2. Cell – Hexagon Shape approximation and cell coverage maximise 3. Largest Service Area – GSM Service Area 4. Not Wireline Backhaul - Microwave 5. UMTS – Universal Mobile Telecommunication System 6. C = B log2 (1+SNR) 7. MIMO Release - Rel. 7 8. 5G Phase-II (R16) - Dec-2019 Explanation from material: The 3GPP is at the heart of 5G standardization. As such, it has already mapped out: 5G Phase 1 - this is based on the Release 15 specifications, frozen in September 2018. Unfortunately, this does not meet all the IMT2020 requirements. 5G Phase 2 - this is based on Release 16 specifications, frozen in December 2019 - ready for the IMT2020 submission. 9. TCH Congestion – 0.02 10. CSSR – 0.95 11. Optimisation – RF Optimisation 12. Deliver Telemedicine – No such technology (IP Med is wrong) 13. Initial LTE D/L speed = 100 Mbps 14. Not a function of Node-B – Uplink Transmission 15. PSTN – Public Switched Telephone Network 16. FTTH – Fiber to Terminal Home (challengeable as FTTH – Fiber to The Home) Explanation from material: Today, fiber networks come in many varieties, depending on the termination point: building (FTTB), home (FTTH), curb (FTTC) etc. For simplicity, most people have begun to refer to the fiber network as FTTx, in which x stands for the termination point. 17. GPON – TDM 18. MLLN – Managed Lease Line Network 19. MLLN largest Node – Cluster Node 20. MLLN Accelerator Node – 128 Mbps 21. Inter-exchange Signalling – CAS & CCS 22. Signalling – Ring Back Tone when line is free 23. Signalling – Impedance decreases 24. Signalling – SS7 25. Wi-Fi latest – IEEE 802.11 ac 26. ADSL – Asymmetric Digital Subscriber Line 27. Core > Cladding 28. OFC Disadvantage – Complexity 29. Extrinsic Splice Loss – Axial Tilt 30. BWelec. = 0.707 X BWopt. 31. S-Band = 1460-1530 32. 4-8 Ghz = C-Band 33. OTDR – Optical Time Domain Reflectometer 34. Ethernet analyser – does not have Antenna 35. RTFMS – Remote Fiber Monitoring System 36. IPv4 – 32-bits 37. Class-A - 8-bit N/w Prefix 38. Data generated at - Application Layer 39. Routing Protocols – between Router and Router 40. Router works at – last 3-layers 41. TCP/IP – 4-layers 42. DNS – Domain Name System 43. MAC-Address – 48-bits 44. Min. Broadband Speed as per TRAI – 256 Kbps 45. IoT – Internet of Things 46. Cloud Services – M2M 47. EB-cell – Enterprise Business Services in whole country 48. Channel Partner – sells BSNL services and products 49. Sales – 8-Retailers / BTS 50. MSME – greater than 250 crores PAPER-I: Common 51. MS-Word Blue wavy line – Grammatical mistakes 52. CAPEX – Plant and Apparatus 53. Project – Form-C 54. Asset Management – Commissioning Date automatic 55. Depreciation – monthly 56. MSTC – Metal Scrap and Trading Corporation 57. MSTC e-waste auction – Medicines 58. MSTC – send information to all Bidders 59. Payback Period & ROI – Exact answer – 2 years 4 months, 50%. No such answer in options hence challengable) 60. Prefeasibility Study - time available and the confidence of the decision maker. 61. PERT – 11 62. USO – Department of Telecommunication 63. USO Levy – 5% of AGR 64. Contract Management – Each party selects one arbitrator. They select the third one. 65. Promise in Words – Express 66. Emergent procurement – Negotiations Route 67. Tender Documents verification – APO 68. Bid Security forfeit – if fail to sign agreement 69. Tenders up to 10-crores - DGM, AGM, AGM 70. Review when Project Cost exceeds - 75% 71. RTI – no need to specify reason for information 72. RTI 2nd level of grievance – Information Commission 73. APIO – 35-days 74. PGRMS – not meant for RTI 75. PGRMS complaints – 1000 per year 76. Taxes grievance site – e-NIVARAN 77. e-Publishing vs e-Procurement – 1 & 3 are correct. 2 & 4 are incorrect. 78. CPPP – 4-DSC Class-III 79. In e-procurement Zonal/Regional Office – Level-II 80. GPMS – Excellent-100 Good-80 Avergae-60 81. GPMS at Corporate Office – CMD 82. GPMS vs BBSC –large number of KPIs within each Scorecard 83. Energy Conversation - integrated energy purchase and energy management budget be developed as part of the energy management action plan. 84. Energy Conservation – 2, 3, 4 are correct. 1 is incorrect. 85. Building Orientation/ Architectural Features – No-Cost Methods 86. Project Ojas - to save energy and focus on tapping of renewable sources of energy 87. Oorja App – Historical Data – DBV 88. Oorja App - All Sanity, Discom. & Oorja Bill Validation failed Invoices will appear under Bills Pending at Site In-charge 89. Roles and Authorisation – BASIS Module 90. ERP changes approval – Steering Committee 91. Not ERP Project Sponsor – CEO of Infosys 92. ESS – does not have Subordinate Leave (it is in MSS) 93. Project Management – CPM is used where emphasis is on optimizing resource allocation 94. Little-Mirriles approach – Social Cost Benefit Analysis 95. Scrap Process- Approval of Scrap Proposal – Formation of Committee – Review by Committee – NRV 96. E-File code creation – Super Administrator 97. Slope of Crash Cost Graph – Mathematically = -1000/week as one value increases and other decreases. Else +1000/week (challengeable) 98. CDA Rules – Rule-61: The employee against whom disciplinary proceedings have been initiated will cease to be in service on the date of superannuation but the disciplinary proceedings will continue as if he was in service until the proceedings are concluded and final order is passed in respect thereof 99. CDA Rules – Rule-33 Major Penalty: Removal from service which shall not be a disqualification for future employment under Govt. /or the Corporation / Company owns or controlled by the Govt. 100. CDA Rules – Rule 21 : Every employee shall report within a month to the competent authority every transaction concerning movable property owned or held by him in his own name or in the name of a member of his family, if the value of such property exceeds: (i) Rs.100000/- in case of employees in the Non-Executive category.