You are on page 1of 3
‘Schedule of Rates, LGED, February 2023 Tom Code Brio Description of arn [Section 09: ‘ver the BFS, fling te intersces thy with same ype of snd, eal complete nal respect as per approved rawing, specication ang drecton ofthe Engineer h-chare, ‘Concrete Block Road soem ‘ICGH(auM): Labour charge Tor plang up the wasting CC Block of any Ses on selina ar slope of embankment, including staking the materate at aspecfied distance ele all complete as per rection of the ELC a ono ReCCB(cum): Labour charge fr Sating/Resating of sae layer CC Block af afferent sos on road to, Including preparation base, rue to level, maintaining camber, super elevation, sade, watering and ramming the base, including carrying CC blocks, supplying and fling the interstices tightly with sand (FM -0.5), et.al complete in all espect as per approved Arawing, specication and dection ofthe Engheern-cherge aaa Boas (CCRSS-PiV: Manufacturing and supplying Plain Cement Concrete (PCC) Blocks with coment ‘conforming to BOS EN 197-1 : 2005 CEM-I/A-M 42.5, using stel shutter, wth 46rmm ‘downgraded Stone Shingles, sand (F¥>=1.5) and minimum cement content relates to mix rae 1:36 satisfying specid minimum compressive trenath 10.0Mpa at 28 day, including ‘fading, washings shingles, ming in standard mixture machine, casting in forms, making Shutter water-tight propery, compacting by vibrator rachine ard curing fora least 28 days, Including preparaton of platform, shuttering and stacking in measurable stacks et.al complete n al respect as per approved crawing, speciation and drecton ofthe Engineer in. sarge, 08084 PCC Block Sze: mind2UOMNASOTE ‘ech 2.08 ans PC Block Sas STmRIOORANODETIN ech 36a 8053 PCE Block Sze: 00GmmDSOOMMDOOFISO} wach 750 oan6 ‘CGBES-FE: Providing PCC Block on End Edging (T0Omm across) oF xe (GzemxL00mmx225mm), inducing man facturing and suplying Plain Cement Concrete (0c) Blacks with cement conforming to 8DS EN 197-1 : 2003 CEN-IIJA-M 42.5, using stel Shute, with 4mm down graded Stone Shingles, sand (FM>=1,5) and minimum cement Content relates to mic rato 1:36 salsying specified minimum compressive strength 10,0Mpa 3828 dys, iclucing cating venches tue to level & grade, remevng earth, efling & Fameing the sides properly, including supplying and ling the gaps with local sand (FM - 0.5), ‘te. all complete in al Fespect as per approved drawing, specication and drecton oF the Engineern-charge, 5H ronnea ‘CCBSS-EE-R: Providing CU lock on End Edging (average 125mm scross) for submersble road of size [\: 1060mma: SommXW:(100mm-+1S0mM)}, cng manufacturing and Supplying Plain Cement Concrete (PCC) Blcks with cement conforming to 8DS EN 157-1 2003 CEN-II/A. 42-5N, using stel shutter, with 40mm down graced Stone Shingles, sand (fet>=1,5) and minimum cement content relates to ma ratio 13.6 sisting specified Iinimum compressive strengtn10,0Mpa at 28 days, including cing trenches true to level ‘7ade, removing earth, refi & ranvving the sie propel, induding supplying and filing the gaps with local sane (FM 0.5), et. all complete in al respct as per approved drawing, spectcaton and dection ofthe Engnee-n-ehare. waar ona? (CCASC-RW: Manufacturing and supplying Pain Cement Concrete (PCC) Sicks with coment ‘pnforming to BDS EN 197-1 : 2003 C=MLI/A-M 42.5, for road pavement works using tee! shutter, with 40mm down graded Stone Chips, sand (FM>=1.8) and minimum cement content Felates to mac ratio 1:24 satsfyng spcied minimum compressive strength 20.0Mpa at 28 days Including grading, washings stone chips, mixing in standard mixture machine, castng In form, making shutter watertight propery, compacting by vibrator mactine and caring for at least 28 dys, nclucing preparation of platform, shuttering and stacking In measurable stacks teal complete in al respect as per approved drawing, spectcaton and drction ofthe Engineersn-carge. [Excluding the cost of labour charge for back sett aoaa7 PCC Block Sze: 375minX225mexaSOre ‘each T7682 See ‘CCBSC-RW: Proving sale layer PCC Sock on road top of se