2. CONTRACTOR SHALL STAKE LOCATION OF RIGHT-OF-WAY GI PRACTICES FOR APPROVAL BY ENGINEER PRIOR TO EXCAVATION WORK.
3. NO CHANGES SHALL BE MADE TO THE DESIGN OR LAYOUT WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER. LAYOUT THE WORK AS PER NORTHING AND EASTING
COORDINATES AND GI PRACTICE DIMENSIONS SHOWN ON PLANS AND FIELD VERIFY. WRITTEN ASSET DIMENSIONS SHALL GOVERN. DO NOT SCALE DISTANCES OR ASSET
DIMENSIONS FOR LAYOUT PURPOSES.
4. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE ALL EXISTING SIDEWALK FLAGS ADJACENT TO THE GI PRACTICE. WHENEVER AN ADJACENT FLAG HAS A
WIDTH OF LESS THAN OR EQUAL TO 36", THE CONTRACTOR SHALL REPLACE ONE ADDITIONAL FULL FLAG BEYOND. ALL REPLACEMENTS SHALL BE IN FULL COMPLIANCE WITH
THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.
8. THE CONTRACTOR SHALL BE PREPARED TO CUT, CAP AND/OR REROUTE IRRIGATION LINES FOUND IN THE FIELD AS REQUIRED TO SUIT THE INSTALLATION OF GREEN
INFRASTRUCTURE.
9. THE CONTRACTOR SHALL REMOVE AND RESTORE ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF THE WEARING COURSE AND ONE-AND-A-HALF (1 1/2') FOOT WIDTH OF ROADWAY
CONCRETE PAVEMENT BASE ALONG THE CURB LINE AND ADJACENT TO THE CONCRETE APRONS, WHERE REQUIRED. ALL WORK MUST BE COMPLETED IN FULL COMPLIANCE
WITH THE APPLICABLE SECTIONS OF THE STANDARD HIGHWAY SPECIFICATIONS.
10. AUTHORIZED PARKING - FOR ANY GREEN INFRASTRUCTURE PRACTICE THAT WILL IMPACT AUTHORIZED PARKING SPACES TO THE CONSTRUCTION OF GREEN
INFRASTRUCTURE PRACTICES, THE CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE DEPARTMENT OF TRANSPORTATION (NYCDOT) AUTHORIZED PARKING AND
SPECIAL USE UNIT AT LEAST TWO WEEKS IN ADVANCE OF CONSTRUCTION. CONTACT PERSON: MERISA GILMAN, SENIOR PROGRAM MANAGER, 212-839-3240,
MGILMAN@DOT.NYC.GOV
12. THE CONTRACTOR SHALL NOT BE PERMITTED TO OPERATE AUXILIARY EQUIPMENT WHICH GENERATES EXHAUST OR OTHER HEAT UPWARD (E.G., GENERATORS AND
COMPRESSORS), UNDER THE BRANCHES OF TREES WHERE THE BRANCHES ARE LESS THAN 25' ABOVE THE GROUND, UNLESS APPROVED BY THE ENGINEER IN
CONSULTATION WITH THE CERTIFIED ARBORIST.
13. THE CONTRACTOR SHALL NOT BE PERMITTED TO STORE, STOCKPILE, OR LAY DOWN, ANY CONSTRUCTION MATERIAL INCLUDING, BUT NOT LIMITED TO, LUMBER, FUEL, AND
OIL CONTAINERS, PIPES, AND/OR PIPE FITTINGS, BARRICADES, HAND TOOLS, HOSES, RECEPTACLES, AND ASPHALT WITHIN ANY EXISTING TREE PIT OR R.O.W. GI PRACTICE.
GI-100
STANDARDS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1
- NO CONNECTION TO SEWERS
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET
C B A PLAN
EQ EQ
+
ENGINEERED
9"
B
SOIL ENGINEERED
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE SOIL CONCRETE HEADER
REINFORCED REINFORCED (3) SIDES (TYP.)
8" THICK CAST-IN-PLACE
CONCRETE APRON CONCRETE APRON
REINFORCED UNDISTURBED
12" WIDE GABION FILLED CONCRETE GUTTER 12" WIDE GABION SOIL
WITH CLEAN CLEAN
CLEAN FILLED WITH CLEAN CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE OPEN-GRADED
A
OPEN-GRADED OPEN-GRADED STONE OPEN-GRADED CONCRETE
STONE BASE
WRAP GABION IN STONE BASE (TYP.) STONE BASE ENCASEMENT PLACED
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5'-0" OR AS PER DESIGN GEOTEXTILE
5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
(TOP AND SIDES ONLY)
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER DEPTH SCHEDULE
UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE ROWB A B
CAST-IN-PLACE. WITH TREE 2'-6" 2'-0"
NO TREE 3'-0" 1'-6"
P.E. 05-13-2022
DEPTH SCHEDULE MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-122 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE JOINT AT MID-SPAN
L-SHAPED EDGING
SEE GI-501A, B, C & D FOR WITH MINIMUM 9" STAKES
TYPICAL PLANTING PLANS SEE DRAWING GI-204
SURFACE GRADING AS
PER DRAWING GI-124
FLOW
+
[OUTLET] [INLET]
15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"
PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT D ROADWAY D LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE
APRON APRON
PLAN
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1A - WITH STONE COLUMNS
PROPERTY LINE
- NO CONNECTION TO SEWERS
5'-0"
OR AS PER DESIGN
SEE DRAWING GI-501A, B, C & D FOR TYPICAL CONCRETE STRIP TAPER 1% - 2% CONTINUOUS EROSION CONTROL
. BIOSWALE 20'-0"
A PLANTING PLANS
EXISTING
SIDEWALK
TO FOLLOW CURB TAPER CROSS SLOPE TOWARDS MATTING
LOCATION OF
REFER TO DETAILS ON THIS AND NEXT PAGE TOP OF CURB PLANTED AREA EXPANSION JOINT AND
VARIES OR AS PER DESIGN
4'-6" EQ EQ 4'-6" DROP CURB [INLET] L-SHAPED EDGING WITH FILLER (TYP.)
MIN. 9" STAKES, SEE 1" SIDEWALK
EXISTING TOP OF GUTTER
CATCH BASIN (BEYOND) GI-204 6"
DESIGN
5'-0" OR
B B
AS PER
CURB LINE
ROADWAY PLANTED
PITCH
AREA
1'-3"
FLOW
BIOSWALE BIOSWALE
OUTLET INLET 9"
A PLAN ENGINEERED CONCRETE
WWM 6x6 - W8xW8 SOIL HEADER (3) SIDES
1'-3"
+ 3" GEOTEXTILE (TOP AND
SIDES ONLY)
12"
TOP OF STONE
(TYP.)
INTERFACE OF
ENGINEERED SOIL
EQ EQ
SIDES ONLY
12" DIAMETER PVC PIPE
WRAPPED ALL AROUND
PERMEABLE SOIL WITH GEOTEXTILE FABRIC.
PENETRATION INTO
PERMEABLE SOIL LAYER
GRANULAR FILL TO FILL THE
PENETRATION INTO
ANNULAR SPACE BETWEEN THE
GRANULAR FILL TO FILL THE STONE COLUMN AND THE HOLE
ANNULAR SPACE BETWEEN TEMPORARY, 18"
THE STONE COLUMN PIPE MAXIMUM DIAMETER CLEAN OPEN-GRADED
AND THE HOLE PERMEABLE SOIL STONE
CASING AUGERED INTO
LAYER
PERMEABLE LAYER BOTTOM OF COLUMN TO BE
STONE FILLED PERFORATED 12"
DIAMETER PVC PIPE WRAPPED OPEN
OPEN BOTTOM
ALL AROUND WITH GEOTEXTILE (TYP.)
FABRIC (TYP.)
SECTION B-B ℄
NOTES: SECTION A-A
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES AT BIOSWALE STONE COLUMN
IMPERMEABLE LINER UNDERNEATH. DEPTH SCHEDULE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING
ROWB A B
TAPERS TO BE CAST-IN-PLACE.
WITH TREE 2'-6" 2'-0" P.E. 05-13-2022
NO TREE 3'-0" 1'-6" MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
DEPTH SCHEDULE
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
EQ
SIDEWALK 5'-0" OR AS PER DESIGN CONCRETE HEADER
STONE LOW POINT SET 3" MIDDLE STONE COLUMN STONE
COLUMN BELOW OUTLET ONLY IN ROW BIOSWALE COLUMN STEEL TREE GUARD
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207
INVERT
+ WITHOUT TREE (3-SIDES TYP.) SEE DRAWING
GI-601, GI-602, GI-603 & GI-604
CONCRETE TAPER TO FOR SEDIMENT CONTROL
EQ
FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO DEVICE AT INLET, REFER TO
OUTLET INVERT MATCH CONTRACT PLANS GI-501D
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-0"
FLOW
+
[OUTLET] [INLET]
15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"
PITCH
CONCRETE GUTTER
TO MATCH EXISTING TO REMAIN
ASPHALT
PAVEMENT
D ROADWAY
D
LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY
REINFORCED CONCRETE
PLAN REINFORCED CONCRETE
FIELD CONDITIONS AND SITE ENGINEER
APRON APRON
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
PROPERTY
LINE
DESIGN
5'-0" OR
AS PER
CURB LINE
EXISTING FLOW
CATCH BASIN
BIOSWALE BIOSWALE
OUTLET INLET
STORM WATER INLET
C B SEE DRAWINGS GI-202 OR
PLAN GI-203
5'-0" 5'-0"
CONCRETE STRIP TO OR AS PER DESIGN PLANTED AREA, SEE PLANTING OR AS PER DESIGN
FOLLOW CURB TAPER PLANS (NO TREE PERMITTED) 1% - 2% CONTINUOUS
1% - 2% CONTINUOUS
TOP OF CURB CROSS SLOPE 3-SIDED STEEL TREE CURB TO MATCH CROSS SLOPE TOWARDS PLANTED AREA, SEE
TOWARDS PLANTED GUARD, SEE GI-601, GI-602, CONTRACT PLANS PLANTED AREA PLANTING PLANS (NO
DROP CURB [INLET]
TOP OF GUTTER AREA GI-603 & GI-604 DROP CURB TREE PERMITTED)
(BEYOND) EROSION CONTROL [OUTLET] EROSION CONTROL
CLEANOUT, 6" MATTING WWM 6x6-W8xW8 MATTING
SEE ROADWAY CLEANOUT,
ROADWAY GI-204
PITCH SEE GI-204
1'-3"
HT. VARIES
WWM 6x6-W8xW8
9"
CONCRETE HEADER 8" THICK CAST-IN-PLACE
CONCRETE HEADER
(3 SIDES) REINFORCED
(3) SIDES
CONCRETE APRON
ENGINEERED SOIL 12"x5" CONCRETE STRIP
WRAP STONE IN L-SHAPED EDGING WITH
8" THICK CAST-IN-PLACE CLEAN UNDISTURBED SOIL
GEOTEXTILE (TOP MIN. 9" STAKES (TYP.)
2'-6"
REINFORCED CONCRETE CLEAN OPEN-GRADED
AND SIDES ONLY) ENGINEERED SOIL
APRON OPEN-GRADED 12" WIDE GABION FILLED
1
STONE BASE 8" SOLID HDPE PIPE
12" WIDE GABION FILLED STONE BASE 22 2 ° INJECTION WITH CLEAN
MOLDED ELBOW OPEN-GRADED STONE 8" PERFORATED HDPE
WITH CLEAN PIPE RISER WRAPED
OPEN-GRADED STONE WRAP GABION IN WRAP GABION IN WITH GEOTEXTILE
8" SOLID DUAL WALL HDPE GEOTEXTILE (TOP AND GEOTEXTILE (TOP AND
PIPE SEE DETAIL ON SIDES ONLY) SIDES ONLY)
DRAWING GI-204
SECTION B-B SECTION C-C
AT BIOSWALE INLET AT BIOSWALE OUTLET
NOTES:
1. NO STAKE SHALL BE DRIVEN INTO HDPE DUAL WALL PIPE.
2. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
3. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-122 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE JOINT AT MID-SPAN
L-SHAPED EDGING
SEE GI-501A, B, C & D FOR WITH MINIMUM 9" STAKES
TYPICAL PLANTING PLANS SEE DRAWING GI-204
CLEANOUT; CLEANOUT;
SURFACE GRADING AS
REFER TO DETAILS 8" DIA. PERFORATED REFER TO
22 12° BEND PER DRAWING GI-124
EQ
GI-204 HDPE PIPE WRAPPED DETAILS GI-204
EQ
FOLLOW CURB LINE (TYP.) NEW CURB TYPE TO DEVICE AT INLET, REFER TO
OUTLET INVERT MATCH CONTRACT PLANS GI-501D SOLID PIPE TO
NEW CURB TYPE TO MATCH
CONTRACT PLANS STORMWATER INLET,
SEE PLANS AND DETAILS
EXISTING CURB
1'-0"
FLOW
+
[OUTLET] [INLET]
15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"
PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT D ROADWAY D LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE
APRON PLAN APRON
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER CHAMBER - NO CONNECTION TO SEWERS
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET
C B A
PLAN
3-SIDED STEEL TREE
GUARD, SEE GI-601, PLANTED AREA, SEE 1"
12"x5" CONCRETE STRIP PLANTING PLANS (NO CONCRETE STRIP TO 12"x5" CONCRETE EROSION CONTROL
GI-602, GI-603 & GI-604 12"x5" CONCRETE
WITH 1% - 2% TREE PERMITTED) FOLLOW CURB TAPER STRIP WITH 1% - 2% MATTING (TYP.)
STRIP
CONTINUOUS CROSS 1'-6" CONTINUOUS CROSS
TOP OF CURB EXPANSION JOINT
SLOPE TOWARDS TO CURB 3"-THICK LEVELING SLOPE TOWARDS
DROP CURB [INLET] AND FILLER (TYP.)
PLANTED AREA SIDEWALK COURSE (TYP.) SIDEWALK PLANTED AREA
TOP OF GUTTER 6" SIDEWALK
DROP CURB
[OUTLET] ROADWAY (BEYOND)
ROADWAY PLANTED LOW ROADWAY PLANTED
PITCH
AREA POINT AREA
1'-3"
+
1'-6"
ENGINEERED ENGINEERED ENGINEERED
SOIL SOIL SOIL 9"
6"
6"
6"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE CONCRETE
REINFORCED 8" THICK CAST-IN-PLACE REINFORCED HEADER (3) SIDES (TYP.)
CONCRETE APRON REINFORCED CONCRETE APRON UNDISTURBED
12" WIDE GABION FILLED 4" MINIMUM CONCRETE GUTTER
3'-0"
12" WIDE GABION SOIL
WITH CLEAN STONE FILLED WITH CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE COVER OPEN-GRADED STONE CONCRETE
HDPE STORMWATER
WRAP GABION IN CHAMBER CAPPED AT (TYP.) ENCASEMENT PLACED
GEOTEXTILE (TOP AND BOTH ENDS, SEE L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) GI-204 WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5" MINIMUM
GEOTEXTILE
BEDDING
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE. P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-122 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSIONS SCHEDULE JOINT AT MID-SPAN
L-SHAPED EDGING
SEE GI-501A, B, C & D FOR WITH MINIMUM 9" STAKES
TYPICAL PLANTING PLANS SEE DRAWING GI-204
1'-0" 1'-0" SURFACE GRADING AS
PER DRAWING GI-124
FLOW
+
[OUTLET] [INLET]
15% - 20%
PITCH FLOW
8"-THICK REINFORCED
1'-6"
PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING TO REMAIN
PAVEMENT D ROADWAY D LIMIT OF NEW CURB TO EXTEND
4'-4" 5'-4" BEYOND THE ROWB AS DETERMINED BY
PLAN FIELD CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE
APRON APRON
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2
- NO CONNECTION TO SEWERS
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET
C B A PLAN
EQ EQ
+
ENGINEERED
9"
B
SOIL ENGINEERED
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE SOIL CONCRETE HEADER
REINFORCED REINFORCED (3) SIDES (TYP.)
8" THICK CAST-IN-PLACE
CONCRETE APRON CONCRETE APRON
REINFORCED UNDISTURBED
12" WIDE GABION FILLED CONCRETE GUTTER 12" WIDE GABION SOIL
WITH CLEAN CLEAN
CLEAN FILLED WITH CLEAN CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE OPEN-GRADED
A
OPEN-GRADED OPEN-GRADED STONE OPEN-GRADED CONCRETE
STONE BASE
WRAP GABION IN STONE BASE (TYP.) STONE BASE ENCASEMENT PLACED
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5'-0" OR AS PER DESIGN GEOTEXTILE
5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
(TOP AND SIDES ONLY)
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]
15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"
EXISTING TO REMAIN
PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT CONCRETE GUTTER LIMIT OF NEW CURB TO EXTEND
PAVEMENT D ROADWAY D BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
PROPERTY LINE 5'-0"
OR AS PER DESIGN
CONCRETE STRIP TAPER 1% - 2% CONTINUOUS EROSION CONTROL
A TO FOLLOW CURB TAPER CROSS SLOPE TOWARDS MATTING
LOCATION OF BIOSWALE 15'-0" SEE DRAWING GI-501A, B, C & D FOR TYPICAL TOP OF CURB PLANTED AREA EXPANSION JOINT AND
EXISTING
VARIES OR AS PER DESIGN PLANTING PLANS L-SHAPED EDGING WITH FILLER (TYP.)
3'-6" 3'-6" SIDEWALK DROP CURB [INLET]
REFER TO DETAILS ON THIS AND NEXT MIN. 9" STAKES, SEE 1" SIDEWALK
PAGE TOP OF GUTTER
(BEYOND) GI-204 6"
CURB LINE
B DESIGN B ROADWAY
5'-0" OR
AS PER
PITCH PLANTED
EXISTING
AREA
CATCH BASIN
1'-3"
BIOSWALE BIOSWALE FLOW
OUTLET INLET 9"
ENGINEERED CONCRETE
A PLAN WWM 6x6 - W8xW8 SOIL HEADER (3) SIDES
8" THICK CAST-IN-PLACE
REINFORCED
℄
3-SIDED STEEL TREE GUARD, SEE GI-601, EROSION CONTROL MATTING
CONCRETE APRON
GI-602, GI-603 & GI-604 GRADE TO ALLOW FOR 3" DEEP
1" UNDISTURBED SOIL STEEL SPIKE IN 4" DIA.
CLEAN OPEN-GRADED STONE DEPRESSION, SEE DRAWING GI-124
12" WIDE GABION FILLED CONCRETE
BASE WRAPPED WITH GEOTEXTILE 6"
WITH CLEAN OPEN-GRADED ENCASEMENT PLACED
(TOP AND SIDES ONLY)
STONE WRAPPED IN IN ENGINEERED SOIL
12"
+ 3" (TYP.)
1'-3"
GEOTEXTILE (TOP AND
SIDES ONLY) TOP OF STONE
COLUMN CAP BELOW
9"
B
INTERFACE OF
ENGINEERED SOIL
EQ EQ
PENETRATION INTO
FABRIC (TYP). GRANULAR FILL TO FILL THE
PERMEABLE SOIL LAYER ANNULAR SPACE BETWEEN THE
PENETRATION INTO
GRANULAR FILL TO FILL THE PERMEABLE SOIL STONE COLUMN AND THE HOLE
ANNULAR SPACE BETWEEN LAYER
CLEAN OPEN-GRADED
THE STONE COLUMN PIPE
TEMPORARY, 18" MAXIMUM STONE
AND THE HOLE
DIAMETER CASING AUGERED
BOTTOM OF COLUMN TO BE
STONE FILLED PERFORATED 12" INTO PERMEABLE LAYER OPEN
DIAMETER PVC PIPE WRAPPED OPEN BOTTOM
ALL AROUND WITH GEOTEXTILE (TYP.)
FABRIC (TYP.)
SECTION B-B
℄
SECTION A-A
NOTES: AT BIOSWALE STONE COLUMN
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES
IMPERMEABLE LINER UNDERNEATH. DEPTH SCHEDULE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING ROWB A B
TAPERS TO BE CAST-IN-PLACE. WITH TREE 2'-6" 2'-0" P.E. 05-13-2022
NO TREE 3'-0" 1'-6" MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
DEPTH SCHEDULE
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2A - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
PLACE EXPANSION
SEE GI-122 FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DIMENSIONS SCHEDULE
EQ
SIDEWALK CONCRETE HEADER
LOW POINT STEEL TREE GUARDS
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 +
SET 3" BELOW
(3-SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
CONCRETE TAPER TO OUTLET INVERT FOR SEDIMENT L-SHAPED EDGING
EQ
FOLLOW CURB LINE (TYP.) WITH MINIMUM 9" STAKES
CONTROL DEVICE AT
OUTLET SEE DRAWING GI-204
NEW CURB TYPE TO MATCH INLET, REFER TO GI-501D
CONTRACT PLANS INVERT
EXISTING CURB
1'-0"
1'-6"
TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]
15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"
EXISTING TO REMAIN
PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT
PAVEMENT
D ROADWAY CONCRETE GUTTER D LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
PROPERTY
LINE
LOCATION OF BIOSWALE 15'-0" SEE DRAWING GI-501A, B, C & D FOR TYPICAL EXISTING
VARIES, SEE PLAN OR AS PER DESIGN PLANTING PLANS SIDEWALK
C B REFER TO DETAILS ON THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
FLOW
C B
PLAN
5'-0" 5'-0"
CONCRETE STRIP TO OR AS PER DESIGN PLANTED AREA, SEE PLANTING OR AS PER DESIGN
FOLLOW CURB TAPER PLANS (NO TREE PERMITTED) 1% - 2% CONTINUOUS
1% - 2% CONTINUOUS
TOP OF CURB CROSS SLOPE 3-SIDED STEEL TREE CURB TO MATCH CROSS SLOPE TOWARDS PLANTED AREA, SEE
TOWARDS PLANTED GUARD, SEE GI-601, GI-602, CONTRACT PLANS PLANTED AREA PLANTING PLANS (NO
DROP CURB [INLET]
TOP OF GUTTER AREA GI-603 & GI-604 DROP CURB TREE PERMITTED)
(BEYOND) EROSION CONTROL [OUTLET] EROSION CONTROL
CLEANOUT, 6" MATTING WWM 6x6-W8xW8 MATTING
SEE ROADWAY CLEANOUT,
ROADWAY GI-204
PITCH SEE GI-204
1'-3"
HT. VARIES
WWM 6x6-W8xW8
9"
CONCRETE HEADER 8" THICK CAST-IN-PLACE
CONCRETE HEADER
(3 SIDES) REINFORCED
(3) SIDES
CONCRETE APRON
ENGINEERED SOIL 12"x5" CONCRETE STRIP
WRAP STONE IN L-SHAPED EDGING WITH
8" THICK CAST-IN-PLACE CLEAN UNDISTURBED SOIL
GEOTEXTILE (TOP MIN. 9" STAKES (TYP.)
REINFORCED CONCRETE CLEAN AND SIDES ONLY) 2'-6" OPEN-GRADED ENGINEERED SOIL
APRON OPEN-GRADED 12" WIDE GABION FILLED
STONE BASE 8" SOLID HDPE PIPE
12" WIDE GABION FILLED STONE BASE 22 12 ° INJECTION WITH CLEAN
MOLDED ELBOW OPEN-GRADED STONE 8" PERFORATED HDPE
WITH CLEAN PIPE RISER WRAPED
OPEN-GRADED STONE WRAP GABION IN WRAP GABION IN WITH GEOTEXTILE
8" SOLID DUAL WALL HDPE GEOTEXTILE (TOP AND GEOTEXTILE (TOP AND
PIPE SEE DETAIL ON SIDES ONLY) SIDES ONLY)
DRAWING GI-204
SECTION B-B SECTION C-C
AT BIOSWALE INLET AT BIOSWALE OUTLET
NOTES:
1. NO STAKE SHALL BE DRIVEN INTO HDPE DUAL WALL PIPE.
2. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
3. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2B - WITH STORMWATER INLET
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
PLACE EXPANSION
SEE GI-122 FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DIMENSIONS SCHEDULE
EQ
HDPE PIPE WRAPPED
EQ
FOLLOW CURB LINE (TYP.) OUTLET INVERT WITH MINIMUM 9" STAKES
CONTROL DEVICE AT
SEE DRAWING GI-204
NEW CURB TYPE TO MATCH INLET, REFER TO GI-501D
CONTRACT PLANS
EXISTING CURB
1'-0"
1'-6"
TO REMAIN 5"-THICK CONCRETE STRIP EXPANSION JOINT
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]
15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"
EXISTING TO REMAIN
PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT CONCRETE GUTTER LIMIT OF NEW CURB TO EXTEND
PAVEMENT D ROADWAY D BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET INLET
C B A PLAN
1'-3"
+
1'-6"
ENGINEERED ENGINEERED ENGINEERED
SOIL SOIL SOIL 9"
6"
6"
6"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE CONCRETE
REINFORCED 8" THICK CAST-IN-PLACE REINFORCED HEADER (3) SIDES (TYP.)
CONCRETE APRON REINFORCED CONCRETE APRON UNDISTURBED
12" WIDE GABION FILLED 4" MINIMUM CONCRETE GUTTER
3'-0"
12" WIDE GABION SOIL
WITH CLEAN STONE FILLED WITH CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE COVER OPEN-GRADED STONE CONCRETE
HDPE STORMWATER
WRAP GABION IN CHAMBER CAPPED AT (TYP.) ENCASEMENT PLACED
GEOTEXTILE (TOP AND BOTH ENDS, SEE L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) GI-204 WITH MIN. 9" STAKES (TYP.)
(TYP.), SEE GI-204 WRAP STONE IN
5" MINIMUM
GEOTEXTILE
BEDDING
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE. 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
PLACE EXPANSION
SEE GI-122 FOR EXPANSION JOINT (TYP.)
JOINT AT MID-SPAN
DIMENSIONS SCHEDULE
STORMWATER CHAMBER CAPPED AT
SEE GI-501A, B, C & D FOR BOTH ENDS; SEE SCHEDULE ON GI-204
TYPICAL PLANTING PLANS
SURFACE GRADING AS
PER DRAWING GI-124
FLOW +
[OUTLET] NEW CURB TYPE TO [INLET]
15% - 20%
PITCH MATCH CONTRACT PLANS FLOW EXISTING CURB
1'-6"
EXISTING TO REMAIN
PITCH
TO MATCH EXISTING 8"-THICK REINFORCED
ASPHALT
PAVEMENT
D ROADWAY CONCRETE GUTTER D LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED
4'-4" 5'-4" BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
REINFORCED
REINFORCED CONCRETE
CONCRETE APRON
APRON
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3
- NO CONNECTION TO SEWERS
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
BIOSWALE BIOSWALE
OUTLET B INLET
C A
EQ EQ
+
ENGINEERED
9"
B
SOIL ENGINEERED
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 SOIL
8" THICK CAST-IN-PLACE CONCRETE HEADER
REINFORCED 8" THICK CAST-IN-PLACE REINFORCED (3) SIDES (TYP.)
CONCRETE APRON REINFORCED CONCRETE APRON UNDISTURBED
12" WIDE GABION FILLED CONCRETE APRON
12" WIDE GABION SOIL
WITH CLEAN L-SHAPED EDGING WITH
CLEAN FILLED WITH CLEAN CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE MINIMUM 9" STAKES, CLEAN
A
OPEN-GRADED OPEN-GRADED STONE OPEN-GRADED CONCRETE
SEE DRAWING GI-204 OPEN-GRADED
WRAP GABION IN STONE BASE (TYP.) STONE BASE ENCASEMENT PLACED
WRAP GABION IN STONE BASE
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) GEOTEXTILE (TOP AND
WITH MIN. 9" STAKES (TYP.)
