You are on page 1of 9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

NOTE
A V-001 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
FEED GAS SCRUBBER 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 10.2 MMSCFD 3. FOR ONLINE SAMPLING CONNECTED TO THE GC.
ID x T/T : 679 mm x 2000 mm 4. TO LINE DRAIN.
TO VENT STACK 5. BDV TO BE MANUALLY ACTIVATED
DESIGN PRESSURE : 34 Barg 3"-VL-1004-A
DESIGN TEMPERATURE : 50°C 0P16-I-PR-PID-01-003
OPERATING PRESSURE : 27 Barg
OPERATING TEMPERATURE : 21°C

3"-VL-1001-A

2"-VL-1003-A
B B

SET @ 34 BARG
SIZE: 2"H3"
CASE BLOCKED DISCHARGE
150#
RO
PSV 001 300#
001

MIN 600 MM
C LO C
150#

300# 3A2RF

150#
3/4B2T 2B2RF 300#
BDV 2B2R

003
2B2RF LO
D NOTE 5 D
ESD 2"
- FO

C ZS C
ZI
3/4B2T 003 2B2R
003 O
O

DPT
001
E E

HH : 31 BARG
PI PSD
002 002
LL : 25 BARG

2 PV
F TO ANALYZER GC SHELTER F

2"-VL-1000-B
TUBING 001B set @27 barg
0P16-I-PR-PID-01-002-SHT3
PT

2"-VL-1002-B
PIC
HH 4"x2" 4"x2" 001A/B 002
PSD ESD TI
REFERENCE DOCUMENT
- - 001 4B2R 2" 4B2R 1/2B2T TO INLET GAS DRYER (D-001A/B) DOCUMENT / DRAWING No. REV TITLE
600# 300# 6"x4"
C N2 4"-HG-1002-B
EXISTING NEW ZI 0P16-I-PR-PID-01-002-SHT2
6"
PIPELINE PIPELINE 3/4B2T PT
001
O TT 001 2B2R
G 001
PV N5 G
SDV ZS C N4
001A 2"
2"
EXISTING PIPELINE

3/4B2T NOTE 3 001 001 PI


O 1/2B2T N8
2" 001
6"x4" 4"x2" 4"x2" 6"x4" 2"
4"-HG-1000-B 4"-HG-1001-B N1 2B2R x 3/4
6" REFERENCE DOCUMENT
6"-600# 6"-HG-1000-B 4B2R 4" 4B2R 4B2R 2" 4B2R
FC DOCUMENT / DRAWING No. REV TITLE

3/4B2T 3/4B2T
H N6A H
OWNER :
2"
2B2R
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG

HH N7A
PSD 2" 2B2R CONSULTANT:
-
PT PLN ENJINIRING
V-001
LZT
LT
I 002
CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
001
SETTING LEVEL PROJECT :
HHLL = .......700mm
USD HLL = .......600mm CNG PLANT 10 MMSCFD FOR RIAU
LL
V001 LLL = .......500mm GAS FIRED POWER PLANT (GFPP) 200 MW
LLLL = .......400mm N7B
TITLE : SCALE :
2" 2B2R
N6B PIPING & INSTRUMENTATION DIAGRAM
2B2R H : OPEN NTS
2" LIC
2B2R CNG MAIN PROCESS
J 001 L : CLOSE
FEED GAS SCRUBBER J
2B2R N9
NOTE 4 DOC. No. : SHEET No. : REV :
2"
2B2R
0P16-I-PR-PID-01-002 1 OF 9 2
N3 DOC. TYPE :
2" PIPING INSTRUMENT & CONTROL
NOTE 4 AUTO RESET ABOVE LL
HH CIVIL & STRUCTURE X PROCESS
PSD ESD USD
2"
- - V001
LL ELECTRICAL

K MECHANICAL K

SDV ZS C ZI C LV REV DESCRIPTION PRE CHK APP DATE

002 002 002 001 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23
O O
TO CLOSED DRAIN VESSEL (V-004) 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 16/02/23
2"-DC-1000-B 2"-DC-1001-A
0P16-I-PR-PID-01-004
2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23
2" 2B2R 2"x1" 1" 2"x1" 2A2R
NC
L L
3/4A2T
EPC CONTRACTOR :

1B4Z

300# 150#
M M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A D-001A/B 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
FEED GAS DRYER 0P-16-I-PR-PID-01-001
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 2 x 5.1 MMSCFD 3. TYPICAL WITH D-001A.
SIZE : VTA 4. REFER TO VENDOR DRAWING NO. JOB1268-DD-DWG-PR-002
DESIGN PRESSURE : 34 Barg FOR DETAILS OF VENDOR SCOPE.
5. TSH AND TSL ON ELECTRICAL HEATER WILL TRIGGER AN
DESIGN TEMPERATURE : 250 °C 2 ALARM.
OPERATING PRESSURE : 27 Barg 6. THIS LINE IS NOT FLOWS TO THE VENT STACK INSTEAD
OPERATING TEMPERATURE : 21 °C CIRCULATE IN FEED GAS DRYER PACKAGE
TYPE : FULLY AUTOMATIC (WILL BE UPDATED AFTER LATEST VENDOR UPDATE)
B B

