Professional Documents
Culture Documents
NOTE
A V-001 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
FEED GAS SCRUBBER 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 10.2 MMSCFD 3. FOR ONLINE SAMPLING CONNECTED TO THE GC.
ID x T/T : 679 mm x 2000 mm 4. TO LINE DRAIN.
TO VENT STACK 5. BDV TO BE MANUALLY ACTIVATED
DESIGN PRESSURE : 34 Barg 3"-VL-1004-A
DESIGN TEMPERATURE : 50°C 0P16-I-PR-PID-01-003
OPERATING PRESSURE : 27 Barg
OPERATING TEMPERATURE : 21°C
3"-VL-1001-A
2"-VL-1003-A
B B
SET @ 34 BARG
SIZE: 2"H3"
CASE BLOCKED DISCHARGE
150#
RO
PSV 001 300#
001
MIN 600 MM
C LO C
150#
300# 3A2RF
150#
3/4B2T 2B2RF 300#
BDV 2B2R
003
2B2RF LO
D NOTE 5 D
ESD 2"
- FO
C ZS C
ZI
3/4B2T 003 2B2R
003 O
O
DPT
001
E E
HH : 31 BARG
PI PSD
002 002
LL : 25 BARG
2 PV
F TO ANALYZER GC SHELTER F
2"-VL-1000-B
TUBING 001B set @27 barg
0P16-I-PR-PID-01-002-SHT3
PT
2"-VL-1002-B
PIC
HH 4"x2" 4"x2" 001A/B 002
PSD ESD TI
REFERENCE DOCUMENT
- - 001 4B2R 2" 4B2R 1/2B2T TO INLET GAS DRYER (D-001A/B) DOCUMENT / DRAWING No. REV TITLE
600# 300# 6"x4"
C N2 4"-HG-1002-B
EXISTING NEW ZI 0P16-I-PR-PID-01-002-SHT2
6"
PIPELINE PIPELINE 3/4B2T PT
001
O TT 001 2B2R
G 001
PV N5 G
SDV ZS C N4
001A 2"
2"
EXISTING PIPELINE
3/4B2T 3/4B2T
H N6A H
OWNER :
2"
2B2R
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG
HH N7A
PSD 2" 2B2R CONSULTANT:
-
PT PLN ENJINIRING
V-001
LZT
LT
I 002
CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
001
SETTING LEVEL PROJECT :
HHLL = .......700mm
USD HLL = .......600mm CNG PLANT 10 MMSCFD FOR RIAU
LL
V001 LLL = .......500mm GAS FIRED POWER PLANT (GFPP) 200 MW
LLLL = .......400mm N7B
TITLE : SCALE :
2" 2B2R
N6B PIPING & INSTRUMENTATION DIAGRAM
2B2R H : OPEN NTS
2" LIC
2B2R CNG MAIN PROCESS
J 001 L : CLOSE
FEED GAS SCRUBBER J
2B2R N9
NOTE 4 DOC. No. : SHEET No. : REV :
2"
2B2R
0P16-I-PR-PID-01-002 1 OF 9 2
N3 DOC. TYPE :
2" PIPING INSTRUMENT & CONTROL
NOTE 4 AUTO RESET ABOVE LL
HH CIVIL & STRUCTURE X PROCESS
PSD ESD USD
2"
- - V001
LL ELECTRICAL
K MECHANICAL K
002 002 002 001 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23
O O
TO CLOSED DRAIN VESSEL (V-004) 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 16/02/23
2"-DC-1000-B 2"-DC-1001-A
0P16-I-PR-PID-01-004
2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23
2" 2B2R 2"x1" 1" 2"x1" 2A2R
NC
L L
3/4A2T
EPC CONTRACTOR :
1B4Z
300# 150#
M M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A D-001A/B 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
FEED GAS DRYER 0P-16-I-PR-PID-01-001
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 2 x 5.1 MMSCFD 3. TYPICAL WITH D-001A.
SIZE : VTA 4. REFER TO VENDOR DRAWING NO. JOB1268-DD-DWG-PR-002
DESIGN PRESSURE : 34 Barg FOR DETAILS OF VENDOR SCOPE.
5. TSH AND TSL ON ELECTRICAL HEATER WILL TRIGGER AN
DESIGN TEMPERATURE : 250 °C 2 ALARM.