SIDES ONLY)
(TYP.), SEE GI-204 WRAP STONE IN
12" WIDE GABION
5'-0" OR AS PER DESIGN GEOTEXTILE
FILLED WITH CLEAN 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
(TOP AND SIDES ONLY)
OPEN-GRADED STONE
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER
UNDERNEATH.
DEPTH SCHEDULE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE ROWB A B
CAST-IN-PLACE. WITH TREE 2'-6" 2'-0"
NO TREE 3'-0" 1'-6" P.E. 05-13-2022
MANAGING DIRECTOR, DATE
DEPTH SCHEDULE GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3
- NO CONNECTION TO SEWERS
10'-0" OR AS PER DESIGN
SEE GI-122 FOR
DIMENSIONS SCHEDULE EXPANSION JOINT
(TYP.)
SEE GI-501A, B, C & D FOR
SURFACE GRADING AS PER
TYPICAL PLANTING PLANS
DRAWING GI-124
CONCRETE HEADER
SIDEWALK STEEL TREE GUARDS
(3-SIDES TYP.) SEE DRAWING
1'-0"
TO REMAIN EXPANSION JOINT
FLOW +
[OUTLET]
[INLET] FLOW
EXISTING CURB
15% - 20%
1'-6"
PITCH
TO REMAIN
EXISTING
PITCH
TO MATCH EXISTING
ASPHALT
PAVEMENT
D ROADWAY D LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED
8"-THICK CONCRETE BY FIELD CONDITIONS AND SITE
5'-4" ENGINEER
APRON
PLAN
8"
5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE INLET APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMN
PROPERTY LINE - NO CONNECTION TO SEWERS
5'-0"
CONCRETE STRIP TO OR AS PER DESIGN
SEE DRAWING GI-501A, B, C & D FOR TYPICAL EXISTING
FOLLOW CURB TAPER ℄ 1'-6"
LOCATION OF BIOSWALE A 10'-0" OR PLANTING PLANS SIDEWALK
TOP OF CURB
1% - 2% CONTINUOUS
DROP CURB [INLET] 1/2" EXPANSION JOINT AND
VARIES AS PER DESIGN REFER TO DETAILS ON THIS AND NEXT PAGE CROSS SLOPE FILLER PER NYC DOT HIGHWAY
1'-6"
TOP OF GUTTER TOWARDS PLANTED
1'-6" SPEC. SECTION 2.15 (TYP.)
(BEYOND) AREA 1"
SIDEWALK
B DESIGN B ROADWAY
5'-0" OR
AS PER
PITCH
SEE TABLE PLANTED
AREA
BIOSWALE FLOW
CURB LINE OUTLET BIOSWALE
EXISTING INLET
CATCH BASIN A ENGINEERED
PLAN SOIL CONCRETE
HEADER (3) SIDES
WWM 6x6 - W8xW8
1'-6"
℄ 8" THICK CAST-IN-PLACE
EROSION CONTROL REINFORCED
3-SIDED STEEL TREE GUARD,
MATTING CONCRETE APRON
SEE GI-601, GI-602, GI-603 & STEEL SPIKE IN 4" DIA.
GRADE TO ALLOW FOR 3" 1" UNDISTURBED SOIL
GI-604 CONCRETE
DEEP DEPRESSION, SEE 12"
6" L-SHAPED EDGING WITH ENCASEMENT PLACED
DRAWING GI-124
1'-3"
WITH CLEAN OPEN-GRADED
TOP OF STONE COLUMN
STONE WRAPPED IN
CAP BELOW INTERFACE
9" GEOTEXTILE (TOP AND
B
OF ENGINEERED SOIL
SIDES ONLY)
AND STONE BASE. CAP
TO BE PERFORATED
CLEAN OPEN-GRADED STONE FILLED PERFORATED
UNDISTURBED SOIL
STONE BASE WRAPPED IN 12" DIAMETER PVC PIPE
CLEAN OPEN-GRADED GEOTEXTILE, TOP AND WRAPPED ALL AROUND
A
STONE COLUMN CAP SHALL BE STONE SIDES ONLY WITH GEOTEXTILE FABRIC
PERFORATED AND PLACED BASE WRAPPED WITH
UNDER THE GEOTEXTILE GEOTEXTILE (TOP AND PERMEABLE SOIL
FABRIC (TYP). SIDES ONLY)
TEMPORARY, 18" MAXIMUM
PERMEABLE SOIL DIAMETER CASING AUGERED
PENETRATION INTO
GRANULAR FILL TO FILL THE
PERMEABLE SOIL LAYER
DEPTH SCHEDULE
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3A - WITH STONE COLUMN
- NO CONNECTION TO SEWERS
10'-0" OR AS PER DESIGN
SEE GI-122 FOR
DIMENSIONS SCHEDULE EXPANSION JOINT
(TYP.)
SEE GI-501A, B, C & D FOR
SURFACE GRADING AS PER
TYPICAL PLANTING PLANS
DRAWING GI-124
STONE COLUMN
CONCRETE HEADER
1'-6"
SIDEWALK STEEL TREE GUARDS
(3-SIDES TYP.) SEE DRAWING
1'-0"
TO REMAIN EXPANSION JOINT
FLOW +
[OUTLET]
[INLET] FLOW
15% - 20%
EXISTING CURB
1'-6"
PITCH
TO REMAIN
EXISTING
PITCH
ASPHALT D TO MATCH EXISTING
ROADWAY
D LIMIT OF NEW CURB TO EXTEND
PAVEMENT BEYOND THE ROWB AS DETERMINED
8"-THICK CONCRETE BY FIELD CONDITIONS AND SITE
5'-4" ENGINEER
APRON
PLAN
EXTENT OF NEW EXTENT OF NEW CURB
CURB VARIES PER TOP OF CURB, BEYOND VARIES PER FIELD
FIELD CONDITIONS JOINT (TYP.) CONDITION
HEADER (BEYOND) 2'-0" 10" 18" 2'-2" HEADER (BEYOND)
TO HEADER TO HEADER
HEIGHT OF ADJACENT HEIGHT OF ADJACENT
ASPHALT PAVEMENT FLUSH ASPHALT PAVEMENT
WITH CONCRETE APRON 1 PITCH 1 PITCH FLUSH WITH CONCRETE
1.75 2 APRON
8"
8"
5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE INLET APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. RAIN GARDEN TYPE1, TYPE 2, AND TYPE 3
- NO CONNECTION TO SEWERS
W
EXISTING
CATCH BASIN
R.O.W. R.O.W. FLOW
OUTLET INLET
C B A
PLAN
3-SIDED STEEL TREE PLANTED AREA, CONCRETE STRIP TO 12"x5" CONCRETE STRIP
12"x5" CONCRETE STRIP GUARD, SEE GI-601, SEE PLANTING FOLLOW CURB TAPER WITH 1% - 2% CONTINUOUS
WITH 1% - 2% GI-602, GI-603 & GI-604 PLANS (NO TREE TOP OF CURB CROSS SLOPE TOWARDS EXPANSION JOINT AND
CONTINUOUS CROSS 1'-6" 12"x5" CONCRETE FILLER (TYP.)
PERMITTED) PLANTED AREA
SLOPE TOWARDS TO CURB STRIP DROP CURB [INLET]
SIDEWALK SIDEWALK
PLANTED AREA 3"-THICK LEVELING TOP OF GUTTER
DROP CURB COURSE (TYP.) LOW POINT (BEYOND)
[OUTLET] ROADWAY 6"
ROADWAY PLANTED AREA ROADWAY PITCH PLANTED AREA
1'-3"
+
18"
ENGINEERED ENGINEERED ENGINEERED
SOIL SOIL SOIL 9"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 (TYP.) 8" THICK CAST-IN-PLACE CONCRETE
REINFORCED 8" THICK CAST-IN-PLACE CLEAN REINFORCED HEADER (3) SIDES (TYP.)
CONCRETE APRON CLEAN CLEAN
OPEN-GRADED REINFORCED OPEN-GRADED CONCRETE APRON OPEN-GRADED
18"
UNDISTURBED
12" WIDE GABION FILLED STONE BASE CONCRETE GUTTER STONE BASE 12" WIDE GABION STONE BASE SOIL
WITH CLEAN WRAP STONE IN FILLED WITH CLEAN STEEL SPIKE IN 4" DIA.
OPEN-GRADED STONE GEOTEXTILE OPEN-GRADED STONE CONCRETE
WRAP GABION IN (TOP AND SIDES ONLY) (TYP.) ENCASEMENT PLACED
W W W
GEOTEXTILE (TOP AND L-SHAPED EDGING IN ENGINEERED SOIL
SIDES ONLY) SECTION C-C SECTION B-B WITH MIN. 9" STAKES SECTION A-A (TYP.)
AT R.O.W. OUTLET AT MIDSECTION [LOWEST POINT] (TYP.), SEE GI-204 AT R.O.W. INLET
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE. 05-13-2022
P.E.
3. PLAN LAYOUT DIMENSIONS AND PLANTING PLAN AS PER GI-122 FOR THE R.O.W.
RAIN GARDEN TYPE SPECIFIED. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
DIMENSION SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
- NO CONNECTION TO SEWERS
L
SIDEWALK
W
OUTLET INVERT
EXISTING CURB
TO REMAIN
FLOW
+
[OUTLET] [INLET]
15% - 20%
PITCH FLOW
1'-6"
EXISTING
PITCH
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY
R.O.W. BIOSWALE OR RAIN GARDEN DETAILS PLANTING PLAN SEE GI-124 FOR
GRADING
LENGTH (L), WIDTH (W),
TYPE PAGE NUMBER
1FT. INCREMENT 6 IN. INCREMENT SIDEWALK
W
13' ≤ L ≤ 16' 4'-0" TO 6'-0" TYPE 2 GI-501A-C
OUTLET
INVERT
10' ≤ L ≤ 12' 4'-0" TO 6'-0" TYPE 3
EXISTING CURB
DIMENSION AND PLANTING PLAN SCHEDULE
1'-6"
TO REMAIN
NOTES:
2'-0" 10" 18" 2'-2"
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. BIOSWALE OR R.O.W. RAIN GARDEN TYPE SPECIFIED.
FLOW +
[OUTLET] [INLET] FLOW
10% - 20%
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR WILL CONFIRM THE LEVELS OF THE R.O.W. BIOSWALE OR R.O.W. RAIN GARDEN TO PITCH
1'-6"
PREVENT FLOODING.
PITCH
EXISTING TO MATCH EXISTING
3. DOT APPROVAL REQUIRED FOR ALL WIDTHS GREATER THAN 5'. ASPHALT ROADWAY
PAVEMENT
4. PLANTING QUANTITIES AND PLANS FOR VARIABLE WIDTH R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS AS PER THE PAGE NUMBERS 5'-4"
SPECIFIED, DISTRIBUTED EVENLY.
5. TREES SPECIES AS DIRECTED BY DPR. TREES ARE ONLY PERMITTED IN R.O.W. BIOSWALES WITH AN ENGINEERED SOIL LAYER 24"
TYPE 3
DEEP. P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STONE COLUMN SCHEDULE FOR VARIABLE SIZE R.O.W. BIOSWALE
- NO CONNECTION TO SEWERS
L
STONE COLUMNS
A EQ EQ A
EQ
SIDEWALK
W
THIRD COLUMN (IF
EQ
SPECIFIED)
OUTLET INVERT
FLOW
+
[OUTLET] [INLET]
15% - 20%
PITCH FLOW
8"-THICK REINFORCED
EXISTING
PITCH
CONCRETE GUTTER
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY
TYPE 1/ TYPE 2
L
STONE COLUMN
R.O.W. BIOSWALE DETAILS
DETAILS
A
LENGTH (L), WIDTH (W), NUMBER OF
TYPE A
1FT. INCREMENT 6 IN. INCREMENT COLUMNS
SIDEWALK
17' ≤ L ≤ 20' 4'-0" TO 6'-0" TYPE 1 3 4'-6"
A
W
13' ≤ L ≤ 16' 4'-0" TO 6'-0" TYPE 2 2 3'-6"
STONE
10' ≤ L ≤ 12' 4'-0" TO 6'-0" TYPE 3 1 1'-6" COLUMN OUTLET
INVERT
DIMENSION SCHEDULE
NOTES:
1. STANDARD STONE COLUMN CROSS SECTIONAL DETAILS AS SPECIFIED.
FLOW +
[OUTLET] [INLET] FLOW
15% - 20%
2. THIRD STONE COLUMN LOCATED IN CENTER OF ROWB. PITCH
EXISTING
PITCH
3. ROWB WITH THREE STONE COLUMNS WILL NOT CONTAIN A TREE. TO MATCH EXISTING
ASPHALT ROADWAY
4. TOP OF STONE COLUMN COVER BELOW INTERFACE OF ENGINEERED SOIL AND STONE BASE. PAVEMENT
5. DEPTH OF BOTTOM OF STONE COLUMNS SHALL BE MEASURED FROM SURFACE GRADE.
TYPE 3
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
SURFACE GRADING PLANS FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
- NO CONNECTION TO SEWERS
CONTOU R (TYP.)
SIDEWALK R (TYP.) CONTOU
RETENTION AREA
+
LOW POINT
W
SET 3" BELOW
OUTLET INVERT FOR SEDIMENT CONTROL
DEVICE AT INLET, REFER
TO GI-501D
EXISTING CURB
TO REMAIN
[OUTLET] [INLET]
+
15% - 20%
FLOW FLOW
PITCH
PITCH
TO MATCH EXISTING
ROADWAY
CO R
N
(T TO T OU )
SIDEWALK YP UR N P .
.) CO (TY
RETENTION AREA
+
LOW POINT
W
[OUTLET] [INLET]
+
15% - 20%
FLOW FLOW
NOTES: PITCH
PITCH
1. ALL SURFACE GRADING TO TAPER TO MATCH EXISTING
TOWARDS THE LOW POINT. ROADWAY
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. BIOSWALE
- NO CONNECTION TO SEWERS
ROWB ROWB
A A
EXISTING
CATCH BASIN FLOW
OUTLET INLET OUTLET INLET
DETAIL E
PLAN
5'-0"
21"
CONCRETE WALKWAY
6"
5'-0"
CONCRETE HEADER
LINER
(3) SIDES NEW CURB
1"
CLEAN OPEN-GRADED STONE
+
2'-6"
WRAP STONE IN WRAPPED IN GEOTEXTILE (TOP [INLET] [OUTLET]
PITCH
GEOTEXTILE (TOP AND SIDES ONLY) PITCH
AND SIDES ONLY)
FLOW
CONCRETE
GUTTER
DETAIL E
LENGTH AS PER DESIGN
CONCRETE WALKWAY
SECTION A-A
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. BIOSWALE
- NO CONNECTION TO SEWERS
5"-THICK CAST-IN-PLACE
PROPERTY LINE
C B A CONCRETE WALKWAY EXISTING
CONCRETE 5'-0" STEEL TREE GUARD (3 SIDES TYP.) SIDEWALK
LOCATION OF BIOSWALE
WALKWAY CLEAR
VARIES
CURB LINE FOOTER SPACE
ROWB ROWB
EXISTING
CATCH BASIN FLOW
OUTLET INLET OUTLET INLET
C B A
PLAN
1% - 2% CONTINUOUS
5'-0" OR AS PER DESIGN
CROSS SLOPE
5"-THICK CONCRETE STRIP 5'-0" OR PER DESIGN
TOWARDS PLANTED
CAST-IN-PLACE TO FOLLOW CURB
AREA 3-SIDED STEEL TREE IMPERMEABLE CONCRETE WALKWAY TAPER 1% - 2% CONTINUOUS EROSION CONTROL
CURB TO MATCH GUARD, SEE GI-601, LINER
1'-6" 1" EXPANSION JOINT TOP OF CURB CROSS SLOPE MATTING
CONTRACT PLANS GI-602, GI-603 & GI-604 3"-THICK
TO CURB AND FILLER (TYP.) DROP CURB [INLET] TOWARDS PLANTED EXPANSION JOINT
DROP CURB SIDEWALK LEVELING AREA
1"
1" SIDEWALK TOP OF GUTTER
[OUTLET] COURSE 6"
(BEYOND)
ROADWAY PLANTED ROADWAY ROADWAY PLANTED
AREA PITCH AREA
1'-3"
ENTIRE BIOSWALE
9"
ENGINEERED
5'-0" DEPTH
ENGINEERED
SOIL SOIL
8" REINFORCED UNDISTURBED 8" REINFORCED
CONCRETE APRON 8" REINFORCED CONCRETE APRON CONCRETE
SOIL
CONCRETE HEADER (3) SIDES
L-SHAPED EDGING WITH STEEL SPIKE IN 4" DIA. CLEAN OPEN-GRADED 12" GABION
MIN. 9" STAKES (TYP.), CLEAN CONCRETE GUTTER STONE BASE WRAPPED CLEAN
SEE GI-204 OPEN-GRADED ENCASEMENT CONCRETE IN GEOTEXTILE (TOP OPEN-GRADED
STONE BASE PLACED IN WALKWAY FOOTER AND SIDES ONLY) STONE BASE WRAP STONE IN
ENGINEERED SOIL (BEYOND) GEOTEXTILE
(TYP.) (TOP AND SIDES ONLY)
HDPE BARRIER TO
5'-0" OR AS PER DESIGN BE INSTALLED
ONLY WHEN
REQUIRED, SEE
SECTION C-C SECTION B-B GI-204 SECTION A-A
AT OUTLET AT WALKWAY AT INLET
NOTE:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE CAST-IN-PLACE.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
- NO CONNECTION TO SEWERS
3'-6"
EXISTING
CATCH BASIN FLOW
OUTLET INLET
(TYP.) (TYP.)
C B A
PLAN
3 1/2"
SIDEWALK MATTING 1"
DROP CURB 1" TOP OF GUTTER 6" SIDEWALK
1" (BEYOND)
[OUTLET]
4 1/2"
ROADWAY PLANTED ROADWAY PLANTED
5"
PITCH
AREA
6"
AREA
1'-3"
ENGINEERED
ENGINEERED ENGINEERED
SOIL
SOIL SOIL 9"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 WWM 6x6-W8xW8
CONCRETE
5'-0"
REINFORCED CONCRETE 8" THICK CAST-IN-PLACE 8" THICK CAST-IN-PLACE HEADER (3) SIDES
CONCRETE APRON HEADER (3) SIDES REINFORCED REINFORCED
12"x5" CONCRETE UNDISTURBED CONCRETE GUTTER CLEAN CONCRETE APRON CLEAN
CLEAN STEEL SPIKE IN 4"
3'-0"
STRIP SOIL L-SHAPED EDGING WITH OPEN-GRADED UNDISTURBED SOIL OPEN-GRADED
OPEN-GRADED DIA. CONCRETE
12" WIDE GABION FILLED STEEL SPIKE IN 4" DIA. MINIMUM 9" STAKES, STONE BASE 3"-THICK LEVELING STONE BASE
STONE BASE ENCASEMENT
WITH CLEAN CONCRETE ENCASEMENT SEE DRAWING GI-204 COURSE PLACED IN
OPEN-GRADED STONE PLACED IN ENGINEERED WRAP GABION IN 12" WIDE GABION FILLED ENGINEERED SOIL
WRAP GABION IN SOIL (TYP.) GEOTEXTILE (TOP AND (TYP.)
WITH CLEAN
GEOTEXTILE (TOP AND SIDES ONLY) OPEN-GRADED STONE
SIDES ONLY) WRAP STONE IN
12" WIDE GABION 3'-6" 3'-6"
L-SHAPED EDGING GEOTEXTILE
3'-6" FILLED WITH CLEAN WITH MIN. 9" STAKES, (TOP AND SIDES
OPEN-GRADED STONE SEE GI-204 ONLY)
SECTION C-C SECTION B-B SECTION A-A
AT MIDSECTION [LOWEST POINT] AT GREENSTRIP INLET
AT GREENSTRIP OUTLET
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER
UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE 05-13-2022
P.E.
CAST-IN-PLACE.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x3'-6" R.O.W. GREENSTRIP TYPE 1
- NO CONNECTION TO SEWERS
FLOW
+
[OUTLET] [INLET]
FLOW
15% - 20%
PITCH EXISTING CURB
8"-THICK REINFORCED
1'-6"
EXISTING TO REMAIN
PITCH
ASPHALT TO MATCH EXISTING
CONCRETE GUTTER D EXPANSION JOINT - LIMIT OF NEW
PAVEMENT D ROADWAY CURB TO EXTEND BEYOND THE
ROWGS AS DETERMINED BY FIELD
4'-4" 5'-4" CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE INLET
APRON APRON
PLAN
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
- NO CONNECTION TO SEWERS
3'-6"
EXISTING
CATCH BASIN FLOW
OUTLET INLET
(TYP.) (TYP.)
C B A
PLAN
3 1/2"
SIDEWALK MATTING 1"
DROP CURB 1" TOP OF GUTTER 6" SIDEWALK
1" (BEYOND)
[OUTLET]
4 1/2"
ROADWAY PLANTED ROADWAY PLANTED
5"
PITCH
AREA AREA
6"
1'-3"
ENGINEERED
ENGINEERED ENGINEERED
SOIL
SOIL SOIL 9"
8" THICK CAST-IN-PLACE WWM 6x6-W8xW8 WWM 6x6-W8xW8
CONCRETE
5'-0"
REINFORCED CONCRETE 8" THICK CAST-IN-PLACE 8" THICK CAST-IN-PLACE HEADER (3) SIDES
CONCRETE APRON HEADER (3) SIDES REINFORCED REINFORCED
12"x5" CONCRETE UNDISTURBED CONCRETE GUTTER CLEAN CONCRETE APRON CLEAN
CLEAN STEEL SPIKE IN 4"
3'-0"
STRIP SOIL L-SHAPED EDGING WITH OPEN-GRADED UNDISTURBED SOIL OPEN-GRADED
OPEN-GRADED DIA. CONCRETE
12" WIDE GABION FILLED STEEL SPIKE IN 4" DIA. MINIMUM 9" STAKES, STONE BASE 3"-THICK LEVELING STONE BASE
STONE BASE ENCASEMENT
WITH CLEAN CONCRETE ENCASEMENT SEE DRAWING GI-204 COURSE PLACED IN
OPEN-GRADED STONE PLACED IN ENGINEERED WRAP GABION IN 12" WIDE GABION FILLED ENGINEERED SOIL
WRAP GABION IN SOIL (TYP.) GEOTEXTILE (TOP AND (TYP.)
WITH CLEAN
GEOTEXTILE (TOP AND SIDES ONLY) OPEN-GRADED STONE
SIDES ONLY) WRAP STONE IN
12" WIDE GABION 3'-6" 3'-6"
L-SHAPED EDGING GEOTEXTILE
3'-6" FILLED WITH CLEAN WITH MIN. 9" STAKES, (TOP AND SIDES
OPEN-GRADED STONE SEE GI-204 ONLY)
SECTION C-C SECTION B-B SECTION A-A
AT MIDSECTION [LOWEST POINT] AT GREENSTRIP INLET
AT GREENSTRIP OUTLET
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER
UNDERNEATH. 05-13-2022
P.E.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE
CAST-IN-PLACE. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x3'-6" R.O.W. GREENSTRIP TYPE 2
- NO CONNECTION TO SEWERS
15'-0" OR AS PER DESIGN
SEE GI-132 FOR PLACE EXPANSION
DIMENSIONS SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
SEE GI-502 FOR TYPICAL SURFACE GRADING AS PER
PLANTING PLANS DRAWING GI-132
CONCRETE HEADER
SIDEWALK STEEL TREE GUARD
(3 SIDES TYP.) SEE GI-601,
GI-602, GI-603 & GI-604
CONCRETE TAPER TO
FOR SEDIMENT L-SHAPED EDGING WITH MINIMUM
3'-6"
FOLLOW CURB LINE (TYP.)
CONTROL DEVICE AT 9" STAKES SEE DRAWING GI-204;
GABION WALL BELOW OUTLET
INVERT INLET, REFER TO GI-502
CONCRETE STRIP, SEE GI-207
EXISTING CURB TO NEW CURB TYPE TO
REMAIN 5"-THICK CONCRETE STRIP
1'-6"
MATCH CONTRACT PLANS
FLOW +
[OUTLET] [INLET] FLOW
EXISTING CURB
15% - 20%
PITCH
1'-6"
EXISTING 8"-THICK REINFORCED TO REMAIN
PITCH
ASPHALT TO MATCH EXISTING CONCRETE GUTTER EXPANSION JOINT - LIMIT OF NEW
PAVEMENT
D ROADWAY D CURB TO EXTEND BEYOND THE
ROWGS AS DETERMINED BY FIELD
4'-4" 5'-4" CONDITIONS AND SITE ENGINEER
REINFORCED CONCRETE REINFORCED CONCRETE INLET
APRON APRON
PLAN
8"
WITH APRONS
4'-4" 5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 11' x 3'-6" R.O.W. GREENSTRIP TYPE 3
- NO CONNECTION TO SEWERS
3'-6"
EXISTING
CATCH BASIN FLOW
OUTLET
B INLET
(TYP.) (TYP.)
C A
PLAN
3 1/2"
MATTING 1"
DROP CURB TOP OF GUTTER
1" 1" 6" SIDEWALK
[OUTLET] (BEYOND)
4 1/2"
ROADWAY PLANTED ROADWAY PLANTED
5"
PITCH
6"
AREA AREA
1'-3"
ENGINEERED
ENGINEERED ENGINEERED
SOIL
SOIL SOIL 9"
8" THICK CAST-IN-PLACE
WWM 6x6-W8xW8 WWM 6x6-W8xW8
REINFORCED CONCRETE CONCRETE
5'-0"
CONCRETE APRON HEADER (3) SIDES 8" THICK CAST-IN-PLACE 8" THICK CAST-IN-PLACE HEADER (3) SIDES
REINFORCED REINFORCED
12"x5" CONCRETE UNDISTURBED
CLEAN CONCRETE APRON CLEAN CONCRETE APRON CLEAN
STRIP SOIL STEEL SPIKE IN 4"
3'-0"
OPEN-GRADED L-SHAPED EDGING WITH OPEN-GRADED UNDISTURBED SOIL OPEN-GRADED
12" WIDE GABION FILLED STEEL SPIKE IN 4" DIA. DIA. CONCRETE
STONE BASE MINIMUM 9" STAKES, STONE BASE 3"-THICK LEVELING STONE BASE
WITH CLEAN CONCRETE ENCASEMENT ENCASEMENT
SEE DRAWING GI-204 COURSE PLACED IN
OPEN-GRADED STONE PLACED IN ENGINEERED
SOIL (TYP.) WRAP GABION IN 12" WIDE GABION FILLED ENGINEERED SOIL
WRAP GABION IN
GEOTEXTILE (TOP AND WITH CLEAN (TYP.)
