Professional Documents
Culture Documents
ADDIS ABABA
Page 1 i
Mohammediemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal
PROJECT OWNER:
MOHAMMEDJEMAL SULTAN AMAN
+251 09 13 63 08 64
Confidentiality
This proposal contains confidential information, specifications and knowledge. The information contained in this
document and its associated annexes is the property of Mohammedjemal Sultan Aman. In providing this document,
Mohammedjemal Sultan Aman assumes that the recipient agrees to its being treated as confidential. Any other use,
specifically the making of copies, distribution or transfer to third parties is not permitted without the approval of
Mohammedjemal Sultan Aman. This shall also apply to any subsequent phases of the negotiations, and their results. This
document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its
contents may not otherwise be disclosed without Mohammedjemal Sultan Aman’s authorization.
Page I
Mohammediemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal
Table of Content
Page II
Mohammediemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal
Page III
Mohammediemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal
ABBRIVATIONS
Page V
Mohammediemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal
LIST OF TABLES
Table 1: Executive Summary
Table 2: The Project Facilities and Service Plan
Table 3: SWOT Analysis
Table 4: Land Utilization Plan
Table 5: Land Use Plan
Table 6: Utilities
Table 7: List of Building and Civil Works and Their Costs
Table 8: Manpower Requirement and Annual Labor Cost
Table 9: Project Implementation Schedule
Page VI
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
EXCUTIVE SUMMARY
Table-1- Executive Summary
Type of the Project Construction of mixed use building
Project Name Mohammedjemal Sultan Aman Mixed Use Building (MSA Building)
Project Owner Mohammedjemal Sultan Aman
Project Location Country Ethiopia
Stories 20
Contractor GC 1
Building height 70 meter above the level ground.
Project Implementation Contractor Design and Build (DB); GC-1
Consultants 1 - Grade 1
Project Capital The total investment cost of the project is estimated $7,500,000.00 (Seven
Million Five Hundred Thousand USD).
Source of Finance A total of $2,250,000.00 (30%) (Two Million Two Hundred Fifty
Thousand USD) is provided by the owner and the remaining
$5,250,000.00 (70%) (FIVE Million Two Hundred Fifty Thousand
Project Period 24 months
Number of working 313 days
days in a year
Page VII
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page VIII
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
1. INTRODUCTION
The second most populous country in Africa, Ethiopia, has an estimated population of more than 110
million people and has an annual growth rate of 2.7%. The expected national growth of Ethiopia
by the end of 2023 is 7.5% which is speculated by World Bank. Ethiopia’s growing population
along with speedy urbanization. The country’s urban population is steadily growing by about
4.7% annually with about 21.6% of the population classified as urban in the year 2020.
The up-to-date fast and vigorous economic growth of Ethiopia especially in Addis Ababa
necessitates equivalent growth of building and construction sector. The time variant positive
development of the capital is now brining the construction of modern and aesthetics buildings for
different purpose. The sector should expand rapidly to support the overall economic
development sustainable. In the building sector of the economy, the multi- purpose in the one
becoming rapidly expanding in Addis Ababa since dynamic economic development of urban
economy requires the construction of these buildings in the city to support the growing of
business service sectors like supermarkets, Beauty salon, shops, offices cinemas, Computer
Center, Cafeterias, restaurant, assembly hall, apartments and other activities. In this regard,
mixed used building expands in the all parts of the city. Investment and property development
play an important role in any emerging markets or economies. Property generally comprises
residential houses and mixed use building property (mainly mixed use building) developed for
rental business and sale. The property investment market in Ethiopia remained under developed
for several years. As a consequence, the supply of residential houses and non-residential mixed
use building that can be used for residence, office space, shopping malls and catering services in
the urban centers of the country is disproportionately low to cope with the growing demand in
the country spinning from the average growth in GDP of 6.5% over the last ten years and
population increase. The relatively good performance of the macro-economy (real growth in
GDP, low inflation rate and growth in investment and export sector) has stimulated
unprecedented investment growth in the property sector over the last five years. The growth of
investment in the property market over the last five years in consistent with the global experience
suggesting that investment in the residential and commercial property is greatly influenced by
the performance of the macroeconomic conditions. In general, a stable macroeconomic condition
leads to economic and business growth and develops investors’ confidence. This certainly spurs
Page 1
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
large demand in the property market for office space, shopping malls, catering services,
apartment and residential houses. Following growing demand trends, and with the expectation of
high return on their investment capital, large number of land developers pooled their financial
resources and invested in the property market.