VENDOR PACKAGE (D-001 A) INSTRUMENT GAS DRYER


TAG D-001A D-001B
CONTRACTOR VENDOR 'A' XS-D001A XS-D001B
'B' XA-D001A XA-D001B
C XS PSD 'C' XL-D001A XL-D001B C
PERMISSIVE
'A' TO VENT STACK
4"-VL-1036-B
0P16-I-PR-PID-01-003
ALARM STATUS XA
'B'

RUNNING STATUS XL
'C'
LCP 1/2"
D D
TSH TSH
3 4
SEPARATOR
3"
COOLER
MCC
DPT
1
E PT 4-WAY VALVE V1 E
1 V15

V3A V8
PRE-FILTER
3"-HG-1004-B 3" 3"
P // // // // // //

3B2RF 1/4"

//
//
F F

//
V16

//
V8
3"-HG-1005-B

//
FROM FEED GAS SCRUBBER (V-001) NOTE 3 REFERENCE DOCUMENT

//
0P16-I-PR-PID-01-002 SHT1 DOCUMENT / DRAWING No. REV TITLE
D-001 B

//
3B2R 1/2"

//
NOTE 6
G G

//
//
V4A V4B
1/2"

//
TI TI

REGENERATING
2 3

//
REFERENCE DOCUMENT
DRYING
LEFT CHAMBER RIGH CHAMBER 1/2" DOCUMENT / DRAWING No. REV TITLE
4"-HG-1003-B

//
H H

//
OWNER :

//
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
SAMPLING POINT

//
// // // // // // // // // // // // // // // UNIT INDUK PEMBANGUNAN SUMBAGTENG

3/4B2T AFTER FILTER

//
3" CONSULTANT:

//
PT PLN ENJINIRING
4B2R
V2 BLOWER

//
I AND 3" 3" CONTRACT. No. : I
1/4" 1/4" 0002.PJ/DAN.02.01/010600/2020

//
FROM INSTRUMENT AIR SUPPLY V6 MOTOR
4-WAY VALVE B M PROJECT :
INSIDE
0P16-I-PR-PID-01-005 1/2" P VESSEL
P
CNG PLANT 10 MMSCFD FOR RIAU
3/4"I2Z 3/4"I5Z V15
1/2" 1/2" 1/4" V14 V12 GAS FIRED POWER PLANT (GFPP) 200 MW
2 V11
TITLE : SCALE :

INSTRUMENT AIR V10 PIPING & INSTRUMENTATION DIAGRAM


D-001B 1/2" CL300 NTS
H 1A 1B CNG MAIN PROCESS
1/2"
J V7A V7B TSH TSH 2 FEED GAS DRYER J
TI TSH
NOTE 5 DOC. No. : SHEET No. : REV :
1 1
DPT
0P16-I-PR-PID-01-002 2 OF 9 2
3" 3"
2 DOC. TYPE :
PIPING INSTRUMENT & CONTROL
HEATER
TSL TSH CIVIL & STRUCTURE X PROCESS

1 2 ELECTRICAL

K TO CLOSED DRAIN VESSEL (V-004) MECHANICAL K


2"-DC-1002-A
NOTE 3

D-001 B

0P16-I-PR-PID-01-004

REV DESCRIPTION PRE CHK APP DATE

0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23

1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23

2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23


4"-HG-1006-B

3"-HG-1008-B

3"-HG-1007-B

L L

EPC CONTRACTOR :

3B2R 3B2R
3/4B2T TO INCOMING GAS METERING (M-001)
4"-HG-1009-B
0P16-I-PR-PID-01-002-SHT3
M M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A M-001A/B 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
INCOMING GAS METERING 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
TYPE : ULTRASONIC 3. METERING STATION IS DESIGNED FOR UNI-DIRECTIONAL
CAPACITY : 10.2 MMSCFD NON FISCAL (NON CUSTODY) FLOW MEASUREMENT.
DESIGN PRESSURE : 37 Barg 4. CONTROL ROOM IN BUILDING SAFE AREA.
5. FOR BORESCOPE INSPECTION INCLINED 45° TOWARDS USM.
DESIGN TEMPERATURE : 50 °C
6. REFER TO VENDOR DRAWINGS FOR DETAILS OF
OPERATING PRESSURE : 27 Barg VENDOR SCOPE.
OPERATING TEMPERATURE : 21°C 7. FOR THE GAS REGEN THAT SEND TO VENT STACK WILL BE
QUANTITY : 2 (1 RUNNING, 1 STANDBY) UPDATED AFTER LATEST VENDOR UPDATE
B 8. GC ANALYZER IS EQUIPPED WITH ALARM FOR MOISTURE B
CONTENT

C C

PCS
GAS METERING PANEL (VENDOR SCOPE)