GEOTEXTILE (TOP AND
SIDES ONLY) OPEN-GRADED STONE
SIDES ONLY) WRAP STONE IN
12" WIDE GABION 3'-6" 3'-6"
3'-6" L-SHAPED EDGING GEOTEXTILE
FILLED WITH CLEAN WITH MIN. 9" STAKES, (TOP AND SIDES
OPEN-GRADED STONE SEE GI-204 ONLY)
SECTION C-C SECTION B-B SECTION A-A
AT GREENSTRIP OUTLET AT MIDSECTION [LOWEST POINT] AT GREENSTRIP INLET
NOTES:
1. CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER P.E. 05-13-2022
UNDERNEATH. MANAGING DIRECTOR, DATE
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE.
STANDARD FOR 11' x 3'-6" R.O.W. GREENSTRIP TYPE 3
- NO CONNECTION TO SEWERS
3'-6"
OUTLET 5"x12" CONCRETE STRIP (TYP.)
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 INVERT NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-6"
TO REMAIN
FLOW
+
[OUTLET] [INLET]
FLOW EXISTING CURB TO REMAIN
15% -20%
1'-6"
PITCH
PITCH
EXPANSION JOINT - LIMIT OF NEW
D TO MATCH EXISTING D CURB TO EXTEND BEYOND THE
ROADWAY
ROWGS AS DETERMINED BY FIELD
CONDITIONS AND SITE ENGINEER
5'-4"
REINFORCED CONCRETE REINFORCED CONCRETE INLET
APRON APRON
PLAN
8"
5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
BOTTOM OF CURB CAST-IN-PLACE REINFORCED CAST-IN-PLACE REINFORCED BOTTOM OF CURB
CONCRETE APRON CONCRETE INLET APRON
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
SURFACE GRADING & DIMENSION SCHEDULE PLANS FOR R.O.W. GREENSTRIPS
- NO CONNECTION TO SEWERS
L
SIDEWALK
GRADING
GRADING
3'-6"
OUTLET
INVERT
FLOW
+
[OUTLET] [INLET]
FLOW
15% -20%
PITCH
EXISTING
PITCH
ASPHALT TO MATCH EXISTING
PAVEMENT ROADWAY
GRADING NOTES:
TYPE 1 & TYPE 2 GRADING PLAN
1. ALL SURFACE GRADING TO TAPER TOWARDS THE LOW POINT.
2. CONTOUR LINES SHOWN ON THIS DRAWING ARE SCHEMATIC
ONLY AND DEPEND ON THE STREET GRADE.
L
LENGTH (L),
GRADING
GRADING
WIDTH TYPE PAGE NUMBER
1FT. INCREMENT
3'-6"
17' ≤ L ≤ 20' TYPE 1
15% - 20%
FLOW
DIMENSION AND PLANTING NOTES: PITCH
PITCH
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W. GREENSTRIP TYPE TO MATCH EXISTING
SPECIFIED. ROADWAY
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR HYDRAULICALLY CONNECTED R.O.W. GREENSTRIPS
- NO CONNECTION TO SEWERS
PLAN
3'-6" 3-SIDED STEEL ROWGS - SIZE ROWGS - SIZE 3-SIDED STEEL TREE
5'-0"
5"-THICK PRECAST TREE GUARD, SEE VARIES VARIES GUARD, SEE GI-601,
CONCRETE COVER GI-601, GI-602, GI-602, GI-603 & GI-604
3" GI-603 & GI-604 5"-THICK PRECAST
EXPANSION JOINT
CONCRETE COVER
(TYP.)
SIDEWALK 1" 3"-THICK LEVELING 1" SIDEWALK
DETAIL C SIDEWALK 6"
COURSE
3"
3"
5"
PLANTED AREA PLANTED AREA
5"
1'-3"
6"
PITCH
1'-4"
3'-0"
LEVELING COURSE CONCRETE CULVERT STONE WRAPPED IN
STONE BASE WRAP STONE
IMPERMEABLE LINER GEOTEXTILE (TOP AND
12" GABION FILLED WITH IN GEOTEXTILE
CLEAN OPEN-GRADED SIDES ONLY)
(TOP AND
STONE HDPE BARRIER TO BE
SIDES ONLY)
INSTALLED ONLY WHEN
WRAP STONE IN REQUIRED, SEE GI-204
GEOTEXTILE
(TOP AND SIDES ONLY)
SECTION B-B 2'-6"
SECTION A-A
AT PEDESTRIAN PATHWAY
6" 6"
5"-THICK PRECAST
3" 3"
CONCRETE COVER
NOTES:
1. CAST-IN-PLACE CONCRETE REQUIRES IMPERMEABLE LINER REINFORCED
CONCRETE CULVERT
5"
UNDERNEATH.
2. ALL INLET AND OUTLET COMPONENTS INCLUDING TAPERS TO BE
1'-4"
6"
CAST-IN-PLACE.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
DETAIL C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
INTENTIONALLY LEFT BLANK
STANDARD FOR R.O.W. STORMWATER SEEPAGE BASIN WITH TYPE 2 CATCH BASIN
- NO CONNECTION TO SEWERS
℄
DIST. TO CENTER LINE OF MANHOLE
PROPERTY LINE
2'-0" MIN. SIDEWALK PLACEMENT
OPTION. SEE NOTE 1 EXISTING
R.O.W. STORMWATER
12" Ø DUCTILE IRON CATCH SIDEWALK
SEEPAGE BASIN. SEE BASIN CONNECTION
GI-206 FOR SCHEDULE 2'-0" MIN.
CURB LINE . DIST. TO CENTER LINE OF MANHOLE
℄
ROADWAY PLACEMENT 3'-6"
OPTION. SEE NOTE 1 DEP STANDARD TYPE
2 CATCH BASIN
EXISTING FLOW
CATCH BASIN
A A
DEP STANDARD 36" Ø EXISTING SIDEWALK
MANHOLE CASTING OR ROADWAY
PLAN
6" MIN
5/8" MIN.
TOP OF COVER FLUSHED D
WITH EXISTING SURFACE 10"
6"
LAID RADIALLY CIRCULAR SLAB COVER
SEE DETAIL A DRAWING 1'-0"
GI-206
10"
3'-0"
4"
4"
12" Ø DUCTILE IRON
6"
2'-0"
1'-0"
6" MIN.
CONNECTION
12" MAX.
2'-0"
12"
6" MIN
tw
5/8" x 6"
D WRAP STONE IN
GEOTEXTILE (TOP ELEVATION SECTION ELEVATION SECTION
AND SIDES ONLY)
PRECAST PRECAST SOLID CONCRETE RING PRECAST PERFORATED CONCRETE RING
PERFORATED
VARIES
CONCRETE RING
NOTES:
(TYP.)
1. THE LOCATION OF THE ROW SEEPAGE BASIN SHALL BE SUCH THAT THE OPENING IN THE TOP SLAB TOGETHER WITH FRAME AND COVER SHALL BE
ENTIRELY IN THE ROADWAY AREA OR ENTIRELY IN THE SIDEWALK AREA.
2'-0" MIN. 2'-0" MIN.
2. ALL SLABS AND RINGS SHALL BE PLACED ON A ONE HALF (1/2) INCH THICK FULL BED OF FRESH MORTAR.
3. SEEPAGE BASIN SOLID RING AND SEEPAGE RING REINFORCING COMPLIES WITH AREA REQUIREMENTS OF ASTM C478. EXCEPT THAT ALL WALL SECTIONS
SHALL BE REINFORCED WITH WWM 6x12 W0.8xW0.4 PLACED IN CENTER OF WALL. IN SOLID RING 1-#4 HOOP SHALL BE PLACED AROUND ALL CAST PIPE
PRECAST REINFORCED OPENINGS. (THE 1-#4 HOOP WILL BE REQUIRED AT CORED OPENINGS FOR BASIN CONNECTIONS IN SOLID RINGS.) (ALL VALUES OF AREA OF STEEL (AS)
CONCRETE CIRCULAR ARE IN SQUARE INCHES AND ARE A MINIMUM.)
FOOTING RING SEE 4. PRECAST PIPE OPENINGS AND CORED OPENINGS FOR CATCH BASIN CONNECTION WILL BE PLACED IN SOLID RING ONLY. NO CORED OPENING WILL BE
DETAIL B DRAWING ALLOWED IN SEEPAGE RINGS.
10"
GI-206 5. CORED OPENINGS IN SOLID RING WILL BE PERMITTED FOR UP TO 12" DIA. DUCTILE IRON CATCH BASIN CONNECTION ONLY.
6. PIPE OPENINGS WILL NOT BE PERMITTED THROUGH JOINTS. DISTANCE FROM TOP OR BOTTOM OF ANY SOLID RING SECTION SHALL BE A MINIMUM OF 6"
2'- 0" OPEN GRADED FOR CORED OPENINGS FOR BASIN CONNECTIONS.
1'-0" 1'-0" STONE BELOW 7. CONCRETE DESIGN MIX = 5,000 PSI (MIN. 28 DAY STRENGTH=4,000 PSI; MAX. W/C=0.47). REBARS - FS = 60,000 PSI. WWM - FS=65,000 PSI.
2'-0"
FOOTING 8. OPENINGS FOR SPACING AND HANDLING WILL BE ALLOWED IN UPPER PORTION OF SOLID RING. HOWEVER, THE CONTRACTOR SHALL FILL ALL SUCH
d OPENINGS WITH NON SHRINK GROUT IMMEDIATELY AFTER INSTALLATION.
UNDISTURBED SOIL 9. IN NO CASE SHALL THE AREA OF THE DRAIN OPENING BE LESS THAN 3.0 SQ. IN.
10. THE CONTRACTOR SHALL HAND COMPACT THE OPEN GRADED STONE BENEATH THE CIRCULAR FOOTING PRIOR TO SETTING THE FOOTING IN PLACE.
P.E. 05-13-2022
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
- NO CONNECTION TO SEWERS
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
C B A
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
PLAN
FASTENER, SEE GI-209 & 5"-THICK CONCRETE TOP
GI-209B OR GI-209C & IMPERMEABLE LINER
GI-209D
3"-THICK LEVELING CAST IRON CLEANOUT -
4" CURB PIECE AND IMPERMEABLE TOP OF COVER FLUSH
COURSE
#4 REBAR ACROSS IMPERMEABLE LINER 5"-THICK CONCRETE LINER WITH TOP OF SURFACE
1'-0"
OPENING, SEE CAST IRON EXPANSION JOINT TOP
GI-170 & GI-171 3"-THICK LEVELING VERTICAL 8" INSIDE
CLEANOUT, SEE AND FILLER
COURSE (TYP.) DIAMETER SOLID
GI-204 SIDEWALK
TOP OF ROAD BEYOND SIDEWALK STEEL FACE 6" 1'-0" HDPE PIPE
6"
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY
ROADWAY
1'-3"
6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"
8" REINFORCED
3'-6"
5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"
BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
4" 1'-0" 4" PIPE (TYP.)
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE 5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER MANAGING DIRECTOR, DATE
REQUIREMENTS. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 1
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE 5"-THICK CONCRETE TOP OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN
6"
+
[INLET]
10% -20%
4'-3"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
4 TO 4.5 11% TO ≥ 10% OPENING FOR 8" INSIDE PERFORATED PIPE.
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
> 4.5 10% PIPE (TYP.) CHAMBER
WWM 6x6-W8xW8 CLEAN OPEN-GRADED
LONGITUDINAL STREET SLOPE STONE
4"
TYPICAL PERFORATED LEVELING COURSE
≤ 5% 10% MIN DEBRIS SCREEN FOR 8"
INSIDE DIA PIPE, SEE
≥ 5% 12% MIN GI-211
. VARIES
A
20'-0"
SIDEWALK 10% MIN - 20% MAX PITCH
LOCATION
OR AS PER DESIGN ROADWAY
4'-6" EQ EQ 4'-6" EXISTING
SIDEWALK
DESIGN
5'-0" OR
AS PER
CURB LINE
B B
WWM 6X6-W8XW8
FLOW REINFORCED
CONCRETE
EXISTING CONSTANT SLOPE CONCRETE APRON
INLET HEADER (3) SIDES
3'-6"
CATCH BASIN DROP CURB [INLET],
CLEAN
2'-10"
SLOPE POURED IN PLACE,
A OPEN-GRADED
CURB TO MEET PRECAST
WRAP STONE IN GEOTEXTILE
STONE BASE ℄ CHAMBER
(TOP AND SIDES ONLY) INLET SCREEN BOX
PLAN SUPPORT BRACKET, SEE
8" DIAMETER
1'-6"
GI-212
OPENING FOR 8" INSIDE TOP OF STEEL OR CAST IRON GRATE CAST IRON PERFORATED HDPE
4"
12" PERFORATED DEBRIS
UNDISTURBED 4" 8" INSIDE DIA. PERFORATED HDPE TEMPORARY, 18" MAXIMUM
4"
SOIL PRECAST CONCRETE CHAMBER PIPE. MAINTAIN CONSTANT SLOPE DIAMETER CASING TO
PERFORATED TOWARDS CHAMBER MINIMUM 5'-0" AUGERED
PENETRATION INTO
1'-6"
1'-6"
1'-6"
SEE GI-211
GRANULAR FILL TO FILL THE
ANNULAR SPACE BETWEEN THE
WWM 6x6-W8xW8
STONE COLUMN PIPE AND HOLE
OPEN-GRADED STONE
LEVELING COURSE CLEAN OPEN-GRADED
STONE BASE BOTTOM OF COLUMN
PRECAST CONCRETE
WRAPPED WITH TO BE OPEN
CHAMBER
PERMEABLE SOIL LAYER
PENETRATION INTO GEOTEXTILE (TOP AND
SIDES ONLY)
6"
1'-0"
PRECAST 4'-6" EQ EQ 4'-6"
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN
EQ
CONSTANT SLOPE 6"
STEEL OR
CAST IRON
SIDEWALK GRATE
STEEL FACE 2'-0"
8" DIAMETER DUAL WALL HDPE
OPENING, SEE FABRICATED 90° BEND
GI-170 & GI-171 CLEANOUT
STONE 8" INSIDE DIAMETER
(TYP.) STEEL FACE CURB COVER
PERFORATED HDPE PIPE
EQ
COLUMN (TYP.)
(TYP.)
1'-8"
6"
+
[INLET]
10% -20%
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"
8" REINFORCED
3'-6"
5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"
CONCRETE GUTTER
DROP CURB [INLET], MORTAR WRAP STONE IN
SLOPE POURED IN PLACE, AROUND PIPE GEOTEXTILE UNDISTURBED SOIL CLEAN OPEN-GRADED
CURB TO MEET PRECAST (TOP AND SIDES ONLY) 8" INSIDE DIA. STONE BASE UNDISTURBED SOIL
CLEAN
CHAMBER OPEN-GRADED VERTICAL 8" INSIDE PERFORATED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE DIAMETER SOLID HDPE PIPE GEOTEXTILE (TOP PERFORATED HDPE
4"
BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
1'-0"
5" MINIMUM
4" 4" PIPE (TYP.) CLEAN OPEN-GRADED
BEDDING
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
STONE BASE
LEVELING COURSE 5'-0" OR AS PER DESIGN
HDPE STORMWATER
SECTION C-C CHAMBER, SEE NOTE 4 SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER P.E. 05-13-2022
REQUIREMENTS.
MANAGING DIRECTOR, DATE
4. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
5"-THICK CONCRETE TOP
6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN
6"
+
[INLET]
10% -20%
4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE
4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN FLOW
INLET
C B A
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
5"-THICK CONCRETE TOP
PLAN
FASTENER, SEE GI-209 &
GI-209B OR GI-209C & IMPERMEABLE LINER
GI-209D
3"-THICK LEVELING CAST IRON CLEANOUT -
4" CURB PIECE AND IMPERMEABLE TOP OF COVER FLUSH
COURSE
#4 REBAR ACROSS IMPERMEABLE LINER 5"-THICK CONCRETE LINER WITH TOP OF SURFACE
1'-0"
OPENING, SEE CAST IRON EXPANSION JOINT TOP
GI-170 & GI-171 3"-THICK LEVELING VERTICAL 8" INSIDE
CLEANOUT, SEE AND FILLER
COURSE (TYP.) DIAMETER SOLID
GI-204 SIDEWALK
TOP OF ROAD BEYOND SIDEWALK STEEL FACE 6" 1'-0" HDPE PIPE
6"
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY
ROADWAY
1'-3"
6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"
8" REINFORCED
3'-6"
5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"
BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
4" 1'-0" 4" PIPE (TYP.)
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE 5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171
P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER MANAGING DIRECTOR, DATE
REQUIREMENTS. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 2
- NO CONNECTION TO SEWERS
6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE
EXPANSION JOINT.
EXISTING CURB
D 2'-10" D CONSTANT SLOPE
EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
2'-0"
6"
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
REINFORCED PLAN AS DETERMINED BY FIELD
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE
4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP FOR PRECAST CONCRETE
CURB LINE
B B
WWM 6X6-W8XW8
FLOW
REINFORCED
EXISTING CONCRETE
INLET CONSTANT SLOPE CONCRETE APRON
CATCH BASIN HEADER (3) SIDES
3'-6"
DROP CURB [INLET],
CLEAN
2'-10"
SLOPE POURED IN PLACE,
A OPEN-GRADED
CURB TO MEET PRECAST
WRAP STONE IN GEOTEXTILE
STONE BASE ℄ CHAMBER
PLAN (TOP AND SIDES ONLY) INLET SCREEN BOX
SUPPORT BRACKET, SEE
8" DIAMETER
1'-6"
TOP OF STEEL OR CAST IRON GRATE 8" INSIDE DIA. PERFORATED PIPE. MAINTAIN GI-212
OPENING FOR 8" INSIDE DIAMETER FLUSH WITH TOP OF SURFACE CONSTANT SLOPE TOWARDS CHAMBER PERFORATED HDPE
4"
12" PERFORATED DEBRIS
1'-6"
PENETRATION INTO
GRANULAR FILL TO FILL THE
WWM 6x6-W8xW8 ANNULAR SPACE BETWEEN THE
STONE COLUMN PIPE AND HOLE
4"
6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE
EQ
CHAMBER CONSTANT SLOPE 6"
STEEL OR
EQ
SIDEWALK CAST IRON
GRATE 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
3'-6" 3'-6"
GI-170 & GI-171 PERFORATED HDPE
STONE COLUMN PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
(TYP.) TYP.
1'-8"
EXPANSION JOINT.
C
EQ
C
EQ
2'-10" CONSTANT SLOPE
EXISTING CURB EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
2'-0"
6"
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
REINFORCED
PLAN AS DETERMINED BY FIELD
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
4'-3"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10%
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PROPERTY LINE
C B A EXISTING
REFER TO DETAILS ON
SIDEWALK
LOCATION VARIES 15'-0" THIS AND NEXT PAGE
OR AS PER DESIGN
CURB LINE
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
C B A
FOR PRECAST CONCRETE
CHAMBER, GRATE AND PLAN
FASTENER, SEE GI-209 & 5"-THICK CONCRETE TOP
GI-209B OR GI-209C & IMPERMEABLE LINER
GI-209D
3"-THICK LEVELING CAST IRON CLEANOUT -
4" CURB PIECE AND IMPERMEABLE TOP OF COVER FLUSH
COURSE LINER
#4 REBAR ACROSS IMPERMEABLE LINER 5"-THICK CONCRETE WITH TOP OF SURFACE
1'-0"
OPENING, SEE CAST IRON EXPANSION JOINT TOP
3"-THICK LEVELING VERTICAL 8" INSIDE
GI-170 & GI-171 CLEANOUT, SEE AND FILLER
COURSE (TYP.) DIAMETER SOLID
GI-204 SIDEWALK
TOP OF ROAD BEYOND SIDEWALK STEEL FACE 6" 1'-0" HDPE PIPE
6"
10% MIN - 20% MAX PITCH CURB ROADWAY SIDEWALK
ROADWAY
ROADWAY
1'-3"
6"
1'-0"
9"
WWM 6X6-W8XW8
4'-3"
8" REINFORCED
3'-6"
5'-0"
8" REINFORCED CONCRETE GUTTER
CONCRETE APRON HEADER (3) SIDES COURSE (TYP.)
2'-10"
CONCRETE GUTTER
DROP CURB [INLET], MORTAR WRAP STONE IN
SLOPE POURED IN PLACE, AROUND PIPE GEOTEXTILE UNDISTURBED SOIL CLEAN OPEN-GRADED
CURB TO MEET PRECAST (TOP AND SIDES ONLY) 8" INSIDE DIA. STONE BASE UNDISTURBED SOIL
CLEAN
CHAMBER OPEN-GRADED VERTICAL 8" INSIDE PERFORATED WRAP STONE IN 8" INSIDE DIAMETER
INLET SCREEN BOX SUPPORT STONE BASE DIAMETER SOLID HDPE PIPE GEOTEXTILE (TOP PERFORATED HDPE
4"
BRACKET, SEE GI-212 HDPE PIPE (TYP.) WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 8" INSIDE DIAMETER GEOTEXTILE (TOP
PERFORATED HDPE AND SIDES ONLY)
PERFORATED DEBRIS
1'-0"
5" MINIMUM
4" 4" PIPE (TYP.) CLEAN OPEN-GRADED 5'-0" OR AS PER DESIGN
BEDDING
SCREEN, SEE GI-211 5'-0" OR AS PER DESIGN
STONE BASE
LEVELING COURSE 5'-0" OR AS PER DESIGN HDPE STORMWATER
SECTION C-C CHAMBER, SEE NOTE 4 SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER
REQUIREMENTS.
P.E. 05-13-2022
4. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN 5"-THICK CONCRETE TOP
FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION
DIMENSION SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE
6"
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN
TOP OF STEEL OR CAST
3'-6" FOR PRECAST CONCRETE
IRON GRATE FLUSH WITH
CHAMBER, GRATE &
TOP OF SURFACE 4" 4"
CONCRETE APRON PITCH SCHEDULE FASTENER, SEE GI-209 &
SIDEWALK
GI-209B OR GI-209C & GI-209D
CURB REVEAL (INCHES) APRON PITCH 5"-THICK CONCRETE TOP
3" 3"
2.5 TO < 3 20% TO ≥ 17% 1'-6" IMPERMEABLE LINER
3" THICK LEVELING COURSE
3 TO < 3.5 17% TO ≥ 14% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO
4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE
4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
- NO CONNECTION TO SEWERS
C A EXISTING
PROPERTY LINE B REFER TO DETAILS ON
SIDEWALK
LOCATION VARIES 10'-0" OR THIS AND NEXT PAGE
CURB LINE AS PER DESIGN
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
C B A
1'-0"
6"
9" 1'-0"
WWM 6X6-W8XW8
4'-3"
3'-6"
5'-0"
CONCRETE APRON HEADER (3) SIDES 8" REINFORCED CONCRETE GUTTER
COURSE (TYP.)
2'-10"
PIPE (TYP.)
WRAP STONE IN AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8
GEOTEXTILE (TOP
PERFORATED DEBRIS AND SIDES ONLY)
SCREEN, SEE GI-211 4" 1'-0" 4"
LEVELING COURSE 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET
NOTES: AT MIDSECTION AT UPSTREAM SECTION
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER MANAGING DIRECTOR, DATE
REQUIREMENTS. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP TYPE 3
8" DIAMETER DUAL WALL HDPE
- NO CONNECTION TO SEWERS
FABRICATED 90° TEE
10'-0" OR AS PER DESIGN
5"-THICK CONCRETE TOP
8" DIAMETER DUAL WALL HDPE EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
1'-0"
WITH THE SURFACE, SEE
PRECAST CONCRETE HEADER
GI-210
CONCRETE
EQ
GRATE
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)
EQ
STEEL FACE CURB COVER
1'-8"
C 2'-10"
C CONSTANT SLOPE
EXPANSION JOINT.
EXISTING CURB 2'-0" EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
6"
+
[INLET]
10% -20%
FLOW 1'-6" FLOW EXTEND THE NEW STEEL FACE
EXISTING 8"-THICK REINFORCED
PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN
4'-3"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) CHAMBER
> 4.5 10% CLEAN OPEN-GRADED
WWM 6x6-W8xW8
STONE
4"
LONGITUDINAL STREET SLOPE TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≤ 5% 10% MIN INSIDE DIA PIPE, SEE
GI-211
≥ 5% 12% MIN
SECTION C-C
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH CONCRETE TOP FOR PRECAST CONCRETE
CURB LINE
B B
WWM 6X6-W8XW8
FLOW
EXISTING REINFORCED
CONCRETE CONSTANT SLOPE
CATCH BASIN INLET CONCRETE APRON
HEADER (3) SIDES
3'-6"
CLEAN
A OPEN-GRADED
DROP CURB [INLET],
SLOPE POURED IN PLACE,
STONE BASE CURB TO MEET PRECAST
PLAN WRAP STONE IN GEOTEXTILE ℄ CHAMBER
(TOP AND SIDES ONLY) INLET SCREEN BOX
TOP OF STEEL OR CAST IRON SUPPORT BRACKET, SEE
4"
1'-6"
GRATE FLUSH WITH TOP OF 8" INSIDE DIA. PERFORATED HDPE PIPE. MAINTAIN GI-212
OPENING FOR 8" INSIDE DIAMETER SURFACE CONSTANT SLOPE TOWARDS CHAMBER PERFORATED DEBRIS
PERFORATED PIPE (TYP.) 8" DIAMETER 12" SCREEN, SEE GI-211
DEBRIS SCREEN, ADJUST IMPERMEABLE LINER (TYP.) PERFORATED HDPE
SIDEWALK PIPE TO ALLOW FOR 3"-THICK LEVELING COURSE PIPE (TYP.) OPENING FOR 8" INSIDE
4" SCREEN (TYP.) DIAMETER PIPE
1'-0"
EQ EQ WWM 6X6-W8XW8
PENETRATION INTO
STONE BASE CLEAN OPEN-GRADED STONE ANNULAR SPACE BETWEEN
WWM 6x6-W8xW8 BASE THE STONE COLUMN PIPE
WRAPPED WITH GEOTEXTILE AND THE HOLE
(TOP AND SIDES ONLY)
OPEN-GRADED STONE
BOTTOM OF COLUMN
TO BE OPEN
PERMEABLE SOIL LAYER
PENETRATION INTO
1'-0"
STONE WITH THE SURFACE, SEE
PRECAST COLUMN CONCRETE HEADER
GI-210
CONCRETE
EQ
CAST IRON EQ EQ
GRATE CLEANOUT (TYP.)
EQ
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)
EQ
EQ
3'-0" STEEL FACE CURB COVER
1'-8"
C 2'-10"
C CONSTANT SLOPE
EXPANSION JOINT.
EXISTING CURB 2'-0" EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
6"
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
EXISTING EXTEND THE NEW STEEL FACE
8"-THICK REINFORCED
PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN
≤ 5% 10% MIN
TYPICAL PERFORATED LEVELING COURSE
DEBRIS SCREEN FOR 8"
≥ 5% 12% MIN INSIDE DIA PIPE, SEE
GI-211
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS. SECTION C-C
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
- NO CONNECTION TO SEWERS
EXISTING
PROPERTY LINE C B A REFER TO DETAILS ON SIDEWALK
LOCATION VARIES 20'-0" THIS AND NEXT PAGE
CURB LINE OR AS PER DESIGN
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
C B A
PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GRASS TOP
GI-209D TOPSOIL
CAST IRON CLEANOUT -
4" CURB PIECE AND CAST IRON EXPANSION JOINT TOP OF COVER FLUSH
#4 REBAR ACROSS CLEANOUT, SEE AND FILLER (TYP.) WITH TOP OF SURFACE
GI-204 GRASS TOP
OPENING, SEE
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOP OF ROAD BEYOND 1'-0" 6" SIDEWALK STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"
1'-0"
1'-3"
9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"
5'-0"
CONSTANT SLOPE CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"
8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER
PERFORATED DEBRIS PIPE (TYP.)
