You are on page 1of 8

SUBCON CODE SUBCON NAME UNIT

SE WORKING TIME

MECH 18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

PI 18.00-21.00

18.00-21.00

001

18.00-21.00

18.00-21.00

18.00-21.00
18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

SS 18.00-21.00

SMP03 PT-JEL

18.00-21.00

MECH 18.00-21.00

18.00-21.00

18.00-21.00

18.00-21.00

002 PI

18.00-21.00

18.00-21.00

18.00-21.00

PI 18.00-21.00

003-B

18.00-21.00

MECH 18.00-21.00
18.00-21.00

18.00-21.00

PI

003-C 18.00-21.00

18.00-21.00

MECH 18.00-21.00

PI 18.00-21.00

WORKSHOP

MECH 18.00-21.00

032 PI 18.00-21.00

TOTAL 1087

REMARK :
NIGHT SHIFT :
OVERTIME : 1.087
3/4/2024

SUPERVISIOR MANPOWER ACTIVITY

Marking nozzle E-1-14, Preparation E-


SUPOYO 45 2-09, Cutting tube E-2-02 . Assembly
chimney EA-3-02 A

Demolish pipe spool PSR, Grinding,


HERYANTO 60
cutting and beveling

TINGKOS 50 Stringging pipe spool, fit up

Demolish , Open bolt and flange (pre


WIDODO 28
demolish)

SINAN 14 Demolish pipe spool TP-550,461

PENRY 30 Demolish pipe spool

ABDUL MAJID 32 Tie in, grinding and demolish pipe

SYAHRULLAH 7 Supporting tim piping

KAMILUDDIN 8 Install tubing

CECEP 15 Tightening bolt (torque)

Remove blind flange after hydrotest


HABIBUR(YOGI) 21 001-TP-FG-004, Cutting end cup ,
Bevelling end cup

BUDI 28 Demolish, fit up and welding activity

ANIK 5 Prepare for material TA

SUHARIANTO 20 Install slip blind


BORNOK 66 Welding activity

Support piping in CDU, VDU, HCC


SUHARTO 22
AREA

PEDRO 8 Str 003b-001

ANGGI 56 Scaffolding Installation

ENDANG 25 Bolt tightening, plumbness STR-003A

Cutting support open bolt and install


SUJANA 35
support to air fan cooler

Chipping fondation pump G-1-10AB,


SUCIPTO 19
Moving skit Pump G-1-05C

NOPRI 45 Scaffolding Installation

MARGONO 70 Stringging pipe spool, fit up

FIRDAUS 31 Scaffolding Installation

DEKER 22 Scaffolding Installation STR

SURYANA 11 Installation tubing to manifold

MONANG 45 Stringging pipe spool, fit up

PANGIHUTAN 40 Demolish pipe, Install blind flange

SOFIAN B 25 Scaffolding Installation

Chipping fondation pump G-3-2-


SUCIPTO 17
08AB,Padding plate G-3-21CD
SOFYAN 35 Scaffolding Installation

DWI ARIANTO 50 Stringging pipe spool, fit up

CHOIRUROHMAN 20 Scaffolding Installation

HABIBUR 15 Preparation for hydrotest

Install slip blind C-3-08B,A, Remove


RUSIMAN 26
stud bolt

HABIBUR 11 Preparation for hydrotest

SUCIPTO 7 Open bolt cup pump, moving skit

Cutting line SCWS and prepare tie in


SLAMET RIYADI 23
16A/16B

1087
SUBCON CODE SUBCON NAME UNIT
SE WORKING TIME

001 MECH 19.00-07.00

19.00-07.00

SMP03 PT-JEL

003-B PI 19.00-07.00

19.00-07.00

TOTAL 69

REMARK :
NIGHT SHIFT : 69 MP
OVERTIME :
3/4/2024

SUPERVISIOR MANPOWER ACTIVITY

SAPRAN HARAHAP(NPE) 21 Replace, fit up and welding nozzle

NERA 26 Stringging pipe spool, fit up

RAMLI 11 Scaffolding Installation

JUNAIDI 11 Welding activity

69