HUB SWITCH
D CONTRACTOR VENDOR D
05

PRINT SHARE 001


STATION
COMPUTER

C1 C2 C3 IC4 NC4 IC5 NC5 TI PI FI FQI TI PI FI FQI


AI AI AI AI AI AI AI 001A 001A 001A 001A 002B 002B 002B 002B
001 002 003 004 005 006 007
E E
AIC FQIC FQIC PRINTER
LASERJET
001 001 002
C8+ C02 N2 H25 JOULE DENSITY C C C C
ZI ZI ZI ZI
AI AI AI AI AI AI
001A 001B 002A 002B
001 002 003 004 005 006 O O O O PRINTER
DOT MATRIX

RJ.45
F F

TO VENT STACK
1''-VL-1005-B
0P16-I-PR-PID-01-003 REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE

3/4" 300#
ANALYZER GC SHELTER RF
(VENDOR SCOPE)
G G
NOTE 7
1" 150# RF

1" 150# RF
GC C6+ AT REFERENCE DOCUMENT
NOTE 8
100 DOCUMENT / DRAWING No. REV TITLE

TT
SCS
001A/M-001
H FROM FEED GAS SCRUBBER PT
H
OWNER :
TUBING
0P16-I-PR-PID-01-002 SHT1 001A/M-001 PG
TE PT. PERUSAHAAN LISTRIK NEGARA (Persero)
2 001A/M-001 UNIT INDUK PEMBANGUNAN SUMBAGTENG
001A/M-001 HH : 31 BARG
FT PSD
001A/M-001 TW TG 1/2" 006 CONSULTANT:
FROM OUT GOING METERING LL : 25 BARG
TUBING 001A/M-001001A/M-001 LOCKABLE
0P16-I-PR-PID-01-002 SHT7 ZSO ZSC ZS0 ZSC PT PLN ENJINIRING
2 001A/M-001 001A/M-001 001B/M-001 001B/M-001
(NOTE 6)
2 1-1/2" 1-1/2"
I PROFILER
3/4" NPT
300# 300# SW 300# SW
1/2"-800# SW CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
STREAM-A 3/4"-800# SW
PI PROJECT :
4" 300#RF 4" 300#RF TO FUEL GAS RECEIVER (V-002)
5D 10D 2D 1 1/2''-FG-1000-B
DBB BALL VALVE 4" 300#
USM
DBB BALL VALVE 006 0P16-I-PR-PID-01-002 SHT8 CNG PLANT 10 MMSCFD FOR RIAU
LOCKABLE 5D LOCKABLE GAS FIRED POWER PLANT (GFPP) 200 MW
2 TITLE : SCALE :

PIPING & INSTRUMENTATION DIAGRAM


NTS
PT CNG MAIN PROCESS
J 006 INCOMING GAS METERING J

HEADER 4"
DOC. No. : SHEET No. : REV :

SC
1/2B2T TO GAS COMPRESSOR (C-001A/B/C) 0P16-I-PR-PID-01-002 3 OF 9 2
4''-HG-1010-B
12" 2000# 0P16-I-PR-PID-01-002 SHT4 DOC. TYPE :
3/4"-300# RF TUBE PIPING INSTRUMENT & CONTROL
3/4"-300# RF
FROM FEED GAS DRYER (D-001A/B) CIVIL & STRUCTURE X PROCESS
4''-HG-1009-B
0P16-I-PR-PID-01-002 SHT2 ELECTRICAL
RETRACTABLE MANUAL
SAMPLE SAMPLE
K PROBE BOTTLE MECHANICAL K
TT
002B/M-001 REV DESCRIPTION PRE CHK APP DATE
PT
002B/M-001 PG 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23
TE 002B/M-001 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 16/02/23
FT 002B/M-001
2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23
002B/M-001
L TW TG L
LOCKABLE
HEADER 4" ZS0 ZSC 002B/M-001002B/M-001 ZS0 ZSC
002A/M-001 002A/M-001 002B/M-001 002B/M-001
3/4" (NOTE 6) 1-1/2" 1-1/2" EPC CONTRACTOR :
PROFILER 300# RF 1/2"-800# SW
300# RF 300# RF 3/4"-800# SW
STREAM-B
4" 300#RF 5D 10D 2D 4" 300#RF
4" 300#
DBB BALL VALVE USM DBB BALL VALVE
LOCKABLE 5D LOCKABLE
METERING PACKAGE (VENDOR SCOPE)
M M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A C-001A/B/C 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
CNG COMPRESSOR PACKAGE 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
QUANTITY : 3 EA (2 RUNNING, 1 STANDBY) 3. REFER TO VENDOR DRAWING NO. OP16-VIII-PID-01-001
CAPACITY : 5 MMSCFD (ea) FOR DETAILS OF VENDOR SCOPE.
SUCTION PRESSURE : 27 Barg 4. THIS RECYCLE LINE IS USED FOR START-UP BYPASS (FOR
CRANKING PURPOSE)
DISCHARGE PRESSURE : 250 Barg
SUCTION TEMPERATURE : 21 °C
DISCHARGE TEMPERATURE : 40 °C