4" 1'-0" 4" PERFORATED HDPE
SCREEN, SEE GI-211 PIPE (TYP.) 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE
5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 1
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION GRASS TOP
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN
6"
+
[INLET]
10% -20%
4'-4"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) 4" 4" CHAMBER
> 4.5 10% WWM 6x6-W8xW8 OPEN-GRADED STONE
4"
PERFORATED DEBRIS LEVELING COURSE
LONGITUDINAL STREET SLOPE SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≤ 5% 10% MIN
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
SECTION D-D
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP FOR PRECAST CONCRETE
CHAMBER, GRATE AND
TYPE 1A - WITH STONE COLUMNS FASTENER, SEE GI-209A &
GI-209B OR GI-209C &
- NO CONNECTION TO SEWERS GI-209D
PROPERTY LINE GRASS TOP MORTAR AROUND PIPE
EXPANSION TOPSOIL 4" CURB PIECE AND
JOINT AND CAST IRON #4 REBAR ACROSS
FILLER (TYP.) CLEANOUT, SEE OPENING, SEE
1'-0"
GI-204 GI-170 & GI-171
. VARIES
A 20'-0"
EXISTING
SIDEWALK TOP OF GUTTER BEYOND
LOCATION SIDEWALK
REFER TO DETAILS ON
OR AS PER DESIGN 10% MIN - 20% MAX PITCH
4'-6" EQ EQ 4'-6" THIS AND NEXT PAGE
ROADWAY
DESIGN
5'-0" OR
AS PER
CURB LINE
B B
FLOW 9" WWM 6X6-W8XW8
REINFORCED
INLET CONCRETE
EXISTING CONSTANT SLOPE CONCRETE APRON
HEADER (3) SIDES
3'-6"
CATCH BASIN CLEAN DROP CURB [INLET],
A
2'-10"
OPEN-GRADED SLOPE POURED IN PLACE,
STONE BASE CURB TO MEET PRECAST
WRAP STONE IN ℄ CHAMBER
PLAN GEOTEXTILE INLET SCREEN BOX
CONCRETE COLLAR (TOP AND SIDES ONLY) SUPPORT BRACKET,
1'-6"
OPENING FOR 8" INSIDE 3"x3" TYP. 8" INSIDE DIAMETER SEE GI-212
TOP OF STEEL OR CAST IRON GRATE 8" INSIDE DIA. PERFORATED HDPE
DIAMETER PERFORATED PIPE PERFORATED HDPE PERFORATED DEBRIS
4"
FLUSH WITH TOP OF SURFACE PIPE. MAINTAIN CONSTANT SLOPE CAST IRON CLEANOUT,
DEBRIS SCREEN,
1'-6"
1'-6"
SEE GI-211
PENETRATION INTO
ANNULAR SPACE BETWEEN
THE STONE COLUMN PIPE
WWM 6x6-W8xW8
AND THE HOLE
6"
1'-0"
PRECAST 4'-6" EQ EQ 4'-6"
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN
EQ
CONSTANT SLOPE 6"
STEEL OR
CAST IRON
SIDEWALK GRATE
STEEL FACE 2'-0"
8" DIAMETER DUAL WALL HDPE
OPENING, SEE FABRICATED 90° BEND
GI-170 & GI-171 8" INSIDE DIAMETER
STONE COLUMN STEEL FACE CURB COVER
EQ
PERFORATED HDPE PIPE
(TYP.) (TYP.)
1'-8"
6"
+
[INLET]
10% -20%
3 TO < 3.5 17% TO ≥ 14% 1'-6" TOPSOIL 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE
GI-170 & GI-171
3.5 TO < 4 14% TO ≥ 11% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO
4'-4"
4 TO 4.5 11% TO ≥ 10% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
C B A
PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GRASS TOP
GI-209D TOPSOIL
CAST IRON CLEANOUT -
4" CURB PIECE AND CAST IRON EXPANSION JOINT TOP OF COVER FLUSH
#4 REBAR ACROSS CLEANOUT, SEE AND FILLER (TYP.) WITH TOP OF SURFACE
GI-204 GRASS TOP
OPENING, SEE
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOP OF ROAD BEYOND 1'-0" 6" SIDEWALK STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"
1'-0"
1'-3"
9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"
REINFORCED
5'-0"
CONSTANT SLOPE HEADER (3) SIDES CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"
8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER CLEAN OPEN-GRADED
PERFORATED DEBRIS PIPE (TYP.) CLEAN STONE BASE
PERFORATED HDPE
5" MINIMUM
SCREEN, SEE GI-211 4" 1'-0" 4" CLEAN OPEN-GRADED
5'-0" OR AS PER DESIGN
BEDDING
PIPE (TYP.) HDPE 5'-0" OR AS PER DESIGN
LEVELING COURSE OPEN-GRADED STONE BASE
5'-0" OR AS PER DESIGN HDPE STORMWATER STORMWATER
STONE BASE
CHAMBER, SEE NOTE 3 CHAMBER, SEE
SECTION C-C SECTION B-B NOTE 3 SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE. P.E. 05-13-2022
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 MANAGING DIRECTOR, DATE
3. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 1C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE OBSERVATION WELL
FABRICATED 90° TEE FLUSH WITH THE SURFACE, SEE GI-210
20'-0" OR AS PER DESIGN
SEE GI-172 FOR DIMENSION PLACE EXPANSION
8" DIAMETER DUAL WALL HDPE SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
6"
1'-0"
PRECAST
CONCRETE CONCRETE HEADER
CHAMBER
5'-0" OR AS PER DESIGN
6"
+
[INLET]
10% -20%
4'-4"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
3.5 TO < 4 14% TO ≥ 11% PERFORATED PIPE.
OPENING FOR 8" INSIDE
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
4 TO 4.5 11% TO ≥ 10% PIPE (TYP.) CHAMBER
4" 4"
WWM 6x6-W8xW8 OPEN-GRADED STONE
> 4.5 10%
4"
PERFORATED DEBRIS LEVELING COURSE
SCREEN FOR 8" INSIDE
STREET SLOPE DIA PIPE, SEE GI-211
≤ 5% 10% MIN
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
C B A
1'-0"
1'-3"
9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"
5'-0"
CONSTANT SLOPE CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"
8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER
PERFORATED DEBRIS PIPE (TYP.)
4" 1'-0" 4" PERFORATED HDPE
SCREEN, SEE GI-211 PIPE (TYP.) 5'-0" OR AS PER DESIGN 5'-0" OR AS PER DESIGN
LEVELING COURSE
5'-0" OR AS PER DESIGN
SECTION C-C SECTION B-B SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 2
- NO CONNECTION TO SEWERS
6"
1'-0"
GI-210
GRASS TOP
PRECAST CONCRETE HEADER
CONCRETE
EXPANSION JOINT.
EXISTING CURB D 2'-10"
D CONSTANT SLOPE
EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
2'-0"
6"
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
REINFORCED
PLAN AS DETERMINED BY FIELD
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
4'-4"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
3.5 TO < 4 14% TO ≥ 11% PERFORATED PIPE.
OPENING FOR 8" INSIDE
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
4 TO 4.5 11% TO ≥ 10% PIPE (TYP.) CHAMBER
4" 4"
WWM 6x6-W8xW8 OPEN-GRADED STONE
> 4.5 10%
4"
PERFORATED DEBRIS LEVELING COURSE
SCREEN FOR 8" INSIDE
STREET SLOPE DIA PIPE, SEE GI-211
≤ 5% 10% MIN
CURB LINE
B B
9" WWM 6X6-W8XW8
REINFORCED
FLOW CONCRETE
CONSTANT SLOPE CONCRETE APRON
HEADER (3) SIDES
3'-6"
EXISTING INLET
CLEAN DROP CURB [INLET],
2'-10"
CATCH BASIN SLOPE POURED IN PLACE,
A OPEN-GRADED
STONE BASE CURB TO MEET PRECAST
WRAP STONE IN ℄ CHAMBER
GEOTEXTILE INLET SCREEN BOX
PLAN (TOP AND SIDES ONLY) SUPPORT BRACKET,
1'-6"
8" INSIDE DIAMETER SEE GI-212
OPENING FOR 8" INSIDE TOP OF STEEL OR CAST IRON GRATE 8" INSIDE DIA. PERFORATED HDPE PIPE. PERFORATED DEBRIS
PERFORATED HDPE
4"
PENETRATION INTO
1'-6"
1'-6"
6"
1'-0"
GI-210
3'-6"
PRECAST 3'-6" CONCRETE HEADER
CONCRETE
EQ
CHAMBER CONSTANT SLOPE 6"
STEEL OR
SIDEWALK CAST IRON
GRATE 2'-0"
STEEL FACE 8" DIAMETER DUAL WALL HDPE
OPENING, SEE 8" INSIDE DIAMETER FABRICATED 90° BEND
GI-170 & GI-171 PERFORATED HDPE
STONE COLUMN PIPE (TYP.) CLEANOUT, STEEL FACE CURB COVER
(TYP.) TYP.
1'-8"
EQ
EXISTING CURB C 2'-4" C 2'-0"
EXISTING CURB
TO REMAIN TO REMAIN
2'-0"
6"
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36"
PLAN CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
CURB REVEAL (INCHES) APRON PITCH TOP OF STEEL GRATE FLUSH 3'-6" NOTES:
FOR PRECAST CONCRETE
WITH TOP OF SURFACE 3'-0" CHAMBER, GRATE &
2.5 TO < 3 20% TO ≥ 17% SIDEWALK FASTENER, SEE GI-209A &
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN
GI-209B OR GI-209C & GI-209D
GRADED STONE STARTING AT THE BASE OF THE INFILTRATION
3 TO < 3.5 17% TO ≥ 14% GRASS TOP BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
3.5 TO < 4 14% TO ≥ 11% 1'-6" TOPSOIL 2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR
DETAILS SEE GI-170 & GI-171
4 TO 4.5 11% TO ≥ 10% L2"x2"x1/4" BELOW METAL
GRATE ANCHORED TO
4'-4"
PROPERTY LINE
C B A EXISTING
REFER TO DETAILS ON
SIDEWALK
LOCATION VARIES 15'-0" THIS AND NEXT PAGE
CURB LINE OR AS PER DESIGN
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
C B A
PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C & GRASS TOP
GI-209D TOPSOIL
CAST IRON CLEANOUT -
4" CURB PIECE AND CAST IRON EXPANSION JOINT TOP OF COVER FLUSH
#4 REBAR ACROSS CLEANOUT, SEE AND FILLER (TYP.) WITH TOP OF SURFACE
GI-204 GRASS TOP
OPENING, SEE
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOP OF ROAD BEYOND 1'-0" 6" SIDEWALK STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"
1'-0"
1'-3"
9" 6"
WWM 6X6-W8XW8 1'-0"
4'-4"
5'-0"
CONSTANT SLOPE CONCRETE GUTTER CONCRETE GUTTER
CONCRETE APRON
2'-10"
8" DIAMETER AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8 PERFORATED HDPE
8" INSIDE DIAMETER CLEAN OPEN-GRADED
PERFORATED DEBRIS PIPE (TYP.) CLEAN STONE BASE
1'-0" PERFORATED HDPE
5" MINIMUM
SCREEN, SEE GI-211 4" 4" CLEAN OPEN-GRADED
5'-0" OR AS PER DESIGN
BEDDING
PIPE (TYP.) HDPE 5'-0" OR AS PER DESIGN
LEVELING COURSE OPEN-GRADED STONE BASE
5'-0" OR AS PER DESIGN HDPE STORMWATER STORMWATER
STONE BASE
CHAMBER, SEE NOTE 3 CHAMBER, SEE
SECTION C-C SECTION B-B NOTE 3 SECTION A-A
AT INLET AT MIDSECTION AT UPSTREAM SECTION
NOTES:
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE P.E. 05-13-2022
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
MANAGING DIRECTOR, DATE
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171
3. USE SMALLEST HDPE STORMWATER CHAMBER SIZE PER GI-204 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 2C - WITH STORMWATER CHAMBER
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE 15'-0" OR AS PER DESIGN
FABRICATED 90° TEE
SEE GI-172 FOR PLACE EXPANSION GRASS TOP
DIMENSION SCHEDULE JOINT AT MID-SPAN EXPANSION JOINT (TYP.)
6"
1'-0"
GI-210
PRECAST CONCRETE HEADER
CONCRETE
6"
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
PITCH
ASPHALT CONCRETE GUTTER 24" MIN. BEYOND THE
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED PLAN CONDITIONS AND SITE
CONCRETE APRON 13" 36"
ENGINEER
4'-4"
4 TO 4.5 11% TO ≥ 10% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) 4" 4" CHAMBER
STREET SLOPE WWM 6x6-W8xW8 OPEN-GRADED STONE
4"
PERFORATED DEBRIS LEVELING COURSE
≤ 5% 10% MIN SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
- NO CONNECTION TO SEWERS
C A
PROPERTY LINE EXISTING
B SIDEWALK
LOCATION VARIES 10'-0" OR REFER TO DETAILS ON
CURB LINE AS PER DESIGN THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
EXISTING
CATCH BASIN FLOW
INLET
B
C A
PLAN
FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
GI-209B OR GI-209C &
GI-209D
CAST IRON CLEANOUT -
4" CURB PIECE AND TOP OF COVER FLUSH
#4 REBAR ACROSS EXPANSION JOINT WITH TOP OF SURFACE
OPENING, SEE GRASS TOP
GRASS TOP AND FILLER (TYP.)
GI-170 & GI-171 TOPSOIL 8" SOLID HDPE PIPE
TOPSOIL SIDEWALK
TOP OF GUTTER BEYOND 6" STEEL FACE CURB SIDEWALK TOPSOIL 6" 1'-0"
10% MIN - 20% MAX PITCH SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"
1'-3"
1'-0"
9"
6"
WWM 6X6-W8XW8 1'-0"
4'-4"
CONSTANT SLOPE
3'-6"
5'-0"
CONCRETE APRON HEADER (3) SIDES CONCRETE GUTTER CONCRETE GUTTER
2'-10"
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP TYPE 3
- NO CONNECTION TO SEWERS
8" DIAMETER DUAL WALL HDPE
FABRICATED 90° TEE
10'-0" OR AS PER DESIGN
8" DIAMETER DUAL WALL HDPE GRASS TOP EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
1'-0"
WITH THE SURFACE, SEE
PRECAST CONCRETE HEADER
GI-210
CONCRETE
EQ
GI-209B
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)
EQ
STEEL FACE CURB COVER
1'-8"
D 2'-10" D CONSTANT SLOPE
EXPANSION JOINT.
EXISTING CURB 2'-0" EXISTING CURB
2'-4" 2'-0"
TO REMAIN TO REMAIN
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
EXISTING EXTEND THE NEW STEEL FACE
8"-THICK REINFORCED
PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN
4'-4"
3.5 TO < 4 14% TO ≥ 11% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
4 TO 4.5 11% TO ≥ 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) 4" 4" CHAMBER
> 4.5 10% WWM 6x6-W8xW8 OPEN-GRADED STONE
4"
PERFORATED DEBRIS LEVELING COURSE
STREET SLOPE SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≤ 5% 10% MIN
≥ 5% 12% MIN
SECTION D-D
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON P.E. 05-13-2022
DETAILED CONSTRUCTION DRAWINGS. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. INFILTRATION BASIN WITH GRASS TOP
TYPE 3A - WITH STONE COLUMN FOR PRECAST CONCRETE
CHAMBER, GRATE AND
FASTENER, SEE GI-209A &
- NO CONNECTION TO SEWERS GI-209B OR GI-209C &
GI-209D
PROPERTY LINE MORTAR AROUND PIPE
1/2" EXPANSION JOINT
AND FILLER PER NYC 4" CURB PIECE AND
DOT HIGHWAY SPEC. #4 REBAR ACROSS
SECTION 2.15 (TYP.) OPENING, SEE
GRASS TOP
A EXISTING
TOPSOIL
GI-170 & GI-171
LOCATION VARIES 10'-0" SIDEWALK
SIDEWALK 10% MIN - 20% MAX
OR AS SHOWN
REFER TO DETAILS ON PITCH
EQ EQ
THIS AND NEXT PAGE ROADWAY
DESIGN
5'-0" OR
AS PER
CURB LINE
B B
FLOW 9" WWM 6X6-W8XW8
REINFORCED
INLET CONCRETE
CONSTANT SLOPE CONCRETE APRON
HEADER (3) SIDES
EXISTING A
3'-6"
CLEAN DROP CURB [INLET],
CATCH BASIN
2'-10"
OPEN-GRADED SLOPE POURED IN PLACE,
STONE BASE CURB TO MEET PRECAST
PLAN WRAP STONE IN ℄ CHAMBER
GEOTEXTILE
(TOP AND SIDES ONLY) INLET SCREEN BOX
SUPPORT BRACKET
1'-6"
8" DIAMETER
OPENING FOR 8" INSIDE TOP OF STEEL OR CAST IRON GRATE PERFORATED HDPE PERFORATED DEBRIS
4"
DIAMETER PERFORATED PIPE FLUSH WITH TOP OF SURFACE PIPE. (TYP.) SCREEN, SEE GI-211
PENETRATION INTO
1'-6"
8" DIAMETER DUAL WALL HDPE GRASS TOP EXPANSION JOINT (TYP.)
FABRICATED 90° BEND
1'-0"
STONE WITH THE SURFACE, SEE
PRECAST COLUMN CONCRETE HEADER
GI-210
CONCRETE
EQ
CAST IRON
CLEANOUT (TYP.)
EQ
GRATE
SIDEWALK 8" INSIDE DIA.
STEEL FACE 8" DIAMETER DUAL WALL HDPE
PERFORATED
OPENING, SEE FABRICATED 90° BEND (TO BE
HDPE PIPE (TYP.)
GI-170 & GI-171 PERFORATED IN FIELD)
EQ
EQ
3'-0" STEEL FACE CURB COVER
1'-8"
2'-10" EXPANSION JOINT.
EXISTING CURB
C C CONSTANT SLOPE
EXISTING CURB
2'-0" 2'-4" 2'-0"
TO REMAIN TO REMAIN
+
[INLET]
10% -20%
FLOW FLOW
1'-6"
EXISTING EXTEND THE NEW STEEL FACE
8"-THICK REINFORCED
PITCH
ASPHALT 24" MIN. BEYOND THE
CONCRETE GUTTER
PAVEMENT INFILTRATION BASIN, THE LIMIT
OF THE NEW CONCRETE CURB
AS DETERMINED BY FIELD
REINFORCED
13" 36" CONDITIONS AND SITE
CONCRETE APRON
ENGINEER
PLAN
4'-4"
CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
> 4.5 10% OPENING FOR 8" INSIDE PERFORATED PIPE.
DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
DESIGN
WIDTH
PER
EXISTING
CATCH BASIN EXISTING GRASS STRIP FLOW
INLET
C B A
5"
10% MIN - 20% MAX PITCH CURB SIDEWALK
ROADWAY
ROADWAY ROADWAY
1'-0"
3"
1'-3"
5"
3"
4 1/2"
2"
1'-0" 9"
WWM 6X6-W8XW8
4'-4"
5'-0"
CONCRETE GUTTER CONCRETE GUTTER
3'-6"
PIPE (TYP.) AND SIDES ONLY) AND SIDES ONLY) PIPE (TYP.)
WWM 6X6-W8XW8
8" DIAMETER
LEVELING COURSE
4" 1'-0" 4" PERFORATED HDPE
PIPE (TYP.) 5'-0" OR AS SHOWN 5'-0" OR AS SHOWN
5'-0" OR AS SHOWN
SECTION B-B
NOTES:
SECTION C-C AT MIDSECTION SECTION A-A
AT INLET AT UPSTREAM SECTION
1. THE CONTRACTOR SHALL HAND-COMPACT 1'-0" IN DEPTH OF OPEN GRADED STONE STARTING AT THE BASE OF THE
INFILTRATION BASIN PRIOR TO ADDING ADDITIONAL OPEN GRADED STONE.
2. FOR STEEL FACE OPENING DIMENSIONS AND STEEL REBAR DETAILS SEE GI-170 & GI-171 P.E. 05-13-2022
3. CAST IN PLACE CONCRETE TOP REQUIRES AN IMPERMEABLE LINER. SEE SPECIFICATIONS FOR IMPERMEABLE LINER
REQUIREMENTS
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN
WITH COMBINATION OF CONCRETE & GRASS TOP
- NO CONNECTION TO SEWERS
LENGTH AS PER DESIGN
OBSERVATION WELL
6"
CLEANOUT
1'-0"
STEEL OR CAST
IRON GRATE
6"
2'-0"
SIDEWALK GRASS STRIP TO MATCH EDGE OF CONCRETE EXISTING GRASS STRIP
EXISTING CONDITIONS
VARIES
1'-8"
GRASS TOP
EXISTING CURB D D EXISTING CURB
TO REMAIN TO REMAIN
6"
+
[INLET]
10% - 20%
PLAN
PLAN
4'-4"
4 TO 4.5 11% TO ≥ 10% CHAMBER WALLS (TYP.) 8" INSIDE DIAMETER
OPENING FOR 8" INSIDE PERFORATED PIPE.
> 4.5 10% DIAMETER PERFORATED PRECAST CONCRETE
2'-10"
PIPE (TYP.) 4" 4" CHAMBER
LONGITUDINAL STREET SLOPE WWM 6x6-W8xW8 OPEN-GRADED STONE
4"
PERFORATED DEBRIS LEVELING COURSE
≤ 5% 10% MIN SCREEN FOR 8" INSIDE
DIA PIPE, SEE GI-211
≥ 5% 12% MIN
* 2" MINIMUM OPENING TO BE MAINTAINED
UNLESS ADDITIONAL DIRECTION SHOWN ON
DETAILED CONSTRUCTION DRAWINGS. SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASINS STEEL FACE CURB OPENING DETAILS
- NO CONNECTION TO SEWERS
6"
6"
SURFACE TYPE
PER CONTRACT
SIDEWALK PLANS
2'-0"
+
10% MIN -
FLOW A 20% MAX A
1'-6"
EXISTING
PITCH
ASPHALT
FLOW
PAVEMENT
13" 3'-0"
PLAN
GI-171
GI-171
GI-171
B
D
CURB BEYOND
4"
EQ
8" THICK CONCRETE
GUTTER (TYP.)
8"
BOTTOM OF CURB
CONCRETE APRON
#4 REBAR ACROSS STEEL FACE
STEEL FACE OPENING WWM 6x6 - W8xW8 EXPANSION
OPENING, SEE NOTE 2 (TYP.) JOINT
GI-171
GI-171
GI-171
C
D
EQ
SECTION A-A 2'-4"
NOTES:
REBAR DETAIL
1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE R.O.W.
INFILTRATION BASIN TYPE SPECIFIED.
2. REBAR REQUIRED FOR OPENINGS GREATER OR EQUAL TO 2.5" P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASINS STEEL FACE CURB OPENING DETAILS
- NO CONNECTION TO SEWERS
1 5/8"
WELDED TO STEEL FACE OPENING, SEE NOTE 3
NOTE 3
EQ
10% MIN TO 20%
ROADWAY 1/2" DIA. ANCHOR, MAX PITCH ROADWAY 1/2" DIA. ANCHOR,
ROADWAY
4"
SEE NOTE 4 (TYP.) SEE NOTE 1
EQ
1/2" DIA. ANCHOR,
8" REINFORCED SEE NOTE 5 (TYP.)
CONCRETE APRON 8"-THICK REINFORCED STEEL FACED CURB
CONCRETE APRON
STEEL FACED CURB
DROP CURB [INLET] SLOPE
POURED IN PLACE CURB TO
MEET PRECAST CHAMBER
SECTION D-D SECTION C-C SECTION B-B
STEEL FACE CURB DETAIL STEEL FACE CURB DETAIL
STEEL FACE CURB OPENING DETAIL
4" 4"
SURFACE TYPE
PER CONTRACT
SIDEWALK
W PLANS
+
[INLET]
10% MIN -
20% MAX
FLOW
EXISTING
PITCH
ASPHALT FLOW
PAVEMENT
TYPE 1/TYPE 2
DIMENSIONS SCHEDULE
EXISTING CURB EXISTING CURB NOTES:
TO REMAIN TO REMAIN 1. STANDARD CROSS-SECTIONAL DETAILS AND NOTES AS PER THE
R.O.W. INFILTRATION BASIN TYPE SPECIFIED.
FLOW FLOW
PITCH
EXISTING
ASPHALT 05-13-2022
P.E.
PAVEMENT
MANAGING DIRECTOR, DATE
TYPE 3 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D
- NO CONNECTION TO SEWERS
PROPERTY
LINE
B A
EXISTING
LOCATION OF BIOSWALE 20'-0" SIDEWALK
VARIES, SEE PLAN OR AS PER DESIGN
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
CURB LINE
1'-0" EQ EQ
TOPSOIL TREE PLANTING -
12"x5" CONCRETE WHEN DIRECTED TOPSOIL CLEANOUT,
STRIP 12"x5" CONCRETE SEE GI-204
PLANTED AREA
BRICK BASE - AS STRIP TOP LAYER,
REQUIRED TOP LAYER 2"-3" 3"-THICK LEVELING 2"-3" MULCH
LEVELING COURSE MULCH COURSE (TYP.) CONCRETE
C.I. FRAME AND GRATING AS REQUIRED ROADWAY CURB HEADER
STEEL TREE GUARD
(WITHOUT CURB PIECE), 1" (3-SIDES TYP.) SEE GI-601, SIDEWALK
SLOPE TO 12"
SEE DEP STANDARDS GI-602, GI-603 & GI-604
FRAME
2"
1'-3"
1"
B
9" CONCRETE 9"
8"
A
5'-2"
CONCRETE ENCASEMENT
OPEN-GRADED WRAP GABION WALL IN
6" L. HOOK, SEE WRAP STONE IN 8" INSIDE DIAMETER
STONE BASE GEOTEXTILE (TOP AND
DEP STANDARDS GEOTEXTILE (TOP PERFORATED PIPE
3'-4"
STANDARDS SE60
DEPTH SCHEDULE SECTION B-B
9"
ROWB A B
WITH TREE 3'-0" 2'-0"
8" 3'-6" 8" NO TREE 3'-6" 1'-6"
P.E. 05-13-2022
NOTE:
SECTION A-A MANAGING DIRECTOR, DATE
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1D
- NO CONNECTION TO SEWERS
20'-0" OR AS PER DESIGN
SEE GI-186 FOR PLACE EXPANSION EXPANSION JOINT (TYP.)
DIMENSION SCHEDULE JOINT AT MID-SPAN
1'-0"
CLEANOUT,
OBSERVATION WELL, SEE GI-213
REFER TO
EQ
DETAILS GI-204
5'-0" OR AS PER DESIGN
SIDEWALK 1'-3" CONSTANT SLOPE CONCRETE HEADER
STEEL TREE GUARD (3-SIDES
1'-0" TYP.) SEE GI-601, GI-602, GI-603 &
GI-604
GABION WALL BELOW
CONCRETE STRIP, SEE GI-207 SEE GI-503A, THROUGH GI-503G
EQ
FOR TYPICAL PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-6"
FLOW
EXISTING 8" INSIDE DIAMETER
STORMWATER
ASPHALT PERFORATED PIPE EXISTING CURB
PAVEMENT INLET, SEE
TO REMAIN
GI-185 PITCH PITCH
LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
FIELD CONDITIONS AND SITE ENGINEER
C C
ASPHALT TO BE
TOP OF ROADWAY C.I. FRAME AND GRATING
1'-0"
PITCHED TOWARDS
PITCH
(BEYOND) (WITHOUT CURB PIECE), PLAN THE CI GRATE.
