2"
2"

2"
1'-6"

1'-6"
STACKED DRAINAGE STACKED DRAINAGE
6"

6"
CELLS, SEE GI-409 CELLS, SEE GI-409
6" 6"
PVC CAP WITH PRIMER
PVC CAP WITH PRIMER 4" PVC SLOTTED WELL 1'-6" 4" PVC SLOTTED WELL
1'-6" AND SOLVENT CEMENT
AND SOLVENT CEMENT SCREEN 0.01 SLOT SCREEN 0.01 SLOT
SIZE WITH PVC CAP SIZE WITH PVC CAP
SECTION A-A SECTION B-B

NOTES:
1. WHEN REQUIRED, THE OBSERVATION SHALL BE PLACED DOWNSTREAM FROM A CHECK DAM P.E. 04-01-2022
2. IMPERMEABLE LINER REQUIRED UNDER CAST-IN-PLACE CONCRETE MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - UTILITY CROSSING DETAILS
C
SIDEWALK

SPLIT PVC PIPE WATERTIGHT EXPANDING


6" THICK PRECAST NEW CURB FOAM SEALANT IN PVC
POROUS CONCRETE SPLIT SLEEVE (THROUGH
PANEL ENTIRE SLEEVE)

A A

6"
SPLIT PVC SLEEVE, SEE
UTILITY SLEEVING
DETAIL, THIS SHEET 2" LEVELING
CAST-IN-PLACE PRECAST POROUS COURSE
CURB/HEADER CONCRETE PANEL

EXISTING UTILITY CLEAN

SEE NOTE
CROSSING OPEN-GRADED
B B STONE BASE
SPLIT PVC SLEEVE,
SEE UTILITY STACKED
SLEEVING DETAIL DRAINAGE CELLS
THIS SHEET BIAXIAL GEOGRID

4"
(TYP.)
A A
6"

CLEAN OPEN GRADED 1'-0" MIN. 1'-0" MIN.


STONE BASE
SECTION A-A
EXISTING UTILITY 6" HEADER SECTION B-B
CROSSING
C
ROADWAY

PLAN - UTILITY CROSSING

CAST-IN-PLACE WATERTIGHT EXPANDING NEW CAST-IN-PLACE


CONCRETE FOAM SEALANT IN SPLIT CONCRETE CURB
HEADER SLEEVE (THROUGH NEW SIDEWALK TO EXISTING
ENTIRE SLEEVE) MATCH EXISTING UTILITY
CLEAN-OPEN GRADED CROSSING
STONE BASE 2D WATERTIGHT
SPLIT PVC EXPANDING FOAM
PIPE D SEALANT IN SPLIT PVC
SLEEVE (THROUGH
6" UNDISTURBED
UNDISTURBED EXISTING ENTIRE SLEEVE)
SOIL
SOIL UTILITY

6"
4"

SECTION C-C UTILITY SLEEVING DETAIL

NOTE: P.E. 04-01-2022


SLEEVING DETAILS ONLY APPLICABLE WHEN UTILITY IS FOUND MANAGING DIRECTOR, DATE
WITHIN 24" OR LESS FROM TOP OF PRECAST POROUS PANEL GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - SECTIONS AND DETAILS
NEW CAST-IN-PLACE
CONCRETE CURB
6" CONCRETE 6" CONCRETE
JOINT FILLER
HEADER, 0" 1/2" THICK PRE-MOLDED HEADER, 0" JOINT FILLER
REVEAL EXPANSION JOINT FILLER REVEAL BACKER ROD
BACKER ROD (1/2" - 1" DIA.), 6" THICK PRECAST
1/2" CONFORMS TO ASTM D1751 1/2"
ROADWAY ROADWAY POROUS CONCRETE
3/8" STONE BELOW
BACKER ROD PANEL
6"-THICK PRECAST 6" THICK PRECAST
POROUS CONCRETE POROUS CONCRETE
PANEL PANEL

1/2"
LEVELING COURSE LEVELING COURSE
LEVELING
COURSE

TYPICAL JOINT SEALANT DETAIL ALTERNATE JOINT SEALANT DETAIL TYPICAL POROUS CONCRETE PANEL JOINT DETAIL
AT CONCRETE HEADER AT CONCRETE HEADER AT CONCRETE CURB

5'-0"

1'-0" 3'-0" 1'-0"

PERMANENT LIFTING POINT


1/8" OPEN JOINT

1'-0"
(TYP.), PLUG TO BE PROVIDED
6" THICK PRECAST BY MANUFACTURER
POROUS CONCRETE PROVIDED 1/8" HDPE 5'-0"
PANEL SPACER
1'-0" 3'-0" 1'-0"

4'-0"

2'-0"

1'-0"
2'-0"
LEVELING
COURSE 1'-0"