S7SmmOC2SmMNTEORIT, Inctuding manufacuring and supplying Pain Cement Concrete (PCC) Blcks with conent ‘conforming to BOS EN 197-1 ; 2003 CEM-I/A-M 42.5, using stelshute, with Alm down ‘raded Stone Chips, sand (FM>=1.8) and minimum cement content rats to mie rallo 12:4 Sty specfed minimum compressive strength 20.0Npa at 28 days, including. preparation of bed by cutng or filing with raring the file’ up earth to the sme profile a that ofthe Finished pavement, induzing canying. and plac PCC blocks, fing the interstices tightly wth sand (FM 0.5), et. all complete in all respect as per approved drawing, speciation and recon ofthe Engineersn-chage an TEs] a8 TCOCB: Labour charge fe layng snake aye” Oc Block of afleret ses for protective wal, inciuding preparaton trenches, tu level, maintaining alignment, wateing and ramming he base, Ineuding carrying. and placing CC blocks, ling minimum 659% Interstees of Oc Block work gnuy with cement mortar (1:6), raking out jin, cleaning and Soaking Block atleast or 24 hours before use, washing of sand, curing fr requste pri, et.al complete inal respect as per approved Grawing,spedcation an cretion of the Engineer in-charge, [Excucing the cast of Cc Slo 13664 Tote Rae ofa ee seu be weliove oa aupp and cara, Pape 20 ‘Schedule of Rates, LGED, February 2023 Tom Code Brief Description of tern oes ‘Une Block Paver Supping and laying Teciory made csment concrete interacting high svenath as specified paver universal uni-block mace by block making machine with mechanically ampressec wth high load-bearing capecry, eniched weather resistance, the lw water absorption capacty of standard thick and approved desgn/shape, sie in required long lasting (clout, texture and patter conferming 85-6717 or as specified approved by the E-F-C, lad ‘ver the prepare sand bedding layer maintaining grade,camber and superslevatio,includog ‘earing ee. all complete in al respect as pr drawing, speciicaton, ection and accepted by the Engineerin-charge. Costindded all material, their camiages, hire charges of ‘machineries, equipment or constuction and Gualty conal as per speciation, wages of labour and operational staf et. 085.01 ‘om Thick (Ses 222m lon), Colour Gay, Pirimum Compressive Svength 25HFa sa 108828 oes oem Thick (Ste: 222rMAT TOMA), Calour Redl Blac any oer SutableGalur, Minima Compressive Strength: 25MPa san Tiss 085.05 ‘om Thick (Size: 222m TOR), Colour Gay, Panimum Compressive Svengih: S0RPa sam 1148.35 onis.o Omnm Thick (Sie: DSmmRi Tom, Calour Rad/BlacNany aber Sutable Colour, Minima Compressive Svength: 30MPa wan ToT onas05 ‘Omm Thick (Siz: 222mm TOT), Colour: Gray, Minimum Compreseve Stength SoM Pa wa Tava oais.06 ‘Orem Thick (Sie: D52mmxiTOmn, Celour:Red|Blacany aber Stable Colour, Minima Compressive Svength: 35MPa san Ta osiso7 ‘Orn Thick (Se 220ml One), Cour: Gray, Minimum Compressive Seng S0MPa oD 196735] oai5.08 ‘orn Thick (Sie: 22zreL LOMA), Calour RadyBlacany oer Sutable Calbur, Minima Compressive Strength: 30MPa san Tene 8809 ‘Om Thick (Swe: 222mm lOve), Colour Gay, Minimum Compressive Svength S5MPa an Tsiea7 RI5.10 Tem Tek (Ste: 2DzAT TOMA), Calor ReGT Tac any Or Sutable Cau, Minima Compressive Strength: 35MPa san T6671 eas. ‘orm Thick (Siz: 222m TOM), Colour Gay, Minimum Compressive Svength AOMPa sa T7273] oes.a2 ‘mm Tick (See: 222mmeL TOMA), Calour Red/ Bled any oer Sutable Gakur, Minimum Compressive Strength: 40MPa san Tia sess omen Thick (Se: 222m Tor), Colour Gray, inimom Compressive Strength 30NPS san 151095 sonia Goren The (See: 22zmeet Tone, Colour ReW/BlakJany her Sutebe Calour, Minar Compressive Svength: 30MPa wan WoO. Ronisas TOO Thick (Sue: 220m Tor), Colour Gray, Mnmum Compressive Strength 35NPa can Taso oais16 Toren THe (Sha: 22zrecLLOne, Colour Red/BlckJany Sher Sutabe Calour, Minar Compressive Strength: 35MPa a 195825 oaisa7 Omen Thick (Sie: 220mrox Tor), Colour: Gray, Minimum Compressive Sirengih 4ONPa san 1909.12 oaiie Goren Tek (Sue: Z2zreL Owe, Colour Red/BlckJany cher Sutabe Colour, Minar Compressive Strength: 40MPa a 207 