CAST IRON FRAME SET 1" SEE DEP STANDARDS
BELOW TOP OF ROAD SE58A & SE59A
1'-0"
ROADWAY 1'-0" 1'-0"
1"
1"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 20'x5' R.O.W. BIOSWALE TYPE 1DA - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS 5'-0"
OR AS PER DESIGN
TOP LAYER,
PROPERTY 1'-2" 2"-3" MULCH
LINE 12"x5" CONCRETE CLEANOUT, SEE GI-204
STRIP EXPANSION JOINT AND
3"-THICK LEVELING FILLER (TYP.)
A EXISTING COURSE (TYP.)
. BIOSWALE
LOCATION OF 20'-0" 1"
SIDEWALK PLANTED
VARIES OR AS PER DESIGN SIDEWALK
4'-6" EQ EQ 4'-6" ROADWAY AREA
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
B B
TOPSOIL
INLET FLOW
CURB LINE
CONCRETE
EXISTING
HEADER (3) SIDES
CATCH BASIN
A STEEL SPIKE IN 4" DIA.
UNDISTURBED SOIL
CONCRETE ENCASEMENT
PLAN L-SHAPED EDGING WITH PLACED IN SOIL LAYER
MINIMUM 9" STAKES, SEE (TYP.)
1'-0"
WELL SCREEN 0.01 PVC CAP
TOP LAYER, SLOT SIZE WITH SIDES ONLY)
SOLID CLEANOUT TOP OF STONE
2"-3" MULCH TOPSOIL PVC CAP
COVER, SEE GI-204 12" WIDE GABION WALL COLUMN WITH
(TYP.) FILLED WITH OPEN-GRADED PERFORATED CAP
STONE EQ EQ (TYP.)
CLEAN OPEN-GRADED
SOLID 8" INSIDE 8" INSIDE DIAMETER STONE BASE WRAPPED IN
B
DIAMETER HDPE PERFORATED HDPE PIPE GEOTEXTILE, TOP AND
SIDES ONLY STONE FILLED PERFORATED
PIPE
12" DIAMETER PVC PIPE
WRAPPED ALL AROUND
WITH GEOTEXTILE FABRIC.
PERMEABLE SOIL
TEMPORARY 18" MAXIMUM
1'-0" DIAMETER CASING AUGERED
A
EXISTING CONSTANT SLOPE INTO PERMEABLE LAYER
PENETRATION INTO
1'-0"
1'-0"
STONE OBSERVATION WELL, SEE GI-213
COLUMN
EQ
5'-0" OR AS PER DESIGN
1'-2"
COLUMN 1'-0" TYP.) SEE GI-601, GI-602, GI-603 &
GI-604
GABION WALL BELOW 4'-6" EQ EQ 4'-6"
SEE GI-503A, THROUGH GI-503G
EQ
CONCRETE STRIP, SEE GI-207
FOR TYPICAL PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-6"
FLOW
EXISTING
STORMWATER
ASPHALT EXISTING CURB
PAVEMENT TOP OF ROADWAY C.I. FRAME AND GRATING INLET, SEE
TO REMAIN
(BEYOND) (WITHOUT CURB PIECE), GI-185 PITCH PITCH
LIMIT OF NEW CURB TO EXTEND
CAST IRON FRAME SET 1" SEE DEP STANDARDS
BEYOND THE ROWB AS DETERMINED BY
BELOW TOP OF ROAD SE58A & SE59A
FIELD CONDITIONS AND SITE ENGINEER
C C
ROADWAY 1'-0" 1'-0" ASPHALT TO BE
1'-0"
PITCHED TOWARDS
PITCH
THE CI GRATE.
1"
1"
1'-0"
PLAN
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D
- NO CONNECTION TO SEWERS
PROPERTY
LINE
B A
EXISTING
LOCATION OF BIOSWALE 15'-0" SIDEWALK
VARIES, SEE PLAN OR AS PER DESIGN
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
CURB LINE
B A
PLAN
1'-0" EQ EQ
TOPSOIL TREE PLANTING -
12"x5" CONCRETE WHEN DIRECTED TOPSOIL CLEANOUT,
STRIP 12"x5" CONCRETE SEE GI-204
PLANTED AREA
BRICK BASE - AS STRIP TOP LAYER,
REQUIRED TOP LAYER 2"-3" 3"-THICK LEVELING 2"-3" MULCH
LEVELING COURSE MULCH COURSE (TYP.) CONCRETE
C.I. FRAME AND GRATING AS REQUIRED ROADWAY CURB HEADER
STEEL TREE GUARD
(WITHOUT CURB PIECE), 1" (3-SIDES TYP.) SEE GI-601, SIDEWALK
SLOPE TO 12"
SEE DEP STANDARDS GI-602, GI-603 & GI-604
FRAME
2"
1'-3"
1"
B
9" CONCRETE 9"
8"
A
5'-2"
CONCRETE ENCASEMENT
OPEN-GRADED WRAP GABION WALL IN
6" L. HOOK, SEE WRAP STONE IN 8" INSIDE DIAMETER
STONE BASE GEOTEXTILE (TOP AND
DEP STANDARDS GEOTEXTILE (TOP PERFORATED PIPE
3'-4"
STANDARDS SE60
DEPTH SCHEDULE SECTION B-B
9"
ROWB A B
WITH TREE 3'-0" 2'-0"
8" 3'-6" 8" NO TREE 3'-6" 1'-6"
P.E. 05-13-2022
NOTE:
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2D
- NO CONNECTION TO SEWERS
CLEANOUT;
REFER TO
DETAILS GI-204 15'-0" OR AS PER DESIGN
SEE GI-186 FOR DIMENSION PLACE EXPANSION
EXPANSION JOINT (TYP.)
SCHEDULE JOINT AT MID-SPAN
1'-0"
CONCRETE HEADER
EQ
5'-0" OR AS PER DESIGN
SIDEWALK CONSTANT SLOPE STEEL TREE GUARD (3-SIDES
TYP.) SEE GI-601, GI-602,
GI-603 & GI-604
1'-0"
1'-3" SEE GI-503A THROUGH
GABION WALL BELOW
CONCRETE STRIP SEE GI-207 GI-503G FOR TYPICAL
EQ
PLANTING PLANS
8" INSIDE DIAMETER
NEW CURB TYPE TO MATCH
PERFORATED PIPE
CONTRACT PLANS
EXISTING CURB 12"x5" CONCRETE STRIP
TO REMAIN
1'-6"
EXPANSION JOINT
FLOW
EXISTING EXISTING CURB
ASPHALT TO REMAIN
PAVEMENT STORMWATER
INLET SEE PITCH PITCH LIMIT OF NEW CURB TO EXTEND
GI-185 BEYOND THE ROWB AS DETERMINED BY
TOP OF ROADWAY C.I. FRAME AND GRATING FIELD CONDITIONS AND SITE ENGINEER
(BEYOND) (WITHOUT CURB PIECE), C C
SEE DEP STANDARDS ASPHALT TO BE
CAST IRON FRAME SET 1"
SE58A & SE59A PITCHED TOWARDS
1'-0"
BELOW TOP OF ROAD
PITCH
THE CI GRATE.
ROADWAY 1'-0" 1'-0"
1'-0"
PLAN
1"
1"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS 5'-0"
OR AS PER DESIGN
TOP LAYER,
PROPERTY 1'-2" 2"-3" MULCH
LINE 12"x5" CONCRETE CLEANOUT, SEE GI-204
STRIP EXPANSION JOINT AND
3"-THICK LEVELING FILLER (TYP.)
A COURSE (TYP.)
. BIOSWALE
LOCATION OF 15'-0" EXISTING 1"
SIDEWALK PLANTED
VARIES OR AS PER DESIGN ROADWAY SIDEWALK
AREA
3'-6" 3'-6"
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
CURB LINE B B
TOPSOIL
EXISTING INLET FLOW
CATCH BASIN A CONCRETE
HEADER (3) SIDES
1'-0"
SLOT SIZE WITH
PVC CAP SIDES ONLY)
SOLID CLEANOUT TOP LAYER, TOPSOIL PVC CAP TOP OF STONE
COVER, SEE GI-204 2"-3" MULCH 12" WIDE GABION WALL COLUMN WITH
(TYP.) FILLED WITH OPEN-GRADED PERFORATED CAP
STONE EQ EQ (TYP.)
CLEAN OPEN-GRADED
SOLID 8" INSIDE STONE BASE WRAPPED IN
DIAMETER HDPE PIPE GEOTEXTILE, TOP AND
B
8" INSIDE DIAMETER SIDES ONLY STONE FILLED PERFORATED
PERFORATED HDPE PIPE 12" DIAMETER PVC PIPE
WRAPPED ALL AROUND
PERMEABLE SOIL WITH GEOTEXTILE FABRIC.
A
1'-0" INTO PERMEABLE LAYER
PENETRATION INTO
GRANULAR FILL TO FILL THE
1'-0"
PERMEABLE SOIL
LAYER DEPTH SCHEDULE
GRANULAR FILL TO FILL THE
ANNULAR SPACE BETWEEN THE ROWB A B
TEMPORARY, 18" MAXIMUM
STONE COLUMN PIPE AND THE HOLE
DIAMETER CASING AUGERED WITH TREE 3'-0" 2'-0" SECTION A-A
INTO PERMEABLE LAYER NO TREE 3'-6" 1'-6" AT BIOSWALE STONE COLUMN
STONE FILLED PERFORATED 12"
DIAMETER PVC PIPE WRAPPED
OPEN BOTTOM (TYP.)
ALL AROUND WITH GEOTEXTILE
FABRIC (TYP.)
P.E. 05-13-2022
SECTION B-B MANAGING DIRECTOR, DATE
NOTE:
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH
STANDARD FOR 15'x5' R.O.W. BIOSWALE TYPE 2DA - WITH STONE COLUMNS
- NO CONNECTION TO SEWERS
8" INSIDE DIAMETER
CLEANOUT; PERFORATED PIPE
REFER TO
DETAILS GI-204 15'-0" OR AS PER DESIGN
SEE GI-186 FOR DIMENSION PLACE EXPANSION
EXPANSION JOINT (TYP.)
SCHEDULE JOINT AT MID-SPAN
1'-0"
CONCRETE HEADER
CONSTANT SLOPE
EQ
SIDEWALK STEEL TREE GUARD (3-SIDES
1'-3" TYP.) SEE GI-601, GI-602,
GI-603 & GI-604
1'-0"
1'-2"
GABION WALL BELOW SEE GI-503A THROUGH
3'-6" 3'-6"
EQ
CONCRETE STRIP SEE GI-207 GI-503G FOR TYPICAL
STONE COLUMNS
PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB 12"x5" CONCRETE STRIP
TO REMAIN
1'-6"
EXPANSION JOINT
FLOW
EXISTING EXISTING CURB
ASPHALT TO REMAIN
PAVEMENT STORMWATER
INLET SEE PITCH PITCH LIMIT OF NEW CURB TO EXTEND
TOP OF ROADWAY C.I. FRAME AND GRATING GI-185 BEYOND THE ROWB AS DETERMINED BY
(BEYOND) (WITHOUT CURB PIECE), FIELD CONDITIONS AND SITE ENGINEER
CAST IRON FRAME SET 1" SEE DEP STANDARDS C C
ASPHALT TO BE
BELOW TOP OF ROAD SE58A & SE59A
PITCHED TOWARDS
1'-0"
PITCH
THE CI GRATE.
ROADWAY 1'-0" 1'-0"
1'-0"
PLAN
1"
1"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D
- NO CONNECTION TO SEWERS
PROPERTY
LINE
B A EXISTING
SIDEWALK
LOCATION OF BIOSWALE 10'-0" OR
VARIES AS PER DESIGN
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
CURB LINE
EXISTING FLOW
CATCH BASIN
B A
PLAN
1'-0" EQ EQ
TOPSOIL TREE PLANTING -
12"x5" CONCRETE WHEN DIRECTED TOPSOIL CLEANOUT,
STRIP 12"x5" CONCRETE SEE GI-204
PLANTED AREA
BRICK BASE - AS STRIP TOP LAYER,
REQUIRED TOP LAYER 2"-3" 3"-THICK LEVELING 2"-3" MULCH
LEVELING COURSE MULCH COURSE (TYP.) CONCRETE
C.I. FRAME AND GRATING AS REQUIRED ROADWAY CURB HEADER
STEEL TREE GUARD
(WITHOUT CURB PIECE), 1" (3-SIDES TYP.) SEE GI-601, SIDEWALK
SLOPE TO 12"
SEE DEP STANDARDS GI-602, GI-603 & GI-604
FRAME
2"
1'-3"
1"
B
9" CONCRETE 9"
8"
A
5'-2"
CONCRETE ENCASEMENT
OPEN-GRADED WRAP GABION WALL IN
6" L. HOOK, SEE WRAP STONE IN 8" INSIDE DIAMETER
STONE BASE GEOTEXTILE (TOP AND
DEP STANDARDS GEOTEXTILE (TOP PERFORATED PIPE
3'-4"
STANDARDS SE60
DEPTH SCHEDULE SECTION B-B
9"
ROWB A B
WITH TREE 3'-0" 2'-0"
8" 3'-6" 8" NO TREE 3'-6" 1'-6"
P.E. 05-13-2022
NOTE:
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
CAST-IN-PLACE CONCRETE STRIP REQUIRES IMPERMEABLE LINER UNDERNEATH
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3D
- NO CONNECTION TO SEWERS
1'-0"
OBSERVATION WELL, SEE GI-213
EQ
5'-0" OR AS PER DESIGN
SIDEWALK CONCRETE HEADER
STEEL TREE GUARD (3-SIDES
CONSTANT SLOPE 1'-0" TYP.) SEE GI-601, GI-602, GI-603
& GI-604
1'-3"
GABION WALL BELOW SEE GI-503A THROUGH GI-503G
EQ
CONCRETE STRIP, SEE GI-207 FOR TYPICAL PLANTING PLANS
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
TO REMAIN 12"x5" CONCRETE STRIP
1'-6"
EXPANSION JOINT
FLOW
EXISTING STORMWATER EXISTING CURB
ASPHALT INLET TO REMAIN
PAVEMENT SEE GI-185
PITCH PITCH LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
TOP OF ROADWAY C.I. FRAME AND GRATING
FIELD CONDITIONS AND SITE ENGINEER
(BEYOND) (WITHOUT CURB PIECE), C C
CAST IRON FRAME SET 1" SEE DEP STANDARDS ASPHALT TO BE
BELOW TOP OF ROAD SE58A & SE59A PITCHED TOWARDS
1'-0"
PITCH
THE CI GRATE.
ROADWAY 1'-0" 1'-0"
1'-0"
PLAN
1"
1"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 10'x5' R.O.W. BIOSWALE TYPE 3DA - WITH STONE COLUMN
- NO CONNECTION TO SEWERS 5'-0"
OR AS PER DESIGN
TOP LAYER,
PROPERTY 2"-3" MULCH
1'-2"
LINE
12"x5" CONCRETE CLEANOUT, SEE GI-204
STRIP EXPANSION JOINT AND
3"-THICK LEVELING FILLER (TYP.)
COURSE (TYP.)
A EXISTING
SIDEWALK
1"
LOCATION OF BIOSWALE 10'-0" OR PLANTED
ROADWAY AREA SIDEWALK
VARIES AS PER DESIGN
REFER TO DETAILS ON
THIS AND NEXT PAGE
DESIGN
5'-0" OR
AS PER
CURB LINE
B 1'-6" B
TOPSOIL
EXISTING FLOW
CATCH BASIN
A CONCRETE
HEADER (3) SIDES
1'-0"
GI-602, GI-603 & GI-604 MULCH SIDES ONLY)
TOP OF STONE
12" WIDE GABION WALL COLUMN WITH
FILLED WITH OPEN-GRADED PERFORATED CAP
STONE EQ EQ (TYP.)
CLEAN OPEN-GRADED
B
8" INSIDE DIAMETER
STONE BASE WRAPPED IN
PERFORATED HDPE PIPE
GEOTEXTILE, TOP AND
SIDES ONLY STONE FILLED PERFORATED
12" DIAMETER PVC PIPE
UNDISTURBED SOIL WRAPPED ALL AROUND
1'-0"
WITH GEOTEXTILE FABRIC.
PERMEABLE SOIL
SOLID 8" INSIDE
A
CONSTANT SLOPE TEMPORARY 18" MAXIMUM
DIAMETER HDPE
DIAMETER CASING AUGERED
PIPE
1'-0"
PENETRATION INTO
GRANULAR FILL TO FILL THE
OPEN-GRADED STONE BASE ANNULAR SPACE BETWEEN
WRAPPED WITH GEOTEXTILE TOP OF STONE COUMN PVC CAP WITH THE STONE COLUMN PIPE
(TOP AND SIDES ONLY) WITH PERFORATED CAP PRIMER AND AND THE HOLE
SOLVENT
CEMENT OPEN-GRADED STONE
PERMEABLE SOIL LAYER
1'-0"
1'-2
OBSERVATION WELL, SEE GI-213
EQ
5'-0" OR AS PER DESIGN
SIDEWALK 1'-3" CONCRETE HEADER
STEEL TREE GUARD (3-SIDES
CONSTANT SLOPE 1'-0" TYP.) SEE GI-601, GI-602, GI-603
& GI-604
GABION WALL BELOW 1'-6" SEE GI-503A THROUGH GI-503G
EQ
CONCRETE STRIP, SEE GI-207 FOR TYPICAL PLANTING PLANS
STONE
NEW CURB TYPE TO MATCH
COLUMN
CONTRACT PLANS
EXISTING CURB
TO REMAIN 12"x5" CONCRETE STRIP
1'-6"
EXPANSION JOINT
FLOW
EXISTING STORMWATER EXISTING CURB
ASPHALT INLET TO REMAIN
PAVEMENT SEE GI-185
PITCH PITCH LIMIT OF NEW CURB TO EXTEND
BEYOND THE ROWB AS DETERMINED BY
TOP OF ROADWAY C.I. FRAME AND GRATING FIELD CONDITIONS AND SITE ENGINEER
(BEYOND) (WITHOUT CURB PIECE),
C C
ASPHALT TO BE
CAST IRON FRAME SET 1" SEE DEP STANDARDS
PITCHED TOWARDS
1'-0"
BELOW TOP OF ROAD SE58A & SE59A
PITCH
THE CI GRATE.
1"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
SECTION C-C GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. BIOSWALE TYPE D STORMWATER INLET SECTIONS & DETAILS
- NO CONNECTION TO SEWERS
L
1'-0"
SIDEWALK CLEANOUT;
REFER TO
DETAILS GI-204 CONCRETE HEADER
STEEL TREE GUARD (3-SIDES TYP.)
1'-0" SEE GI-601, GI-602, GI-603 & GI-604
W
GABION WALL UNDER 1'-3"
CONCRETE STRIP, SEE
GI-207
NEW CURB TYPE TO MATCH
CONTRACT PLANS
EXISTING CURB
1'-0"
C C
1'-6"
TO REMAIN 5" THICK CONCRETE STRIP EXPANSION JOINT
FLOW
EXISTING 8" INSIDE DIAMETER PERFORATED PIPE, EXISTING CURB
ASPHALT SEE CORRESPONDING GI FEATURE TO REMAIN
STORMWATER
PAVEMENT FOR CORRECT PIPE PLACEMENT
INLET (ALTERNATE LIMIT OF NEW CURB TO EXTEND
WITHIN THE PRACTICE
LOCATION PER DEP BEYOND THE ROWB AS DETERMINED
APPROVAL) BY FIELD CONDITIONS AND SITE
PLAN ENGINEER
12"x5"
CONCRETE HEADER
CONCRETE CONCRETE
STRIP STORMWATER INLET
12"x5" CONCRETE HEADER
LEVELING (BRICK COURSE ABOVE
STRIP SIDEWALK
COURSE NOT SHOWN FOR
LEVELING CLARITY)
GABION
E COURSE E WALL
GABION
BRICK COURSE. 8" 4'-0" 8"
WALL
AS REQUIRED
5-#6@3" OC
5-#6@3"
8"
8"
F F
2"
1'-4"
EQ EQ
4'-10"
3"
ROADWAY
CURB
4'-6"
2'-2"
10"
DIAMETER PIPE WITH
3'-4"
PERFORATED COVER
C.I. HOOD, SEE
8" INSIDE DIA. HDPE
DEP STANDARDS
PIPE
SE60
8"
MORTAR
AROUND PIPE CAST IRON FRAME
5'-4"
EXISTING SOIL [WITHOUT CURB PIECE] PLAN [WITH REINFORCEMENT]
AND GRATING , SEE DEP
PLAN [WITH CASTING]
9"
SIDEWALK
W
EXISTING CURB
TO REMAIN
FLOW
EXISTING
ASPHALT
PAVEMENT
TYPE 1/TYPE 2
L
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
TYPE 3 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-200
MISCELLANEOUS DETAILS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD FOR ROWB/ROWGS/ROWRG INLET & OUTLET
CAST IN PLACE
20'-0" OR AS PER DESIGN CONCRETE STRIP
L-SHAPED EDGING
CONCRETE GUTTER (TYP)
SURFACE TAPERED SURFACES WITH
GRADING AS BRUSHED FINISH (TYP.)
PER DRAWING DROP CURB OUTLET ELEVATION
GI-124
5'-0" OR AS PER DESIGN
OUTLET INVERT +
SET 3" BELOW
OUTLET INVERT
GABION BELOW
CONCRETE STRIP
L-SHAPED
EDGING (TYP.)
CAST-IN-PLACE
CONCRETE STRIP
GABION BELOW CONCRETE STRIP NEW CURB (TYP)
CONCRETE STRIP (TYP.)
10
"
CURB LINE HEADER (TYP.)
5"-THICK CONCRETE
1'-0"
[INLET] 2'-
0
1'-6"
STRIP "
2'-0" 10" 18" 2'-2"
+
15% - 20%
FLOW [OUTLET]
PITCH 8"-THICK REINFORCED FLOW
1'-6"
PITCH
TO MATCH EXISTING
CONCRETE GUTTER
A A
ROADWAY
4'-4" 5'-4"
CONCRETE
APRON LEVELING COURSE
PLAN
NEW CURB (TYP) ISOMETRIC VIEW
TAPERED SURFACES WITH OUTLET
BRUSHED FINISH (TYP.)
N.T.S.
DROP CURB INLET ELEVATION
HEADER (TYP)
CAST-IN-PLACE CONCRETE INLET
APRON WITH 15% - 20% PITCH (TYP)
EXTENT OF NEW CURB
2'- CONCRETE GUTTER (TYP) VARIES PER FIELD CONDITION
2"
18" 2'-2"
TYPICAL EXPANSION HEADER (BEYOND)
CAST-IN-PLACE TO HEADER
1'- CONCRETE STRIP JOINT HEIGHT OF ADJACENT
6"
ASPHALT PAVEMENT
ADJACENT 8"-THICK,
L-SHAPED EDGING PITCH 1 PITCH FLUSH WITH CONCRETE
18"-WIDE REINF. 2 APRON
LEVELING COURSE CONCRETE GUTTER, TOP
FLUSH WITH APRON
5'-4"
WWM 6x6-W8xW8 WWM 6x6-W8xW8
CAST-IN-PLACE REINFORCED
CONCRETE APRON BOTTOM OF CURB
LEVELING COURSE
L-SHAPED EDGING
SECTION A-A
ISOMETRIC VIEW
INLET
N.T.S.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR STORMWATER INLET
FOR R.O.W. BIOSWALE TYPE 1B AND TYPE 2B - NO CONNECTION TO SEWERS
8"
1" CLEAR
6" L. HOOK, SEE
DEP STANDARDS
4'-10"
8'-2" +/-
GRATING , SEE DEP MODIFIED STANDARDS SE60
STANDARDS SE58A & SE59B C.I. HOOD,
6'-6"
SEE DEP
4'-0" SUMP
(3'-0" MIN.)
STANDARDS
SE60 8" 4'-0" 8"
8" 3'-6" 8"
5'-4"
A
PLAN [WITH CASTING]
12"
CURB
8"
2" NOTES:
8"
B CONC. SDWK. SLOPE PAVEMENT
B SLOPE PAVEMENT TO CASTING TO CASTING
FINAL GRADE (TOP OF CURB)
EXIST. RDWY. 7" EXIST. RDWY.
TYP.
BRICK, SINGLE REMOVABLE PRECAST TYPE-2 BRICK, SINGLE LAYER
LAYER
SLAB (SEE DETAIL a-a)
MORTAR AROUND
3'-6"
8"
8"
PIPE OUTLET
4" (TYP.)
0.5" MORTAR
LIFTING HOOK, JOINT, TYP. 6" L. HOOK, SEE DEP
TYPICAL FOR FOUR LIFTING 4" STANDARDS SE60
8" SOLID DUAL
[SEE DETAIL] HOOK WALL HDPE PIPE 1 1/2"R WELDED HANDLE
8" [SEE DETAIL] ON MODIFIED C.I.
HOOD, SEE DEP
4"
1 1/2" STANDARDS SE60
WWM-AS=0.12 B.W. 15" X 15" OPENING
8" 4'-0" 8" #6 REINF. BAR
(SEE NOTE 1)
LIFTING HOOK (SEE
3'-0"
NOTES)
6'-6"
A WWM-AS=0.12 B.W.
10" MAX.
PLAN
4'-0" SUMP
(3'-0" MIN)
8" (TYP.)
a 1 1/2"R (TYP.)
NOTE:
1'-0"
R3"
6"
ALL STEEL LIFTING BAR
REINFORCEMENT [SEE DETAIL]
2" (TYP.) SECTION B-B
4'-10"
6" 6"
ARE #6 BARS
NOTES:
8"
1. LOCATION OF OPENING SHALL BE DETERMINED PRIOR TO THE MANUFACTURING OF BASIN BY FIELD MEASUREMENTS.
2. LOCATION OF CURB SHALL BE AS SHOWN UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
3. LOCATION AND ANGLE OF 8" HDPE OUTLET PIPE MAY BE VARIED TO SUIT FIELD CONDITIONS. 1" CLEAR
4. LIFTING HOOKS SHALL BE LOCATED IN THE SECTION AS PER MANUFACTURERS RECOMMENDATIONS AND GROUTED 11" 2" 2"
4" 4"
a PRIOR TO BACKFILLING. (FOUR (4) LIFTING HOOKS SHALL BE PROVIDED FOR EACH SECTION AND SHALL BE PLACED 2" 3" 2"
5'-4" SYMMETRICALLY AND IN SUCH A MANNER AS TO PROVIDE FOR THE EVEN LIFTING OF THE SECTION.)
5. LIFTING BAR TO BE CUT FLUSH TO SURFACE AFTER PLACEMENT OF PRECAST TYPE 2 SLAB. 4'-10"
6. CONCRETE IS TO BE CLASS 40 AND 5% AIR ENTRAINED. REBARS-GRADE 60. WWM-F S = 65,000 PSI.
REINFORCEMENT PLAN 7. MODIFY STANDARD CAST IRON HOOD AND HOOKS [SE60] AS PER DRAWING DETAIL a-a
[REMOVABLE PRECAST TYPE 2 SLAB] [OF REMOVABLE PRECAST TYPE 2 SLAB]
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. SECTIONS AND DETAILS
VARIES LENGTH AS SPECIFIED SOLID 45° BEND
CONCRETE HEADER
4" MIN.