To this effect, the owner of the envisioned mixed use building who has been living for long time
in this city with a name Mohammed Mixed use building, planned to construct the building in
Kolfe Keranyo Sub-city, woreda 4 and undertaken this project study to check the market,
technical and financial feasibility of this project. The promoter is very ambitious and committed
to realize the project. Hence, they expect to get the necessary support from the city
administration to make the project to be operational. Besides, the government policies and
incentives for the private sector investment are very promising that motivates the promoter to
engaged in mixed use building business.
Mohammed Jemal Sultan Aman is a legally registered company established to play its role
to reduce such critical mixed-use building problem in Addis Ababa by providing clean,
comfortable, classic and model mixed use building that will add an aesthetic and multi-
dimensional values to the town and the country at large.
With the vision of curbing the lack of mixed use buildings in Addis Ababa, Mohammed
Jemal Sultan Aman has emerged with mega attentions with the objective that will provide
mixed-use building to distinguished customers.
Page 2
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
4. PROJECT RATIONAL
The proposed project is convincing for the following key reasons:
Curbing the need of mixed use building Houses:
It is well known that the population growth rate of the country is growing at alarming rate that
created imbalance between the size of population who needs mixed use building houses and the
supply of houses at the cities. So that in this project scenario, the city population who needs
mixed use building house are very high so that it is expected that the project curb the need of
mixed use building house at some portion for high profile guests.
Page 3
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Location Rational:
Mohammed Jemal Sultan Aman high rise mixed use building is located at the heart of
Addis Ababa where 25% of high rise mixed use building found. Most of high rise mixed use
buildings are located within 25 km radius from the Addis Ababa Bole International Airport,
but Mohammed Jemal Sultan Aman mixed use building is located within nearly 25km distance
from the Airport.
Investment Rationale:
The existing promising investment opportunities, the demands of service need along with
relatively sound investment support made by the government in such kinds of feasible projects,
compelled the project promoters to initiate mixed use building house construction project to be
established for residence dwellers to curb their acute social need. Despite the promising business
opportunities of the city, the trend on such kinds of investment found to minimal. The mismatch
between the demand for and supply of such kind of project is easily observed in the city. Thus
the main rationale behind this project is to curb housing problem in the city for high-income
group’s population.
Therefore, the existing shortage or absence in the supply of these houses, along with its
commercial and administrative access, better location and infrastructure access, escalating trend
of urbanization and business activities, thus it is with such reason that this project is identified
and proposed and assumed to be more social and economically viable project.
Attractive Site Components:
The availability of the plot land in center of the city is the major rational of the project. Having
construction site in the center of the town will reduce risk and cost of construction. In addition, it
would be very easy to access basic infrastructures easily. The peace and security of the project
will also be very high.
Page 4
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page 5
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
In addition to serving as a source of employment and income for the city, the project renders
social services for different group of people. Hence, it also serves as a source of mental
satisfaction for different users, since, the center encompasses different recreational areas; it will
divert the attention of the users from different evil deeds. It deemed to minimize the demand for
shops and other bundles of services in the area. Moreover, it serves as the pilot experience and
ground for other investor to enter into such kinds of community development.
6. PROJECT LOCATION
The project area is located in Addis Ababa city administration, Kolfe Keranyo Sub-city
Woreda 07, near Wako Gutu School. The geographical coordinate of the project is 8.985685,
38.760307; XQP6+637. The geographical coordinate of the project is 8.985685, 38.760307;
XQP6+637. The construction area is 25 kilometer away from the Addis Ababa Bole
International Airport. The proposed project will have a total area of 1,500m2. The project
area is near to the main road which is 10.7 meter from the building. The project area is
surrounded by mixed use buildings, residential houses and small shops.