OPERATING PRESSURE : 27 Barg 6. THIS LINE IS NOT FLOWS TO THE VENT STACK INSTEAD
OPERATING TEMPERATURE : 21 °C CIRCULATE IN FEED GAS DRYER PACKAGE
TYPE : FULLY AUTOMATIC (WILL BE UPDATED AFTER LATEST VENDOR UPDATE)
B B
RUNNING STATUS XL
'C'
LCP 1/2"
D D
TSH TSH
3 4
SEPARATOR
3"
COOLER
MCC
DPT
1
E PT 4-WAY VALVE V1 E
1 V15
V3A V8
PRE-FILTER
3"-HG-1004-B 3" 3"
P // // // // // //
3B2RF 1/4"
//
//
F F
//
V16
//
V8
3"-HG-1005-B
//
FROM FEED GAS SCRUBBER (V-001) NOTE 3 REFERENCE DOCUMENT
//
0P16-I-PR-PID-01-002 SHT1 DOCUMENT / DRAWING No. REV TITLE
D-001 B
//
3B2R 1/2"
//
NOTE 6
G G
//
//
V4A V4B
1/2"
//
TI TI
REGENERATING
2 3
//
REFERENCE DOCUMENT
DRYING
LEFT CHAMBER RIGH CHAMBER 1/2" DOCUMENT / DRAWING No. REV TITLE
4"-HG-1003-B
//
H H
//
OWNER :
//
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
SAMPLING POINT
//
// // // // // // // // // // // // // // // UNIT INDUK PEMBANGUNAN SUMBAGTENG
//
3" CONSULTANT:
//
PT PLN ENJINIRING
4B2R
V2 BLOWER
//
I AND 3" 3" CONTRACT. No. : I
1/4" 1/4" 0002.PJ/DAN.02.01/010600/2020
//
FROM INSTRUMENT AIR SUPPLY V6 MOTOR
4-WAY VALVE B M PROJECT :
INSIDE
0P16-I-PR-PID-01-005 1/2" P VESSEL
P
CNG PLANT 10 MMSCFD FOR RIAU
3/4"I2Z 3/4"I5Z V15
1/2" 1/2" 1/4" V14 V12 GAS FIRED POWER PLANT (GFPP) 200 MW
2 V11
TITLE : SCALE :
1 2 ELECTRICAL
D-001 B
0P16-I-PR-PID-01-004
3"-HG-1008-B
3"-HG-1007-B
L L
EPC CONTRACTOR :
3B2R 3B2R
3/4B2T TO INCOMING GAS METERING (M-001)
4"-HG-1009-B
0P16-I-PR-PID-01-002-SHT3
M M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A M-001A/B 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
INCOMING GAS METERING 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
TYPE : ULTRASONIC 3. METERING STATION IS DESIGNED FOR UNI-DIRECTIONAL
CAPACITY : 10.2 MMSCFD NON FISCAL (NON CUSTODY) FLOW MEASUREMENT.
DESIGN PRESSURE : 37 Barg 4. CONTROL ROOM IN BUILDING SAFE AREA.
5. FOR BORESCOPE INSPECTION INCLINED 45° TOWARDS USM.
DESIGN TEMPERATURE : 50 °C
6. REFER TO VENDOR DRAWINGS FOR DETAILS OF
OPERATING PRESSURE : 27 Barg VENDOR SCOPE.
