‘Schedule of Rates, LGED, February 2023
Tom Code
Brio Description of arn
[Section 09:
‘ver the BFS, fling te intersces thy with same ype of snd, eal complete nal
respect as per approved rawing, specication ang drecton ofthe Engineer h-chare,
‘Concrete Block Road
soem
‘ICGH(auM): Labour charge Tor plang up the wasting CC Block of any Ses on selina ar slope
of embankment, including staking the materate at aspecfied distance ele all complete as per
rection of the ELC
a
ono
ReCCB(cum): Labour charge fr Sating/Resating of sae layer CC Block af afferent sos on
road to, Including preparation base, rue to level, maintaining camber, super elevation, sade,
watering and ramming the base, including carrying CC blocks, supplying and fling the
interstices tightly with sand (FM -0.5), et.al complete in all espect as per approved
Arawing, specication and dection ofthe Engheern-cherge
aaa
Boas
(CCRSS-PiV: Manufacturing and supplying Plain Cement Concrete (PCC) Blocks with coment
‘conforming to BOS EN 197-1 : 2005 CEM-I/A-M 42.5, using stel shutter, wth 46rmm
‘downgraded Stone Shingles, sand (F¥>=1.5) and minimum cement content relates to mix
rae 1:36 satisfying specid minimum compressive trenath 10.0Mpa at 28 day, including
‘fading, washings shingles, ming in standard mixture machine, casting in forms, making
Shutter water-tight propery, compacting by vibrator rachine ard curing fora least 28 days,
Including preparaton of platform, shuttering and stacking in measurable stacks et.al
complete n al respect as per approved crawing, speciation and drecton ofthe Engineer in.
sarge,
08084
PCC Block Sze: mind2UOMNASOTE
‘ech
2.08
ans
PC Block Sas STmRIOORANODETIN
ech
36a
8053
PCE Block Sze: 00GmmDSOOMMDOOFISO}
wach
750
oan6
‘CGBES-FE: Providing PCC Block on End Edging (T0Omm across) oF xe
(GzemxL00mmx225mm), inducing man facturing and suplying Plain Cement Concrete
(0c) Blacks with cement conforming to 8DS EN 197-1 : 2003 CEN-IIJA-M 42.5, using stel
Shute, with 4mm down graded Stone Shingles, sand (FM>=1,5) and minimum cement
Content relates to mic rato 1:36 salsying specified minimum compressive strength 10,0Mpa
3828 dys, iclucing cating venches tue to level & grade, remevng earth, efling &
Fameing the sides properly, including supplying and ling the gaps with local sand (FM - 0.5),
‘te. all complete in al Fespect as per approved drawing, specication and drecton oF the
Engineern-charge,
5H
ronnea
‘CCBSS-EE-R: Providing CU lock on End Edging (average 125mm scross) for submersble
road of size [\: 1060mma: SommXW:(100mm-+1S0mM)}, cng manufacturing and
Supplying Plain Cement Concrete (PCC) Blcks with cement conforming to 8DS EN 157-1
2003 CEN-II/A. 42-5N, using stel shutter, with 40mm down graced Stone Shingles, sand
(fet>=1,5) and minimum cement content relates to ma ratio 13.6 sisting specified
Iinimum compressive strengtn10,0Mpa at 28 days, including cing trenches true to level
‘7ade, removing earth, refi & ranvving the sie propel, induding supplying and filing
the gaps with local sane (FM 0.5), et. all complete in al respct as per approved drawing,
spectcaton and dection ofthe Engnee-n-ehare.
waar
ona?
(CCASC-RW: Manufacturing and supplying Pain Cement Concrete (PCC) Sicks with coment
‘pnforming to BDS EN 197-1 : 2003 C=MLI/A-M 42.5, for road pavement works using tee!
