Professional Documents
Culture Documents
Debit backwash
Backwash rate Vbw 30 m/h ( 20 - 50 )
Debit per bed qbw 3,900 m /h 3
qbw = Vbw L B
Debit total Qbw 15,600 m /h3
Qbw = qbw Nbw
Underdrain sebuah bed (L x B)
Luas total orifice AO 0.2 % L x B ( 0.2 - 0.5 )
0.2600 m 2
0.5200 m2
dl
dl
So
S
do do 1/2 So So 1/2 So
o
dm L
l
Satuan :
d = day, hari; h = hour, jam; min = minute, menit; s = second, detik
mwc = meter water column
1 atm = 1 kg/cm2 = 10 mwc
Referensi :
1. Terence J. McGhee, Water Supply and Sewerage, 1991
2. Harry S. Harbold, Sanitary Engineering Problems and Calculation for the Professional Engineer, 1979
3. B S N Raju, Water Supply and Wastewater Engineering, 1995
Cara pengoperasian/pengisian data :
Sheet ini dapat diisi data sesuai huruf/angka hijau. Huruf hijau bisa diisi angka. Angka hijau tidak boleh diisi huruf.
Selain huruf/angka hijau tidak dapat diganggu karena diprotek. Yah, dilihat sajalah. Isinya mengenai mekanisme desain secara tabelaris.
Yang penting, pilih dan isi kode satuan yang diinginkan, mulai dari 0, 1, 2 dan seterusnya. Nilainya diisi sesuai dengan satuan yang dipilih.
Tidak semua angka, baik input maupun kriteria harus dirubah, kecuali ada pertimbangan khusus dari anda. (Jngn tersinggung loh)
VS1 d
Cek Stoke's Law Re1 966 - Re1 = Re >1, jadi dg Stoke's itu tdk cocok
uT
Langkah lanjutan di bawah ini bila Stoke's Law di atas tidak disarankan untuk dipakai
DESKRIPSI SIMBOL VOLUME UNIT CATATAN/KRITERIA
Koefisien Drag CD2 0.2994 - CD2 = 18,5/Re10,6 Re2 = 1 - 2000
(Transisi)
4 g (Ss - 1) d
Pengendapan terkoreksi 1 VS2 0.254 m/s VS2 = (rumus umum)
3 CD2
VS2 d
Re3 278.26 - Re3 =
uT
4 g (SS - 1) d
Pengendapan terkoreksi 2 VS3 0.1748 m/s VS3 =
3 CD3
Untuk desain backwashing rate tentunya diambil di antara fluidizasi minimal dan normal.
( 20 - 50 ) m/h
0.001553
VISKOSITAS
VISKOSITAS ABSOLUT VISKOSITAS
TEMPERATUR
(DINAMIK), m KINEMATIK, n
[Centipoise] [Centistoke]
[oC] [10-2 g/(cm.s)] [10-2 cm2/s]
[10-3 kg/(m.s)] [10-6 m2/s]
[10-3 N.s/m2]
[10-3Pa.s]
0 1.7921 1.7923
1 1.7330 1.7332
2 1.6740 1.6741
3 1.6208 1.6208
4 1.5676 1.5676
5 1.5201 1.5201
6 1.4726 1.4726
7 1.4299 1.4300
8 1.3872 1.3874
9 1.3484 1.3487
10 1.3097 1.3101
11 1.2743 1.2748
12 1.2390 1.2396
13 1.2069 1.2076
14 1.1748 1.1756
15 1.1452 1.1462
16 1.1156 1.1168
17 1.0879 1.0893
18 1.0603 1.0618
19 1.0345 1.0361
20 1.0087 1.0105
21 0.9847 0.9867
22 0.9608 0.9629
23 0.9384 0.9407
24 0.9161 0.9186
25 0.8953 0.8980
26 0.8746 0.8774
27 0.8554 0.8584
28 0.8363 0.8394
29 0.8183 0.8216
30 0.8004 0.8039
m [kg/(m.s)]
n [m2/s] =
r [kg/m3]
Ref. : BSN Raju, WATER SUPPLY AND WASTEWATER ENGINEERING
6.7 m
Length per bed L 8.38 m L = (W) x (rasio L/W)
8.4 m
Bed depth H 3.6 m
Freeboard h1 0.4 m ( 0.4 - 0.6 )