OPERATING TEMPERATURE : 21°C 7. FOR THE GAS REGEN THAT SEND TO VENT STACK WILL BE
QUANTITY : 2 (1 RUNNING, 1 STANDBY) UPDATED AFTER LATEST VENDOR UPDATE
B 8. GC ANALYZER IS EQUIPPED WITH ALARM FOR MOISTURE B
CONTENT
C C
PCS
GAS METERING PANEL (VENDOR SCOPE)
HUB SWITCH
D CONTRACTOR VENDOR D
05
RJ.45
F F
TO VENT STACK
1''-VL-1005-B
0P16-I-PR-PID-01-003 REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE
3/4" 300#
ANALYZER GC SHELTER RF
(VENDOR SCOPE)
G G
NOTE 7
1" 150# RF
1" 150# RF
GC C6+ AT REFERENCE DOCUMENT
NOTE 8
100 DOCUMENT / DRAWING No. REV TITLE
TT
SCS
001A/M-001
H FROM FEED GAS SCRUBBER PT
H
OWNER :
TUBING
0P16-I-PR-PID-01-002 SHT1 001A/M-001 PG
TE PT. PERUSAHAAN LISTRIK NEGARA (Persero)
2 001A/M-001 UNIT INDUK PEMBANGUNAN SUMBAGTENG
001A/M-001 HH : 31 BARG
FT PSD
001A/M-001 TW TG 1/2" 006 CONSULTANT:
FROM OUT GOING METERING LL : 25 BARG
TUBING 001A/M-001001A/M-001 LOCKABLE
0P16-I-PR-PID-01-002 SHT7 ZSO ZSC ZS0 ZSC PT PLN ENJINIRING
2 001A/M-001 001A/M-001 001B/M-001 001B/M-001
(NOTE 6)
2 1-1/2" 1-1/2"
I PROFILER
3/4" NPT
300# 300# SW 300# SW
1/2"-800# SW CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
STREAM-A 3/4"-800# SW
PI PROJECT :
4" 300#RF 4" 300#RF TO FUEL GAS RECEIVER (V-002)
5D 10D 2D 1 1/2''-FG-1000-B
DBB BALL VALVE 4" 300#
USM
DBB BALL VALVE 006 0P16-I-PR-PID-01-002 SHT8 CNG PLANT 10 MMSCFD FOR RIAU
LOCKABLE 5D LOCKABLE GAS FIRED POWER PLANT (GFPP) 200 MW
2 TITLE : SCALE :
HEADER 4"
DOC. No. : SHEET No. : REV :
SC
1/2B2T TO GAS COMPRESSOR (C-001A/B/C) 0P16-I-PR-PID-01-002 3 OF 9 2
4''-HG-1010-B
12" 2000# 0P16-I-PR-PID-01-002 SHT4 DOC. TYPE :
3/4"-300# RF TUBE PIPING INSTRUMENT & CONTROL
3/4"-300# RF
FROM FEED GAS DRYER (D-001A/B) CIVIL & STRUCTURE X PROCESS
4''-HG-1009-B
0P16-I-PR-PID-01-002 SHT2 ELECTRICAL
RETRACTABLE MANUAL
SAMPLE SAMPLE
K PROBE BOTTLE MECHANICAL K
TT
002B/M-001 REV DESCRIPTION PRE CHK APP DATE
PT
002B/M-001 PG 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23
TE 002B/M-001 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 16/02/23
FT 002B/M-001
2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23
002B/M-001
L TW TG L
LOCKABLE
HEADER 4" ZS0 ZSC 002B/M-001002B/M-001 ZS0 ZSC
002A/M-001 002A/M-001 002B/M-001 002B/M-001
3/4" (NOTE 6) 1-1/2" 1-1/2" EPC CONTRACTOR :
PROFILER 300# RF 1/2"-800# SW
300# RF 300# RF 3/4"-800# SW
STREAM-B
4" 300#RF 5D 10D 2D 4" 300#RF
4" 300#
DBB BALL VALVE USM DBB BALL VALVE
LOCKABLE 5D LOCKABLE
METERING PACKAGE (VENDOR SCOPE)
M M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A C-001A/B/C 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
CNG COMPRESSOR PACKAGE 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
QUANTITY : 3 EA (2 RUNNING, 1 STANDBY) 3. REFER TO VENDOR DRAWING NO. OP16-VIII-PID-01-001
CAPACITY : 5 MMSCFD (ea) FOR DETAILS OF VENDOR SCOPE.
SUCTION PRESSURE : 27 Barg 4. THIS RECYCLE LINE IS USED FOR START-UP BYPASS (FOR
CRANKING PURPOSE)
DISCHARGE PRESSURE : 250 Barg
SUCTION TEMPERATURE : 21 °C
DISCHARGE TEMPERATURE : 40 °C
B 2 B
TO VENT SYSTEM
4"-VL-1006-A
0P16-I-PR-PID-01-003
C C
FROM IA / PA SYSTEM
D 0P16-I-PR-PID-01-005
// // //
D
//
//
//
//
//
//
//
//
//
//
//
E // // E
//
//
F F
// //
REFERENCE DOCUMENT
//
DOCUMENT / DRAWING No. REV TITLE
TO CNG STORAGE //
//
0P16-I-PR-PID-01-002 SHT5
//
//
G G
1 1/2"-HG-1014-G
1 1/2 G2Z
2"-HG-1017-G
REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE
1 1/2"-HG-1015-G
C-001B
H 1 1/2 G2Z H
OWNER :
1 1/2"-HG-1016-G PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG
C-001C
1 1/2 G2Z
CONSULTANT:
PT PLN ENJINIRING
PROJECT :
ELECTRICAL
K MECHANICAL K
// // // // // // // // // // // // // // //
//
//
//
REV DESCRIPTION PRE CHK APP DATE
L L
EPC CONTRACTOR :
RS
3"-HG-1012-B
C-001B
3B2R
RS
M 3"-HG-1013-B
C-001C M
3B2R
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
TO VENT STACK
A T-001~060 6"-VL-1033-A 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
0P16-I-PR-PID-01-003 0P-16-I-PR-PID-01-001.