1'-0"
TYPICAL PANEL TO PANEL JOINT DETAIL 5'x4'x6" POROUS PANEL PLAN VIEW 5'x2'x6" POROUS PANEL PLAN VIEW

NOTES:
1. MAXIMUM JOINT SPACE BETWEEN POROUS CONCRETE PANELS IS 1/8".
2. CURB AND HEADER EXPANSION JOINTS AT 10 FEET MAXIMUM SPACING.
3. CONTRACTOR SHALL TRIM (VIA SAWCUT) POROUS CONCRETE PANELS NO MORE THAN 6" ON ANY END
4. NO POROUS CONCRETE PANEL SHALL BE LESS THAN 4 FT IN LENGTH WITHOUT THE ENGINEER'S APPROVAL
5. ADJUST THE LIMIT OF WORK TO AVOID END PANELS LESS THAN 4 FT IN LENGTH.
6. CONTRACTOR SHALL INSTALL 3/4" STONE IN LIFTS OF 6" (MAX.) AND SHALL MAKE TWO PASSES OF A PLATE
COMPACTOR (200 LBS MIN.) OVER EACH LIFT PRIOR TO INSTALLATION OF 3/8" LEVELING COURSE.
7. AT THE DIRECTION OF THE ENGINEER, CONTRACTOR TO REPLACE ANY CURB OR DRIVEWAY APRON THAT IS
DAMAGED DURING CONSTRUCTION AS PER NYCDOT STANDARDS.
8. SEAL EDGES OF ANY SAWCUTS IN THE WEARING COURSE WITH LIQUID ASPHALT CEMENT AS PER TITLE 34 P.E. 04-01-2022
NYCDOT HIGHWAY RULES (PAGE 71, SECTION 2-11(E)(12)(VIII)). MANAGING DIRECTOR, DATE
9. CASTINGS INCLUDE BUT NOT LIMITED TO MANHOLES, UTILITY VALVES AND UTILITY GRATES. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - SECTIONS AND DETAILS

2"
FRONT VIEW

PRECAST POROUS CLEAN OPEN-GRADED


ROADWAY MAXIMUM DISTANCE CONCRETE PANEL STONE BASE
NUMBER OF STONE
1'-8"

LONGITUDINAL BETWEEN CHECK DAMS LEVELING BIAXIAL GEOGRID


COLUMNS, WHEN REQUIRED COURSE
SLOPE, S (%) (FT) (TYP.)

0 ≤ S ≤ 0.5 100 3
0.5 < S ≤ 1.0 50 2
1 < S ≤ 1.5 33 2

6"
1.5 < S ≤ 2.0 25 1

1'-6"

2"
2.0 < S ≤ 2.5 20 1
2'-0" 2" 2.5 < S ≤ 5.0 10 1
NOTE: CHECK DAMS TO BE SPACED EQUALLY
PLAN VIEW SIDE VIEW

DRAINAGE CELL DIMENSIONS CHECK DAM SPACING SCHEDULE TYPICAL SECTION


(AT LOCATIONS WITH NO DRAINAGE CELLS)

P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-500
PLANTING PLANS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD PLANTING LAYOUT FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS

GI-501D
GI-501D
A

A
A A A A A A A A A A A A A (6) A A A A A A A A A A A
(8) A (6) A
(8) A
(7) B A B B B B B B B B B B B A A B B B B B B B B A
(4) B
(3) B
A B B C C C C C C C C A A B B C C C C C A
(4) C (5) B
(2) C
(3) C (2) C

+
OUTLET INLET SEDIMENT CONTROL OUTLET INLET
AREA- SEE GI-501D SEDIMENT CONTROL

GI-501D

GI-501D
AREA- SEE GI-501D
BULB BULB

A
A B C CLUSTERS
TYPE I A B C CLUSTERS TYPE II
Tree 16 11 7 11 Tree 12 8 4 8
No Tree 17 13 8 11 No Tree 14 10 5 8

GI-501D
A
A A A A A A A
(5) A
(5) A
A B B B B B A
(2) B
A B C C A
(2) B SEDIMENT CONTROL
(2) C AREA- SEE GI-501D

+
OUTLET INLET

GI-501D
BULB

A
A B C CLUSTERS
TYPE III
Tree 10 4 2 6
No Tree 11 6 2 6
NOTES FOR CONSTRUCTION:
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE SHOWN.
2. PLANTING PLANS ARE DETERMINED PER THE SCHEDULE ON PLANTING PLANS FOR STANDARD ROWB PAGES, GI-501B AND
GI-501C.
3. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S STREET TREE
SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
4. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS. BULBS FOR FALL PLANTING ONLY.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROWB WITH NO TREE.
7. AREA DIRECTLY IN FRONT OF INLET SHALL REMAIN UNPLANTED AND RESERVED FOR SEDIMENT CONTROL.
P.E. 05-13-2022
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE CONDITIONS. ADJUSTMENTS
MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO ASSET SIZE OR OTHER OBSTRUCTION. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR WET AND DRY R.O.W. BIOSWALES
AND R.O.W. RAIN GARDENS

SUNNY (SOUTH-FACING) PLANT SCHEDULE FOR WET SITES SUNNY (SOUTH-FACING) PLANT SCHEDULE FOR DRY SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

A SHRUB FOTHERGILLA GARDENII DWARF FOTHERGILLA 2-GALLON ARONIA ARBUTIFOLIA


A SHRUB CHOKEBERRY 2-GALLON
'BRILLIANTISSIMA
B GRASS ACORUS AMERICANA AMERICAN SWEETFLAG 1-GALLON 18" O.C CHASMANTHIUM 18" O.C
B GRASS NORTHERN SEA OATS 1-GALLON
LATIFOLIUM
C PERENNIAL PENSTEMON DIGITALIS BEARDTONGUE 1-GALLON
C PERENNIAL COREOPSIS 'REDSHIFT' TICKSEED 1-GALLON
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB AS SHOWN BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB AS SHOWN

SHADY (NORTH-FACING) PLANT SCHEDULE FOR WET SITES SHADY (NORTH-FACING) PLANT SCHEDULE FOR DRY SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

A SHRUB ILEX GLABRA 'SHAMROCK' SHAMROCK INKBERRY 2-GALLON A SHRUB ILEX GLABRA 'SHAMROCK' SHAMROCK INKBERRY 2-GALLON

EUPATORIUM RUGOSUM 18" O.C


EUPATORIUM RUGOSUM 18" O.C B PERENNIAL SNAKEROOT 1-GALLON
B PERENNIAL SNAKEROOT 1-GALLON 'CHOCOLATE'
'CHOCOLATE'
C GRASS LIRIOPE SPICATA LILY TURF 1-GALLON
C GRASS CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE 1-GALLON
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB AS SHOWN
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB AS SHOWN

