Comprehensive Primavera P6 Hands-On Training Manual

Shahabaz Bim coordinator


https://www.linkedin.com/in/mohammad-shahabaz-nagundi-220036103?utm_source=share&utm_campaign=share_via&utm_content=profile&utm_medium=android_app
Part-1
Slide 2. Logging In
Slide 5. General and admin symbols & EPS, project, and WBS symbols
Slide 6. Activity symbols, Report and layout symbols & Work product and document symbols
Slide 7. Resource and role symbols
Slide 8. The Enterprise Project Structure(EPS)
Slide 9. Organiztion Breakdown Structure &
About Primavera Logging In

Primavera P6 as a robust project management software developed by Oracle. Its


used to managing large-scale projects across various industries.
Primavera P6 helps in planning, scheduling, tracking, and managing projects
efficiently, leading to improved project outcomes and organizational success.
key features such as advanced scheduling, resource management, reporting,
portfolio management, and integration capabilities with other software tools.

What should know Before Working on Primavera

• scope identification project


• Organization Breakdown structure
• Work Breakdown Structure
• Activity types
• Task dependent/Resource Dependent/Milestone/Wbs
Summary
• Resource Usage Optimum
• Risk Identify & Reduction to lowest level Steps
• Project on date completion 1.Click Start,Programs,Primavera,Project Management
• Comparison(Planned vs Actual) 2.Type a Login Name <Admin> and Password <******>
• Earn Value Management(EVM) 3.Click ok
• Technical Terms(CPI,SPI, CV ,SV)
General and admin symbols
These symbols represent general data.

EPS, project, and WBS symbols


These symbols represent EPS, project, and WBS data
Activity symbols Report and layout symbols
These symbols represent activity data. These symbols represent report and layout data

Work product and document symbols


These symbols represent work product or document data.
Resource and role symbols
These symbols represent resource and role data.

Issue, risk, and threshold symbols


These symbols represent issue or threshold data.
The Enterprise Project Structure(EPS) Enterprise→Enterprise Project Structure

The Enterprise Project Structure(EPS) forms the hierarchical


structure of your database of projects. Each EPS node ( or folder)
can be subdivided into multiple levels to represent the work that Opening the EPS
needs to be done in your organization. The three fields to enter when adding an EPS node are:
EPS ID-Identifies the selected EPS node
EPS Name-Description of the selected EPS node
Responsible Manager-Use this field to select an OBS(Organizational Breakdown Structure)
The Enterprise Structure(EPS) is a hierarchy used to organize element to associate with the selected level of the EPS)
projects
The EPS is made of roots and nodes
• Each root in the EPS can be subdivided into many nodes
• Nodes represent different levels within the structure
Ex: nodes can represent divisions within your
company,departments,projects groups,or site locations
All projects must be included in a node
• Each node can contain an unlimited number of projects
• Projects always represent the lowest level of the hierachy
• placement of a project in the heirarchy determines the
summary level in which it is included
Organiztion Breakdown Structure
An obs is a hierarchical arrangements of a projects management structure. It
determines how people within a company are organized and what rights and access
they have to various projects.
OBS is not same as a resource pool
Resouces are assigned to activities & OBS elements are associated with EPS nodes and
projects
OBS Element corresponding to an EPS node is the project manager who responsible for
all work included in that branch of hierarchy
In this way OBS supports larger projects that involve several projects managers with
diffrent areas of responsibility
Enterprise→ Organiztion Breakdown Structure(OBS)

On the OBS page:


Click Add.
Note: The OBS is automatically added as a child of another OBS.
1. Move the OBS to the correct location in the list and hierarchical position by clicking Row
Actions and selecting Move Item Up and Move Item Down arrows.
2. In the OBS Name field, double-click and type a unique name.
3. Click the Users detail window.
In the Users detail window, remove or assign users to the OBS.
Tips 1. To remove a user from the OBS, select a user, click Row Actions and click Delete.
2. To assign users to the OBS, click Assign....
•When you set up enterprise project structure (EPS) nodes, a root OBS is automatically
assigned to the root EPS. In the Select Users dialog box:

•When you create a new project, the default responsible manager is automatically assigned 1. Select a Project Security Profile.
so that an OBS element is available for each work breakdown structure (WBS) element 2. Select users and click Select.
added to the project. 3. When you are finished assigning users, click Close.
Related Topics
On the OBS page, click Save.
Thank you