B 2 B
TO VENT SYSTEM
4"-VL-1006-A
0P16-I-PR-PID-01-003

C C

FROM IA / PA SYSTEM
D 0P16-I-PR-PID-01-005
// // //
D

//
//

//

//

//

//

//

//

//

//
//

E // // E

//
//

F F

// //
REFERENCE DOCUMENT

//
DOCUMENT / DRAWING No. REV TITLE
TO CNG STORAGE //
//

0P16-I-PR-PID-01-002 SHT5
//
//

G G

1 1/2"-HG-1014-G

1 1/2 G2Z
2"-HG-1017-G

REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE
1 1/2"-HG-1015-G

C-001B
H 1 1/2 G2Z H
OWNER :
1 1/2"-HG-1016-G PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG
C-001C
1 1/2 G2Z
CONSULTANT:

PT PLN ENJINIRING

FROM INCOMING GAS METERING


I 0P16-I-PR-PID-01-002 SHT 3
//
//
CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
//

PROJECT :

CNG PLANT 10 MMSCFD FOR RIAU


//

GAS FIRED POWER PLANT (GFPP) 200 MW


RS TITLE : SCALE :
3"-HG-1011-B

3B2R PIPING & INSTRUMENTATION DIAGRAM


NTS
CNG MAIN PROCESS
J INCOMING GAS COMPRESSOR J
DOC. No. : SHEET No. : REV :
0P16-I-PR-PID-01-002 4 OF 9 2
DOC. TYPE :
4"-HG-1010-B

PIPING INSTRUMENT & CONTROL

CIVIL & STRUCTURE X PROCESS

ELECTRICAL

K MECHANICAL K
// // // // // // // // // // // // // // //
//

//

//
REV DESCRIPTION PRE CHK APP DATE

0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23


TO CLOSED DRAIN VESSEL 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23
2"-DC-1003-A
0P16-I-PR-PID-01-004
2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23

L L

EPC CONTRACTOR :

RS
3"-HG-1012-B
C-001B
3B2R
RS
M 3"-HG-1013-B
C-001C M
3B2R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
TO VENT STACK
A T-001~060 6"-VL-1033-A 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
0P16-I-PR-PID-01-003 0P-16-I-PR-PID-01-001.
CNG STORAGE 2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 11.4 MMSCF TOTAL 3. RUPTURE DISK IS INSTALLED IN EACH TUBE SKID VENT
PRESSURE (DES/OP) : 275/250 BARG LINE BEFORE VENT STACK SUB HEADER, VENT STACK
TO PRESSURE REDUCING
TEMPERATURE (DES/OPERATION) : 65/40 °C SUB HEADER FROM EACH BANK.
UNIT & HEATER
8"-HG-1026-G 4. ALL CABLING ON CNG STORAGE SKID BY CONTRACTOR.
QUANTITY : 480 CYLINDERS (60 SKIDS) 0P16-I-PR-PID-01-002 SHT8 5. PSV SUPPLIED BY VENDOR.
6. REFER TO VENDOR DRAWINGS FOR DETAILS OF
VENDOR SCOPE.
7. ONE BANK CONSIST OF 120 CYLINDERS, FOUR BANK
B C C C C CONSIST OF 480 CYLINDERS B
ZI ZI ZI ZI 8. TO HANDLE OVERPRESSURE CASE TUBE SKID ARE
001B 4G2J 002B 4G2J 003B 4G2J 004B 4G2J EQUIPPED WITH TWO RELIEF VALVES AND ONE RUPTURE
O O O O
DISK
9. FROM FILLING HEADER LINE TO EACH TUBE SKID.
C C C C
ZS ZS ZS ZS 10. FROM EACH TUBE SKID TO DECANTING HEADER LINE.
2G2J 2G2J 2G2J 2G2J
001B O 002B O 003B O 004B O
XIC XIC XIC XIC
001B 002B 003B 004B
XV XV XV XV
001B 002B 003B 004B
C 4G2J 4G2J 4G2J
C
4G2J

1 1/2"-VL-1015-A

1 1/2"-VL-1019-A

1 1/2"-VL-1023-A

1 1/2"-VL-1027-A
1 1/2"-VL-1014-A

1 1/2"-VL-1018-A

1 1/2"-VL-1022-A

1 1/2"-VL-1026-A
SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG
SIZE : 1"x1 1/2" SIZE : 1"x1 1/2" SIZE : 1"x1 1/2" SIZE : 1"x1 1/2"

D PSV NOTE 5 PSV NOTE 5 PSV NOTE 5 PSV NOTE 5 D


001B 002B 003B 004B
A A A A
1 1/2A2ZF G 1 1/2A2ZF G 1 1/2A2ZF G 1 1/2A2ZF G

SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG
SIZE : 1"x1 1/2" 1G2Z SIZE : 1"x1 1/2" 1G2Z SIZE : 1"x1 1/2" 1G2Z SIZE : 1"x1 1/2" 1G2Z

4"-HG-1025-G
4"-HG-1022-G

4"-HG-1024-G
4"-HG-1023-G
1"-VL-1007-A

1"-VL-1008-A

1"-VL-1009-A

1"-VL-1010-A
PSV NOTE 5 PSV NOTE 5 PSV NOTE 5 PSV NOTE 5
001A 002A 003A 004A
E A A A A E
1 1/2A2ZF G 1 1/2A2ZF G 1 1/2A2ZF G 1 1/2A2ZF G