CNG STORAGE 2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 11.4 MMSCF TOTAL 3. RUPTURE DISK IS INSTALLED IN EACH TUBE SKID VENT
PRESSURE (DES/OP) : 275/250 BARG LINE BEFORE VENT STACK SUB HEADER, VENT STACK
TO PRESSURE REDUCING
TEMPERATURE (DES/OPERATION) : 65/40 °C SUB HEADER FROM EACH BANK.
UNIT & HEATER
8"-HG-1026-G 4. ALL CABLING ON CNG STORAGE SKID BY CONTRACTOR.
QUANTITY : 480 CYLINDERS (60 SKIDS) 0P16-I-PR-PID-01-002 SHT8 5. PSV SUPPLIED BY VENDOR.
6. REFER TO VENDOR DRAWINGS FOR DETAILS OF
VENDOR SCOPE.
7. ONE BANK CONSIST OF 120 CYLINDERS, FOUR BANK
B C C C C CONSIST OF 480 CYLINDERS B
ZI ZI ZI ZI 8. TO HANDLE OVERPRESSURE CASE TUBE SKID ARE
001B 4G2J 002B 4G2J 003B 4G2J 004B 4G2J EQUIPPED WITH TWO RELIEF VALVES AND ONE RUPTURE
O O O O
DISK
9. FROM FILLING HEADER LINE TO EACH TUBE SKID.
C C C C
ZS ZS ZS ZS 10. FROM EACH TUBE SKID TO DECANTING HEADER LINE.
2G2J 2G2J 2G2J 2G2J
001B O 002B O 003B O 004B O
XIC XIC XIC XIC
001B 002B 003B 004B
XV XV XV XV
001B 002B 003B 004B
C 4G2J 4G2J 4G2J
C
4G2J
1 1/2"-VL-1015-A
1 1/2"-VL-1019-A
1 1/2"-VL-1023-A
1 1/2"-VL-1027-A
1 1/2"-VL-1014-A
1 1/2"-VL-1018-A
1 1/2"-VL-1022-A
1 1/2"-VL-1026-A
SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG
SIZE : 1"x1 1/2" SIZE : 1"x1 1/2" SIZE : 1"x1 1/2" SIZE : 1"x1 1/2"
SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG SET @ 275 BARG
SIZE : 1"x1 1/2" 1G2Z SIZE : 1"x1 1/2" 1G2Z SIZE : 1"x1 1/2" 1G2Z SIZE : 1"x1 1/2" 1G2Z
4"-HG-1025-G
4"-HG-1022-G
4"-HG-1024-G
4"-HG-1023-G
1"-VL-1007-A
1"-VL-1008-A
1"-VL-1009-A
1"-VL-1010-A
PSV NOTE 5 PSV NOTE 5 PSV NOTE 5 PSV NOTE 5
001A 002A 003A 004A
E A A A A E
1 1/2A2ZF G 1 1/2A2ZF G 1 1/2A2ZF G 1 1/2A2ZF G
F CONTRACTOR VENDOR F
2
DECANTING
DECANTING
PT TT PT TT PT TT
DECANTING
PT TT
001B 001B 002B 002B 003B 003B 004B 004B
H H
OWNER :
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG
CONSULTANT:
PT PLN ENJINIRING
FILLING
FILLING
FILLING
FILLING
D D D D
I CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
PT TT PT TT PT TT PT TT PROJECT :
001A 001A 002A 002A 003A 003A 004A 004A
CNG PLANT 10 MMSCFD FOR RIAU
GAS FIRED POWER PLANT (GFPP) 200 MW
TITLE : SCALE :
NOTE 8 PIT TIT PIT TIT PIT TIT PIT TIT
001A 001A 002A 002A 003A 003A 004A 004A PIPING & INSTRUMENTATION DIAGRAM
NTS
L: -30 °C L: -30 °C L: -30 °C L: -30 °C CNG MAIN PROCESS
H: 50 °C H: 50 °C H: 50 °C H: 50 °C CNG STORAGE
J NOTE 9 NOTE 9 NOTE 9 NOTE 9