MIXED SUN AND SHADE (EAST/WEST-FACING) PLANT SCHEDULE FOR DRY SITES
MIXED SUN AND SHADE (EAST/WEST-FACING) PLANT SCHEDULE FOR WET SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
A SHRUB ARONIA MELANOCARPA BLACK CHOKEBERRY 2-GALLON
A SHRUB ILEX GLABRA 'SHAMROCK' SHAMROCK INKBERRY 2-GALLON
PANICUM VIRGATUM
B GRASS SWITCH GRASS 1-GALLON 18" O.C
B PERENNIAL IRIS VERSICOLOR BLUE FLAG IRIS 1-GALLON 18" O.C 'SHENANDOAH'
NEPETA X FAASSENII
C PERENNIAL CATMINT 1-GALLON
C GRASS CAREX 'ICE DANCE' SEDGE 1-GALLON 'WALKERS LOW'
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULBS AS SHOWN
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB AS SHOWN

WET SITES DRY SITES

NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
3. PLANTING PLANS ARE BASED ON HYDROLOGIC REGIME (WET/ DRY OR AVERAGE).
4. TO DETERMINE WET/DRY/AVERAGE, CONSIDER SIZE OF TRIBUTARY DRAINAGE AREA AND NUMBER OF ADJACENT
BIOSWALES. ESTIMATE INDIVIDUAL TRIBUTARY AREA PER BIOSWALE BY CONSULTING THE INTERIM GEOTECHNICAL
REPORT SUMMARY TABLE FOR AVAILABLE UPSTREAM DISTANCE AND MINIMUM REQUIRED UPSTREAM DISTANCE.
5. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT REPLACEMENT WITH P.E. 05-13-2022
AGENCY APPROVAL.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR R.O.W. COMBINATION WET/DRY
BIOSWALES AND R.O.W. RAIN GARDENS

SUNNY (SOUTH-FACING) PLANT SCHEDULE FOR AVERAGE SITES


LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

ARONIA ARBUTIFOLIA
A SHRUB CHOKEBERRY 2-GALLON
'BRILLIANTISSIMA

B PERENNIAL AESCLEPIAS INCARNATA SWAMP MILKWEED 1-GALLON 18" O.C

PANICUM VIRGATUM
C GRASS SWITCH GRASS 1-GALLON
'SHENANDOAH'
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULBS AS SHOWN

SHADY (NORTH-FACING) PLANT SCHEDULE FOR AVERAGE SITES


LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

A SHRUB ILEX GLABRA 'SHAMROCK' SHAMROCK INKBERRY 2-GALLON


SHORT TOOTHED MOUNTAIN
B PERENNIAL PYCNAMTHEMUM MUTICUM 1-GALLON 18" O.C
MINT
EUPATORIUM RUGOSUM
C PERENNIAL SNAKEROOT 1-GALLON
'CHOCOLATE'
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULBS AS SHOWN

MIXED SUN AND SHADE (EAST/WEST-FACING) PLANT SCHEDULE FOR AVERAGE SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

PHYSOCARPUS OPULIFOILIUS
A SHRUB LITTLE DEVIL NINEBARK 2-GALLON
'LITTLE DEVIL'
18" O.C
B PERENNIAL LIATRIS SPICATA GAYFEATHER 1-GALLON

C GRASS CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE 1-GALLON

BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULBS AS SHOWN

COMBINATION WET/DRY SITES

NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
3. INDUSTRIAL VS. RESIDENTIAL PLANTING PLANS ARE BASED ON HIGH VS. LOW PEDESTRIAN TRAFFIC
AREAS. P.E. 05-13-2022
4. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT MANAGING DIRECTOR, DATE
REPLACEMENT WITH AGENCY APPROVAL. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING LAYOUT FOR R.O.W. BIOSWALES
AND R.O.W. RAIN GARDENS
5'-0" OR AS SHOWN
ON CONTRACT PLANS

EROSION CONTROL
NO PLANTING ABOVE TREE MATTING
ROOTBALL HALF OF A 30" DIA.
2" STAKES WITH ARBOR TIES
CORREGATED PIPE 1'-3"
ROOT FLARE OF TREE SEDIMENT
EXPOSED CONTROL AREA
INLET B B

1"
ALL PLANTS PLANTED AT EROSION CONTROL MATTING

2"
GRADE, NOT ABOVE OR BELOW,
WITHOUT MOUNDED SOIL LOOSEN AND SCORE ROOTS

6"-8"
OF ALL POTTED PLANTS
BEFORE PLANTING
1'-6"

8"-10" LANDSCAPING ENGINEERED SOIL


STAKE
+ SECTION A-A
AT INLET WITH SEDIMENT CONTROL DEVICE
UNDISTURBED SOIL

REMOVE BURLAP AND TOP 18" O.C.


BULB PLANTING DEPTH
2/3 OF WIRE CAGE FROM IS 2X HEIGHT OF BULB
ROOTBALL HALF OF A 30" DIAMETER 8 EQUALLY SPACED 8"-10"
ENGINEERED SOIL

A
COMPACT SOIL BELOW CLEAN OPEN-GRADED STONE CORRUGATED PIPE LONG STAKES
TREE TO PREVENT SINKING

PLANTING PLAN DETAIL

EQ
C
A

1'-3"
2'-6"

EQ EQ
INLET
NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.