Page 6
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
PROJECT
SITE
Page 7
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
BUILDING
AREA
Page 8
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page 9
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
7. MARKET STUDY
There are a number of factors which affects the demand of standardized mixed use building.
Among these factors, the most important is population growth and the level of income. The
currently increasing number of population in the city due to rural to urban high-rate of
population migration which in turn increase the number of population in the city.
7.1. Market Analysis
There are a number of factors which affects the demand of standardized high rise mixed use
building. Of these factors, the most important to have influence is population growth and the
level of income. The current expanding service sector in Addis Ababa city has been inviting
skilled and unskilled labor forces to the center; in addition, the number of both national and
international offices has been increasing. Above all the increase in the number of population
increases for the provision of different services. Nowadays, most of the private business
organizations need their own small-medium offices in order to give their services and provide
their products, and they prefer the place that found in the center or close to the road. As clearly
indicated in the introductory part of this proposal, Addis Ababa is the dynamically growing
urban center of Ethiopia. Though the market demand gap for high rise mixed use building is not
clearly understand there is wider gap for such demand as many merchants, organizations are
flouring to the city every day.
7.2. The Demand-Supply Gap
There has been a significant growth in the number of local and international trades across the
country. This increase is mainly associated with the stimulation of economic activist and partly
due to an increase in the flow of international and local traders in to the Addis Ababa. Since
Addis Ababa is an important mixed use building in addition there is a significant increase in
business activates and hence increasing the number of traders. Even though there is a lack of
quantitative estimates that depict the actual demand and also the annual growth rate commercial
facilities are scarce in the city. As a result there is a large gap between the developed and that of
the supply for modern Bank and cafeteria accommodation hence this project would not face any
problem of demand scarcity for it mixed use building and it would provide good service to
customers.
Page 10
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
The demand for office space is a derived demand because firms rent space as an input to the
production of services or goods they provide to businesses and households in the local or
national economy. Following our survey of office space users in several areas are mainly firms
providing banking, offices, cafeteria and restaurants, supermarkets, computer center service.
Future demand for office space is actually driven from growth in number of offices in the city
which in turn is influenced by the macro-economic growth in the country. Assuming that
demand for office space is directly related to the growth in the economy; the forecast for office
space demand is shown in tables below. As shown in the table below, the demand is increasing
astonishingly.
7.5. Target customers
The target customers of this envisaged project include:-
1. Very high profile individuals,
2. Investors,
3. Business Community,
4. Business organization,
5. The government offices,
6. Non-governmental organizations,
Page 11
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
7.7. Competition
There are different forms of competition that may face the envisaged high rise mixed use
building. These are price and non-price based competition. Moreover, there are different
competitors that will compete with the project either directly or indirectly. But the high rise
mixed use building under discussion has diversified marketing strategies that could enable it
Cope up with the different competitors in the market. Moreover it will frequently conduct
competitors research which focuses on, the strength and the weaknesses, the different
competitors’ strategies, the techniques they use in rendering the service, their customer handling
methods, and others. Generally the project has many other projects all over Addis Ababa villages
which compete with it.
Page 12
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
café service as well as modern mixed use building that primarily serve its dwellers, guests and
major clients.
Since the project will be engaged in high rise mixed use building, the main sources of its annual
revenue would be from the rental of building spaces such as houses, shops, offices, and banking,
café and restaurant. Based on the market price of similar high rise mixed use building in the area,
the envisioned buildings set the following fair price (With VAT) for its service, hence when the
building construction fully get operational it is assumed to generate a yearly income of ETB
75,005,000.00 (Seventy Five Million Five Thousand ETB).
Page 13
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page 14
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
The project operated by Mohammed Jemal Sultan Aman does not include land
contamination, waste disposal, water pollution, construction of housing societies on agricultural
land, reduction of green spaces, and carbon emissions. The project will not expose any risks
and liabilities associated with a property. The availability of an environmental assessment prior
to the transfer of property identifies no potential problems. Full disclosure of environmental,
health, and safety hazards before buying a property is going to be a critical element of due
diligence requirements in future.