COVER SIDEWALK 8" INSIDE DIAMETER
PERFORATED PIPE
7 1/2"
H
H
80 MIL HDPE
W BARRIER;
5" MIN
LENGTH OF GI
PRACTICE
EQ EQ
BOTH ENDS OF HDPE SIDE VIEW END VIEW HDPE BARRIER
STORMWATER CHAMBER TO WITH 12" TOE
BE SEALED WITH END CAPS PERFORATED
ROW GI WIDTH W H COVER (TYP.)
12"
5" MINIMUM STONE BEDDING
≥ 5' 40"-51" 25"-30"
STORMWATER INLET
≤ 4'-6" 34"-36" 16"-20.5" CROSS-SECTION
HDPE BARRIER DETAILS
DIMENSION SCHEDULE AGAINST SIDEWALK
(ONLY IF DIRECTED)
HDPE STORMWATER CHAMBER N.T.S. ROWB TYPE D TYPICAL
N.T.S. PIPE/STORMWATER INLET
COVER SOLID CLEANOUT
COVER (TYP.) SET 2"
CONNECTION
COVER
ABOVE SURFACE
SOLID CLEANOUT GRADE
GRADE COVER (TYP.)
ENGINEERED
DRAINAGE HOLES SOLID DRAIN
2% SLOPE HDPE PIPE TO ELBOW
(OPTIONAL) BODY
SOIL
6" (± 0.25")
6" (± 0.25")
COVER
CAST IRON CLEANOUT COVER CAST IRON CLEANOUT COVER PERFORATED
(TYP.) WITH CAMLOCK LOCKING (TYP.) TO BE FLUSH WITH FLOW
DEP COVER 8" INSIDE DIA. OPEN-GRADED
8" MECHANISM TOP OF GRADE SURFACE PERFORATED PIPE STONE LAYER FROM INLET
WYE FITTING
9 7/8"
CLEAN OUT
OPENING DIMENSIONS
GRADED
STONE
OPEN
SOLID DRAIN
BODY CLEAN-OUT DETAIL- ROWB TYPE D - HDPE PIPE
L-SHAPED EDGING 90° BEND 8" INSIDE DIA. PERFORATED HDPE PIPE. N.T.S.
N.T.S.
WATERTIGHT EXPANDING
WATER FOAM SEALANT IN SPLIT
ENGINEERED
UTILITY 3" SOIL
A SLEEVE (THROUGH 6"
CLASS B
DUCT 3" ENTIRE SLEEVE)
CONCRETE
D 2D HEADER
COLLAR
1'-0"
A INTERFACE BETWEEN SPLIT PVC PIPE
CONCRETE CLEAN
18"
COLLAR AND HDPE
BLANK UTILITY SLEEVE
COLLAR (TYP.) OPEN-GRADED BARRIER TO BE SEALED MARKER DETAIL
STONE BASE WITH WATERPROOF CONCRETE
WRAP STONES IN STRIP
SEALANT. SEE NOTES
GEOTEXTILE (TOP
AND SIDES ONLY) 80 MIL HDPE BARRIER;
GABION (BEYOND), LENGTH OF GI
PARTIALLY SHOWN PRACTICE WITH 12"
FOR CLARITY, SEE
SECTION TOE. SEE NOTES
GI-207 HDPE
CURB
BARRIER. WATER UTILITY SOLID PVC PIPE
12"
SEE NOTES D FOR FUTURE
WATERTIGHT EXPANDING
WATER SERVICE
FOAM SEALANT BETWEEN
2D + 6"
NOTES: 6" UTILITY AND PVC SPLIT
1. HDPE BARRIER TO BE INSTALLED WHEN THERE IS AN UTILITY CROSSING ONLY IF WATER SERVICE IS 2D 2D SLEEVE (THROUGH
AND/OR WHEN THERE IS LESS THAN 10' FROM THE ASSET TO THE ENCOUNTERED: ADDITIONAL
ENTIRE SLEEVE) SOLID PVC PIPE ROADWAY
BUILDING LINE. SLEEVE TO BE CONSTRUCTED
FOR FUTURE WATER 3" TO BE CAPPED AT
2. ANY SEAMS IN THE HDPE BARRIER MUST HAVE A 1'-0" OVERLAP AND BE 3" CLASS B CONCRETE COLLAR WATER
SERVICE. SOLID PVC PIPE TO BOTH ENDS
SEALED WITH WATERTIGHT SEALANT UTILITY DUCT
3. ADDITIONAL SLEEVE SHALL BE PVC PIPE AND EXTEND OUTWARD AS BE CAPPED AT BOTH ENDS.
LOCATION TO BE MARKED ON
SHOWN ABOVE.
CONCRETE HEADER, CROSS SECTION A-A PLAN B-B
4. SPLIT PVC PIPE SHALL BE USED TO SLEEVE THE EXISTING WATER
SERVICE LINE AND SOLID PVC PIPE SHALL BE USED FOR THE SPARE DIRECTLY ABOVE PVC PIPE.
SLEEVE. WATER UTILITY CROSSING DETAIL
N.T.S.
CURB SIDEWALK
2D + 6"
PLANTED
AREA
HDPE
BARRIER NOTES:
D UTILITY
WATERTIGHT EXPANDING 1. HDPE BARRIER TO BE INSTALLED WHEN THERE IS
UTILITY FOAM SEALANT IN SPLIT WATERTIGHT EXPANDING FOAM AN UTILITY CROSSING AND/OR WHEN THERE IS LESS
ENGINEERED
DUCT 3" SOIL A SLEEVE (THROUGH 2D + 6" 2D
SEALANT BETWEEN UTILITY AND THAN 10' FROM THE ASSET TO THE BUILDING LINE.
3" ENTIRE SLEEVE) PVC SPLIT SLEEVE (THROUGH 2. ANY SEAMS IN THE HDPE BARRIER MUST HAVE A
D 2D ENTIRE SLEEVE) 1'-0" OVERLAP AND BE SEALED WITH WATERTIGHT
SEALANT.
1'-0" 3" 3" CLASS B CONCRETE COLLAR
A INTERFACE BETWEEN
18"
CONCRETE COLLAR AND HDPE
COLLAR (TYP.)
CLEAN
BARRIER TO BE SEALED
CROSS SECTION A-A
OPEN-GRADED
STONE BASE WITH WATERPROOF
WRAP STONES IN
SEALANT. SEE NOTES
GEOTEXTILE (TOP
AND SIDES ONLY) 80 MIL HDPE BARRIER;
GABION (BEYOND), LENGTH OF GI UTILITY CROSSING DETAIL 05-13-2022
P.E.
PARTIALLY SHOWN PRACTICE WITH 12"
FOR CLARITY, SEE
SECTION TOE. SEE NOTES N.T.S. MANAGING DIRECTOR, DATE
GI-207 GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD DETAILS FOR R.O.W. STORMWATER SEEPAGE BASIN
CIRCULAR REINFORCED CONCRETE SLAB AND FOOTING
PLAN OF CIRCULAR SLAB PLAN OF PRECAST CIRCULAR FOOTING RING PRECAST SEEPAGE BASIN SCHEDULE
VARIES #4 HOOPS TOP MIN.. 6" PRECAST CIRCULAR PRECAST CIRCULAR THICKNESS
AND BOTTOM MAX.12" SLAB (FT) FOOTING RING (FT) (IN)
3-#6@4" BOTH
WAYS D d t
SECTION IN CIRCULAR SLAB SECTION IN PRECAST CIRCULAR FOOTING RING CIRCULAR SLAB AND FOOTING SCHEDULE
DETAIL A DETAIL B
#6 REINFORCING
3"R BAR
10"
3"R
8" 8"
P.E. 05-13-2022
LIFTING BAR DETAIL MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. SECTIONS AND DETAILS - GABION LAYOUT
TOP OF CONCRETE
STRIP FLUSH WITH
CURB TAPER
5"-THICK CONCRETE STRIP
CONCRETE CURB
[INLET]
A [OUTLET] A
PITCH
FLOW
8"-THICK REINFORCED FLOW
CONCRETE GUTTER
PITCH TO MATCH
EXISTING ROADWAY PLAN
LEVELING STONE
GABION BELOW
CONCRETE STRIP
GABION PLACED
BELOW CONCRETE
GABION FILLED WITH STRIP
CLEAN OPEN
GRADED STONE
SECTION A-A
TYPICAL GABION LAYOUT
GABION BELOW CONCRETE
CONCRETE STRIP STRIP
CONCRETE STRIP 3"-THICK LEVELING STONE
OUTLET CONCRETE STRIP INLET
6" MIN. 6" MIN.
2"
3- #4 @ 3" O.C.
3" MAX. TYP.
ENGINEERED SOIL LEVELING STONE
GABION BELOW
CONCRETE STRIP UTILITY CROSSING,
(LOCATION MAY VARY) GABION PLACED
BELOW CONCRETE
GABION FILLED WITH CLEAN OPEN GRADED
STRIP
CLEAN OPEN STONE BASE
GRADED STONE
SECTION A-A
GABION LAYOUT WITH UTILITY CROSSINGS
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN INLET WITH PRECAST CONCRETE CHAMBER
20'-0" OR AS PER DESIGN
6"
1'-0"
5'-0" OR AS PER DESIGN
6"
1'-8" 2'-10"
EXISTING CURB 2'-4" EXISTING CURB
2'-0"
TO REMAIN 2'-0" TO REMAIN
6"
+
[INLET]
1'-6"
FLOW
PITCH
EXISTING
ASPHALT FLOW
PAVEMENT
13" 36"
PLAN
CONCRETE GUTTER
(TYP.)
CONCRETE GUTTER
(TYP.) TOP OF CONCRETE CHAMBER
L6x4x3/8" FLUSH WITH SURFACE
STEEL FACED CURB L6x4x3/8"
STEEL GRATE ABOVE STEEL FACED CURB
1" INLET INVERT STEEL GRATE, TOP FLUSH
(PARTIALLY SHOWN WITH THE SURFACE
ELEVATION INLET INVERT
FOR CLARITY) (PARTIALLY SHOWN ELEVATION
CONCRETE INLET APRON FOR CLARITY)
WITH 10% - 20% PITCH CONCRETE INLET APRON
WITH 10% - 20% PITCH
OPENING FOR 8" INSIDE DIA OPENING FOR 8" INSIDE DIA
PERFORATED PIPE PERFORATED PIPE
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS - CONCRETE TOP
STEEL GRATE
SEE PART PLAN
NOT SHOWN
FOR CLARITY
FLOW
FLOW
PRECAST CONCRETE
CHAMBER WITH CONCRETE
STEEL GRATE COVER TOP
L2"x2"x1/4" BELOW
1" x 3/16" BEARING BAR L2" x 2" x 1/4" CONCRETE TOP
STEEL GRATE
ANCHORED TO 1" x 3/16" CROSS BAR
STEEL GRATE NYCDEP TYP.
CHAMBER WALLS (TYP)
COVER
A A
G-CLIP FASTENER OR
APPROVED EQUAL FLUSH GRATING FASTENER WITH
WITH TOP OF GRATE RECESSED BOLT (TYP.) 45°
3/8" x 4" PLAIN STEEL STUD
WELDED TO STEEL ANGLE
+ DETAIL A-A
INLET CONCRETE TOP STEEL BAR GRATE BRACING
10% - 20%
INVERT
PITCH
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS - GRASS TOP
PRECAST CONCRETE
CHAMBER WITH GRASS
STEEL GRATE COVER TOP
L2"x2"x1/4" BELOW
STEEL GRATE
ANCHORED TO
STEEL GRATE CHAMBER WALLS (TYP.) STEEL GRATE
COVER SEE PART PLAN
NYCDEP NOT SHOWN
A A FOR CLARITY
G-CLIP FASTENER OR
APPROVED EQUAL, FLUSH
WITH TOP OF GRATE
FLOW
FLOW
INVERT
PITCH
GRASS TOP
1" x 3/16" L-SHAPED EDGING, TOP
1" 1" x 3/16"
BEARING BAR L2" x 2" x 1/4" FLUSH WITH SURFACE,
PART PLAN - GRASS TOP L2" x 2" x 1/4" GRASS
BEARING BAR
DIMENSIONS PER
STEEL GRATE, LIFTING POINTS AND FASTENER DETAIL 1" x 3/16" TOP 1" x 3/16"
TYP. TYP. GI-204
CROSS BAR CROSS BAR
STAKES SHALL NOT
PUNCTURE THE
GIOTEXTILE FABRIC
PRECAST CONCRETE GRATING
CHAMBER WITH FASTENER WITH
GRASS GRATING
STEEL GRATE COVER RECESSED BOLT
TOP FASTENERS WITH 45° 45°
L2"x2"x1/4" BELOW RECESSED BOLTS
STEEL GRATE 3/8" x 4" PLAIN STEEL 3/8" x 4" PLAIN STEEL
ANCHORED TO STUD WELDED TO STEEL STUD WELDED TO
STEEL GRATE NYCDEP
CHAMBER WALLS (TYP) ANGLE STEEL ANGLE
COVER DETAIL B-B
DETAIL A-A
B B STEEL BAR GRATE BRACING
STEEL BAR GRATE BRACING (PRECAST CONCRETE CHAMBER FOR GRASS TOP IB)
G-CLIP FASTENER OR
APPROVED EQUAL, FLUSH
WITH TOP OF GRATE
+
INLET
10% - 20%
INVERT
PITCH
P.E. 05-13-2022
PART PLAN - GRASS TOP MANAGING DIRECTOR, DATE
STEEL GRATE, LIFTING POINTS AND FASTENER DETAIL
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. INFILTRATION BASIN STEEL GRATE DETAILS
3"
SMOOTHLY WELDED TO BARS
EMBOSSED LETTERS
A
L2"x2"x1/4"
NYC DEP
11/16"
NYCDEP
G-CLIP FASTENER OR
APPROVED EQUAL
SECTION A-A PLATE WITH DEP LOGO
A
B B
BEARING BARS OF
1" X 3/16"
9"
3"
D D C G-CLIP FASTENER OR
APPROVED EQUAL
BEARING BAR
CROSS BAR
L2"x2"x1/4"
1"
C 8"
SECTION D-D
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN INLET WITH PRECAST CONCRETE
CHAMBER & CAST IRON GRATE
- NO CONNECTION TO SEWERS
SIDEWALK SIDE A
CAST IRON GRATE
CAST IRON
4"
SEE INLET FLUSH WITH
GRATE NOT
CHAMBER SURFACE, (NOT
SHOWN FOR A
PLAN SHOWN FOR
CLARITY
1 1/2"
CLARITY) SEE
B B SECTIONS BELOW
1'-0"
1 1/2" AND GI-209D FOR
1 1/2"
1 1/2"
A DETAILS
FLOW
FLOW
C C
4"
PLAN
ROADWAY SIDE A
4"
2 1/2" 1 1/2" 1 1/2" 2 1/2"
1'-6" ANCHOR TAB,
6"
6"
SEE GI-209D
FOR DETAILS
2- #4 REBAR
4"
ANCHOR TAB,
1 1/2"
SEE GI-209D FOR
DETAILS
6"
2- #4 REBAR
4'-8"
2'-10"
(TYP.)
DETAIL D
4"
1 1/16"
PLAN VIEW AND
ANCHOR TAB
DETAIL
5 1/2"
2 1/2"
1"
1'-2 3/16"
1'-2 1/2"
TYP.
1'-3"
3/8" 1/4"
1"
D&T 5/16" - 18 5/16" - 18 x 1 1/2" BOLT
ROADWAY SIDE 5/16" FLAT WASHER COUNTERSINK 1" DIA.
7" 7" 1 1/2" x 1 1/2" x 1/4" L
1" WIDE X 3/16" FLAT STEEL (8) FLAT
5/8"
WELDED TO FRAME UNDERSIDE OF
FRAME, SEE ANCHOR TAB DETAIL
3'-1"
BOLT DETAIL
3'-0 1/2"
1 1/2" x 1 1/2" x 1/4" L
3'-0 3/16"
1 3/16"
1 1/2"
5/8"
NOTE:
MATERIAL - GRATE OF GRAY CAST IRON ASTM A48 CLASS 35B, FRAME OF HOT ROLLED, FABRICATED
STEEL, ASTM A36 05-13-2022
P.E.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. INFILTRATION BASIN OBSERVATION WELL
- NO CONNECTION TO SEWERS
E
OBSERVATION
6"
CLEANOUT, TYP. WELL
6"
2'-0"
SURFACE TYPE PER
DESIGN PLANS
+
FLOW
FLOW
PLAN E
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. INFILTRATION BASIN DEBRIS SCREEN
RUBBER FEET
PULL HANDLE
1/8"
"NYCDEP" CUT
THROUGH FRAME
PERFORATED
DEBRIS SHIELD
"
" 1/4
3-1 /4 " (REF)
1 / 16
ϕ 9"(REF)
DEBRIS SCREEN
REFERENCE
1/
16
"
REAR
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD R.O.W. INFILTRATION BASIN INLET SCREEN BOX
3/16" 3-1/4" 5-1/4"
1-1/4"
NOTES:
11/16"
1. WEIGHT (EMPTY): 15 LBS. MAX. 1-3/4"
2. MATERIAL: WELDED ALUMINUM CONSTRUCTION. 1/4"
3. MOUNTING HARDWARE PROVIDED BY MANUFACTURER 2-5/8"
4. MINIMUM PERFORMANCE CHARACTERISTICS (TYP): 1/2" 1"
11"
4.1. DEBRIS CAPACITY: 0.88 CU-FT
4.2. FILTERED FLOW RATE: 1.7 CFS.
4.3. BYPASS FLOW RATE: 0.86 CFS 1/16"
5. TYPICAL INSTALLATION:
6. INSTALLATION SHOULD BE PERFORMED BY QUALIFIED 3-3/8" 11-1/2"
PERSONNEL ONLY. CAREFULLY REMOVE THE STORM GRATE.
THEN LOCATE AND MARK THE HOLES FOR EACH SUPPORT 6"
2'-5" 3/1
BRACKET (OPTIONAL TEMPLATE AVAILABLE). SECURE THE
LEFT AND RIGHT SUPPORT BRACKETS USING THE PROVIDED TYPICAL BRACKET DIMENSIONS
HARDWARE. LOWER THE INLET SCREEN BOX ONTO THE PLAN TYPICAL SCREEN CONFIGURATION
BRACKETS VERIFY THAT THE INLET SCREENBOX RESTS ~1/8" (LEFT/RIGHT ARE MIRRORED)
BELOW THE CHAMBER INLET OPENING. THEN CAREFULLY
REPLACE THE STORM GRATE.
1'-0 7/8"
10"
8"
8"
5"
INLET SCREEN BOX
1-1/2"
LEFT/RIGHT SUPPORT (LIFTING SLOT)
BRACKETS
1/8"
TAB BYPASS HOOD
THIC
KNE
SS
LIFTING TABS Q
BYPASS
PRECAST CONCRETE
CHAMBER
P.E. 05-13-2022
REFERENCE VIEWS MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. BIOSWALE TYPE D OBSERVATION WELL
- NO CONNECTION TO SEWERS
A
1'-0"
OBSERVATION WELL
1'-0"
1'-3"
FLOW
PLANTED AREA
REMOVABLE OBSERVATION
WELL COVER PLAN
TOP LAYER 2"-3"
TOPSOIL OBSERVATION
WELL
MULCH A
12"x5" CONCRETE
STRIP STEEL TREE GUARD
(3-SIDES TYP.) SEE GI-601,
1'-0" 12" GI-602, GI-603 & GI-604
B
UNDISTURBED
SOIL
4" PVC SCHEDULE 40
PIPE
4" PVC SLOTTED WELL
SCREEN 0.01 SLOT
A
5'-2"
ROWB A B
8" 3'-6" 8" WITH TREE 3'-0" 2'-0"
NO TREE 3'-6" 1'-6" P.E. 05-13-2022
SECTION A-A MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-300
GUIDELINES FOR RIGHT-OF-WAY
GREEN INFRASTRUCTURE
STORMWATER GREENSTREET
PRACTICES
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1 LAYOUT
- NO CONNECTION TO SEWERS
PROPERTY LINE
CURB LINE
A FLOW
A
+ +
W
1' OFFSET
LOW POINT SET TAPER TO
1'-0"
4" STRIPE
B 3"-6" BELOW C ROADWAY
GI-302 OUTLET INVERT GI-302 GRADE
L
FLOW
GRADING PLAN
SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
NOTES: INVERT (EL___) CULVERT CULVERT INLET INVERT
(EL___)
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE OUTLET PITCH INLET (EL___)
WITH STORMWATER GREENSTREET CALCULATIONS. INVERT (EL___) INVERT (EL___) (EL___)
4"
4"
FOR 3"-6" DEEP
ROADWAY
DEPRESSION
7"
7"
1'-6"
1'-7"
1'-3"
+
6"
5"
9" 9"
L-SHAPED EDGING
5"
WITH MINIMUM 9" REINFORCED CONCRETE
STAKES CULVERT
CLEAN OPEN-GRADED
12" MIN.
SEE DRAWING GI-204 (CHANNEL DEPTH VARIES)
6" MIN.
STONE BASE
3'L x 1'W x 2'H GABION WRAP STONE IN
FILLED WITH GEOTEXTILE (TOP AND
OPEN-GRADED STONE SIDES ONLY) CONCRETE PATHWAY
LEVELING COURSE
WRAP GABION IN
GEOTEXTILE (TOP AND
SIDES ONLY) ENGINEERED SOIL
18"-24" DEPTH
WRAP STONE IN
FROM LOW POINT
GEOTEXTILE
(TOP AND SIDES ONLY) SECTION B-B CLEAN OPEN-GRADED SECTION C-C
STONE BASE
UNDISTURBED SOIL AT MIDSECTION AT PEDESTRIAN PATHWAY
TOP OF HEADER
4"
BOTTOM OF NOTCH FLUSH WITH
TOP OF SIDEWALK
4"
CONCRETE HEADER
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". UNDISTURBED SOIL
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 1A-WITH STONE COLUMNS
LAYOUT
PROPERTY LINE - NO CONNECTION TO SEWERS
CURB LINE
EXISTING
CATCH BASINS CONCRETE PATHWAY (TYP.) EXPANSION
STONE COLUMN- EXISTING
SEE DRAWING GI-312 JOINT EVERY 10' (MAX.)
SEE GI-103 DETAILS CONCRETE
FOR DETAILS SIDEWALK
L-SHAPED EDGING
STEEL TREE GUARDS (TYP.)
WITH MINIMUM 9" BIOFILTER INLET
OUTLET - SEE ROWB SEE DRAWING GI-601,
STAKES SEE TRANSITION SECTION -
TYPE 1 STANDARDS GI-602, GI-603 & GI-604 SEE DRAWING GI-310
DRAWING GI-204 EXISTING CURB TO
FOR DETAILS FOR DETAILS
NEW HEADER
4" x 4" NOTCHES
TAPER UP TO 4" ABOVE LOW POINT SET
B C (TYP.) - SEE CONCRETE HEADER - EXISTING
SIDEWALK GRADE 3"-6" BELOW GI-304 GI-304 GI-304 FOR 4" ABOVE SIDEWALK CURB
OUTLET INVERT DETAILS GRADE
A FLOW
A
+ +
W
1' OFFSET
1'-0"
3'L x 1'W x 2'H GABION FILLED WITH TAPER TO
4" STRIPE
OPEN-GRADED STONE B C ROADWAY
BELOW STONE STRIP WITH GI-304 GI-304 GRADE
L-SHAPED EDGING ON THREE SIDES REINFORCED LOW POINT SET 3"-6"
CONCRETE BELOW CULVERT
L CULVERT INLET INVERT
FLOW
GRADING PLAN
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE CONCRETE
WITH STORMWATER GREENSTREET CALCULATIONS. SGS OUTLET LP (EL___) CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
INVERT (EL___) CULVERT CULVERT INLET INLET INVERT
(EL___)
OUTLET INVERT INVERT (EL___) (EL___)
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH (EL___)
VARIES. TOTAL DEPTH NOT TO EXCEED 60". (EL___) PITCH
3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE
DIRECTION OF THE ENGINEER. + +
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.
CLEAN OPEN-GRADED STONE BASE
5. STONE COLUMN AND/OR PEDESTRIAN PATHWAY WHEN REQUIRED.
4"
4"
ROADWAY GRADE TO ALLOW SIDEWALK SIDEWALK
ROADWAY
FOR 3"-6" DEEP
7"
7" DEPRESSION
1'-7"
1'-3"
1'-6"
6"
5"
9"
L-SHAPED EDGING WITH 9"
5"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT
12" MIN.
(CHANNEL DEPTH VARIES) CLEAN OPEN-GRADED
6" MIN.
3'L x 1'W x 2'H GABION STONE BASE
FILLED WITH WRAP STONE IN
GEOTEXTILE (TOP AND CONCRETE PATHWAY
OPEN-GRADED STONE
SIDES ONLY) LEVELING COURSE
WRAP STONE IN ENGINEERED SOIL
GEOTEXTILE 18"-24" DEPTH
(TOP AND SIDES ONLY) FROM LOW POINT
WRAP GABION IN GEOTEXTILE CLEAN OPEN-GRADED
(TOP AND SIDES ONLY) STONE BASE
TEMPORARY 18", MAXIMUM
SECTION C-C
PERMEABLE SOIL LAYER
DIAMETER CASING AUGERED AT PEDESTRIAN PATHWAY
GRANULAR FILL TO FILL THE
ANNULAR SPACE BETWEEN INTO PERMEABLE SOIL
TOP OF HEADER
THE STONE COLUMN PIPE AND OPEN BOTTOM (TYP)
THE HOLE SECTION B-B 4"
AT MIDSECTION (STONE COLUMN) BOTTOM OF NOTCH FLUSH WITH
TOP OF SIDEWALK
4"
CONCRETE HEADER
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". UNDISTURBED SOIL
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2 LAYOUT
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN PROPERTY LINE
A FLOW
+ +
W
CONCRETE NECKDOWN
RADIUS AND LOW POINT SET TAPER TO
CROSSWALK RAMPS AS OUTLET - SEE 3"-6" BELOW ROADWAY
A B C
1'-0"
REQUIRED BY DOT ROWB TYPE 1 OUTLET INVERT GRADE
STANDARDS FOR GI-306 GI-306 1' OFFSET
DETAILS L 4" STRIPE
FLOW
GRADING PLAN
SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
INVERT (EL___) CULVERT CULVERT INLET INVERT (EL___)
OUTLET INLET (EL___)
INVERT (EL___) PITCH INVERT (EL___) (EL___)
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN
ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
+ +
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT.
STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". CLEAN OPEN-GRADED STONE BASE
3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE
DIRECTION OF THE ENGINEER.
4. IF DEEPER LOW POINT (L.P.) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED. SECTION A-A
5. PEDESTRIAN PATHWAY WHEN REQUIRED.
P.E. 05-13-2022
6. WHERE (EL___) IS INDICATED, ELEVATION TO BE SHOWN IN CONTRACT PLANS.
MANAGING DIRECTOR, DATE
7. HEADER NOTCHES ARE PLACED EQUALLY SPACED 4' TO 7' APART. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2 LAYOUT
- NO CONNECTION TO SEWERS
4"
4"
SIDEWALK EXISTING
ROADWAY FOR 3"-6" DEEP
DEPRESSION ROADWAY
7"
7"
1'-6"
1'-7"
1'-3"
+
5"
9"
5"
L-SHAPED EDGING WITH 9"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT
12" MIN.