A
3. INDUSTRIAL VS. RESIDENTIAL PLANTING PLANS ARE BASED ON HIGH VS. LOW PEDESTRIAN TRAFFIC SEDIMENT CONTROL
AREAS. AREA
4. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT
REPLACEMENT WITH AGENCY APPROVAL. PART PLAN B-B
AT INLET WITH SEDIMENT CONTROL DEVICE

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE AND LAYOUT FOR R.O.W. GREENSTRIPS

A
GREENSTRIP PLANT QUANTITIES FOR ALL TYPES
A A A A A A A A A A A A
SEDIMENT CONTROL LOCATION TYPE I TYPE II TYPE III SIZE SPACING
TYPE I C C C C C C C C C C C AREA
A 12 9 7 2-GALLON
18" O.C
C 11 8 6 1- GALLON

OUTLET INLET CLUSTER 2 BULBS AT AS


11 8 6 BULB
SHOWN

A
NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:

A
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
A A A A A SEDIMENT CONTROL 3. PLANTING PLANS ARE BASED ON HYDROLOGIC REGIME (WET/ DRY OR AVERAGE).
A A A A
AREA 4. TO DETERMINE WET/DRY/AVERAGE, CONSIDER SIZE OF TRIBUTARY DRAINAGE AREA AND NUMBER OF ADJACENT
TYPE II C C C C C C C C BIOSWALES. ESTIMATE INDIVIDUAL TRIBUTARY AREA PER BIOSWALE BY CONSULTING THE INTERIM GEOTECHNICAL
REPORT SUMMARY TABLE FOR AVAILABLE UPSTREAM DISTANCE AND MINIMUM REQUIRED UPSTREAM DISTANCE.
5. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT REPLACEMENT WITH
AGENCY APPROVAL.

OUTLET INLET
PLANTED AREA
A

HALF OF A 30" DIA. HALF OF A 30" DIA.


CONCRETE STRIP CORRUGATED PIPE CORRUGATED PIPE
A

TOP OF CURB EROSION CONTROL 6 EQUALLY SPACED 8"-10"


MATTING LANDSCAPING STAKES
DROP CURB [INLET]

A
SEDIMENT CONTROL
A A A A A A A SEDIMENT
AREA
CONTROL AREA
TYPE III C C C C C B 1'-0" B
C
SIDEWALK

2 1/2"

4 1/2"

EQ
PITCH

1"

1'-0"
OUTLET INLET

6"-8"
A

EQ EQ
INLET

NOTES FOR CONSTRUCTION:


1. PLANTING LOCATIONS ARE SPECIFIC TO EACH PLANT TYPE SHOWN. 8"-10" LANDSCAPING
2. PLANTING PLANS ARE DETERMINED PER THE SCHEDULE ON PLANTING PLANS FOR STANDARD ROWB PAGES,

A
STAKE
GI-501B AND GI-501C.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS. SHRUBS SHALL HAVE A MULTI-STEM FORM. ENGINEERED SOIL
4. BULBS ARE ONLY TO BE PLANTED IN FALL.
5. AREA DIRECTLY IN FRONT OF INLET SHALL REMAIN UNPLANTED AND RESERVED FOR SEDIMENT CONTROL. SECTION A-A PART PLAN B-B
AT GREENSTRIP INLET WITH SEDIMENT CONTROL DEVICE AT INLET WITH SEDIMENT CONTROL DEVICE

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE & LAYOUT FOR TYPE D R.O.W.
INDUSTRIAL SUN BIOSWALES
(6) D
INDUSTRIAL SUN- Type I (6) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
12 A PERENNIAL ECHINACEA 'CHEYENNE SPIRIT' CONEFLOWER 1-GALLON TYPE I (3) C (3) C
E E
10 B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY 2-GALLON (5) B
18"O.C.
6 C GRASSES SORGASTRUM NUTANS INDIAN GRASS 1-GALLON E (5) B
12 D PERENNIAL NEPETA 'WALKERS LOW' CATMINT
(6) A (6) A
18 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE


SMOOTH OXEYE 1-GALLON
3 E PERENNIAL HELIOPSIS HELIANTHOIDES 18" O.C.

INDUSTRIAL SUN- Type II


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
10 A PERENNIAL ECHINACEA 'CHEYENNE SPIRIT' CONEFLOWER 1-GALLON
(5) D (5) D
6 B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY 2-GALLON
18" O.C.
6 C GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS 1-GALLON (3) C (3) C
TYPE II E E
10 D PERENNIAL NEPETA 'WALKERS LOW' CATMINT (3) B

14 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN E (3) B


ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E PERENNIAL HELIOPSIS HELIANTHOIDES SMOOTH OXEYE 1-GALLON (5) A (5) A
18" O.C.

INDUSTRIAL SUN-Type III


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
8 A PERENNIAL ECHINACEA 'CHEYENNE SPIRIT' CONEFLOWER 1-GALLON

8 B GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS 18" O.C.


8 C PERENNIAL NEPETA 'WALKERS LOW' CATMINT
(4) C (4) C
12 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE TYPE III
3 D SHRUB MORELLA PENSYLVANICA 18" O.C. D D
NORTHERN BAYBERRY 2-GALLON
(4) B D
(4) B
NOTES FOR CONSTRUCTION:
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER (4) A (4) A
DRAWINGS.
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S
STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO FLOW
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO P.E. 05-13-2022
ASSET SIZE OR OTHER OBSTRUCTION. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE & LAYOUT FOR TYPE D R.O.W.
INDUSTRIAL SHADE BIOSWALES
(6) D
INDUSTRIAL SHADE - Type I (6) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
12 A GRASSES CAREX APPALACHICA APPALACHIAN SEDGE 1-GALLON TYPE I (3) C (3) C
E E
(5) B
10 B SHRUB ROSA VIRGINIANA VIRGINIA ROSE 2-GALLON
18"O.C.
6 C GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS 1-GALLON E (5) B
12 D PERENNIAL SOLIDAGO CAESIA BLUESTEM GLODENROD
(6) A (6) A
18 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE


3 E PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER 1-GALLON 18" O.C.

INDUSTRIAL SHADE- TYPE II


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
10 A GRASSES CAREX APPALACHICA APPALACHIAN SEDGE 1-GALLON (5) D (5) D
6 B SHRUB ROSA VIRGINIANA VIRGINIA ROSE 2-GALLON
18" O.C.
6 C GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS (3) C (3) C
1-GALLON TYPE II E E
10 D PERENNIAL SOLIDAGO CAESIA BLUESTEM GLODENROD (3) B
14 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN
E (3) B
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER 1-GALLON 18" O.C. (5) A (5) A

INDUSTRIAL SHADE- Type III


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
8 A GRASSES CAREX APPALACHICA APPALACHIAN SEDGE 1-GALLON

8 B PERENNIAL ASTER CORDIFOLIUS BLUE WOOD ASTER 18" O.C.


8 C PERENNIAL SOLIDAGO CAESIA BLUESTEM GLODENROD
(4) C (4) C
12 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE


3 D SHRUB ROSA VIRGINIANA VIRGINIA ROSE 2-GALLON 18" O.C. TYPE III
D D

(4) B D
(4) B
NOTES FOR CONSTRUCTION:
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER
DRAWINGS. (4) A (4) A
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S
STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
FLOW
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO P.E. 05-13-2022
ASSET SIZE OR OTHER OBSTRUCTION.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. INDUSTRIAL MIXED BIOSWALES
(6) D
INDUSTRIAL MIXED SUN/SHADE - Type I (6) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
12 A PERENNIAL MEEHANIA CORDATA CREEPING MINT 1-GALLON TYPE I (3) C (3) C
E E
10 B SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC 2-GALLON (5) B
18"O.C.
6 C GRASSES TRIDENS FLAVUS PURPLETOP 1-GALLON E (5) B
12 D PERENNIAL ASTER LATERIFLORUS 'LADY IN BLACK' CALICO ASTER
(6) A (6) A
18 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE


1-GALLON 18" O.C.
3 E PERENNIAL RATIBIDA PINNATA PRAIRIE CONEFLOWER

INDUSTRIAL MIXED SUN/SHADE - Type II


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
10 A PERENNIAL MEEHANIA CORDATA CREEPING MINT 1-GALLON (5) D (5) D

6 B SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC 2-GALLON


(3) C (3) C
6 C GRASSES TRIDENS FLAVUS PURPLETOP 1-GALLON
18" O.C. TYPE II E E
(3) B
10 D PERENNIAL ASTER LATERIFLORUS 'LADY IN BLACK' CALICO ASTER
E (3) B
NARCISSUS 'DUTCH MASTER'
14 BULB TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN (5) A (5) A
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E PERENNIAL RATIBIDA PINNATA 1-GALLON 18" O.C.
PRAIRIE CONEFLOWER

INDUSTRIAL MIXED SUN/SHADE Type III


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
8 A PERENNIAL MEEHANIA CORDATA 1-GALLON
CREEPING MINT
8 B GRASSES TRIDENS FLAVUS PURPLETOP 18" O.C.
(4) C (4) C
8 C PERENNIAL ASTER LATERIFLORUS 'LADY IN BLACK' CALICO ASTER

12 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN TYPE III
D D
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC 2-GALLON 18" O.C. (4) B (4) B
D

NOTES FOR CONSTRUCTION: (4) A (4) A


1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER
DRAWINGS.
FLOW
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S
STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO P.E. 05-13-2022
ASSET SIZE OR OTHER OBSTRUCTION. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. RESIDENTIAL SUN BIOSWALES (4) D (4) D

RESIDENTIAL SUN - Type I


(6) C
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
(6) C

14 A GROUNDCOVER ASTER ERICOIDES 'SNOW FLURRY' HEATH ASTER 1-GALLON TYPE I E

6 B SHRUB HYPERICUM CALYCINUM ST. JOHN'S WORT 2-GALLON


18"O.C. E E
12 C PERENNIAL ASCLEPIAS TUBEROSA BUTTERFLY MILKWEED (3) B (3) B
1-GALLON
8 D GRASSES SCHIZACHYRIUM SCOPARIUM LITTLE BLUE STEM
(7) A (7) A
NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL
18 BULB CLUSTER OF 2 AS SHOWN
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E SHRUB MORELLA PENSYLVANICA BAYBERRY 2-GALLON 18" O.C.

RESIDENTIAL SUN - Type II


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING (4) D (4) D
10 A GROUNDCOVER ASTER ERICOIDES 'SNOW FLURRY' HEATH ASTER 1-GALLON
(5) C (5) C
6 B SHRUB HYPERICUM CALYCINUM ST. JOHN'S WORT 2-GALLON
18" O.C.
10 C PERENNIAL ACHILLEA MILLEFOILIUM 'PAPRIKA' YARROW
1-GALLON
TYPE II E

8 D GRASSES SCHIZACHYRIUM SCOPARIUM LITTLE BLUE STEM


(3) B E E
(3) B
14 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
(5) A (5) A
3 E SHRUB MORELLA PENSYLVANICA BAYBERRY 2-GALLON 18" O.C.