8 osi519 00men Thick (Ste: 222moxL Tom), Colour Gray, Minimum Compressive Sirengih 45NPa =n 705636 oe t5a0 Toone The (Shes D2ammeT Tone, Cour RET Oany oer Sotae Cau, Minar Compressive Strength: 45M Pa vam Tisase a6 1S-30MPa(RW): Sopplyng and Fong factory made coment concrete Pre Cast Keb stone of spec Size as per aporaved draning and design for side of fotoath/mecian/read island et ‘ng 20mm downgraded Stone Chips of LAA value <30%, sand (FM>=2.5) and minimum ament conforming to BDS EN 197-1: 2003 CEN-I/acM 42.5N content relates to mix ratio 1:1.25:24satisying spcifed minimum required average strength fer = 38.5 Mpa and satisfying a compressive strength f¢ = 30 Mpa at 28 days on standard cylinders, ke stone Should be made by specied machine with mecharicaly compressed wth high load-bearing ‘apaciyevicned weather resistance, the low water absorption capa of standard Nek and approved desgr/shape sein require fong-astng colour, tecure an patter conforming 5717 or as specie appraved bythe ELC. incluaing cating trenches te to level & maintaining grage, algnment ané eight, removing earth, preparation xer funcaton, Inctcing canying and placing kerb stone Bay, e-llng & ramming the ses propery, etc all complete in all respect as per drain, specication, drecton and accepted by the Engineer Invcharge. Cost induded all materials, their earrages, hire carges of wachineres, equipment for construction and quality conto s per specication, wages of labour and operational staff ete Ti. oaiea S-35HPa{RWD): Supplying and Png fadory made coment concrete Pre Cast eo stone oF specie size as per aporaved draning and design for side of footpath/mecarVroad island et sng 2Umm downgraced Stone Chips of LAA value 30%, sand (FM>=2 8) and minimum ‘cement conforming to BDS EN 197-1: 2003 CEN-IpicM 42.5N centent relates to marimum Imacraio 1:12:23 satitying specied misimum required average strength fer = 45 Mpa and Satshing 2 compressive stenath Pe = 35 Mpa at 28 days on standard cylinders kero stone Should be made by specied machine with mecharicaly compressed wth high load-bearing T0057 Tote Rae ofl ee seul be wehisve oa supp and aa, Pape moss eof | Tom Goak Brio Description of arn ‘apaciy evicned weather resistance, the low water absorpion capsly of standard tick and approved desgr/shapesie In required long-lasting colour, texure and patter conforming BS: 65717 or as specie approved by the E--C. rcudin cutng trenches tue to level & maintaining grace, alignment an height, removing earth, preparation kerb founcaton, Inetuding carrying and placing kerb stone bay, refling & ramming the Sdes propery et. all complete nal respec as per drawing, specication, cretion and accepted by te Engineer Inecharge. Cost induded all materials, thelr earrages, hire carges of machineries, equipment for construction and quality convo as per specication, wages of labour and opertenal staff tte Bonar SprkCamn Spreading fling sand @ OOicam/sqn or as requred of muamum FH=0.8 waformiy ‘over the lag paving blocks, nduding ecal handling, Booming and compacting 2 east two asses of vbratery plate compactor or by aporoprate mecharical means to obtain smooth top Furface subsequent after 7 days fatr re-do the actvty again [standard compactors may have weight of about $09, plate area of about 0.3 sam and apply a certrfugal ore of about {SKN such ratory compacton shouldbe continued tl the top ofeach paving block isn level th ts adacent blocks, There sould not be delay in compaction ate laying of paving blocks te achieve unfority af compaction and retention ofthe pattem of laying) et ll ‘ampletein al respect as per drawing, spectiation, drecton and accepted bythe Engine charge. sam 7a] [Section-10: Special Road Maintenance anon ALN: Preparation of Pothole for smal path works (pothole, edge breaking, ett) By cuttng, Scaring ad loosening of existing damaged Base/sub- bass Course materials upto the depth {af 150mm atthe pothole aeas inorder to make regular shape of he pothole including levang, dressing and compacting ranualy where