J
DOC. No. : SHEET No. : REV :
0P16-I-PR-PID-01-002 5 OF 9 2
DOC. TYPE :
VENDOR SCOPE PIPING INSTRUMENT & CONTROL
1 1/2" HG-1019-G
1 1/2" HG-1020-G
1 1/2"HG-1021-G
1"-DC-1004-A
1"-DC-1006-A
1"-DC-1008-A
1"-DC-1010-A
ELECTRICAL
K MECHANICAL K
C
C C C
ZI ZI O ZI ZI
002A 003A 004A REV DESCRIPTION PRE CHK APP DATE
001A O O
O C 0 ISSUED FOR APPROVAL ADE HPO ISA 19/01/23
C 1 1/2G2Z 1 1/2G2Z C 1 1/2G2Z C 1 1/2G2Z
ZS ZS ZS 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23
ZS
001A O 002A O 003A O 004A O
XIC XIC XIC 2 RE-ISSUED FOR APPROVAL ADE HPO ISA 20/03/23
XIC 1G2Z 1G2Z 1G2Z 1G2Z
001A 002A 003A 004A
L XV XV XV XV L
001A 002A 003A 004A
2"-HG-1017-G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A PV-002A/B/C E-001 E-002 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
PRESSURE REDUCING UNIT PRE-HEATER RE-HEATER 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
QUANTITY : 3 (A/B/C) SHELL DESIGN PRESSURE : 4.5 BARG SHELL DESIGN PRESSURE : 4.5 BARG 3. BDV SHOULD BE PUSH BUTTON.
CAPACITY : 24 MMSCFD (EA) SHELL OPERATING PRESSURE : 3 BARG SHELL OPERATING PRESSURE : 3 BARG 4. INLET P : 250 Barg, P REDUCED TO 40 Barg
OPERATING P (IN/OUT) : 250/39 BARG SHELL DESIGN TEMPERATURE : 110° C SHELL DESIGN TEMPERATURE : 110° C INLET P : 200 Barg, P REDUCED TO 40 Barg
OPERATING T : -4 °C TO 65 °C INLET P : 100 Barg, P REDUCED TO 40 Barg
SHELL OPERATING TEMPERATURE : 91.5° C TO 39.2° C SHELL OPERATING TEMPERATURE : 91.55° C TO 5.83° C
2 INLET P : 30 Barg, P IS NOT REDUCED
MATERIAL : CS (LTCS) TUBES DESIGN PRESSURE : 275 BARG TUBES DESIGN PRESSURE : 47 BARG
TUBES OPERATING PRESSURE : 250 BARG TUBES OPERATING PRESSURE : 39 BARG
TUBES DESIGN TEMPERATURE : 110° C TUBES DESIGN TEMPERATURE : -25° C TO 110° C
B TUBES OPERATING TEMPERATURE : 37.9° C TO 56.9° C TUBES OPERATING TEMPERATURE : - 4.87° C TO 40.7° C B
TEMA : BEM TEMA : BEM
C C
D D
E E
TI PI
001 002
3A2R TV
FROM WATER FIRED HEATER 3/4A2T 001
3"-SW-1001-A-HI-25
F 0P16-I-PR-PID-01-002 SHT9 25 HI
3" TO VENT STACK F
3A2R 3A2R
2"-SW-1003-A-HI-25
2 0P16-I-PR-PID-01-003
G G
25 HI
2"-SW-1002-A-HI-25
3"-SW-1004-A-HI-25
2"-VL-1029-A
REFERENCE DOCUMENT
600 MM
300# 004
2A2R SET @39 BARG NOTE 4 2 2
MIN
H HH: 44 Barg NOTE 3
H
PSD BDV OWNER :
2B2R
- 004 PT. PERUSAHAAN LISTRIK NEGARA (Persero)
ESD UNIT INDUK PEMBANGUNAN SUMBAGTENG
SET@39 BARG FO
2" 004
6"-HG-1028-G PV
002A PIC PI 2A2R CONSULTANT:
002A/B/C 003 SET@43°C C C
6G2J 6B2R 2B2R ZS ZI
004 004 PT PLN ENJINIRING
25 CI TIC O O
6" 001
8"-HG-1034-B-CI-25
G GL B 6"-HG-1031-B-CI-25
I CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
PT PT
002A/B/C 003
2"-VL-1028-B
3/4B2T TT PROJECT :
002
MIN. 600 MM MIN. 600 MM TI CNG PLANT 10 MMSCFD FOR RIAU
TI 004 GAS FIRED POWER PLANT (GFPP) 200 MW
003 3/4B2T
TO OUTGOING METERING (M-002) TITLE : SCALE :
FROM CNG STORAGE (T-001~060)
0P16-I-PR-PID-01-002 SHT5
8"-HG-1026-G
E-001 6"-HG-1029-G PV
002B
SET @39 BARG
25 CI
8B2R
E-002 8"-HG-1035-B
8B2R
0P16-I-PR-PID-01-002 SHT7
2
PIPING & INSTRUMENTATION DIAGRAM
NTS
6G2J 6B2R CNG MAIN PROCESS
J 2 25 CI PRESSURE REDUCING UNIT & HEATER J
6"
G GL B 6"-HG-1032-B-CI-25 DOC. No. : SHEET No. : REV :
2
8"-HG-1027-G
0P16-I-PR-PID-01-002 6 OF 9
3/4B2T
DOC. TYPE :
MIN. 600 MM MIN. 600 MM PIPING INSTRUMENT & CONTROL
6"-HG-1030-G PV ELECTRICAL
2"-SW-1006-A-HI-25
002C
2"-SW-1005-A-HI-25
MIN. 600 MM MIN. 600 MM 1 RE-ISSUED FOR APPROVAL ADE HPO ISA 15/02/23
25 HI
25 HI
L L
TI PI EPC CONTRACTOR :
002 003
M M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A M-002 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
OUTGOING GAS METERING 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
TYPE : ULTRASONIC FLOW METER 3. SAMPLE PROBE SHALL HAVE PRESSURE REGULATION AT
CAPACITY : 48 MMSCFD THE TIP.
DESIGN PRESSURE : 45 Barg 4. ALL CABLING BETWEN METERING SKID AND MEETING
CONTROL PANEL BY CONTRACTOR.
DESIGN TEMPERATURE : 65 °C
5. REFER TO VENDOR DRAWINGS FOR DETAILS OF 2
OPERATING PRESSURE : 37-39 BARG VENDOR SCOPE.
OPERATING TEMPERATURE : 25°-40 °C 6. THE SDV WILL BE CLOSED AUTOMATICALLY DURING
EMERGENCY SHUTDOWN.
B B
001
-
HUB SWITCH
D D
LASERJET
PRINTER
DOT MATRIKS
E PRINTER E
MASS S.VOL
TI PI FI FI FQI
F FQIC F
M-002 C C
ZI ZI
RJ.45
G G
REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE
H H
OWNER :
PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG
CONSULTANT:
SC
TW TG 1/2" PT
LOCKABLE
8B4R
CNG POWER
PLANT PLANT
M M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A V-002 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
FUEL GAS RECEIVER 0P-16-I-PR-PID-01-001.
2 2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
ID X T/T : 446mm x 1500mm 3. TURBINE FLOW METER.
DESIGN PRESSURE : 8 BARG 4. TO LINE DRAIN.
DESIGN TEMPERATURE : 50 °C 5. THE HOLDING TIME OF THE FUEL GAS RECEIVER IS 3
MINUTES.