RESIDENTIAL SUN - Type III


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
6 A GROUNDCOVER ASTER ERICOIDES 'SNOW FLURRY' HEATH ASTER 1-GALLON

10 B PERENNIAL ACHILLEA MILLEFOILIUM 'PAPRIKA' YARROW


18" O.C. (4) C (4) C
8 C GRASSES SCHIZACHYRIUM SCOPARIUM LITTLE BLUE STEM

BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN


12

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE


TYPE III D

3 E SHRUB MORELLA PENSYLVANICA BAYBERRY 2-GALLON


18" O.C. (5) B D D (5) B

NOTES FOR CONSTRUCTION: (3) A (3) A


1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER
DRAWINGS.
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S FLOW

STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE P.E. 05-13-2022
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO MANAGING DIRECTOR, DATE
ASSET SIZE OR OTHER OBSTRUCTION. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. RESIDENTIAL SHADE BIOSWALES
RESIDENTIAL SHADE - Type I (4) D (4) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING

14 A GROUNDCOVER MEEHANIA CORDATA CREEPING MINT 1-GALLON (6) C


(6) C
6 B SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA 2-GALLON
18" O.C. TYPE I E
CLUSTERED
12 C PERENNIAL PYCNANTHEMUM MUTICUM
MOUNTAIN MINT
1-GALLON
E E
8 D GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS
(3) B (3) B
18 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN
(7) A (7) A
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE

3 E PERENNIAL BAPTISIA AUSTRALIS WILD INDIGO 2-GALLON 18" O.C.

RESIDENTIAL SHADE - Type II


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
10 A GROUNDCOVER MEEHANIA CORDATA CREEPING MINT 1-GALLON (4) D (4) D

6 B SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA 2-GALLON


(5) C (5) C
18" O.C.
10 C PERENNIAL PYCNANTHEMUM MUTICUM CLUSTERED 1-GALLON
MOUNTAIN MINT
8 D GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS TYPE II E

14 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN (3) B E E


(3) B
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E PERENNIAL BAPTISIA AUSTRALIS WILD INDIGO 2-GALLON 18" O.C. (5) A (5) A

RESIDENTIAL SHADE - Type III


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
6 A GROUNDCOVER MEEHANIA CORDATA CREEPING MINT 1-GALLON

10 B PERENNIAL CLUSTERED 18" O.C.


PYCNANTHEMUM MUTICUM (4) C
MOUNTAIN MINT (4) C
8 C GRASSES CHASMANTHIUM LATIFOLIUM NORTHERN SEA OATS

12 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE TYPE III D

3 D SHRUB CEANOTHUS AMERICANUS NEW JERSEY TEA 2-GALLON 18" O.C.


(5) B D D (5) B
NOTES FOR CONSTRUCTION:
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER
DRAWINGS. (3) A (3) A
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S
STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
FLOW
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO P.E. 05-13-2022
ASSET SIZE OR OTHER OBSTRUCTION. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. RESIDENTIAL MIXED BIOSWALES
RESIDENTIAL MIXED SUN/SHADE - Type I (4) D (4) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
14 A GRASSES CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE 1-GALLON (6) C
(6) C
6 B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY 2- GALLON
18" O.C. TYPE I E
12 C PERENNIAL AMSONIA 'BLUE ICE' BLUESTAR 1-GALLON

8 D GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS E E


(3) B (3) B
18 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN
(7) A (7) A
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E PERENNIAL BAPTISIA AUSTRALIS WILD INDIGO 2-GALLON 18" O.C.

RESIDENTIAL MIXED SUN/SHADE - Type II


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
(4) D (4) D
10 A GRASSES CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE 1-GALLON

6 B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY 2- GALLON (5) C (5) C


18" O.C.
10 C PERENNIAL AMSONIA 'BLUE ICE' BLUESTAR
1-GALLON TYPE II E
8 D GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS

14 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN (3) B E E


(3) B
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E PERENNIAL BAPTISIA AUSTRALIS WILD INDIGO 2-GALLON 18" O.C. (5) A (5) A

RESIDENTIAL MIXED SUN/SHADE Type III


QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
6 A GRASSES CAREX FLACCA ‘BLUE ZINGER’ GLACOUS SEDGE 1-GALLON

10 B PERENNIAL AMSONIA 'BLUE ICE' BLUESTAR 18" O.C.


(4) C (4) C
8 C GRASSES PANICUM VIRGATUM 'SHENANDOAH' SWITCHGRASS

12 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN

ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE


TYPE III D
3 D SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY 2- GALLON
18" O.C.
(5) B D D (5) B

NOTES FOR CONSTRUCTION:


(3) A (3) A
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER
DRAWINGS.
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S
FLOW
STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE P.E. 05-13-2022
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO MANAGING DIRECTOR, DATE
ASSET SIZE OR OTHER OBSTRUCTION. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING LAYOUT FOR TYPE D R.O.W. BIOSWALES

TREE PLANTING AS REQUIRED


PLANTING PER DPR STANDARDS
ROOT FLARE OF TREE EXPOSED NO PLANTING ABOVE TREE
NO PLANTING ABOVE TREE ROOT BALL ROOTBALL NOTES FOR CONSTRUCTION:
WHEN SPECIFIED, 3 PLANTS TO BE
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER
INSTALLED IN PLACE OF TREE DRAWINGS.
MULCH SHALL BE 2" AWAY FROM
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S
WOODY STEMS OF TREES AND SHRUBS STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
ALL PLANTS PLANTED AT GRADE, 3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
NOT ABOVE OR BELOW 4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
LOOSEN AND SCORE ROOTS OF ALL WITH WOODY STEMS OF PLANTS.
POTTED PLANTS BEFORE PLANTING
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE
TOP LAYER:
3" MULCH
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO
3'-2 1/8"

ASSET SIZE OR OTHER OBSTRUCTION.

