You are on page 1of 1

PLAN

DS

SPOT DETAIL

PLAN SECTION
LEGEND: FFL

WATER DISTRIBUTION SYSTEM


WATERLINE
F FAUCET
WC WATER CLOSET
LAV LAVATORY SECTION
SECTION
4 AIR CHAMBER DETAIL 5 CLEAN-OUT DETAIL
P-1 SCALE NTS P-1 SCALE NTS

1 CATCH BASIN DETAIL


P-1 SCALE NTS

WASTE, SEWER & VENT SYSTEM


SANITARY LINE
VENT LINE
FCO FLOOR CLEAN-OUT

FD SHOWER/FLOOR DRAIN
PLAN
VS VENT STACK
SS SOIL STACK ��
FFL
VAC VENT ACROSS CEILING
VP VENT PIPE
PVC POLYVINYL CHLORIDE
WP WET PIPE
SP SOIL PIPE
PLAN
VTR VENT THRU ROOF
ST SEPTIC TANK
AC AIR CHAMBER
SECTION
WASTE, SEWER & VENT SYSTEM
DRAINAGE LINE SCHEDULE OF DIMENSIONS
DS DOWNSPOUT PIPE
SIZE IN
DIMENSION IN MM

'A' D F

CB CATCH BASIN 50 100x100 225.42

75 125x125 225.42

RD ROOF DRAIN 100 150x150 225.42


SLOPE = 1/10 SLOPE = 1/10
150 200x200 282.57

CD CORRIDOR DRAIN
2 FLOOR DRAIN DETAIL
PLUMBING FIXTURES P-1 SCALE NTS

LAV LAVATORY
WC WATER CLOSET

SECTION
6 TYPICAL SEPTIC TANK DETAIL
P-1 SCALE NTS

PROJECT NAME AND LOCATION PREPARED BY SHEET NO.


REPUBLIC OF THE PHILIPPINES
A PROPOSED CONSTRUCTION OF GERALD N. IGLESIA
PROVINCE OF LEYTE
PEOPLE CENTER REYMARK C. MENDIOLA
KARL ANGELO S. LACABE
1
MUNICIPALITY OF TOLOSA
BRGY. IMELDA
TOLOSA, LEYTE
CIVIL ENGINEERING STUDENTS P-1

You might also like