Water depth h2 1.5 m ( 1.5 - 2.5 )
Media depth (pas h3 0.7 m ( 0.6 - 0.9 )
(kerikil) h4 0.5 m ( 0.4 - 0.6 )
Underdrained depth h5 0.5 m ( 0.45 - 0.6 )
Check Filtration rate during backwashing
Flow per bed QF2 300 m3/h
Area per bed abed 56.3 m2
Filtration rate VF 5.3 m/h ( 5 - 10 )
Backwash flow
Backwash rate Vbw 30 m/h ( 20 - 50 )
Flow per bed qbw 1,688 m /h3
qbw = Vbw L B
Flow total Qbw 3,377 m /h 3
Qbw = qbw Nbw
Underdrain per bed (L x B)
Area total orifice AO 0.2 % L x B ( 0.2 - 0.5 )
0.1126 m 2
0.2251 m2
0.4502 m2
Orifice per bed dO 8 mm ( 6 - 12 )
2240.4 holes
2242 holes
Lateral per bed dl 60 mm ( 60 - 90 )
79.7 unit
80 unit
Manifold per bed dm 757.3 mm 1 unit
758 mm
Flow backwash per bed qbw 1688.4 m3/h
Velocity (lateral) vl 2.08 m/s < 2.25 vl = (qbw / 3600) / Al
Velocity (manifold) vm 1.04 m/s < 2.25 vm = (qbw / 3600) / Am
DESKRIPSI SIMBOL VOLUME UNIT CATATAN/KRITERIA
Distance orifice c/c So 8 cm So = 7.5 cm untuk do = 6 mm
So = 20 cm untuk do = 12 mm
dl
dl
So So
S
do do 1/2 So So So 1/2 So
o
dm Ll
Trough
Flow backwash per bed (boks filter) qbw 1,688 m3/h 0.30 m
0.47 m3/s b 0.10 m
h2
Flow per trough qtr 0.09 m3/s 1.73 b h11.5
Nos. ntr 5.5 unit ntr = qbw / qtr h1 0.30 m
~ 6.0 unit
Distance trough c/c 2.0 m ( 1.5 - 2.5 ) h3 0.60 m
Distance trough to the near wall < 1m
Slope S 0 m/m level sand top
(un-expanded)
DESKRIPSI SIMBOL VOLUME UNIT CATATAN/KRITERIA
Air Pencuci dan Reservoir
Debit backwash total (serentak) Qbw 3377 m3/h Qbw = qbw Nbw
Backwash period tbw 3 min ( 3 - 10 )
Volume reservoir pencuci VR 84.4 m3 VR = Vbw tbw Abed
1.2 % ( 1 - 5 ) ~ VR / Q F
Tekanan backwashing pada lateral/orifice p1 10 mwc ~ m < 1
Head loss (pasir, underdrain dan pipa) p2 4 mwc ( 2 - 5 )
Tekanan total (tinggi reservoir) P 14.0 mwc P = p1 + p2
Satuan :
d = day, hari; h = hour, jam; min = minute, menit; s = second, detik
mwc = meter water column
1 atm = 1 kg/cm2 = 10 mwc
1 m =100 cm = 1000 mm
Referensi :
1. Terence J. McGhee, Water Supply and Sewerage, 1991
2. Harry S. Harbold, Sanitary Engineering Problems and Calculation for the Professional Engineer, 1979
3. B S N Raju, Water Supply and Wastewater Engineering, 1995
Cara pengoperasian/pengisian data :
Sheet ini dapat diisi data sesuai huruf/angka hijau. Huruf hijau bisa diisi angka. Angka hijau tidak boleh diisi huruf.
Selain huruf/angka hijau tidak dapat diganggu karena diprotek. Yah, dilihat sajalah. Isinya mengenai mekanisme desain secara tabelaris.
Yang penting, pilih dan isi kode satuan yang diinginkan, mulai dari 0, 1, 2 dan seterusnya. Nilainya diisi sesuai dengan satuan yang dipilih.
Tidak semua angka, baik input maupun kriteria harus dirubah, kecuali ada pertimbangan khusus dari anda. (Jngn tersinggung loh)