(CHANNEL DEPTH VARIES) CLEAN OPEN-GRADED
6" MIN.
3'L x 1'W x 2'H GABION STONE BASE
FILLED WITH WRAP STONE IN
OPEN-GRADED STONE GEOTEXTILE (TOP AND
SIDES ONLY) CONCRETE PATHWAY
WRAP GABION IN LEVELING COURSE
GEOTEXTILE (TOP AND
SIDES ONLY) ENGINEERED SOIL
WRAP STONE IN 18"-24" DEPTH
GEOTEXTILE FROM LOW POINT
(TOP AND SIDES ONLY)
UNDISTURBED CLEAN OPEN-GRADED
SOIL SECTION B-B STONE BASE
SECTION C-C
AT MIDSECTION AT PEDESTRIAN PATHWAY
TOP OF HEADER
4"
BOTTOM OF NOTCH FLUSH WITH
TOP OF SIDEWALK
4"
CONCRETE HEADER
NOTES:
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60". UNDISTURBED SOIL
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS
LAYOUT
- NO CONNECTION TO SEWERS
EXISTING
CATCH BASIN PROPERTY LINE
EXISTING CURB LINE (TYP.) EXPANSION CONCRETE PATHWAY BIOFILTER INLET EXISTING
STEEL TREE GUARDS L-SHAPED EDGING
JOINT EVERY 10' (MAX.) SEE DRAWING GI-312 WITH MINIMUM 9" SEE DRAWING GI-310 CONCRETE
(TYP.) SEE DRAWING
FOR DETAILS STAKES SEE FOR DETAILS SIDEWALK
TAPER UP TO 4" GI-601, GI-602, GI-603
NEW CONCRETE & GI-604 DRAWING GI-204 CONCRETE HEADER -
ABOVE SIDEWALK
GRADE 4" x 4" NOTCHES (TYP.) - 4" ABOVE SIDEWALK
STONE SEE GI-308 FOR GRADE
3'L x 1'W x 2'H GABION FILLED TRANSITION SECTION -
COLUMN, SEE DETAILS EXISTING CURB TO
PROPOSED WITH OPEN-GRADED STONE C
CURB LINE B GI-103 FOR LOW POINT SET 3"-6" NEW HEADER
BELOW STONE STRIP WITH
GI-308 DETAILS GI-308 BELOW CULVERT INLET EXISTING
L-SHAPED EDGING ON
INVERT CURB
THREE SIDES
A FLOW
W
+ +
1'-0"
ROWB TYPE 1 OUTLET INVERT GRADE
CROSSWALK RAMPS AS STANDARDS FOR
REQUIRED BY DOT
GI-308 GI-308 1' OFFSET
DETAILS 4" STRIPE
L
FLOW
GRADING PLAN
NOTES: SGS OUTLET LP (EL___) CONCRETE CONCRETE LP (EL___) WEIR (EL___) SGS BIOFILTER
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE INVERT (EL___) PONDING CULVERT CULVERT PONDING INLET INVERT
(EL___)
WITH STORMWATER GREENSTREET CALCULATIONS. DEPTH 3"-6" OUTLET INLET INVERT DEPTH 3"-6" (EL___)
INVERT (EL___) (EL___) (EL___)
PITCH
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT.
STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
8. 5' (MIN.) DISTANCE BETWEEN STONE COLUMNS; NUMBER OF STONE COLUMNS AS SECTION A-A
REQUIRED BY DEP.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 2A-WITH STONE COLUMNS
LAYOUT
- NO CONNECTION TO SEWERS
4"
4"
GRADE TO ALLOW SIDEWALK ROADWAY
ROADWAY FOR 3"-6" DEEP
7"
DEPRESSION
7"
1'-7"
1'-3"
1'-6"
5"
L-SHAPED EDGING WITH 9" 9"
5"
MINIMUM 9" STAKES REINFORCED CONCRETE
SEE DRAWING GI-204 CULVERT
12" MIN.
(CHANNEL DEPTH VARIES) CLEAN OPEN-GRADED
6" MIN.
3'L x 1'W x 2'H GABION STONE BASE
FILLED WITH WRAP STONE IN
OPEN-GRADED STONE GEOTEXTILE (TOP AND
SIDES ONLY) CONCRETE PATHWAY
WRAP STONE IN LEVELING COURSE
ENGINEERED SOIL
GEOTEXTILE
18"-24" DEPTH
(TOP AND SIDES ONLY)
FROM LOW POINT
WRAP GABION IN GEOTEXTILE CLEAN OPEN-GRADED
(TOP AND SIDES ONLY) STONE BASE
PERMEABLE SOIL LAYER TEMPORARY 18", MAXIMUM SECTION C-C
GRANULAR FILL TO FILL THE DIAMETER CASING AUGERED AT PEDESTRIAN PATHWAY
ANNULAR SPACE BETWEEN INTO PERMEABLE SOIL
THE STONE COLUMN PIPE AND SECTION B-B OPEN BOTTOM (TYP)
THE HOLE
AT MIDSECTION (STONE COLUMN)
TOP OF HEADER
4"
BOTTOM OF NOTCH FLUSH WITH
NOTES: TOP OF SIDEWALK
1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
4"
CONCRETE HEADER
2. IMPERVIOUS ROW AREA IS CALCULATED IN TDA ANALYSIS SPREADSHEET.
3. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
4. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
UNDISTURBED SOIL
5. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.
8. PEDESTRIAN PATHWAY CULVERT COVER TO BE CONCRETE WHEN ELEVATION AT SIDEWALK CURB IS HIGHER THAN ELEVATION AT
ROADWAY CURB; OTHERWISE, CULVERT COVER TO BE METAL GRATED WITH PATHWAY SLOPING TOWARDS GRATING ON EITHER SIDE.
CONCRETE HEADER - NOTCH DETAILS
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) TYPE 3 LAYOUT
- NO CONNECTION TO SEWERS
3'L x 1'W x 2'H GABION
FILLED WITH CLEAN CURBCUT INLET - SEE CONCRETE HEADER -
OPEN-GRADED STONE LOW POINT SET ROWB TYPE 1 FOR CURB 4" ABOVE SIDEWALK GRADE
EXISTING OUTLET - SEE ROWB
BELOW STONE STRIP 3"-6" BELOW TAPER DETAILS
CATCH BASIN TYPE 1 FOR CURB EXISTING EXISTING CURB
WITH L-SHAPED EDGING OUTLET INVERT MEDIAN BIOFILTER INLET
CURB LINE
TAPER DETAILS
ON THREE SIDES A ROADWAY
SEE DRAWING GI-311 FLOW
FOR TYPICAL DETAILS PITCH
B B
10% EXISTING
+ CONCRETE
W
MEDIAN
10%
3'-10"
1'-6"
PITCH FLOW
EXISTING (TYP.) EXPANSION
A ROADWAY JOINT EVERY 10' (MAX.)
GRADING PLAN
WEIR (EL___) SGS INLET
INVERT (EL___)
SGS OUTLET LP (EL___) (EL___)
INVERT (EL___) (EL___)
+
CLEAN OPEN-GRADED STONE BASE
6" W 6"
CURB TYPE TO MATCH
EROSION CONTROL CONTRACT PLANS SECTION B-B
CURB TYPE TO
MATTING
MATCH EXISTING 1'-0"
GRADE TO ALLOW FOR 36"L x 12"W' x 6"H EPOXY NOTES:
ROADWAY BONDED STONE STRIP 1. DEPTH OF SOIL AND STONE SHALL BE DIMENSIONED IN ACCORDANCE WITH STORMWATER GREENSTREET CALCULATIONS.
3"-6" DEEP DEPRESSION
6"
6"
1'-6"
2. ENGINEERED SOIL DEPTH TO BE 18", AND 24" IF TREE IS PRESENT. STONE DEPTH VARIES. TOTAL DEPTH NOT TO EXCEED 60".
+ ROADWAY
1'-6"
3. DEPTH AND MATERIALS MAY CHANGE DUE TO FIELD CONDITIONS UNDER THE DIRECTION OF THE ENGINEER.
L-SHAPED EDGING WITH
4. IF DEEPER LOW POINT (LP) IS REQUIRED, DEP APPROVAL WILL BE REQUIRED.
MINIMUM 9" STAKES
SEE DRAWING GI-204
6" MIN.
6"
V-NOTCHES
FLOW
VARIES
NOTES:
1. NUMBER OF BROKEN STONE BERMS MAY VARY AS REQUIRED BY DEP.
A A
VARIES
CONCRETE
APRON
GRAVEL STRIP
EXIT WEIR
0"
1'-
6"
TAPER INLET
TO DEPTH
INDICATED
BEGIN TAPER
ENTRY WEIR TO ROADWAY
8" REBAR GRADE
DOWEL B BROKEN
STONE BERM
EXTERIOR
PERIMETER
CURB
PLAN
4"
BASIN PERIMETER CURB
EXIT WEIR ENTRY WEIR EXISTING
TOP OF INTERIOR ASPHALT 2" BROKEN
EXISTING ROADWAY
2"
1"
STONE BERM
2"
6"
7"
2"
PERIMETER CURB
4"
1'-3"
6"
6"
LANDSCAPE INTERIOR
1'-0"
1'-3"
1'-2"
1'-0"
6"
1'-0"
ENGINEERED SOIL BROKEN STONE
SOIL
GEOTEXTILE CLEAN OPEN-GRADED UNDISTURBED
GEOTEXTILE CLEAN OPEN-GRADED STONE BASE SOIL
STONE BASE
MATCH WITH
STONE DEPTH
3/8" = 1'-0"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS) MEDIAN BIOFILTER INLET LAYOUT
- NO CONNECTION TO SEWERS
PITCH
CURB TYPE TO 8" 6" 1'-0" 10" 1'-0" 10"
MATCH EXISTING
6"
8" REBAR DOWEL
CONCRETE
SETTLEMENT STRIP
0% SLOPE SIDEWALK CURB
NOTES:
1. NUMBER OF BROKEN STONE BERMS MAY VARY AS REQUIRED BY DEP.
A A
VARIES
V-NOTCHES CONCRETE
HEADER - 4" ABOVE
SIDEWALK GRADE
EXIT WEIR
6"
LANDSCAPE EDGING
INTERIOR PERIMETER
1'-6"
PITCH
6"
7"
BEYOND EXIT WEIR ENTRY WEIR
VARIES
1'-6"
1'-0"
TOP OF INTERIOR
2"
1"
INTERIOR
4"
SIDEWALK
1'-3"
1'-2"
BROKEN STONE
1'-0"
6"
LANDSCAPE
EDGING
GEOTEXTILE FABRIC CLEAN OPEN-GRADED UNDISTURBED
ENGINEERED STONE BASE SOIL
SOIL
GEOTEXTILE CLEAN OPEN-GRADED
MATCH WITH STONE BASE
STONE DEPTH
SECTION B-B
SECTION A-A
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. STORMWATER GREENSTREET (ROWSGS)
CONCRETE AND GRATE PEDESTRIAN PATHWAYS
EXISTING SIDEWALK - NO CONNECTION TO SEWERS
CONCRETE CULVERT CONCRETE PATHWAY STEEL TREE GUARD
COVER SEE DRAWING GI-601,
REINFORCED CONCRETE
6" x 12" STONE STRIP EXPANSION JOINT GI-602, GI-603 & GI-604
CULVERT COVER
A 5" THICK PRECAST
SLOPE TRENCH TOWARDS
#3 REINFORCEMENT
CONCRETE SPACED EVENLY WITH 2" REINFORCED CONCRETE
2'-6" PLANTING (INLET) & TOWARDS
4"
PATHWAY CLEARANCE ON ALL SIDES CULVERT COVER
1'-0" STREET (OUTLET) AT 2% MIN.
6" MIN.
LEVELING COURSE 3'-0 1/2" 1 1/2" x 1 1/2" x 3/16" STEEL STEEL TREE GUARD - 6" THICK LEVELING
2'-0" ANGLE
4"
SEE DRAWING GI-601, COURSE
1/2" PRE MOLDED GI-602, GI-603 & GI-604
MATCH DETPH
VARIES
3'-0 1/2"
B B 1 1/8" 3 1/4" 3 1/4" EXPANSION JOINT
FLOW 3" 3" 6" x 12" STONE
FILLER STRIP BED
L-SHAPED EDGING
4"
WITH MINIMUM 9"
L-SHAPED EDGING
STAKES SEE WITH MINIMUM 9"
5"
DRAWING GI-204 CLEAN OPEN-GRADED
STAKES SEE
STONE BASE
DRAWING GI-204
5" 5"
PRECAST
ENGINEERED SOIL
A CONCRETE
CONCRETE CURB CULVERT GEOTEXTILE
EXISTING ROADWAY FLUSH WITH
PATHWAY CLEAN OPEN-GRADED STONE #3 REINFORCEMENT CONCRETE PATHWAY
6" 5'-0" 6" BASE SPACED EVENLY
WITH 2" CLEARANCE SECTION B-B
ON ALL SIDES
CONCRETE PATHWAY CONCRETE PATHWAY
PLAN SECTION A-A
CONCRETE CURB GALVANIZED D STEEL BAR
EXISTING METAL BAR GRATE STAINLESS STEEL FLAT HEAD
FLUSH WITH PATHWAY GRATE, BAR SIZE
SIDEWALK 1/4" TAP INTO SUPPORT BAR
2" x 2" x 1/4" ANGLE SHALL BE 1" x 3/16"
PRECAST
WITH GRATING EDGE OF PLATE 2" x 2" x 1/4" STEEL ANGLE WITH
CONCRETE PATHWAY
FASTENERS FLUSH AND TRUE GRATING FASTENERS
GALVANIZED STEEL STEEL TREE GUARD - 2" x 2" x 1/4" STEEL
L-SHAPED EDGING ANGLE WITH GRATING
GRATING FASTENERS PITCH TO DRAIN PER PLAN EXPANSION JOINT WITH JOINT SEE DRAWING GI-601,
WITH MINIMUM 9" FASTENERS
3'-0" SEALER GI-602, GI-603 & GI-604
6" x 12" STONE STRIP STAKES SEE
C DRAWING GI-204 1 1/8"
STEEL TREE GUARD - SEE GALVANIZED D STEEL
#3 REINFORCEMENT
VARIES
DRAWING GI-601, GI-602, GI603 & BAR GRATE, BAR SIZE
GI-604 SPACED EVENLY WITH 2" SHALL BE 1" x 3/16"
CLEARANCE ON ALL SIDES EDGE OF PLATE
7"
L-SHAPED EDGING
VARIES
MATCH DETPH
WITH MINIMUM 9"
5"
2'-6"
CLEAN OPEN-GRADED
LEVELING COURSE ENGINEERED SOIL STONE BASE
3"
METAL GRATE
PATHWAY PLAN P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-400
RIGHT-OF-WAY POROUS PAVEMENT
GREEN INFRASTRUCTURE
STANDARDS
STANDARD FOR 4' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS
WITH DRAINAGE CELLS
- NO CONNECTION TO SEWERS
PROPERTY EXISTING
DISTANCE FROM DISTANCE FROM
LINE 6" CAST-IN-PLACE OBSERVATION WELL, SIDEWALK
EDGE OF PROPERTY EDGE OF PROPERTY
CONCRETE HEADER SEE GI-406 FOR DETAILS NEW CAST-IN-PLACE
EXISTING LINE VARIES PER DESIGN LINE VARIES PER DESIGN
FLUSH WITH EXISTING 5'x4', 6"-THICK PRECAST CAST-IN-PLACE CONCRETE CURB
CURB LINE
GRADE (TYP.) POROUS CONCRETE CONCRETE DRAINAGE
5'-0" MIN. PANELS CHECK DAM CELLS
2'-0"
2'-0" 5'-0"
A B C C
4'-0"
FLOW
EXISTING
CATCH BASIN JOINT (TYP.) SEE
SEE SCHEDULE SHEET GI-409
6"
PRECAST POROUS
CONCRETE PANEL
PRECAST POROUS
MIN. SLOPE TO (LIFTING POINTS NOT
℄ ℄ CONCRETE PANEL
MATCH EXISTING SHOWN FOR CLARITY, SEE SCHEDULE GI-409
MIN. SLOPE TO (LIFTING INSERTS
SEE GI-408) MATCH EXISTING JOINT SEALANT,
FULL DEPTH SAWCUT NOT SHOWN FOR
1'-6" 6" 4'-0" LEVELING CAST-IN-PLACE SEE GI-408 CLARITY, SEE
REMOVE AND REPLACE CAST-IN-PLACE CHECK 6" 4'-0" 6"
COURSE DAM, 0" REVEAL. SEE CHECK DAM, 0" CLEAN OPEN GI-408)
2" ASPHALT WEARING CONCRETE HEADER; 0"
COURSE REVEAL NEW CAST-IN-PLACE GI-409 FOR SCHEDULE REVEAL. SEE GI-409 GRADED STONE 1 1/2" DIA.
NEW CAST-IN-PLACE
CONCRETE CURB FOR SCHEDULE BASE WEEP HOLE
EXISTING ASPHALT JOINT SEALANT, SEE GI-408 JOINT SEALANT, CONCRETE CURB
PAVEMENT TO REMAIN SEE GI-408 LEVELING COURSE STACKED MICROGRID, TOP
NEW SIDEWALK TO
DRAINAGE CELLS, AND SIDES OF
MATCH EXISTING CONCRETE HEADER; BIAXIAL GEOGRID
EXISTING ASPHALT OR SEE GI-409 DRAINAGE CELLS
CONCRETE BASE TO 0" REVEAL
SLOPE ONLY
REMAIN
3"
6"
6"
EQ EQ EQ EQ EQ
2'-0"
CAST-IN-PLACE
2'-0"
UNDISTURBED
1'-6"
2"
2"
CONCRETE HEADER SOIL
3"
6"
CAST-IN-PLACE
6"
6"
BASE CONCRETE
HEADER
3"
STACKED DRAINAGE 6" 6" 6"
3"
3"
CELLS, SEE GI-409 BIAXIAL GEOGRID 6" 6" 6"
MICROGRID, TOP UNDISTURBED BENEATH THE CHECK 1 1/2" DIA. WEEP
AND SIDES ONLY SECTION A-A SOIL DAM (NOT SHOWN SECTION B-B HOLE, 4 EQUALLY SECTION C-C
FOR CLARITY) SPACED
BIAXIAL GEOGRID
P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 4' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS TYPE A
WITH DRAINAGE CELLS AND STONE COLUMNS
- NO CONNECTION TO SEWERS
PROPERTY EXISTING
DISTANCE FROM DISTANCE FROM
LINE 6" CAST-IN-PLACE OBSERVATION WELL, SIDEWALK NEW
EDGE OF PROPERTY EDGE OF PROPERTY
CONCRETE HEADER SEE GI-406 FOR DETAILS CAST-IN-PLACE
EXISTING LINE VARIES PER DESIGN
FLUSH WITH EXISTING CAST-IN-PLACE CONCRETE CURB LINE VARIES PER
CURB LINE 5'x4', 6"-THICK PRECAST
GRADE (TYP.) CONCRETE DESIGN
POROUS CONCRETE 1/8" JOINT (TYP.)
5'-0" MIN. PANELS CHECK DAM SEE GI-408
2'-0" 5'-0" A DRAINAGE 2'-0"
B B CELLS
4'-0"
FLOW
EXISTING
CATCH BASIN STONE COLUMNS, SEE SEE SCHEDULE SHEET GI-409
6"
6"
6"
6"
2'-0"
DEPTH OF STONE COLUMN
2"
6"
BIAXIAL GEOGRID
PER DESIGN PLANS
6"
1'-6"
2"
6"
6"
CAST-IN-PLACE
CONCRETE HEADER
6"
3"
UNDISTURBED SOIL 1'-0" 6" 6" STACKED DRAINAGE
CLEAN 1 1/2" DIA. CELLS, SEE GI-409
OPEN-GRADED WEEP HOLE
MICROGRID, TOP
9" EQ EQ 9" STONE BASE BIAXIAL GEOGRID AND SIDES ONLY
TOP OF STONE COLUMN TEMPORARY, 18"
PERFORATED 12" DIAMETER PVC
WITH PERFORATED CAP MAXIMUM DIAMETER
PIPE WRAPPED ALL AROUND WITH
(TYP) CASING AUGERED INTO
GEOTEXTILE FABRIC
GRANULAR FILL TO FILL THE PERMEABLE LAYER
PERMEABLE SOIL LAYER ANNULAR SPACE BETWEEN THE
GRANULAR FILL TO FILL THE STONE COLUMN PIPE AND THE HOLE
CLEAN OPEN-GRADED
ANNULAR SPACE BETWEEN THE
STONE BASE
STONE COLUMN PIPE AND THE HOLE
OPEN BOTTOM, NO SECTION B-B
GEOTEXTILE FABRIC
P.E. 04-01-2022
SECTION A-A
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 2' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS
WITH DRAINAGE CELLS
- NO CONNECTION TO SEWERS
PROPERTY
DISTANCE FROM OBSERVATION WELL, DRAINAGE DISTANCE FROM
LINE EXISTING
EDGE OF PROPERTY 6" CAST-IN-PLACE EDGE OF PROPERTY
SEE GI-406 FOR DETAILS CELLS SIDEWALK
EXISTING LINE VARIES PER DESIGN CONCRETE HEADER LINE VARIES PER DESIGN
CURB LINE FLUSH WITH EXISTING 5'x2', 6"-THICK PRECAST CAST-IN-PLACE
GRADE (TYP.) NEW CAST-IN-PLACE
POROUS CONCRETE CONCRETE CHECK
5'-0" MIN. CONCRETE CURB
PANELS DAM
2'-0" B 5'-0" 2'-0"
A C C
FLOW
2'-0"
SEE SCHEDULE SHEET GI-409
6"
PRECAST POROUS
CONCRETE PANEL
(LIFTING POINTS NOT
MIN. SLOPE TO SHOWN FOR CLARITY, ℄ ℄
MATCH EXISTING SEE GI-408) SEE SCHEDULE GI-409
6"
UNDISTURBED SOIL
2'-0"
2'-0"
UNDISTURBED EQ 9" EQ
1'-6"
2"
2"
SOIL
6"
STACKED DRAINAGE
CELLS, SEE GI-409 CAST-IN-PLACE
6"
6"
6"
6"
6"
MICROGRID, TOP CONCRETEHEADER
AND SIDES ONLY CLEAN OPEN
9" 9" 6" 6" 6"
3"
CAST-IN-PLACE 9" 9" GRADED STONE BIAXIAL GEOGRID 1 1/2" DIA. 6" 6" 6"
CONCRETE HEADER BASE BENEATH THE CHECK WEEP HOLE
BIAXIAL GEOGRID SECTION A-A DAM ( NOT SHOWN SECTION B-B SECTION C-C
FOR CLARITY)
P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR 2' WIDE R.O.W. PRECAST POROUS CONCRETE PANELS TYPE A
WITH DRAINAGE CELLS AND STONE COLUMNS
- NO CONNECTION TO SEWERS
PROPERTY
DISTANCE FROM OBSERVATION WELL, EXISTING DISTANCE FROM
LINE NEW
EDGE OF PROPERTY 6" CONCRETE HEADER SIDEWALK EDGE OF PROPERTY
SEE GI-406 FOR DETAILS CAST-IN-PLACE
EXISTING LINE VARIES PER DESIGN FLUSH WITH EXISTING LINE VARIES PER DESIGN
CONCRETE
CURB LINE GRADE (TYP.) 5'x2', 6"-THICK PRECAST DRAINAGE CURB
POROUS CONCRETE CELLS
5'-0" MIN. PANELS CAST-IN-PLACE
5'-0" CONCRETE 2'-0"
2'-0"
A B B CHECK DAM
FLOW
2'-0 1/2"
SEE SCHEDULE SHEET GI-409
6"
EXISTING STONE COLUMNS, SEE 1/8" JOINT (TYP.) EXPANSION JOINT (TYP).
CATCH BASIN SCHEDULE, SHEET A SEE GI-408 SEE GENERAL NOTE 7,
GI-409 N-01 FOR SPACING
BETWEEN JOINTS EXISTING
PLAN ROADWAY
PRECAST POROUS
CONCRETE PANEL
MIN. SLOPE TO (LIFTING POINTS NOT
MATCH EXISTING SHOWN FOR CLARITY,
1'-6" 6" 2'-0" 6"
SEE GI-408)
FULL DEPTH SAWCUT
℄ LEVELING
℄ ℄ ℄
REMOVE AND REPLACE 2'-0" 2'-0" 1'-6"
COURSE
2" ASPHALT WEARING CAST-IN-PLACE CHECK PRECAST POROUS
COURSE NEW CAST-IN-PLACE DAM, 0" REVEAL. SEE CONCRETE PANEL
CONCRETE CURB GI-409 FOR SCHEDULE
EXISTING ASPHALT LEVELING COURSE
PAVEMENT TO REMAIN NEW SIDEWALK TO JOINT SEALANT, SEE
EXISTING ASPHALT OR MATCH EXISTING GI-408 CLEAN OPEN-GRADED
CONCRETE BASE SLOPE STONE BASE
6"
6"
6"
6"
2'-0"
UNDISTURBED SOIL
PER DESIGN PLANS
2"
1'-6"
2"
BIAXIAL GEOGRID
6"
6"
6"
6"
CAST-IN-PLACE
6"
CONCRETE HEADER
9" 9" CLEAN 6" STACKED
OPEN-GRADED 1 1/2" DIA. DRAINAGE CELLS,
STONE BASE WEEP HOLE SEE GI-409
TOP OF STONE COLUMN
PERFORATED 12" DIAMETER PVC MICROGRID, TOP
WITH PERFORATED CAP
PIPE WRAPPED ALL AROUND WITH AND SIDES ONLY
(TYP) GRANULAR FILL TO FILL THE
GEOTEXTILE FABRIC ANNULAR SPACE BETWEEN THE
PERMEABLE SOIL LAYER PERMEABLE
STONE COLUMN PIPE AND THE HOLE
SOIL LAYER
GRANULAR FILL TO FILL THE TEMPORARY, 18" MAXIMUM
CLEAN OPEN-GRADED
ANNULAR SPACE BETWEEN THE DIAMETER CASING AUGERED
STONE BASE
STONE COLUMN PIPE AND THE HOLE INTO PERMEABLE LAYER
OPEN BOTTOM, NO
SECTION A-A GEOTEXTILE FABRIC SECTION B-B
P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - CASTING DETAILS
SIDEWALK SIDEWALK
NEW CURB
NEW CURB
JOINT SEALANT, SEE GI-408
2'-0" MIN. 2'-0" MIN. JOINT SEALANT, SEE 1'-0" 1'-0"
FOR DETAIL (TYP.)
GI-408 FOR DETAIL (TYP.)
PRECAST
6"
6"
POROUS
CONCRETE
PRECAST PRECAST
6"
6"
EXISTING 6" CONCRETE EXISTING 1/2" PRE-MOLDED
CAST-IN-PLACE 1/2" PRE-MOLDED CAST-IN-PLACE
MANHOLE HEADER VALVE JOINT FILLER TO
CONCRETE. DEPTH EXISTING JOINT FILLER TO CONCRETE. DEPTH
CASTING CASTING MATCH EXISTING
AND REINFORCEMENT ROADWAY MATCH EXISTING AND REINFORCEMENT
EXISTING CONCRETE COLOR
PER DESIGN PLANS CONCRETE COLOR PER DESIGN PLANS
ROADWAY (TYP.)