shutter, with 40mm down graded Stone Chips, sand (FM>=1.8) and minimum cement content
Felates to mac ratio 1:24 satsfyng spcied minimum compressive strength 20.0Mpa at 28
days Including grading, washings stone chips, mixing in standard mixture machine, castng In
form, making shutter watertight propery, compacting by vibrator mactine and caring for at
least 28 dys, nclucing preparation of platform, shuttering and stacking In measurable stacks
teal complete in al respect as per approved drawing, spectcaton and drction ofthe
Engineersn-carge. [Excluding the cost of labour charge for back sett
aoaa7
PCC Block Sze: 375minX225mexaSOre
‘each
T7682
See
‘CCBSC-RW: Proving sale layer PCC Sock on road top of se S7SmmOC2SmMNTEORIT,
Inctuding manufacuring and supplying Pain Cement Concrete (PCC) Blcks with conent
‘conforming to BOS EN 197-1 ; 2003 CEM-I/A-M 42.5, using stelshute, with Alm down
‘raded Stone Chips, sand (FM>=1.8) and minimum cement content rats to mie rallo 12:4
Sty specfed minimum compressive strength 20.0Npa at 28 days, including. preparation
of bed by cutng or filing with raring the file’ up earth to the sme profile a that ofthe
Finished pavement, induzing canying. and plac PCC blocks, fing the interstices tightly wth
sand (FM 0.5), et. all complete in all respect as per approved drawing, speciation and
recon ofthe Engineersn-chage
an
TEs]
a8
TCOCB: Labour charge fe layng snake aye” Oc Block of afleret ses for protective wal,
inciuding preparaton trenches, tu level, maintaining alignment, wateing and ramming he
base, Ineuding carrying. and placing CC blocks, ling minimum 659% Interstees of Oc Block
work gnuy with cement mortar (1:6), raking out jin, cleaning and Soaking Block atleast or
24 hours before use, washing of sand, curing fr requste pri, et.al complete inal
respect as per approved Grawing,spedcation an cretion of the Engineer in-charge,
[Excucing the cast of Cc Slo
13664
Tote Rae ofa ee seu be weliove oa aupp and cara,
Pape 20‘Schedule of Rates, LGED, February 2023
Tom Code
Brief Description of tern
oes
‘Une Block Paver Supping and laying Teciory made csment concrete interacting high svenath
as specified paver universal uni-block mace by block making machine with mechanically
ampressec wth high load-bearing capecry, eniched weather resistance, the lw water
absorption capacty of standard thick and approved desgn/shape, sie in required long lasting
(clout, texture and patter conferming 85-6717 or as specified approved by the E-F-C, lad
‘ver the prepare sand bedding layer maintaining grade,camber and superslevatio,includog
‘earing ee. all complete in al respect as pr drawing, speciicaton, ection and accepted by
the Engineerin-charge. Costindded all material, their camiages, hire charges of
‘machineries, equipment or constuction and Gualty conal as per speciation, wages of
labour and operational staf et.
085.01
‘om Thick (Ses 222m lon), Colour Gay, Pirimum Compressive Svength 25HFa
sa
108828
oes
oem Thick (Ste: 222rMAT TOMA), Calour Redl Blac any oer SutableGalur, Minima
Compressive Strength: 25MPa
san
Tiss
085.05
‘om Thick (Size: 222m TOR), Colour Gay, Panimum Compressive Svengih: S0RPa
sam
1148.35
onis.o
Omnm Thick (Sie: DSmmRi Tom, Calour Rad/BlacNany aber Sutable Colour, Minima
Compressive Svength: 30MPa
wan
ToT
onas05
‘Omm Thick (Siz: 222mm TOT), Colour: Gray, Minimum Compreseve Stength SoM Pa
wa
Tava
oais.06
‘Orem Thick (Sie: D52mmxiTOmn, Celour:Red|Blacany aber Stable Colour, Minima
Compressive Svength: 35MPa
san
Ta
osiso7
‘Orn Thick (Se 220ml One), Cour: Gray, Minimum Compressive Seng S0MPa
oD
196735]
oai5.08
‘orn Thick (Sie: 22zreL LOMA), Calour RadyBlacany oer Sutable Calbur, Minima
Compressive Strength: 30MPa
san
Tene
8809
‘Om Thick (Swe: 222mm lOve), Colour Gay, Minimum Compressive Svength S5MPa
an
Tsiea7
RI5.10
Tem Tek (Ste: 2DzAT TOMA), Calor ReGT Tac any Or Sutable Cau, Minima
Compressive Strength: 35MPa
san
T6671
eas.
‘orm Thick (Siz: 222m TOM), Colour Gay, Minimum Compressive Svength AOMPa
sa
T7273]
oes.a2
‘mm Tick (See: 222mmeL TOMA), Calour Red/ Bled any oer Sutable Gakur, Minimum
Compressive Strength: 40MPa
san
Tia
sess
omen Thick (Se: 222m Tor), Colour Gray, inimom Compressive Strength 30NPS
san
151095
sonia
Goren The (See: 22zmeet Tone, Colour ReW/BlakJany her Sutebe Calour, Minar
Compressive Svength: 30MPa
wan
WoO.
