Tool to caculate area required for Extended Aeration

Sample calculation for STP Plant capacity 25 MLD


Guidance: Yellow cells are to be filled as per design and green cells are to be reviewed and
modified/updated as per need
Components No L W Additional for Area in
Excavation sq. m
Inlet Chamber 1 3.30 3.30 20.00% 13.07
Screen Channel 2 3.60 2.20 20.00% 19.01
Grit channel-manual 2 23.10 2.50 20.00% 138.60
Grit channel-mechanical 2 7.60 7.60 20.00% 138.62
Parshall flume 1 3.32 0.46 20.00% 1.83
Equalization tank 1 31.50 31.50 20.00% 1190.70
Aeration tank 2 57.70 57.70 20.00% 7990.30
Secondary clarifier 2 28.70 20.00% 1552.62
Wetwell for Return sludge pumping 1 8.10 8.10 20.00% 78.73
Pressure Sand filters 1 12.10 20.00% 137.99
Sludge storage tank 1 37.00 20.00% 1290.25
Chlorine mxing tank 1 8.10 8.10 20.00% 78.73
Sludge drying beds 20 16.00 16.00 20.00% 6144.00
Wetwell for Recirculation 1 5.00 20.00% 23.56
Sewage Pump House 100
Area required for contol & switchgear room, 2000
generator room,'and transformer sub station.
Area for staff quarters, office & laboratory 500
Sub total 21398
Add for circulation and external spaces 40.00% 8559
Total area required ( Sqm) 29957
Hectares 3.00
Acre 7.40