1G2Z 1G2Z 1G2Z 1G2Z


1"-VL-1013-G 1"-VL-1017-G 1"-VL-1021-G 1"-VL-1025-G
1"-VL-1012-G 1"-VL-1016-G 1"-VL-1020-G 1"-VL-1024-G

FROM GAS COMPRESSOR (C-001A/B/C)


2"-HG-1017-G
0P16-I-PR-PID-01-002 SHT4 NOTE 10 NOTE 10 NOTE 10 NOTE 10 NOTE 7

F CONTRACTOR VENDOR F
2

BANK 1 BANK 2 BANK 3 BANK 4 REFERENCE DOCUMENT


T-001~T-015 T-016~T-030 T-031~T-045 T-045~T-060
H: 260 BARG H: 75 °C H: 260 BARG H: 75 °C H: 260 BARG H: 75 °C H: 260 BARG H: 75 °C DOCUMENT / DRAWING No. REV TITLE
L: -30 °C L: -30 °C L: -30 °C L: -30 °C
PIT TIT PIT TIT PIT TIT PIT TIT
001B 001B 002B 002B 003B 003B 004B 004B
G DECANTING G

DECANTING

DECANTING
PT TT PT TT PT TT

DECANTING
PT TT
001B 001B 002B 002B 003B 003B 004B 004B

D NOTE 3 NOTE 3 NOTE 3 NOTE 3 REFERENCE DOCUMENT


D D D
DOCUMENT / DRAWING No. REV TITLE

H H
OWNER :
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG

CONSULTANT:

PT PLN ENJINIRING
FILLING

FILLING
FILLING

FILLING
D D D D
I CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
PT TT PT TT PT TT PT TT PROJECT :
001A 001A 002A 002A 003A 003A 004A 004A
CNG PLANT 10 MMSCFD FOR RIAU
GAS FIRED POWER PLANT (GFPP) 200 MW
TITLE : SCALE :
NOTE 8 PIT TIT PIT TIT PIT TIT PIT TIT
001A 001A 002A 002A 003A 003A 004A 004A PIPING & INSTRUMENTATION DIAGRAM
NTS
L: -30 °C L: -30 °C L: -30 °C L: -30 °C CNG MAIN PROCESS
H: 50 °C H: 50 °C H: 50 °C H: 50 °C CNG STORAGE
J NOTE 9 NOTE 9 NOTE 9 NOTE 9
J
DOC. No. : SHEET No. : REV :
0P16-I-PR-PID-01-002 5 OF 9 2
DOC. TYPE :
VENDOR SCOPE PIPING INSTRUMENT & CONTROL

CIVIL & STRUCTURE X PROCESS


1 1/2" HG-1018-G

1 1/2" HG-1019-G

1 1/2" HG-1020-G

1 1/2"HG-1021-G
1"-DC-1004-A

1"-DC-1006-A

1"-DC-1008-A

1"-DC-1010-A
ELECTRICAL

K MECHANICAL K
C
C C C
ZI ZI O ZI ZI
002A 003A 004A REV DESCRIPTION PRE CHK APP DATE
001A O O
O C 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23
C 1 1/2G2Z 1 1/2G2Z C 1 1/2G2Z C 1 1/2G2Z
ZS ZS ZS 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23
ZS
001A O 002A O 003A O 004A O
XIC XIC XIC 2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23
XIC 1G2Z 1G2Z 1G2Z 1G2Z
001A 002A 003A 004A
L XV XV XV XV L
001A 002A 003A 004A

1 1/2G2Z 1 1/2G2Z 1 1/2G2Z 1 1/2G2Z EPC CONTRACTOR :

2"-HG-1017-G

TO CLOSED DRAIN VESSEL


M 3"-DC-1015-A
0P16-I-PR-PID-01-004
M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A PV-002A/B/C E-001 E-002 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
PRESSURE REDUCING UNIT PRE-HEATER RE-HEATER 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
QUANTITY : 3 (A/B/C) SHELL DESIGN PRESSURE : 4.5 BARG SHELL DESIGN PRESSURE : 4.5 BARG 3. BDV SHOULD BE PUSH BUTTON.
CAPACITY : 24 MMSCFD (EA) SHELL OPERATING PRESSURE : 3 BARG SHELL OPERATING PRESSURE : 3 BARG 4. INLET P : 250 Barg, P REDUCED TO 40 Barg
OPERATING P (IN/OUT) : 250/39 BARG SHELL DESIGN TEMPERATURE : 110° C SHELL DESIGN TEMPERATURE : 110° C INLET P : 200 Barg, P REDUCED TO 40 Barg
OPERATING T : -4 °C TO 65 °C INLET P : 100 Barg, P REDUCED TO 40 Barg
SHELL OPERATING TEMPERATURE : 91.5° C TO 39.2° C SHELL OPERATING TEMPERATURE : 91.55° C TO 5.83° C
2 INLET P : 30 Barg, P IS NOT REDUCED
MATERIAL : CS (LTCS) TUBES DESIGN PRESSURE : 275 BARG TUBES DESIGN PRESSURE : 47 BARG
TUBES OPERATING PRESSURE : 250 BARG TUBES OPERATING PRESSURE : 39 BARG
TUBES DESIGN TEMPERATURE : 110° C TUBES DESIGN TEMPERATURE : -25° C TO 110° C
B TUBES OPERATING TEMPERATURE : 37.9° C TO 56.9° C TUBES OPERATING TEMPERATURE : - 4.87° C TO 40.7° C B
TEMA : BEM TEMA : BEM