UNDISTURBED SOIL

TOPSOIL

OPEN-GRADED STONE

PLANTING DETAIL

NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
3. INDUSTRIAL VS. RESIDENTIAL PLANTING PLANS ARE BASED ON HIGH VS. LOW PEDESTRIAN TRAFFIC
AREAS.
4. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT
REPLACEMENT WITH AGENCY APPROVAL.

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-600
STEEL GUARDS STANDARDS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD FOR R.O.W. GI - TYPE 'B' WELDED STEEL GUARD

EQUAL PANELS [4' MIN, 6' MAX] 1/2" x 1-1/2" TOP RAIL 2" PANEL TO ACCOMMODATE 2"
EQUAL ± 11"
TO ACCOMMODATE FULL CIRCLES AS NEEDED END CAP FULL CIRCLES AS NEEDED
1 3/4"
± 5 9/16" 1/2" SQ. BENT RAILS TO FOLLOW
ROUND LINE OF GRADE
2" SQ. STEEL POST
7 1/16"
1"

1-3/4" SQ. STEEL


1/2" SQ. PICKET POST
1/2" x 1-1/2" BOTTOM
RAIL 12" WIDE
1"
1'-5"

CONCRETE
7 15/16"

1/4" GA. STEEL PLATE STRIP


1"

2"
FINISHED GRADE CURB

5"
1" OF HEADER AND
2"

SIDEWALK
2"

4"

4"
1"

1"
1"

STEEL SPIKE LENGTH VARIES


STEEL SPIKE LENGTH VARIES

1" GAP BETWEEN BOTTOM


3
RAIL AND FINISHED GRADE 4" STEEL SPIKE
ADJACENT TO SIDEWALK FULLY WELDED TO
POST ON ALL SIDES
CONCRETE STEEL SPIKE IN 4" DIA.
(TYP.)
ENCASEMENT PLACED CONCRETE ENCASEMENT
ON OPEN-GRADED PLACED IN ENGINEERED
STONE BASE SOIL (TYP.)
STEEL SPIKE IN 4"
CONCRETE DIA. CONCRETE
GEOTEXTILE FABRIC ENCASEMENT
ENCASEMENT
PLACED ON PLACED IN
OPEN-GRADED ENGINEERED SOIL

3"
3"

3" STONE BASE (TYP.)

FRONT ELEVATION SIDE ELEVATION

NOTES:
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I. (ALTERNATE STEEL PER DEP APPROVAL)
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL STEEL TO BE PAINTED BLACK, SEE SPECIFICATIONS FOR DETAILS.
5. RAILS TO FOLLOW LINE OF GRADE.
6. ALL STEEL TO BE SOLID STEEL.
7. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE ENCASEMENT AS PER STANDARD DRAWINGS

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS

CENTER AND LEFT FRONT PANEL -


2" RIGHT FRONT PANEL - EQUAL PANELS TO ACCOMMODATE
EQUAL PANELS TO ACCOMMODATE 9/16" GROOVE FOR
FULL CIRCLES AS NEEDED
FULL CIRCLES AS NEEDED CONNECTING PLATE (TYP.)
2" SQ. STEEL POST WITH 9/16" 1/2" x 1-1/2" TOP RAIL 2" SIDE PANEL 2" 8" 1 3/4"
4 7/8"- 5 3/16" DIA. END CAP
GROOVE FOR CONNECTING 1/2" SQ. BENT ROUND, COUNTERSUNK FOR SS FULL CIRCLES AS NEEDED
PLATE (TYP.) 5" DIA. MAX. 1/2" DIA. SOCKET HEAD
1/2" SQ. PICKET CAP SCREWS (TYP.)
RAILS TO FOLLOW
MIRROR CONNECTION LINE OF GRADE
POST FOR OPPOSITE
1 1/2"
6 1/4"

6 1/4"
END OF ROW GI 1-3/4" SQ. STEEL
POST
CONCRETE 12" WIDE
1'-5"

HEADER CONCRETE
6 1/4"

6 1/4"
1/2" CONNECTION 1" STRIP

2"
PLATE
FINISHED 1" CURB

5"
GRADE
4"

4"
1"

1"
STEEL SPIKE LENGTH VARIES
STEEL SPIKE LENGTH VARIES

TYPICAL LEFT AND CENTER RIGHT FRONT PANEL 1/2" x 1-1/2"


1/2" CONNECTION BOTTOM RAIL
FRONT PANEL WITH POST PLATE (TYP.) WITH CONNECTION ENGINEERED SOIL
AND CONNECTION PLATE PLATE AT EACH END 1/2" x 1 1/2" GA.
AT EACH END OF PANEL STEEL PLATE SPIKE BOLTED
TO POST
CONCRETE LOCKING
HOLES

CONCRETE 4" DIAMETER


ENCASEMENT PLACED CONCRETE
ON OPEN-GRADED ENCASEMENT
STONE BASE
CONCRETE ENCASEMENT
PLACED ON OPEN-GRADED
STONE BASE
3"

