You are on page 1of 4

PAPER – I: Technical

1. Radiated Power = Antenna Gain X Input Power


2. Cell – Hexagon Shape approximation and cell coverage maximise
3. Largest Service Area – GSM Service Area
4. Not Wireline Backhaul - Microwave
5. UMTS – Universal Mobile Telecommunication System
6. C = B log2 (1+SNR)
7. MIMO Release - Rel. 7
8. 5G Phase-II (R16) - Dec-2019
Explanation from material: The 3GPP is at the heart of 5G standardization. As such, it has
already mapped out:
5G Phase 1 - this is based on the Release 15 specifications, frozen in September 2018. Unfortunately,
this does not meet all the IMT2020 requirements.
5G Phase 2 - this is based on Release 16 specifications, frozen in December 2019 - ready for the
IMT2020 submission.
9. TCH Congestion – 0.02
10. CSSR – 0.95
11. Optimisation – RF Optimisation
12. Deliver Telemedicine – No such technology (IP Med is wrong)
13. Initial LTE D/L speed = 100 Mbps
14. Not a function of Node-B – Uplink Transmission
15. PSTN – Public Switched Telephone Network
16. FTTH – Fiber to Terminal Home (challengeable as FTTH – Fiber to The Home)
Explanation from material: Today, fiber networks come in many varieties, depending
on the termination point: building (FTTB), home (FTTH), curb (FTTC) etc. For simplicity,
most people have begun to refer to the fiber network as FTTx, in which x stands for
the termination point.
17. GPON – TDM
18. MLLN – Managed Lease Line Network
19. MLLN largest Node – Cluster Node
20. MLLN Accelerator Node – 128 Mbps
21. Inter-exchange Signalling – CAS & CCS
22. Signalling – Ring Back Tone when line is free
23. Signalling – Impedance decreases
24. Signalling – SS7
25. Wi-Fi latest – IEEE 802.11 ac
26. ADSL – Asymmetric Digital Subscriber Line
27. Core > Cladding
28. OFC Disadvantage – Complexity
29. Extrinsic Splice Loss – Axial Tilt
30. BWelec. = 0.707 X BWopt.
31. S-Band = 1460-1530
32. 4-8 Ghz = C-Band
33. OTDR – Optical Time Domain Reflectometer
34. Ethernet analyser – does not have Antenna
35. RTFMS – Remote Fiber Monitoring System
36. IPv4 – 32-bits
37. Class-A - 8-bit N/w Prefix
38. Data generated at - Application Layer
39. Routing Protocols – between Router and Router
40. Router works at – last 3-layers
41. TCP/IP – 4-layers
42. DNS – Domain Name System
43. MAC-Address – 48-bits
44. Min. Broadband Speed as per TRAI – 256 Kbps
45. IoT – Internet of Things
46. Cloud Services – M2M
47. EB-cell – Enterprise Business Services in whole country
48. Channel Partner – sells BSNL services and products
49. Sales – 8-Retailers / BTS
50. MSME – greater than 250 crores
PAPER-I: Common
51. MS-Word Blue wavy line – Grammatical mistakes
52. CAPEX – Plant and Apparatus
53. Project – Form-C
54. Asset Management – Commissioning Date automatic
55. Depreciation – monthly
56. MSTC – Metal Scrap and Trading Corporation
57. MSTC e-waste auction – Medicines
58. MSTC – send information to all Bidders
59. Payback Period & ROI – Exact answer – 2 years 4 months, 50%. No such answer in
options hence challengable)
60. Prefeasibility Study - time available and the confidence of the decision maker.
61. PERT – 11
62. USO – Department of Telecommunication
63. USO Levy – 5% of AGR
64. Contract Management – Each party selects one arbitrator. They select the third one.
65. Promise in Words – Express
66. Emergent procurement – Negotiations Route
67. Tender Documents verification – APO
68. Bid Security forfeit – if fail to sign agreement
69. Tenders up to 10-crores - DGM, AGM, AGM
70. Review when Project Cost exceeds - 75%
71. RTI – no need to specify reason for information
72. RTI 2nd level of grievance – Information Commission
73. APIO – 35-days
74. PGRMS – not meant for RTI
75. PGRMS complaints – 1000 per year
76. Taxes grievance site – e-NIVARAN
77. e-Publishing vs e-Procurement – 1 & 3 are correct. 2 & 4 are incorrect.
78. CPPP – 4-DSC Class-III
79. In e-procurement Zonal/Regional Office – Level-II
80. GPMS – Excellent-100 Good-80 Avergae-60
81. GPMS at Corporate Office – CMD
82. GPMS vs BBSC –large number of KPIs within each Scorecard
83. Energy Conversation - integrated energy purchase and energy management budget
be developed as part of the energy management action plan.
84. Energy Conservation – 2, 3, 4 are correct. 1 is incorrect.
85. Building Orientation/ Architectural Features – No-Cost Methods
86. Project Ojas - to save energy and focus on tapping of renewable sources of energy
87. Oorja App – Historical Data – DBV
88. Oorja App - All Sanity, Discom. & Oorja Bill Validation failed Invoices will appear under
Bills Pending at Site In-charge
89. Roles and Authorisation – BASIS Module
90. ERP changes approval – Steering Committee
91. Not ERP Project Sponsor – CEO of Infosys
92. ESS – does not have Subordinate Leave (it is in MSS)
93. Project Management – CPM is used where emphasis is on optimizing resource
allocation
94. Little-Mirriles approach – Social Cost Benefit Analysis
95. Scrap Process- Approval of Scrap Proposal – Formation of Committee – Review by
Committee – NRV
96. E-File code creation – Super Administrator
97. Slope of Crash Cost Graph – Mathematically = -1000/week as one value increases and
other decreases. Else +1000/week (challengeable)
98. CDA Rules – Rule-61: The employee against whom disciplinary proceedings have been
initiated will cease to be in service on the date of superannuation but the disciplinary
proceedings will continue as if he was in service until the proceedings are concluded
and final order is passed in respect thereof
99. CDA Rules – Rule-33 Major Penalty: Removal from service which shall not be a
disqualification for future employment under Govt. /or the Corporation / Company
owns or controlled by the Govt.
100. CDA Rules – Rule 21 : Every employee shall report within a month to the competent
authority every transaction concerning movable property owned or held by him in his
own name or in the name of a member of his family, if the value of such property
exceeds: (i) Rs.100000/- in case of employees in the Non-Executive category.

You might also like