C C

D D

E E

TI PI
001 002
3A2R TV
FROM WATER FIRED HEATER 3/4A2T 001
3"-SW-1001-A-HI-25
F 0P16-I-PR-PID-01-002 SHT9 25 HI
3" TO VENT STACK F
3A2R 3A2R

2"-SW-1003-A-HI-25
2 0P16-I-PR-PID-01-003

2A2R 3A2R 3A2R


REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE
25 HI

G G

25 HI
2"-SW-1002-A-HI-25

3"-SW-1004-A-HI-25

2"-VL-1029-A
REFERENCE DOCUMENT

150# DOCUMENT / DRAWING No. REV TITLE


RO

600 MM
300# 004
2A2R SET @39 BARG NOTE 4 2 2

MIN
H HH: 44 Barg NOTE 3
H
PSD BDV OWNER :
2B2R
- 004 PT. PERUSAHAAN LISTRIK NEGARA (Persero)
ESD UNIT INDUK PEMBANGUNAN SUMBAGTENG
SET@39 BARG FO
2" 004
6"-HG-1028-G PV
002A PIC PI 2A2R CONSULTANT:
002A/B/C 003 SET@43°C C C
6G2J 6B2R 2B2R ZS ZI
004 004 PT PLN ENJINIRING
25 CI TIC O O
6" 001
8"-HG-1034-B-CI-25

G GL B 6"-HG-1031-B-CI-25
I CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
PT PT
002A/B/C 003

2"-VL-1028-B
3/4B2T TT PROJECT :
002
MIN. 600 MM MIN. 600 MM TI CNG PLANT 10 MMSCFD FOR RIAU
TI 004 GAS FIRED POWER PLANT (GFPP) 200 MW
003 3/4B2T
TO OUTGOING METERING (M-002) TITLE : SCALE :
FROM CNG STORAGE (T-001~060)
0P16-I-PR-PID-01-002 SHT5
8"-HG-1026-G
E-001 6"-HG-1029-G PV
002B
SET @39 BARG
25 CI
8B2R
E-002 8"-HG-1035-B
8B2R
0P16-I-PR-PID-01-002 SHT7
2
PIPING & INSTRUMENTATION DIAGRAM
NTS
6G2J 6B2R CNG MAIN PROCESS
J 2 25 CI PRESSURE REDUCING UNIT & HEATER J
6"
G GL B 6"-HG-1032-B-CI-25 DOC. No. : SHEET No. : REV :
2
8"-HG-1027-G

0P16-I-PR-PID-01-002 6 OF 9
3/4B2T
DOC. TYPE :
MIN. 600 MM MIN. 600 MM PIPING INSTRUMENT & CONTROL

2A2R CIVIL & STRUCTURE X PROCESS


2A2R
SET @39 BARG
25 CI

6"-HG-1030-G PV ELECTRICAL

2"-SW-1006-A-HI-25
002C
2"-SW-1005-A-HI-25

K 6G2J 6B2R MECHANICAL K


25 CI
6"
G GL B 6"-HG-1033-B-CI-25
REV DESCRIPTION PRE CHK APP DATE

3/4B2T 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23

MIN. 600 MM MIN. 600 MM 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23
25 HI
25 HI

2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23

L L

TI PI EPC CONTRACTOR :
002 003

3/4A2T TO WATER FIRED HEATER 2


3"-SW-1007-A-HI-25
25 HI 0P16-I-PR-PID-01-002 SHT9

M M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A M-002 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
OUTGOING GAS METERING 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
TYPE : ULTRASONIC FLOW METER 3. SAMPLE PROBE SHALL HAVE PRESSURE REGULATION AT
CAPACITY : 48 MMSCFD THE TIP.
DESIGN PRESSURE : 45 Barg 4. ALL CABLING BETWEN METERING SKID AND MEETING
CONTROL PANEL BY CONTRACTOR.
DESIGN TEMPERATURE : 65 °C
5. REFER TO VENDOR DRAWINGS FOR DETAILS OF 2
OPERATING PRESSURE : 37-39 BARG VENDOR SCOPE.
OPERATING TEMPERATURE : 25°-40 °C 6. THE SDV WILL BE CLOSED AUTOMATICALLY DURING
EMERGENCY SHUTDOWN.
B B

LOCATED IN CONTROL ROOM)