(TYP.)
6"
(TYP.)
LEVELING
1'-6"
1'-6"
COURSE
2"
1'-6" 1'-6"
STACKED
DRAINAGE CELLS,
EXISTING SEE GI-409
BACKFILL TO BE 6" 6"
MANHOLE
DETERMINED BY
ENGINEER SECTION A-A SECTION B-B
NOTES:
1. CASTINGS INCLUDE BUT NOT LIMITED TO MANHOLES, UTILITY VALVES AND UTILITY GRATES. IF CASTING
INTERRUPTS HEADER, DETAILS TO BE COORDINATED WITH UTILITY STAKEHOLDER P.E. 04-01-2022
2. IMPERMEABLE LINER REQUIRED UNDER CAST-IN-PLACE CONCRETE AT LOCATIONS WITH UTILITY VALVES MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - OBSERVATION WELL
SIDEWALK CAST-IN-PLACE
CONCRETE CHECK DAM
NEW CAST-IN-PLACE
JOINT SEALANT, SEE GI-408
1'-0" 1'-0" CONCRETE CURB CAST-IN-PLACE
FOR DETAIL (TYP.)
CONCRETE CHECK DAM
SIDEWALK
NEW CAST-IN-PLACE
6"
CONCRETE CURB
JOINT SEALANT, SEE GI-408
FOR DETAIL (TYP.) 1'-0" 1'-0" PRECAST POROUS
CONCRETE PANEL
PRECAST POROUS
6"
A A CONCRETE PANEL
B B
4'-0"
2'-0"
PRECAST PRECAST
POROUS POROUS
CONCRETE CONCRETE
PANEL PANEL
6"
6"
FLOW
FLOW
OBSERVATION 1/2" PRE-MOLDED OBSERVATION 1/2" PRE-MOLDED
7" THICK 7" THICK
WELL JOINT FILLER TO WELL JOINT FILLER TO
CAST-IN-PLACE CAST-IN-PLACE
6" CONCRETE MATCH EXISTING 6" CONCRETE MATCH EXISTING
CONCRETE EXISTING CONCRETE EXISTING
HEADER CONCRETE COLOR HEADER CONCRETE COLOR
ROADWAY (TYP.) ROADWAY (TYP.)
6"
2"
2"
2"
2"
1'-6"
1'-6"
STACKED DRAINAGE STACKED DRAINAGE
6"
6"
CELLS, SEE GI-409 CELLS, SEE GI-409
6" 6"
PVC CAP WITH PRIMER
PVC CAP WITH PRIMER 4" PVC SLOTTED WELL 1'-6" 4" PVC SLOTTED WELL
1'-6" AND SOLVENT CEMENT
AND SOLVENT CEMENT SCREEN 0.01 SLOT SCREEN 0.01 SLOT
SIZE WITH PVC CAP SIZE WITH PVC CAP
SECTION A-A SECTION B-B
NOTES:
1. WHEN REQUIRED, THE OBSERVATION SHALL BE PLACED DOWNSTREAM FROM A CHECK DAM P.E. 04-01-2022
2. IMPERMEABLE LINER REQUIRED UNDER CAST-IN-PLACE CONCRETE MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - UTILITY CROSSING DETAILS
C
SIDEWALK
A A
6"
SPLIT PVC SLEEVE, SEE
UTILITY SLEEVING
DETAIL, THIS SHEET 2" LEVELING
CAST-IN-PLACE PRECAST POROUS COURSE
CURB/HEADER CONCRETE PANEL
SEE NOTE
CROSSING OPEN-GRADED
B B STONE BASE
SPLIT PVC SLEEVE,
SEE UTILITY STACKED
SLEEVING DETAIL DRAINAGE CELLS
THIS SHEET BIAXIAL GEOGRID
4"
(TYP.)
A A
6"
6"
4"
1/2"
LEVELING COURSE LEVELING COURSE
LEVELING
COURSE
TYPICAL JOINT SEALANT DETAIL ALTERNATE JOINT SEALANT DETAIL TYPICAL POROUS CONCRETE PANEL JOINT DETAIL
AT CONCRETE HEADER AT CONCRETE HEADER AT CONCRETE CURB
5'-0"
1'-0"
(TYP.), PLUG TO BE PROVIDED
6" THICK PRECAST BY MANUFACTURER
POROUS CONCRETE PROVIDED 1/8" HDPE 5'-0"
PANEL SPACER
1'-0" 3'-0" 1'-0"
4'-0"
2'-0"
1'-0"
2'-0"
LEVELING
COURSE 1'-0"
1'-0"
TYPICAL PANEL TO PANEL JOINT DETAIL 5'x4'x6" POROUS PANEL PLAN VIEW 5'x2'x6" POROUS PANEL PLAN VIEW
NOTES:
1. MAXIMUM JOINT SPACE BETWEEN POROUS CONCRETE PANELS IS 1/8".
2. CURB AND HEADER EXPANSION JOINTS AT 10 FEET MAXIMUM SPACING.
3. CONTRACTOR SHALL TRIM (VIA SAWCUT) POROUS CONCRETE PANELS NO MORE THAN 6" ON ANY END
4. NO POROUS CONCRETE PANEL SHALL BE LESS THAN 4 FT IN LENGTH WITHOUT THE ENGINEER'S APPROVAL
5. ADJUST THE LIMIT OF WORK TO AVOID END PANELS LESS THAN 4 FT IN LENGTH.
6. CONTRACTOR SHALL INSTALL 3/4" STONE IN LIFTS OF 6" (MAX.) AND SHALL MAKE TWO PASSES OF A PLATE
COMPACTOR (200 LBS MIN.) OVER EACH LIFT PRIOR TO INSTALLATION OF 3/8" LEVELING COURSE.
7. AT THE DIRECTION OF THE ENGINEER, CONTRACTOR TO REPLACE ANY CURB OR DRIVEWAY APRON THAT IS
DAMAGED DURING CONSTRUCTION AS PER NYCDOT STANDARDS.
8. SEAL EDGES OF ANY SAWCUTS IN THE WEARING COURSE WITH LIQUID ASPHALT CEMENT AS PER TITLE 34 P.E. 04-01-2022
NYCDOT HIGHWAY RULES (PAGE 71, SECTION 2-11(E)(12)(VIII)). MANAGING DIRECTOR, DATE
9. CASTINGS INCLUDE BUT NOT LIMITED TO MANHOLES, UTILITY VALVES AND UTILITY GRATES. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
R.O.W. PRECAST POROUS CONCRETE PANELS - SECTIONS AND DETAILS
2"
FRONT VIEW
0 ≤ S ≤ 0.5 100 3
0.5 < S ≤ 1.0 50 2
1 < S ≤ 1.5 33 2
6"
1.5 < S ≤ 2.0 25 1
1'-6"
2"
2.0 < S ≤ 2.5 20 1
2'-0" 2" 2.5 < S ≤ 5.0 10 1
NOTE: CHECK DAMS TO BE SPACED EQUALLY
PLAN VIEW SIDE VIEW
P.E. 04-01-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-500
PLANTING PLANS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD PLANTING LAYOUT FOR R.O.W. BIOSWALES AND R.O.W. RAIN GARDENS
GI-501D
GI-501D
A
A
A A A A A A A A A A A A A (6) A A A A A A A A A A A
(8) A (6) A
(8) A
(7) B A B B B B B B B B B B B A A B B B B B B B B A
(4) B
(3) B
A B B C C C C C C C C A A B B C C C C C A
(4) C (5) B
(2) C
(3) C (2) C
+
OUTLET INLET SEDIMENT CONTROL OUTLET INLET
AREA- SEE GI-501D SEDIMENT CONTROL
GI-501D
GI-501D
AREA- SEE GI-501D
BULB BULB
A
A B C CLUSTERS
TYPE I A B C CLUSTERS TYPE II
Tree 16 11 7 11 Tree 12 8 4 8
No Tree 17 13 8 11 No Tree 14 10 5 8
GI-501D
A
A A A A A A A
(5) A
(5) A
A B B B B B A
(2) B
A B C C A
(2) B SEDIMENT CONTROL
(2) C AREA- SEE GI-501D
+
OUTLET INLET
GI-501D
BULB
A
A B C CLUSTERS
TYPE III
Tree 10 4 2 6
No Tree 11 6 2 6
NOTES FOR CONSTRUCTION:
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE SHOWN.
2. PLANTING PLANS ARE DETERMINED PER THE SCHEDULE ON PLANTING PLANS FOR STANDARD ROWB PAGES, GI-501B AND
GI-501C.
3. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S STREET TREE
SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO BE PLANTED WITH SHRUBS,
PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
4. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS. BULBS FOR FALL PLANTING ONLY.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROWB WITH NO TREE.
7. AREA DIRECTLY IN FRONT OF INLET SHALL REMAIN UNPLANTED AND RESERVED FOR SEDIMENT CONTROL.
P.E. 05-13-2022
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE CONDITIONS. ADJUSTMENTS
MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO ASSET SIZE OR OTHER OBSTRUCTION. MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR WET AND DRY R.O.W. BIOSWALES
AND R.O.W. RAIN GARDENS
SUNNY (SOUTH-FACING) PLANT SCHEDULE FOR WET SITES SUNNY (SOUTH-FACING) PLANT SCHEDULE FOR DRY SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
SHADY (NORTH-FACING) PLANT SCHEDULE FOR WET SITES SHADY (NORTH-FACING) PLANT SCHEDULE FOR DRY SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
A SHRUB ILEX GLABRA 'SHAMROCK' SHAMROCK INKBERRY 2-GALLON A SHRUB ILEX GLABRA 'SHAMROCK' SHAMROCK INKBERRY 2-GALLON
MIXED SUN AND SHADE (EAST/WEST-FACING) PLANT SCHEDULE FOR DRY SITES
MIXED SUN AND SHADE (EAST/WEST-FACING) PLANT SCHEDULE FOR WET SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
A SHRUB ARONIA MELANOCARPA BLACK CHOKEBERRY 2-GALLON
A SHRUB ILEX GLABRA 'SHAMROCK' SHAMROCK INKBERRY 2-GALLON
PANICUM VIRGATUM
B GRASS SWITCH GRASS 1-GALLON 18" O.C
B PERENNIAL IRIS VERSICOLOR BLUE FLAG IRIS 1-GALLON 18" O.C 'SHENANDOAH'
NEPETA X FAASSENII
C PERENNIAL CATMINT 1-GALLON
C GRASS CAREX 'ICE DANCE' SEDGE 1-GALLON 'WALKERS LOW'
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULBS AS SHOWN
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULB AS SHOWN
NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
3. PLANTING PLANS ARE BASED ON HYDROLOGIC REGIME (WET/ DRY OR AVERAGE).
4. TO DETERMINE WET/DRY/AVERAGE, CONSIDER SIZE OF TRIBUTARY DRAINAGE AREA AND NUMBER OF ADJACENT
BIOSWALES. ESTIMATE INDIVIDUAL TRIBUTARY AREA PER BIOSWALE BY CONSULTING THE INTERIM GEOTECHNICAL
REPORT SUMMARY TABLE FOR AVAILABLE UPSTREAM DISTANCE AND MINIMUM REQUIRED UPSTREAM DISTANCE.
5. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT REPLACEMENT WITH P.E. 05-13-2022
AGENCY APPROVAL.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR R.O.W. COMBINATION WET/DRY
BIOSWALES AND R.O.W. RAIN GARDENS
ARONIA ARBUTIFOLIA
A SHRUB CHOKEBERRY 2-GALLON
'BRILLIANTISSIMA
PANICUM VIRGATUM
C GRASS SWITCH GRASS 1-GALLON
'SHENANDOAH'
BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL BULBS AS SHOWN
MIXED SUN AND SHADE (EAST/WEST-FACING) PLANT SCHEDULE FOR AVERAGE SITES
LOCATION TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
PHYSOCARPUS OPULIFOILIUS
A SHRUB LITTLE DEVIL NINEBARK 2-GALLON
'LITTLE DEVIL'
18" O.C
B PERENNIAL LIATRIS SPICATA GAYFEATHER 1-GALLON
NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
3. INDUSTRIAL VS. RESIDENTIAL PLANTING PLANS ARE BASED ON HIGH VS. LOW PEDESTRIAN TRAFFIC
AREAS. P.E. 05-13-2022
4. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT MANAGING DIRECTOR, DATE
REPLACEMENT WITH AGENCY APPROVAL. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING LAYOUT FOR R.O.W. BIOSWALES
AND R.O.W. RAIN GARDENS
5'-0" OR AS SHOWN
ON CONTRACT PLANS
EROSION CONTROL
NO PLANTING ABOVE TREE MATTING
ROOTBALL HALF OF A 30" DIA.
2" STAKES WITH ARBOR TIES
CORREGATED PIPE 1'-3"
ROOT FLARE OF TREE SEDIMENT
EXPOSED CONTROL AREA
INLET B B
1"
ALL PLANTS PLANTED AT EROSION CONTROL MATTING
2"
GRADE, NOT ABOVE OR BELOW,
WITHOUT MOUNDED SOIL LOOSEN AND SCORE ROOTS
6"-8"
OF ALL POTTED PLANTS
BEFORE PLANTING
1'-6"
A
COMPACT SOIL BELOW CLEAN OPEN-GRADED STONE CORRUGATED PIPE LONG STAKES
TREE TO PREVENT SINKING
EQ
C
A
1'-3"
2'-6"
EQ EQ
INLET
NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
A
3. INDUSTRIAL VS. RESIDENTIAL PLANTING PLANS ARE BASED ON HIGH VS. LOW PEDESTRIAN TRAFFIC SEDIMENT CONTROL
AREAS. AREA
4. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT
REPLACEMENT WITH AGENCY APPROVAL. PART PLAN B-B
AT INLET WITH SEDIMENT CONTROL DEVICE
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE AND LAYOUT FOR R.O.W. GREENSTRIPS
A
GREENSTRIP PLANT QUANTITIES FOR ALL TYPES
A A A A A A A A A A A A
SEDIMENT CONTROL LOCATION TYPE I TYPE II TYPE III SIZE SPACING
TYPE I C C C C C C C C C C C AREA
A 12 9 7 2-GALLON
18" O.C
C 11 8 6 1- GALLON
A
NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
A
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
A A A A A SEDIMENT CONTROL 3. PLANTING PLANS ARE BASED ON HYDROLOGIC REGIME (WET/ DRY OR AVERAGE).
A A A A
AREA 4. TO DETERMINE WET/DRY/AVERAGE, CONSIDER SIZE OF TRIBUTARY DRAINAGE AREA AND NUMBER OF ADJACENT
TYPE II C C C C C C C C BIOSWALES. ESTIMATE INDIVIDUAL TRIBUTARY AREA PER BIOSWALE BY CONSULTING THE INTERIM GEOTECHNICAL
REPORT SUMMARY TABLE FOR AVAILABLE UPSTREAM DISTANCE AND MINIMUM REQUIRED UPSTREAM DISTANCE.
5. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT REPLACEMENT WITH
AGENCY APPROVAL.
OUTLET INLET
PLANTED AREA
A
A
SEDIMENT CONTROL
A A A A A A A SEDIMENT
AREA
CONTROL AREA
TYPE III C C C C C B 1'-0" B
C
SIDEWALK
2 1/2"
4 1/2"
EQ
PITCH
1"
1'-0"
OUTLET INLET
6"-8"
A
EQ EQ
INLET
A
STAKE
GI-501B AND GI-501C.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS. SHRUBS SHALL HAVE A MULTI-STEM FORM. ENGINEERED SOIL
4. BULBS ARE ONLY TO BE PLANTED IN FALL.
5. AREA DIRECTLY IN FRONT OF INLET SHALL REMAIN UNPLANTED AND RESERVED FOR SEDIMENT CONTROL. SECTION A-A PART PLAN B-B
AT GREENSTRIP INLET WITH SEDIMENT CONTROL DEVICE AT INLET WITH SEDIMENT CONTROL DEVICE
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE & LAYOUT FOR TYPE D R.O.W.
INDUSTRIAL SUN BIOSWALES
(6) D
INDUSTRIAL SUN- Type I (6) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
12 A PERENNIAL ECHINACEA 'CHEYENNE SPIRIT' CONEFLOWER 1-GALLON TYPE I (3) C (3) C
E E
10 B SHRUB ARONIA ARBUTIFOLIA 'BRILLIANTISSIMA' CHOKEBERRY 2-GALLON (5) B
18"O.C.
6 C GRASSES SORGASTRUM NUTANS INDIAN GRASS 1-GALLON E (5) B
12 D PERENNIAL NEPETA 'WALKERS LOW' CATMINT
(6) A (6) A
18 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN
(4) B D
(4) B
NOTES FOR CONSTRUCTION:
1. PLANTING LOCATIONS ARE SPECIFIC TO EACH TYPE AND PLAN AS SHOWN. PLANTING PLAN PER
DRAWINGS. (4) A (4) A
2. TREES TO BE INCLUDED IN PLANTING PLANS UPON DIRECTION OF DPR, AND SHOULD CONFORM TO DPR'S
STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
FLOW
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO P.E. 05-13-2022
ASSET SIZE OR OTHER OBSTRUCTION.
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. INDUSTRIAL MIXED BIOSWALES
(6) D
INDUSTRIAL MIXED SUN/SHADE - Type I (6) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
12 A PERENNIAL MEEHANIA CORDATA CREEPING MINT 1-GALLON TYPE I (3) C (3) C
E E
10 B SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC 2-GALLON (5) B
18"O.C.
6 C GRASSES TRIDENS FLAVUS PURPLETOP 1-GALLON E (5) B
12 D PERENNIAL ASTER LATERIFLORUS 'LADY IN BLACK' CALICO ASTER
(6) A (6) A
18 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN
12 BULB NARCISSUS 'DUTCH MASTER' TRUMPET DAFFODIL CLUSTER OF 2 AS SHOWN TYPE III
D D
ADDITIONAL PLANTING IN ROW BIOSWALE WITH NO TREE
3 E SHRUB RHUS AROMATICA 'GRO LOW' FRAGRANT SUMAC 2-GALLON 18" O.C. (4) B (4) B
D
STREET TREE SIZE AND FORM.THE AREA DIRECTLY ABOVE THE TREE ROOTBALL (1.5' RADIUS) IS NOT TO
BE PLANTED WITH SHRUBS, PERENNIALS, OR GRASSES, IN ACCORDANCE WITH DPR REQUIREMENTS.
3. ALL PLANTS SHALL BE WELL ROOTED AND VIGOROUS.
4. BULBS FOR FALL PLANTING ONLY, AT 2X DEPTH OF BULB HEIGHT.
5. SHRUBS SHALL TAKE A FULL, MULTI-STEM FORM.
6. ADDITIONAL PLANTS PLANTED AS SHOWN (DASHED) ONLY IN ROW BIOSWALE WITH NO TREE.
7. ALL AREAS ARE TO RECEIVE 3" MULCH COVER UPON PLANTING. MULCH SHALL NOT COME INTO CONTACT
WITH WOODY STEMS OF PLANTS.
8. SPACE PLANTS 18" ON CENTER WHEN POSSIBLE. SPACING MAY VARY BASED ON ACTUAL SITE P.E. 05-13-2022
CONDITIONS. ADJUSTMENTS MAY BE MADE, AT ENGINEER'S APPROVAL, TO EASE CROWDING DUE TO MANAGING DIRECTOR, DATE
ASSET SIZE OR OTHER OBSTRUCTION. GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD PLANTING SCHEDULE FOR TYPE D R.O.W. RESIDENTIAL SHADE BIOSWALES
RESIDENTIAL SHADE - Type I (4) D (4) D
QTY SYMBOL TYPE BOTANICAL NAME COMMON NAME SIZE SPACING
UNDISTURBED SOIL
TOPSOIL
OPEN-GRADED STONE
PLANTING DETAIL
NOTES TO DESIGNER:
PLANTING PLAN SELECTION CRITERIA:
1. PLANTING PLANS ARE BASED ON AMOUNT OF SUN RECEIVED IN EACH LOCATION.
2. TO DETERMINE AMOUNT OF SUN RECEIVED BY EACH LOCATION, CONSIDER DIRECTIONAL ORIENTATION
(NORTH/SOUTH/EAST/WEST) AND HEIGHT OF ADJACENT BUILDINGS.
3. INDUSTRIAL VS. RESIDENTIAL PLANTING PLANS ARE BASED ON HIGH VS. LOW PEDESTRIAN TRAFFIC
AREAS.
4. ADAPTIVE DIRECTION, INCLUDING PALETTE CHANGES, MAY BE GIVEN TO CONTRACTORS FOR PLANT
REPLACEMENT WITH AGENCY APPROVAL.
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
GI-600
STEEL GUARDS STANDARDS FOR
RIGHT-OF-WAY GREEN INFRASTRUCTURE
PRACTICES
STANDARD FOR R.O.W. GI - TYPE 'B' WELDED STEEL GUARD
EQUAL PANELS [4' MIN, 6' MAX] 1/2" x 1-1/2" TOP RAIL 2" PANEL TO ACCOMMODATE 2"
EQUAL ± 11"
TO ACCOMMODATE FULL CIRCLES AS NEEDED END CAP FULL CIRCLES AS NEEDED
1 3/4"
± 5 9/16" 1/2" SQ. BENT RAILS TO FOLLOW
ROUND LINE OF GRADE
2" SQ. STEEL POST
7 1/16"
1"
CONCRETE
7 15/16"
2"
FINISHED GRADE CURB
5"
1" OF HEADER AND
2"
SIDEWALK
2"
4"
4"
1"
1"
1"
3"
3"
NOTES:
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I. (ALTERNATE STEEL PER DEP APPROVAL)
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL STEEL TO BE PAINTED BLACK, SEE SPECIFICATIONS FOR DETAILS.
5. RAILS TO FOLLOW LINE OF GRADE.
6. ALL STEEL TO BE SOLID STEEL.
7. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE ENCASEMENT AS PER STANDARD DRAWINGS
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
6 1/4"
END OF ROW GI 1-3/4" SQ. STEEL
POST
CONCRETE 12" WIDE
1'-5"
HEADER CONCRETE
6 1/4"
6 1/4"
1/2" CONNECTION 1" STRIP
2"
PLATE
FINISHED 1" CURB
5"
GRADE
4"
4"
1"
1"
STEEL SPIKE LENGTH VARIES
STEEL SPIKE LENGTH VARIES
3"
FRONT ELEVATION SIDE ELEVATION
POST AND GROOVE CONNECTION
NOTE: MIRROR CONNECTION POST FOR OPPOSITE END OF ROWGI
NOTES:
1. FIELD MEASUREMENTS MUST BE TAKEN PRIOR TO FABRICATION.
2. ALL STEEL SHALL CONFORM TO SPECIFICATION C1015 OF THE A.I.S.I. (ALTERNATE STEEL PER DEP APPROVAL)
3. ALL JOINTS TO BE WELDED UNLESS NOTED OTHERWISE.
4. ALL POST AND GROOVE CONNECTIONS TO BE BOLTED.
5. ALL VISIBLE BOLTS TO BE COUNTERSUNK AND FLUSHED WITH THE POSTS
6. ALL STEEL TO BE PAINTED BLACK, SEE SPECIFICATIONS FOR DETAIL.
7. RAILS TO FOLLOW LINE OF GRADE.
P.E. 05-13-2022
8. ALL SPIKES OF TREE GUARD TO BE EMBEDDED IN CONCRETE PIERS AS PER STANDARD DRAWINGS
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STANDARD DETAILS FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
2"x2" STEEL POST
22"
POST
1"
1"
10"
FINISHED GRADE FINISHED GRADE
4"
4"
2"
2"
3" STEEL SPIKE LENGTH VARIES
1"
1"
LOCKING HOLES 9/16"
DIA.
1 1/4" CONCRETE
LOCKING HOLES 9/16" 1 1/4" DETAIL A
DIA. NOTE:
SPIKE EMBEDDED IN MACHINED GROOVE
SPIKE BOLTED SPIKE BOLTED OF THE POST FOR ADDITIONAL STRENGTH
TO THE 2"x2" POST TO THE 1 3/4"x 1 3/4" AND SUPPORT
POST
TOP OF
OPEN-GRADED 4" DIA. CONCRETE 4" DIA. CONCRETE
STONE BASE ENCASEMENT ENCASEMENT
/8"
7/8"
R5
1"
9/16" 1/2"
/16"
9/16"
R11 9/16" DIA. HOLES
2"
STEEL SPIKE LENGTH VARIES
1"
1 1/2"
1 1/4"
4"
CONCRETE
9"
9"
LOCKING
17 1/2"
17 3/8"
4"
DETAIL B
3 13/16"
22"
1 3/8"
4"
4"
R5
4"
/8 NOTE:
"
4 1/8"
1"
R11
5"
DETAIL B
1 3/8"
TAP 1/2" - 13
1"
3/4" 1 1/4"
P.E. 05-13-2022
POST AND GROOVE CONNECTION PLATE SPIKE MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
DIMENSION SCHEDULE FOR R.O.W. GI - TYPE 'B-1' STEEL GUARD WITH BOLTED PANELS
FRONT PANELS
2" LEFT PANEL CENTER PANEL CENTER PANEL RIGHT PANEL 2"
1" 1"
1"
2" 2" 2"
SIDE PANEL
SIDE PANEL
1"
FLOW FLOW
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STEEL TREE GUARD MOUNT & EDUCATIONAL SIGN
MOUNT TO FACE
SIDEWALK, SEE
DETAILS THIS AND
STEEL MOUNT FOR NEXT PAGE
EDUCATIONAL SIGN
TREE GUARD TOP
RAIL
SIDEWALK
OUTLET INVERT
EXISTING CURB
TO REMAIN
FLOW +
FLOW
EXISTING
ASPHALT
PAVEMENT
SECTION A-A
PLAN
1"
6"
4"
5/16" DIA.
THREADED
HOLES FOR 1/4"
SCREW
1"
NOTES:
1. EDUCATIONAL SIGN TO BE INSTALLED AS DIRECTED AT EITHER END OF THE GI PRACTICE P.E. 05-13-2022
1.1. HOLES TO SHALL NOT PUNCH TROUGH FACE OF SIGN MANAGING DIRECTOR, DATE
1.2. GRAPHICS AS PER SPECIFICATIONS GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION
STEEL TREE GUARD MOUNT & EDUCATIONAL SIGN
3/16" THICK BENT
PLATE
5
1/
2"
2 - 3/16" THICK
45°
STEEL RIBS
1 7/8"x1 1/2"x 3/16" 3/16"
BENT PLATE
TREE GUARD RAIL
1/4" DIA. SET SCREWS
1 1/2"
1"
7/8"
1/4" - 20 TAMPER
7/8"
1 7/8" RESISTANT SCREW
HEX. NUT
11 1/2" 11 1/2"
1/2"
10 1/2" 10 1/2"
1/2"
4"
RIBS
1/2"
1 1/2" 4 1/2"
2" 7 1/2" 2"
5/16" DIA. THREADED 7 1/2"
5/16" DIA. HOLE FOR HOLE FOR
1/4"-20 SCREWS 1/4" -20 SCREWS 9"
P.E. 05-13-2022
MANAGING DIRECTOR, DATE
GREEN INFRASTRUCTURE DESIGN & CONSTRUCTION