As cost-efficient residential apartment construction technology is employed, wood consumption
is extremely minimized or avoided. The use of wooden formwork has negative effects on the
environment. Moreover, it requires skilled manpower and time to mantle and dismantle the
formwork. The design of the buildings meets the standard code of practice of the country. It’s
fast, economical, and very little formwork is required. The environmental impact assessment
has identified and proposes alternatives and mitigation measures to reduce the environmental
impact of a planned project. The assessment also identified the strong, weak, opportunities and
treats of the project.
Page 15
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page 16
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Opportunity Threat
Create job opportunities for many people, Inflation may occur during the project
and micro and small enterprises, which period
operate at a lower overhead. Vacant land exhausted in the city center
Relevant government housing policy Shortage of basic infrastructures for
High housing demand in the city, large scale housing scheme
High commitment from the government Creation of segregated communities in
side, neighborhood,
High potential to develop the old city skyrocketing construction costs
center,
Peoples support to the project
Page 17
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
The project area is situated at Addis Ababa city that suitable for mixed use building house
construction. It will be fitted with modern security equipment. Trained guards will be hired to
serve in shift.
Page 19
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
11.2. Construction Work and Technology
11.2.1. Construction Schedule
The construction schedule is a critical component of the project's execution plan. It outlines the
timeline for each phase of construction, from site preparation to completion. The estimated
construction duration is subject to adjustments based on factors such as weather conditions,
regulatory approvals, and unforeseen challenges.
11.2.2. Architectural Design & Layout
The architectural design focuses on maximizing functionality, aesthetics, and space utilization. The
layout integrates residential units, commercial spaces, and communal areas, fostering a harmonious
blend of convenience and luxury. Architectural elements prioritize safety, accessibility, and energy
efficiency.
11.2.3. Structural Design
The structural design ensures the building's stability, durability, and compliance with safety
standards. It considers factors such as load-bearing capacity, seismic resilience, and adherence to
local building codes.
11.2.4. Reinforced Concrete
Reinforced concrete is the primary construction material, chosen for its strength and versatility. The
design incorporates reinforced concrete elements to withstand vertical and lateral loads, providing a
robust foundation for the building's structural integrity.
11.2.5. Foundation Design
The foundation design addresses the geological and soil conditions of the project site. It employs
appropriate foundation types, such as pile foundations, to ensure stability and prevent settlement
issues.
11.2.6. Construction Plan and Process
The construction plan outlines the step-by-step process from groundbreaking to project completion.
It includes a detailed breakdown of tasks, resource allocation, and quality control measures. Regular
inspections and adherence to safety protocols are integral to the construction process.
11.3. Utilities
Utilities are a crucial aspect of the project, encompassing water supply, electricity, and waste
Page 20
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
management. The building will be connected to municipal water and power supplies, with backup
systems in place to ensure uninterrupted services. Sustainable practices, such as rainwater
harvesting and energy-efficient technologies, will be integrated into the utility infrastructure.
The technical studies provide a comprehensive overview of the construction and service aspects of
the Mohammed Jemal Sultan Aman project. These studies form the foundation for effective project
management, ensuring that the development meets high-quality standards and aligns with the
envisioned objectives.
Table-6- Utilities Use Plan of the Project
No Description Qty Unit Cost Cost (USD)
1 Electricity, KWh 200,000 0.5*20,000 $10,000.00
2 Water Supply 70,000 0.10*70,000 $7,000.00
3 Telephone 10,000.00 $10,000.00
4 Fuel, oil, lubricants 5000 20*5000 $10,000.00
Total $37,000.00
Page 21
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
12. ENGINEERING AND CIVIL WORKS
12.1. Land, Building, and Civil Works
The mixed use building has a total site area of 1,500 m2. The building floor area is 1200m2 and
the remaining 300 m2 is left for other construction. The type of buildings and its corresponding
civil construction cost is given on Table 7.
Table-7- Building and Civil Works Plan of the Project
No Description Total Price
A. SUB-STRUCTURE
1 Excavation and Earth Work $400,000.00
2 Concrete Work $600,000.00
Sub-total A $1,000,000.00
B. SUPER STRUCTURE
1 Concrete work $1,300,000.00
2 Block work $400,000.00
3 Roofing $120,000.00
4 Carpentry and joinery $160,000.00
5 Metal work $150,000.00
6 Finishing $200,000.00
7 Painting $50,000.00
8 Electromechanical installation $100,000.00
9 Sanitary Installation $200,000.00
Subtotal B $2,680,000.00
A+ B $3,680,000.00
VAT (15%) $1,120,000.00
Grand Total $4,800,000.00
As shown on Table 8, the total cost of building and civil work is estimated at Birr
$4,800,000.00 (Four Million E i g h t Hundred Thousand U S D only) which is 64% of the
total project cost.
Building Construction: - The construction plan encompasses erecting a 20-story building with
meticulous attention to architectural and structural designs. Materials such as reinforced concrete
will be employed for durability and structural integrity. The construction process will follow a
timeline and undergo rigorous quality control measures.
Civil Works: Civil works involve the establishment of essential infrastructure, including road
connectivity, sewage systems, and utilities. These components are integral to the functionality and
Page 22
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
sustainability of the building.
12.2. Manpower and Training Requirement
12.2.1. Manpower Requirement: The project necessitates a diverse workforce, including skilled
and unskilled labor. Professionals such as architects, engineers, project managers, and construction
workers will contribute to different phases of the project.
Table-8- Manpower Requirement
Monthly salary Annual salary Total
SN Position Qty Qualification
in USD in USD salary in USD
MA in Economics or
1 General Manager 1 $366 $4,392 $105,408
Mgt.
Building MSC in Construction
2 1 $273 $3,276 $78,624
Administration Management
10 + 3 in construction
3 Builder 1 $218 $2,616 $62,784
work
10+2 in construction
4 Carpenter 1 $218 $2,616 $62,784
work
5 Electrician 1 Diploma in Electricity $218 $2,616 $62,784
12.2.2. Labor Availability: An assessment of labor availability in the local context will guide the
recruitment process. Collaboration with local labor markets will ensure a skilled and motivated
Page 23
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
workforce, promoting community engagement.
12.3. Project Implementation
Efficient project implementation involves a well-defined plan, resource allocation, and adherence to
timelines. This section outlines the steps from project initiation to completion, emphasizing
milestones and quality benchmarks.
A. The General Manager’s Duties and Responsibilities
• He/she will plan, organize, direct and control the overall activities of the building.
• He/she will devise policies and strategies that will enable the center to be profitable.
• He/she will incorporate modern technological innovation that will facilitate the service delivery of
the building to increase customer’s satisfaction.
• He/she will plan, organize, direct and control the human and non-human resources of the building
so as to achieve the short and long run objectives of the organization.
B. Building Administration Department
The building Administration Department of the multipurpose building has two main sections (HRM
and Finance and General Service section). It has responsible for undertaking the following
activities;
• Manage the human resources and control employee’s activity
• Well non-human resources of the project, which include; effective handling of the different
resources of the building, and devise strategies of controlling against fraud and damage.
• Will provide the right material or inventory to the center with right price at the right time.
• Will plan, organize direct and control the financial transaction of the building by using all the
necessary documents.
• Accountant and casher that will collect money from the customers.
• Will develop sound financial control system by developing modern financial control systems.
• Will prepare the annual financial statements and prepare condensed reports for both the General
Manager and other concerned government body.
• Follow the overall status of the business and provide maintenance and repair services
C. The marketing Department
• Will handle the overall marketing activities of the organization which include planning, organizing,
Page 24
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
directing, and controlling.
• Will develop the marketing strategies for future multipurpose building development
• Will develop effective customer handling strategies.
• Execute the promotion methods.