(VENDOR SCOPE) STATION COMPUTER
C C
005
PCS

001
-

HUB SWITCH

D D

LASERJET
PRINTER

DOT MATRIKS
E PRINTER E
MASS S.VOL

TI PI FI FI FQI

001 001 001 001 001

F FQIC F
M-002 C C
ZI ZI

001A 001B REFERENCE DOCUMENT


O O
DOCUMENT / DRAWING No. REV TITLE

RJ.45
G G

REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE

H H
OWNER :
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG

CONSULTANT:

TO VENT STACK PT PLN ENJINIRING


3/4"-VL-1030-A
0P16-I-PR-PID-01-003
I CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
PROJECT :

CNG PLANT 10 MMSCFD FOR RIAU


GAS FIRED POWER PLANT (GFPP) 200 MW
METERING PACKAGE (VENDOR SCOPE) 3/4" 300#
SCALE :
RF TITLE :

PIPING & INSTRUMENTATION DIAGRAM


NTS
CNG MAIN PROCESS
J OUT GOING GAS METERING J
HH DOC. No. : SHEET No. : REV :
ESD PSD
0P16-I-PR-PID-01-002 7 OF 9 2
TT 005 005
2 LL DOC. TYPE :
001/M-002 PIPING INSTRUMENT & CONTROL
LL : 20 °C HH : 24 Barg
PT
CIVIL & STRUCTURE X PROCESS
TO ANALYZER GC SHELTER 001/M-002 PIC
PG
TUBING TE ELECTRICAL
0P16-I-PR-PID-01-002 SHT 3 001/M-002 006 C
ZI
K FT
001/M-002
LL : 18 Barg MECHANICAL K
005
O
001/M-002
3/4 "-800# SW

SC
TW TG 1/2" PT
LOCKABLE

REV DESCRIPTION PRE CHK APP DATE


(NOTE 3) 001/M-002 001/M-002 006 C
ZSO ZSC ZSO ZSC SET @20.5 Barg
3/4"-300# RF (NOTE 3) PCV SDV ZS 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23
001A/M-002 001A/M-002 001B/M-002 001B/M-002
3/4"-300# RF 002 005 005 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23
3/4" NPT 1 1/2" 1 1/2" 1 1/2" 1/2" O
FROM PRESSURE REDUCING UNIT PROFILER 2000# 10"x8" TO POWER PLANT
STREAM-A 300# SW 300# SW 800# SW 2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23
10"-HG-1036-B
0P16-I-PR-PID-01-002 SHT6 -
RETRACTABLE MANUAL FC
L SAMPLE SAMPLE 8" 300#RF 5D 10D 2D 8" 300#RF 8B2R 8"x6" 6" 8"x6" 8B2R 8B2R
8"
8B2R L
2 DBB BALL VALVE 8" 300# DBB BALL VALVE NOTE 6
PROBE BOTTLE 3/4" 800#NPT
LOCKABLE USM LOCKABLE 2
5D
3/4B2T 2 3/4B2T EPC CONTRACTOR :

8B4R

CNG POWER
PLANT PLANT
M M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A V-002 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
FUEL GAS RECEIVER 0P-16-I-PR-PID-01-001.
2 2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
ID X T/T : 446mm x 1500mm 3. TURBINE FLOW METER.
DESIGN PRESSURE : 8 BARG 4. TO LINE DRAIN.
DESIGN TEMPERATURE : 50 °C 5. THE HOLDING TIME OF THE FUEL GAS RECEIVER IS 3
MINUTES.
OPERATING PRESSURE : 3 BARG
OPERATING TEMPERATURE : 7.3 °C
MATERIAL : CS + 3 MM CA
CAPACITY : 0.2 MMSCFD
B B

C C

SET @7.5 BARG


SIZE: 1"D2"

PSV
002
D 2A2RF
2"-VL-1032-A
TO VENT STACK D
0P16-I-PR-PID-01-003

2"x1"
2A4R

3/4A2T
2A2R
E E

2A2R

F 3/4A2T F

REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE

FI

G 001 G

(NOTE 3) REFERENCE DOCUMENT


NOTE 5 FT
SAMPLING DOCUMENT / DRAWING No. REV TITLE
001 POINT
2"-VL-1031-A

3/4A2T
H N2 1 1/2"-FG-1002-A
TO WATER FIRE HEATER H
OWNER :
1 1/2" 0P16-I-PR-PID-01-005
1 1/2A2Z 1 1/2A2Z 1 1/2A2Z PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG
10D 5D
PCV
SET @ 3 BARG N4 PROFILER CONSULTANT:
001 150# NC
FROM INCOMING METERING 300#
PAH : 4 BARG PT PLN ENJINIRING
(M-001A/B) PT PI
1 1/2"-FG-1000-B 1 1/2"-FG-1001-A N7
0P16-I-PR-PID-01-002 SHT3 N1 1 1/2A2Z
2" 004 004
I 1" 1 1/2" 2A2R x 3/4 PAL : 2 BARG CONTRACT. No. : I
1 1/2B2Z 1 1/2x1 1 1/2x1 1 1/2B2Z 0002.PJ/DAN.02.01/010600/2020