mechanical compactors ae net suabe to ‘ve 2 smooth surface including rusting, removing & stacking al debrs ata safe stance etc al complete nal respect as pe direction ofthe Engineeran-charge, am 278 Binnie THAPHM: Preparation of Fard bed by scarfying and loosening o existing top (BRumInaU5) surface, including bas/sub-base course materls up to the depth of 75mm (irimurn) using mechanical mean, beating dismantled material into specfid ies less than 4m), wth Supplying of extra esh base course materals of required specfeation (required) ncudng spreading, leveling, cressing of loose material uniformly for maintaining camber & grade, twatenng needed, olin with & to 10 MT road roller to give compaction to 100% oF MOD as obtained by standard proctor test et all complete in all respect as per direction of the Engingern-charge. (Rate is excluding the cos of adtional mater supplied) san Eo Some 38: Providing and applying sand Binding wit sand of minimum FH 0.80 0,005 cum per sqm on prepared road surface, including supplying ofall material, their carriage, labours, tools and ulpment et, all complete inal respect as per drecton ofthe Engineer -charge sam 533 Bina 25:mmSGSS: Proving 25mm thick (average) grouting with Zinn downgraded broken stone Shingles (LAA value not exceeding 35) and using 60/70 penetration grace straight run btumen Cnfrming tothe requirements of ASTH/ AASHTO, spraying tack coat @ 0,50kg per sqm over the deaned road surface and laying, spreading stone shingles 0.028cum per sam loose) on the road surface, mantaling prope” camber, lve, grade, super elevation and spraying hot bitumen @1.50kg per sqm uniformly, including roling hard to full covpaction with 8 to 10 MT road rl inducing clearing the surface & heating btumen fom 140°C to 160°C temperture land spreading crushed stone chipe/Sand (F-1.80) G0,006cum per sqm road surface et.al {amplete in al respect as per drection ofthe Engineerio-carge [Reta sam 585 in03.01 25immSGSS: Providing 25mm Wick (average) grouting with 2omm downgraded broken stone Shingles (LAA value nok exceeding 35) and using 60/70 penetration grace straight run oturen confer tothe requirements of ASTHY AASHTO, spaying tack cot 0,50k9 per sqm over the deaned road surface and laying, spreading stone singles @0.028cum per sam (loose) on the road surface, maintaining prope" camber, lve, grade, super elevation and spreying hot bbtumen @1.50kg per sqm uniformly including oling hard to full compaction wth 8 to 10 MT road rl inducing clearing the surface & heating btumen fom 140°C to 160°C terpereture {and spreading crushed stone chips/Sand (F¥-1,80) 20,006com per sqm road surace et all ample in al respect as pr direction ofthe Engineern-cnage [Buk] ain 31099 anna '50mmSGBC: Providing Somm tick (average) grouting with picked brik hips (LAA value not exceeding 40) and usng 60/70_penetraton grade straight run bitumen conforming tthe requirements of ASTM/ AASHTO, lying and spreading picked brick chs 6mm thick (lose) in two layers, 1st ayer of 35mm thick (oose) wit 25mm to UGmem size and ne layer of 259m thick lose) mixing wth 608 of 16mm to 12mm size and 20% of 12mm to Sm sire picked bk chips, spraying tack coat @ 0.50kg per sqm over the cleaned road surface, mainting proper comer, level grade, super elevation and spraying hot ttumen 125k per sam Uniformly on the 1st layer and @1.50kg per sqm on 2nd layer, inludng eling hard to full compaction with 8 to 10 MT read roller including leaning the surface B heating btumen from 140°C to 160°C temperature and spreading crushed ste chips/Sand (FM-1 80) 0.006 cum er sam on road surface et all eomplete inal respect as per drection of te Engineer= sarge. [Reta] sam 732.85 Binnaior '50mmSGBC: Providing Som tid (average) grouting with picked brik his (LAA value not exceeding 40) and usng 60/70_penetratan grade straight run btumen conforming tthe requirements of ASTM AASHTO, laying and spreading picked brick cps Go thick (lose) in sam 780.70 Tote Rae ofl ee seul be wehisve oa supp and aa, Pape a8

You might also like