Tool to caculate area required for Extended Aeration
Sample calculation for STP Plant capacity 25 MLD
Guidance: Yellow cells are to be filled as per design and green cells are to be reviewed and modified/updated as per need Components No L W Additional for Area in Excavation sq. m Inlet Chamber 1 3.30 3.30 20.00% 13.07 Screen Channel 2 3.60 2.20 20.00% 19.01 Grit channel-manual 2 23.10 2.50 20.00% 138.60 Grit channel-mechanical 2 7.60 7.60 20.00% 138.62 Parshall flume 1 3.32 0.46 20.00% 1.83 Equalization tank 1 31.50 31.50 20.00% 1190.70 Aeration tank 2 57.70 57.70 20.00% 7990.30 Secondary clarifier 2 28.70 20.00% 1552.62 Wetwell for Return sludge pumping 1 8.10 8.10 20.00% 78.73 Pressure Sand filters 1 12.10 20.00% 137.99 Sludge storage tank 1 37.00 20.00% 1290.25 Chlorine mxing tank 1 8.10 8.10 20.00% 78.73 Sludge drying beds 20 16.00 16.00 20.00% 6144.00 Wetwell for Recirculation 1 5.00 20.00% 23.56 Sewage Pump House 100 Area required for contol & switchgear room, 2000 generator room,'and transformer sub station. Area for staff quarters, office & laboratory 500 Sub total 21398 Add for circulation and external spaces 40.00% 8559 Total area required ( Sqm) 29957 Hectares 3.00 Acre 7.40