3"
FRONT ELEVATION SIDE ELEVATION
POST AND GROOVE CONNECTION
NOTE: MIRROR CONNECTION POST FOR OPPOSITE END OF ROWGI

NOTES:
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I. (ALTERNATE STEEL PER DEP APPROVAL)
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL POST AND GROOVE CONNECTIONS TO BE BOLTED.
5. ALL VISIBLE BOLTS TO BE COUNTERSUNK AND FLUSHED WITH THE POSTS
6. ALL STEEL TO BE PAINTED BLACK, SEE SPECIFICATIONS FOR DETAIL.
7. RAILS TO FOLLOW LINE OF GRADE.
P.E. 05-13-2022
8. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE PIERS AS PER STANDARD DRAWINGS
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD DETAILS FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
2"x2" STEEL POST

SS 1/2" DIA. SOCKET


HEAD CAP SCREWS
1" LONG
1 3/4" x 1 3/4" STEEL

22"
POST

DETAIL A SS 1/2" DIA. HEXHEAD


BOLTS 1 1/4" LONG

1"

1"

10"
FINISHED GRADE FINISHED GRADE

4"

4"
2"

2"
3" STEEL SPIKE LENGTH VARIES

3" STEEL SPIKE LENGTH VARIES


CONCRETE

1"

1"
LOCKING HOLES 9/16"
DIA.

1 1/4" CONCRETE
LOCKING HOLES 9/16" 1 1/4" DETAIL A
DIA. NOTE:
SPIKE EMBEDDED IN MACHINED GROOVE
SPIKE BOLTED SPIKE BOLTED OF THE POST FOR ADDITIONAL STRENGTH
TO THE 2"x2" POST TO THE 1 3/4"x 1 3/4" AND SUPPORT
POST
TOP OF
OPEN-GRADED 4" DIA. CONCRETE 4" DIA. CONCRETE
STONE BASE ENCASEMENT ENCASEMENT

STEEL POST 2"x2" STEEL POST 13 4"X13 4"

1/2" HIGH STEEL CAP


9/16" 1/2"
WELDED TO THE POST

/8"
7/8"

R5
1"
9/16" 1/2"
/16"

9/16"
R11 9/16" DIA. HOLES

2"
STEEL SPIKE LENGTH VARIES

1"
1 1/2"

1 1/4"

4"
CONCRETE
9"

9"

LOCKING
17 1/2"

17 3/8"

HOLES 9/16" DIA.


18"

4"
DETAIL B
3 13/16"
22"

1 3/8"
4"

4"

R5

4"
/8 NOTE:
"
4 1/8"

1"

4" COUNTERSUNK FOR SOCKET HEAD


FINISHED GRADE CAP SCREWS
"
/16
4"
2"

R11
5"

DETAIL B
1 3/8"
TAP 1/2" - 13
1"

3/4" 1 1/4"
P.E. 05-13-2022
POST AND GROOVE CONNECTION PLATE SPIKE MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
DIMENSION SCHEDULE FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS

FRONT PANELS

2" LEFT PANEL CENTER PANEL CENTER PANEL RIGHT PANEL 2"
1" 1"

1"
2" 2" 2"

SIDE PANEL

SIDE PANEL
1"

FLOW FLOW

FRONT AND SIDE PANELS - PLAN

FRONT PANELS SCHEDULE SIDE PANELS SCHEDULE

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STEEL TREE GUARD MOUNT & EDUCATIONAL SIGN

MOUNT TO FACE
SIDEWALK, SEE
DETAILS THIS AND
STEEL MOUNT FOR NEXT PAGE
EDUCATIONAL SIGN
TREE GUARD TOP
RAIL
SIDEWALK

LOW POINT A A 2" SQ. STEEL POST


+
SET 3" BELOW
(BEYOND)

OUTLET INVERT

EXISTING CURB
TO REMAIN

FLOW +
FLOW
EXISTING
ASPHALT
PAVEMENT
SECTION A-A

PLAN

3/4" 10 1/2" 3/4"


1/2"

1"

6"
4"

5/16" DIA.
THREADED
HOLES FOR 1/4"
SCREW
1"

ISOMETRIC VIEW 1 ISOMETRIC VIEW 2


PLAN - FRONT VIEW PLAN-BACK VIEW SIDE VIEW
MOUNT FOR EDUCATIONAL SIGN
EDUCATIONAL SIGN

NOTES:
1. EDUCATIONAL SIGN TO BE INSTALLED AS DIRECTED AT EITHER END OF THE GI PRACTICE P.E. 05-13-2022
1.1. HOLES TO SHALL NOT PUNCH TROUGH FACE OF SIGN MANAGING DIRECTOR, DATE
1.2. GRAPHICS AS PER SPECIFICATIONS GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STEEL TREE GUARD MOUNT & EDUCATIONAL SIGN
3/16" THICK BENT
PLATE

5
1/
2"
2 - 3/16" THICK

45°
STEEL RIBS
1 7/8"x1 1/2"x 3/16" 3/16"
BENT PLATE
TREE GUARD RAIL
1/4" DIA. SET SCREWS

1 1/2"
1"

7/8"
1/4" - 20 TAMPER

7/8"
1 7/8" RESISTANT SCREW

HEX. NUT

MOUNT COMPONENTS LEFT SIDE VIEW RIGHT SIDE VIEW


SECTION SECTION

11 1/2" 11 1/2"

1/2"
10 1/2" 10 1/2"
1/2"

1/2" (TYP.) 1/4" 5 3/4" 1/2"


4"

4"
RIBS

1/4" DIA. THREADED


EQ HOLES FOR SET EQ
SCREWS
5/16" DIA. HOLES
(TYP.)
7/8"

1/2"
1 1/2" 4 1/2"
2" 7 1/2" 2"
5/16" DIA. THREADED 7 1/2"
5/16" DIA. HOLE FOR HOLE FOR
1/4"-20 SCREWS 1/4" -20 SCREWS 9"

FRONT VIEW BACK VIEW

P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION