COMPUTATION :

LOCATION: CAMARINES SUR POLYTECHNIC COLLEGES

LATITUDE: 13.4060

LONGITUDE: 123.3753

SOLAR IRRADIANCE FOR FEBRUARY 25, 2024

SOLAR IRRADIANCE = Normal Solar Irradiance x cos z

where:

Normal Solar Irradiance = 1000 w/m^2

z = zenith angle

cos z = (sinδ) (sinф) + cosδ cosф [(L.T. - 12) x 15]

where:

δ = Sun Declaration - the latitude at the direct overhead.

ф = Latitude

L.T. = Local Solar Time in Hour

For Sun Declaration

δ = 23.45° sin [ 360/365 (d + 284]; where: d = number of days

δ = 23.45° sin [ 360/365 (25 + 284]

δ = 19.26 south
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

For Local Solar Time in Hour

A = Latitude x Difference between Pacific Standard Time

A = 13.4060 x (-8)

A = -107. 248

B = 360/365 [ d - 81]

B = -55.23287671

Equation for Time

C = EoT = 9.87 sin(2B) - 7.57[ cos(B)] - 1.5 [ sin(B) ]

C = 9.87 sin [2x ( -55.23287671)] - 7.57 [ cos( -55.23287671 )] - 1.5 [sin(-

55.23287671 )]

C = -12.30872853

L.T. TIME CORRECTION FACTORS (TC)

TC = 4 [ longitude - LSTM(A)] + EoT (C)

TC = 4 [ 123.3753 - (-107. 248)] + EoT ( -12.30872853)

TC = 910.18 minutes [ 1 hr / 60 minute]

TC = 15.17 hours
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

Solving for Zenith

cosz = sin (19.26) sin(13.4060) + cos(19.26) cos(13.4060) cos[ (15.17-12) (15) ]

cosz = 0.6962858049

For Solar Irradiance

Solar Irradiance = Normal Solar Irradiance x cosz

Solar Irradiance = 1000 w/m^2 x 0.6962858049

Solar Irradiance = 696.2858049 w/m^2

For Efficiency

Pmax
% max =
( Irradiance )(Area)

Solve for Area

Power
A=
Efficiency x Irradiance

assuming 10% efficiency

100 w
A= 2
0.1 x 1000 w /m

A = 1 m2❑

100 w
% max =
696.2858049 x 1

% max = 14.36%
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

COMPUTATION OF WIRE TO BE USED

SOLAR PANEL TO CHARGE CONTROLLER

Short Circuit Current = 6.68 A

Source Circuit Current = 1.25 x Isc

Source Circuit Current = 1.25 x 6.68

Source Circuit Current = 8.35 A

Based on the PEC Article 6.90.2.2 (a) (4) the ampacity should not be 1.25 less than

Source circuit current therefore,

Size of the wire will be = 1.25 x Source Circuit Current

= 1.25 x 8.35

= 10.44 A

Correction Factor = 0.67 → based on the table 6.40.41

¿ wire
Size of the wire will be =
Correction Factor

10.44
=
0.67

Size of the wire will be = 15.58 A

*Size of wire is 2.0mm^2 but base on manual

FROM BATTERY TO INVERTER


Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

Efficiency of the Inverter = 0.8 = 80%

Inverter Input Nominal Voltage = 12 volts

Minimum Input Voltage = 10.5 volts

Maximum Input Voltage = 15 volts

Wattage = 220 watts

Solve for Current

Pout
Pinput = efficiency

220 watts
Pinput = 0.8

Pinput = 275 watts

Input Current

P input
I=
V pe

275 watts
I = 12 volts

I = 22.9 A

Size of the wire will be = 22.9 x 1.25

Size of the wire will be = 28.6 A

*Wire size is 15 m m2❑

FROM INVERTER TO LOAD


Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

Efficiency of Inverter = 0.8 (80%)

Inverter Output Nominal Voltage = 220 V AC

HOUR ANGLE CALCULATION FROM SOLAR TIME


Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

1
W = 15 (ts -12) 15 x = 0.25
60

from 7 am to 4 pm

TIME COLUMN 1 HOUR ANGLE

7 AM 7 -75°

7:15 AM 7.25 -71.25°

7:30 AM 7.5 -67.5°

7:45 AM 7.75 -63.75°

8:00 AM 8 -60°

8:15 AM 8.25 -56.25°

8:30 AM 8.5 -52.5°

8:45 AM 8.75 -48.75°

9:00 AM 9 -45°

9:15 AM 9.25 -41.45°

9:30 AM 9.5 -37.5°

9:45 AM 9.75 -33.75°

10:00 AM 10 -30°

10:15 AM 10.25 -26.25°

10:30 AM 10.5 -22.5°

10:45 AM 10.75 -18.75°

11:00 AM 11 -15°
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

11:15 AM 11.25 -11.25°

11:30 AM 11.5 -7.5°

11:45 AM 11.75 -3.75°

12:00 NN 12 0°

12:15 PM 12.25 3.75°

12:30 PM 12.5 7.5°

12:45 PM 12.75 11.25°

1:00 PM 13 15°

1:15 PM 13.25 18.75°

1:30 PM 13.5 22.5°

1:45 PM 13.75 26.25°

2:00 PM 14 30

2:15 PM 14.25 33.75°

2:30 PM 14.5 37.5°

2:45 PM 14.75 41.25°

3:00 PM 15 45°

3:15 PM 15.25 48.75°

3:30 PM 15.5 25.5°

3:45 PM 15.75 56.25°


Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

4:00 PM 16 60°

SOLAR IRRADIANCE

Normal Irradiance = 1000 w/m^2

@MARCH 2024

Sunrise : 7:30 = 7.5

Sunset : 7:30 = 17.5

Solar Irradiance @ time : 8am, 9,am, 10am, 11am, 12nn, 1pm, 2pm, 3pm, 4pm, and

5pm.

180(t−tsunrise)
I = Irradiance sin [ (tsunset −tsunrise) ]

@ 8:00 am

180(8−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 156.43 w/m^2

@9:00 am

180(9−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 453.43 w/m^2

@10:00 am
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

180(10−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 707.108 w/m^2

@11:00 am

180(11−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 891.007 w/m^2

@12:00 nn

180(12−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 987.688 w/m^2

@1:00 pm

180(13−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 987.688 w/m^2

@2:00 pm

180(14−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 891.006 w/m^2

@3:00 pm

180(15−7.5)
I = 1000 sin [ ]
(17.5−7.5)
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

COLLEGE OF ENGINEERING AND ARCHITECTURE


ISO 9001:2015

I =707. 106 w/m^2

@4:00 pm

180(16−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 453.99 w/m^2

@1:00 pm

180(17−7.5)
I = 1000 sin [ ]
(17.5−7.5)

I = 156.43 w/m^2