Ronisas
TOO Thick (Sue: 220m Tor), Colour Gray, Mnmum Compressive Strength 35NPa
can
Taso
oais16
Toren THe (Sha: 22zrecLLOne, Colour Red/BlckJany Sher Sutabe Calour, Minar
Compressive Strength: 35MPa
a
195825
oaisa7
Omen Thick (Sie: 220mrox Tor), Colour: Gray, Minimum Compressive Sirengih 4ONPa
san
1909.12
oaiie
Goren Tek (Sue: Z2zreL Owe, Colour Red/BlckJany cher Sutabe Colour, Minar
Compressive Strength: 40MPa
a
207 8
osi519
00men Thick (Ste: 222moxL Tom), Colour Gray, Minimum Compressive Sirengih 45NPa
=n
705636
oe t5a0
Toone The (Shes D2ammeT Tone, Cour RET Oany oer Sotae Cau, Minar
Compressive Strength: 45M Pa
vam
Tisase
a6
1S-30MPa(RW): Sopplyng and Fong factory made coment concrete Pre Cast Keb stone of
spec Size as per aporaved draning and design for side of fotoath/mecian/read island et
‘ng 20mm downgraded Stone Chips of LAA value <30%, sand (FM>=2.5) and minimum
ament conforming to BDS EN 197-1: 2003 CEN-I/acM 42.5N content relates to mix ratio
1:1.25:24satisying spcifed minimum required average strength fer = 38.5 Mpa and
satisfying a compressive strength f¢ = 30 Mpa at 28 days on standard cylinders, ke stone
Should be made by specied machine with mecharicaly compressed wth high load-bearing
‘apaciyevicned weather resistance, the low water absorption capa of standard Nek and
approved desgr/shape sein require fong-astng colour, tecure an patter conforming
5717 or as specie appraved bythe ELC. incluaing cating trenches te to level &
maintaining grage, algnment ané eight, removing earth, preparation xer funcaton,
Inctcing canying and placing kerb stone Bay, e-llng & ramming the ses propery, etc
all complete in all respect as per drain, specication, drecton and accepted by the Engineer
Invcharge. Cost induded all materials, their earrages, hire carges of wachineres, equipment
for construction and quality conto s per specication, wages of labour and operational staff
ete
Ti.
oaiea
S-35HPa{RWD): Supplying and Png fadory made coment concrete Pre Cast eo stone oF
specie size as per aporaved draning and design for side of footpath/mecarVroad island et
sng 2Umm downgraced Stone Chips of LAA value 30%, sand (FM>=2 8) and minimum
‘cement conforming to BDS EN 197-1: 2003 CEN-IpicM 42.5N centent relates to marimum
Imacraio 1:12:23 satitying specied misimum required average strength fer = 45 Mpa and
Satshing 2 compressive stenath Pe = 35 Mpa at 28 days on standard cylinders kero stone
Should be made by specied machine with mecharicaly compressed wth high load-bearing
T0057
Tote Rae ofl ee seul be wehisve oa supp and aa,
Pape mosseof |
Tom Goak
Brio Description of arn
‘apaciy evicned weather resistance, the low water absorpion capsly of standard tick and
approved desgr/shapesie In required long-lasting colour, texure and patter conforming BS:
65717 or as specie approved by the E--C. rcudin cutng trenches tue to level &
maintaining grace, alignment an height, removing earth, preparation kerb founcaton,
Inetuding carrying and placing kerb stone bay, refling & ramming the Sdes propery et.
all complete nal respec as per drawing, specication, cretion and accepted by te Engineer
Inecharge. Cost induded all materials, thelr earrages, hire carges of machineries, equipment
for construction and quality convo as per specication, wages of labour and opertenal staff
tte
Bonar
SprkCamn Spreading fling sand @ OOicam/sqn or as requred of muamum FH=0.8 waformiy
‘over the lag paving blocks, nduding ecal handling, Booming and compacting 2 east two
asses of vbratery plate compactor or by aporoprate mecharical means to obtain smooth top
Furface subsequent after 7 days fatr re-do the actvty again [standard compactors may have
weight of about $09, plate area of about 0.3 sam and apply a certrfugal ore of about
{SKN such ratory compacton shouldbe continued tl the top ofeach paving block isn
level th ts adacent blocks, There sould not be delay in compaction ate laying of paving
blocks te achieve unfority af compaction and retention ofthe pattem of laying) et ll
‘ampletein al respect as per drawing, spectiation, drecton and accepted bythe Engine
charge.