PROJECT :

3/4B2T CNG PLANT 10 MMSCFD FOR RIAU


V-002 GAS FIRED POWER PLANT (GFPP) 200 MW
TITLE : SCALE :
1B4Z
N5A PIPING & INSTRUMENTATION DIAGRAM
NTS
2"
2A2R
CNG MAIN PROCESS
J FUEL GAS RECEIVER J
DOC. No. : SHEET No. : REV :

LG
0P16-I-PR-PID-01-002 8 OF 9 2
DOC. TYPE :
001
PIPING INSTRUMENT & CONTROL

CIVIL & STRUCTURE X PROCESS

ELECTRICAL
N5B
K 2"
2A2R MECHANICAL K
1/2A2R
N3
2" REV DESCRIPTION PRE CHK APP DATE

0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23


NOTE 4
1 RE-ISSUED FOR APPROVAL ADE HPO ISA 16/02/23

2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23

L L

EPC CONTRACTOR :
NC NC TO CLOSED DRAIN VESSEL (V-004)
1"-DC-1013-A 1"-DC-1014-A
0P16-I-PR-PID-01-004
1A4Z 1A2Z

M M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A T-003 P-003A/B E-003 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
HOT WATER DESIGN TANK HOT WATER CIRCULATION PUMP FIRED HEATER 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 1 m³ TEMPERATURE : 110°C DESIGN PRESSURE : 4.5 BAR 3. REFER TO VENDOR DRAWINGS FOR DETAILS OF
TEMPERATURE : 98 °C MAX TYPE : CENTRIFUGAL PUMP DESIGN TEMPERATURE : 110°C VENDOR SCOPE.
TYPE : EXPANSION TANK FLOW RATE : 25 m³/hr OPERATING PRESS. : 3 Barg 4. MAKE UP WATER TO EXPANSION TANK.
5. N2 BOTTLE IS FOR MAINTAINING PRESSURE ON EXPANSION
OPERATING TEMP. : 93°C
TANK T-103 (VENDOR SCOPE).

B B

C C
HOT WATER CIRCULATION SYSTEM PACKAGE
CONTRACTOR VENDOR

TO PRESSURE REDUCING
UNIT HEATER
0P16-I-PR-PID-01-002 SHT6
D D
2
TIC 3"-SW-1001-A-HI-25
-
TO PRESSURE REDUCING
UNIT HEATER 2
3"-SW-1007-A-HI-25 0P16-I-PR-PID-01-002 SHT6
N4
FROM PRESSURE REDUCING CHIMNEY
UNIT HEATER

E 0P16-I-PR-PID-01-002 SHT6 E
N8
2

SET @ 4.5 BARG


HH: 5 BARG
H: 2.5 BARG PT PG
2"-SW-1000-A
F - - HH: 95° C F
WATER TREATMENT L: 1 BARG 2"
TI TT TT
DISTRIBUTION SYSTEM 1/2" 1/2"
- - -
0P16-I-PR-PID-01-006 SHT1
3/4" 3" REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE
OPEN DRAIN

G LE
GAS OUTLET
G
- LL SET @ 30%
PIPE 3" SCH 40

PG 3/4 REFERENCE DOCUMENT


1 1/2"-FG-1002-A -
DOCUMENT / DRAWING No. REV TITLE
FIRED HEATER
FROM FUEL GAS RECEIVER
(V-002) MAIN
GAS E-003
H 0P16-I-PR-PID-01-002 SHT8 H
OWNER :
2 BURNER
PS PS PT. PERUSAHAAN LISTRIK NEGARA (Persero)
B-003
UNIT INDUK PEMBANGUNAN SUMBAGTENG

1" CONSULTANT:
M
1 1/2" PT PLN ENJINIRING
PG
- PG
I PSD STATUS 103 CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
3" 3" 3" 1 1/2"
P-003A PROJECT :
PSD EXPANSION
2 PIPE 3" SCH 40
E003 TANK NOTE 5 CNG PLANT 10 MMSCFD FOR RIAU
P-003B GAS FIRED POWER PLANT (GFPP) 200 MW
PERMISSIVE 1/2" T-003 LG
NOTE 4 SCALE :
110 TITLE :
XS PSD
3" 3" 3"
E003 PIPING & INSTRUMENTATION DIAGRAM
NTS
CNG MAIN PROCESS
ALARM STATUS
J M WATER FIRED HEATER J
XA
E003 NITROGEN (N2) BOTTLE DOC. No. : SHEET No. : REV :

RUN STATUS
0P16-I-PR-PID-01-002 9 OF 9 2
XL DOC. TYPE :
E003 PIPING INSTRUMENT & CONTROL

START COMMAND CIVIL & STRUCTURE X PROCESS


HS ELECTRICAL
E003A
K MECHANICAL K
STOP COMMAND LCP
HS 1 1/2" x1"
E003B REV DESCRIPTION PRE CHK APP DATE

RESET COMMAND 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23


HS
1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23
E003C
2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23

L L

MCC EPC CONTRACTOR :

N7

M M
TO OPEN DITCH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

You might also like