OPERATING PRESSURE : 3 BARG
OPERATING TEMPERATURE : 7.3 °C
MATERIAL : CS + 3 MM CA
CAPACITY : 0.2 MMSCFD
B B
C C
PSV
002
D 2A2RF
2"-VL-1032-A
TO VENT STACK D
0P16-I-PR-PID-01-003
2"x1"
2A4R
3/4A2T
2A2R
E E
2A2R
F 3/4A2T F
REFERENCE DOCUMENT
DOCUMENT / DRAWING No. REV TITLE
FI
G 001 G
3/4A2T
H N2 1 1/2"-FG-1002-A
TO WATER FIRE HEATER H
OWNER :
1 1/2" 0P16-I-PR-PID-01-005
1 1/2A2Z 1 1/2A2Z 1 1/2A2Z PT. PERUSAHAAN LISTRIK NEGARA (Persero)
UNIT INDUK PEMBANGUNAN SUMBAGTENG
10D 5D
PCV
SET @ 3 BARG N4 PROFILER CONSULTANT:
001 150# NC
FROM INCOMING METERING 300#
PAH : 4 BARG PT PLN ENJINIRING
(M-001A/B) PT PI
1 1/2"-FG-1000-B 1 1/2"-FG-1001-A N7
0P16-I-PR-PID-01-002 SHT3 N1 1 1/2A2Z
2" 004 004
I 1" 1 1/2" 2A2R x 3/4 PAL : 2 BARG CONTRACT. No. : I
1 1/2B2Z 1 1/2x1 1 1/2x1 1 1/2B2Z 0002.PJ/DAN.02.01/010600/2020
PROJECT :
LG
0P16-I-PR-PID-01-002 8 OF 9 2
DOC. TYPE :
001
PIPING INSTRUMENT & CONTROL
ELECTRICAL
N5B
K 2"
2A2R MECHANICAL K
1/2A2R
N3
2" REV DESCRIPTION PRE CHK APP DATE
L L
EPC CONTRACTOR :
NC NC TO CLOSED DRAIN VESSEL (V-004)
1"-DC-1013-A 1"-DC-1014-A
0P16-I-PR-PID-01-004
1A4Z 1A2Z
M M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTE
A T-003 P-003A/B E-003 1. FOR GENERAL NOTES & SYMBOLS, SEE DRAWING NO. A
HOT WATER DESIGN TANK HOT WATER CIRCULATION PUMP FIRED HEATER 0P-16-I-PR-PID-01-001.
2. FOR LINE LIST SEE DOCUMENT NO. 0P-16-I-PR-LST-01-001.
CAPACITY : 1 m³ TEMPERATURE : 110°C DESIGN PRESSURE : 4.5 BAR 3. REFER TO VENDOR DRAWINGS FOR DETAILS OF
TEMPERATURE : 98 °C MAX TYPE : CENTRIFUGAL PUMP DESIGN TEMPERATURE : 110°C VENDOR SCOPE.
TYPE : EXPANSION TANK FLOW RATE : 25 m³/hr OPERATING PRESS. : 3 Barg 4. MAKE UP WATER TO EXPANSION TANK.
5. N2 BOTTLE IS FOR MAINTAINING PRESSURE ON EXPANSION
OPERATING TEMP. : 93°C
TANK T-103 (VENDOR SCOPE).
B B
C C
HOT WATER CIRCULATION SYSTEM PACKAGE
CONTRACTOR VENDOR
TO PRESSURE REDUCING
UNIT HEATER
0P16-I-PR-PID-01-002 SHT6
D D
2
TIC 3"-SW-1001-A-HI-25
-
TO PRESSURE REDUCING
UNIT HEATER 2
3"-SW-1007-A-HI-25 0P16-I-PR-PID-01-002 SHT6
N4
FROM PRESSURE REDUCING CHIMNEY
UNIT HEATER
E 0P16-I-PR-PID-01-002 SHT6 E
N8
2
G LE
GAS OUTLET
G
- LL SET @ 30%
PIPE 3" SCH 40
1" CONSULTANT:
M
1 1/2" PT PLN ENJINIRING
PG
- PG
I PSD STATUS 103 CONTRACT. No. : 0002.PJ/DAN.02.01/010600/2020 I
3" 3" 3" 1 1/2"
P-003A PROJECT :
PSD EXPANSION
2 PIPE 3" SCH 40
E003 TANK NOTE 5 CNG PLANT 10 MMSCFD FOR RIAU
P-003B GAS FIRED POWER PLANT (GFPP) 200 MW
PERMISSIVE 1/2" T-003 LG
NOTE 4 SCALE :
110 TITLE :
XS PSD
3" 3" 3"
E003 PIPING & INSTRUMENTATION DIAGRAM
NTS
CNG MAIN PROCESS
ALARM STATUS
J M WATER FIRED HEATER J
XA
E003 NITROGEN (N2) BOTTLE DOC. No. : SHEET No. : REV :
RUN STATUS
0P16-I-PR-PID-01-002 9 OF 9 2
XL DOC. TYPE :
E003 PIPING INSTRUMENT & CONTROL
L L
N7
M M
TO OPEN DITCH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18