sam 7a]
[Section-10:
Special Road Maintenance
anon
ALN: Preparation of Pothole for smal path works (pothole, edge breaking, ett) By cuttng,
Scaring ad loosening of existing damaged Base/sub- bass Course materials upto the depth
{af 150mm atthe pothole aeas inorder to make regular shape of he pothole including
levang, dressing and compacting ranualy where mechanical compactors ae net suabe to
‘ve 2 smooth surface including rusting, removing & stacking al debrs ata safe stance etc
al complete nal respect as pe direction ofthe Engineeran-charge,
am 278
Binnie
THAPHM: Preparation of Fard bed by scarfying and loosening o existing top (BRumInaU5)
surface, including bas/sub-base course materls up to the depth of 75mm (irimurn) using
mechanical mean, beating dismantled material into specfid ies less than 4m), wth
Supplying of extra esh base course materals of required specfeation (required) ncudng
spreading, leveling, cressing of loose material uniformly for maintaining camber & grade,
twatenng needed, olin with & to 10 MT road roller to give compaction to 100% oF MOD as
obtained by standard proctor test et all complete in all respect as per direction of the
Engingern-charge. (Rate is excluding the cos of adtional mater supplied)
san Eo
Some
38: Providing and applying sand Binding wit sand of minimum FH 0.80 0,005 cum per sqm
on prepared road surface, including supplying ofall material, their carriage, labours, tools and
ulpment et, all complete inal respect as per drecton ofthe Engineer -charge
sam 533
Bina
25:mmSGSS: Proving 25mm thick (average) grouting with Zinn downgraded broken stone
Shingles (LAA value not exceeding 35) and using 60/70 penetration grace straight run btumen
Cnfrming tothe requirements of ASTH/ AASHTO, spraying tack coat @ 0,50kg per sqm over
the deaned road surface and laying, spreading stone shingles 0.028cum per sam loose) on
the road surface, mantaling prope” camber, lve, grade, super elevation and spraying hot
bitumen @1.50kg per sqm uniformly, including roling hard to full covpaction with 8 to 10 MT
road rl inducing clearing the surface & heating btumen fom 140°C to 160°C temperture
land spreading crushed stone chipe/Sand (F-1.80) G0,006cum per sqm road surface et.al
{amplete in al respect as per drection ofthe Engineerio-carge [Reta
sam 585
in03.01
25immSGSS: Providing 25mm Wick (average) grouting with 2omm downgraded broken stone
Shingles (LAA value nok exceeding 35) and using 60/70 penetration grace straight run oturen
confer tothe requirements of ASTHY AASHTO, spaying tack cot 0,50k9 per sqm over
the deaned road surface and laying, spreading stone singles @0.028cum per sam (loose) on
the road surface, maintaining prope" camber, lve, grade, super elevation and spreying hot
bbtumen @1.50kg per sqm uniformly including oling hard to full compaction wth 8 to 10 MT
road rl inducing clearing the surface & heating btumen fom 140°C to 160°C terpereture
{and spreading crushed stone chips/Sand (F¥-1,80) 20,006com per sqm road surace et all
ample in al respect as pr direction ofthe Engineern-cnage [Buk]
ain 31099
anna
'50mmSGBC: Providing Somm tick (average) grouting with picked brik hips (LAA value not
exceeding 40) and usng 60/70_penetraton grade straight run bitumen conforming tthe
requirements of ASTM/ AASHTO, lying and spreading picked brick chs 6mm thick (lose) in
two layers, 1st ayer of 35mm thick (oose) wit 25mm to UGmem size and ne layer of 259m
thick lose) mixing wth 608 of 16mm to 12mm size and 20% of 12mm to Sm sire picked
bk chips, spraying tack coat @ 0.50kg per sqm over the cleaned road surface, mainting
proper comer, level grade, super elevation and spraying hot ttumen 125k per sam
Uniformly on the 1st layer and @1.50kg per sqm on 2nd layer, inludng eling hard to full
compaction with 8 to 10 MT read roller including leaning the surface B heating btumen from
140°C to 160°C temperature and spreading crushed ste chips/Sand (FM-1 80) 0.006 cum
er sam on road surface et all eomplete inal respect as per drection of te Engineer=
sarge. [Reta]
sam 732.85
Binnaior
'50mmSGBC: Providing Som tid (average) grouting with picked brik his (LAA value not
exceeding 40) and usng 60/70_penetratan grade straight run btumen conforming tthe
requirements of ASTM AASHTO, laying and spreading picked brick cps Go thick (lose) in
sam 780.70
Tote Rae ofl ee seul be wehisve oa supp and aa,
Pape a8