D. Technical and maintenance manager
• will handle the overall physical maintenance and related issues
• will make sure electricity and back up is organized.
• follow up security issues and educate tenants
• works in collaboration with general service to make sure tenants are well served
Table 9: Project Implementation Schedule
No Activities Time
1 Document preparation, license, TIN, feasibility study, February-May 2024
preparation of preliminary design, finalizing building permit
2 Bank Loan Processing June 2024
3 Site Development August 2024
4 Building and construction work October 2024
5 Service Preparation October 2026
6 Service Deliver to Customers November 2026
Owner
General
Manager
Page 26
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
The financial resource is a prime resource for undertaking any activities. Hence for
implementing, this mixed use building requires a total investment cost of the project is estimated to
be $7,500,000 (Seven Million Five Hundred Fifty Thousand USD) will be financed owner’s
equity and Bank loan. Out of this a total of $2,250,000.00 (Two Million Two Hundred Fifty
Thousand USD(30%) will be provided by the owner and the remaining 5,250,000.00 (70%) (
Five Million Two Hundred Fifty Thousand USD will be financed from local banks loan provision.
12.2. Fixed Investment
A. Land, Building & Construction
Table 10: Land, Building & Construction
No Description of Works Total Cost in USD
1 Building Construction $4,800,000.00
2 Site Development $647,000.00
3 Design and Supervision $400,000.00
Total $5,847,000.00
C. Vehicle
Table 12: Vehicle
No Description UOM Qty. Unit Cost in Total cost in USD
USD
1 Mini-Bus Unit 1 $45,000.00 $45,000.00
2 Pick Up Unit 2 $37,500.00 $75,000.00
Total $120,000.00
Page 27
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
D. Office Equipment’s
Table 13: Office Equipment’s
SN Description UoM Qty Unit price Total price
1 Managerial chairs No 5 $3,500.00 $18,000.00
2 Managerial table No 5 $3,000.00 $15,000.00
3 Office table and chair No 8 $1000.00 $8,000.00
4 Secretarial chair and table No 5 $400.00 $2,000.00
5 Computer, printer, network adaptor, cable, No
photocopier 4 $1,500.00 $6,000.00
6 Shelf No 6 $2,000.00 $12,000.00
7 File cabinet No 8 $720.00 $5760.00
8 Guest chairs No 4 $350.00 $1,400.00
9 TV No 2 $3,500.00 $7,000.00
10 Refrigerator No 2 $1,000.00 $1,000.00
11 phone accessories No 3 $1,000.00 $3,000.00
12 Carpet and curtains LS 8 $2,000.00 $16,000.00
Total $95,000.00
E. Working Capital (Operating Expenses)
Table 14: Working Capital (Operating Expenses)
SN List of Items Total Cost
1 Audit and Legal Fee $20,000.00
2 Stationary Supplies and Stationary Work $25,000.00
3 Promotional Cost and Printing Work $50,000.00
4 Property Insurance $20,000.00
5 Cleaning Supply $10,000.00
6 Uniforms $7,000.00
7 Water Consumption $7,000.00
8 Electricity Consumptions $10,000.00
9 Fuel $10,000.00
10 Telephone And Fax $10,000.00
11 Maintenance Cost $5,000.00
Page 28
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
12 Miscellaneous Cost $15,000.00
Total $189,000.00
F. Pre- Service Expense
Table 15: Pre- Service Expense
Description Cost in USD
Project Proposal $67,000.00
Licensing fee $235,000.00
Total $302,000.00
5 Vehicle $120,000.00
6 Office equipment’s $95,000.00
7 Operating expenses $189,000.00
8 Pre-service expenses $302,000.00
9 Manpower $824,000.00
Total 7,500,000 USD
The total project cost for the construction of the Mohammed Jemal Sultan Aman project is
$7,500,000 (Seven Million Five Hundred Fifty Thousand USD)
Page 29
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page 31
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
BCR is 9 and positive this indicates this project would return 5 birr in benefits for each birr spent.
Page 32
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page 33
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
Page 34
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
14.2. RECOMMENDATIONS
Financial sensitivity analysis shows that the project is highly sensitive to decrease in sales
revenue but relatively less sensitive to increase in raw material and investment costs. Therefore,
it is recommended that the company should give a great attention for the possible reasons for
sales reduction. In this case, different mechanisms should be selected and implemented to
increase sales. In addition to this, the company should decrease its cost that lowers profitability.
The project must utilize modern promotional styles to capture the planned market share. To do
so, it has to design effective strategy to achieve this plan. Although, due care and diligence has
been taken to compile this document, the contained information may vary due to any change in
any of the concerned factors, and the actual results may differ substantially from the presented
information. In this case, any delaying to implement the project creates some problem on its
profitability as there is always change like change in price of services and goods, cost of raw
materials, customers preference and purchasing power etc.….So, it is recommended that
investors should implement the project as soon as possible before any change occurred.
Page 35
Mohammed Jemal Sultan Aman Mixed Use Building-2B+G+20- Project Proposal 2016 E.C.
REFERENCE
[1] World Economic Forum (2020). Ethiopia’s unconventional COVID-19 response.
https://www.weforum.org/agenda/2020/06/ethiopia-covid19-response/ (Accessed 11
September 2020).
[2] International Monetary Fund (2020). Sub-Saharan Africa: COVID-19 an Unprecedented
Threat to Development. IMF Regional Economic Outlook, April 2020
https://www.imf.org/~/media/Files/Publications/REO/AFR/2020/April/English/ch1.ashx?la
=en Pg. 18.
[3] Ethiopia Semonegma (2019). Challenges facing Ethiopia’s construction industry sector. 29
August 2019. https://semonegna.com/challenges-facing-ethiopia-construction-industry-
sector/ (Accessed 11 September 2020).
[5] Terfa, B.K., Chen, N., Liu, D., Zhang, X., and Niyogi, D. (2019). Urban Expansion in
Ethiopia from 1987 to 2017: Characteristics, Spatial Patterns, and Driving
Forces. Sustainability, 11(10), 2973. Pg. 2.
[6] World Bank (2019). Ethiopia Urban Land Supply and Affordable Housing: Housing Deep
Dive Report.
[7] Korea Development Institute (2018). Enhancing National Housing Development and
Administration http://www.ksp.go.kr/english/pageView/publication-eng/620 (Accessed 27
August 2019). Pg. 30.
[8] AACPPO (2017). Addis Ababa City Structure Plan: Draft final summary report, (2017-2027)
Page I
Annex Cash Flow
Year 1 2 3 4 5 6 7 8
A. Income
B. Cost of land
Development, Site $500,000.00 $500,000.00
Clearing & Fence Work
F. Salaries and Benefit $50,550.00 $50,550.00 $50,550.00 $50,550.00 $50,550.00 $50,550.00 $50,550.00 $50,550.00
Total Expense $3,500,00.00 $3,500,00.00 $75,675.00 $75,675.00 $75,675.00 $75,675.00 $75,675.00 $75,675.00
Gross Profit -$3,000,000.00 -$2,500,000.00 $824,325.00 $824,325.00 $824,325.00 $824,325.00 $824,325.00 $824,325.00
- $81,351.25 - $81,351.25 - $81,351.25 - $81,351.25 - $81,351.25 - $81,351.25 - $81,351.25
- Income Tax - $81,351.25
Profit After Tax -3,081,35133.75 2,380,676.25 2,050,676.25 7,463,926.25 5,463,926.25 4,463,926.25 5,463,926.25 5,463,926.25
- Bank Interest 0 0 0 5,00,000.00 3,500,000.00 2,000,000.00 2,000,000.00 2,000,000.00
Net Profit -3,081,35133.75 2,380,676.25 2,050,676.25 1,463,926.25 2,963,926.25 2,463,926.25 2,463,926.25 3,463,926.25
BCR -3.09418163 3.624421803 2.142250464 0.023632241 0.023632241 0.023632241 0.023632241 0.023632241
BCR Average = 2.79065184
Page II