Boiler Life and Availability Improvement Target

“This advanced technology


has applications at electric
utilities offering significant
cost savings for on-line
piping inspection.”
• Bob Penny
Director, Engineering Programs
New York Power Authority
• Phil Winegar
Senior Engineer, R&TD
New York Power Authority
• Jim Sherman
FAC Program Engineer
New York Power Authority

Benefits and operations. Conventional inspection pipe failure at a nuclear power plant.
• Using the INCOTEST system to is based on removal of pipe insulation More recent failures and detected
inspect for flow-accelerated corro- to measure pipe wall thickness with ultra- damage in fossil power plants have
sion damage in large-bore piping sonic testing (UT). This requires a also highlighted the need for addi-
and feedwater heater shells with- maintenance outage and involves the tional steps to control the FAC risk at
out removing insulation, New significant cost of removing and replac- fossil plants. Accordingly, in 1997
York Power Authority estimates a ing the pipe insulation along with costs EPRI developed and published guide-
saving of over $450,000 biannu- due to piping surface preparation. lines that recommend a combination
ally at one site. Radiographic testing can be performed of short-term actions based on inspect-
• The through-insulation inspection through insulation, but it requires sig- ing for existing damage and long-term
technique allows greater flexibility nificant personnel safety measures and actions based on maintaining feedwater
in checking piping independent may interfere with normal plant opera- chemistry parameters to reduce the
of planned maintenance outages. tions. Consulting with EPRI, the New susceptibility of piping to FAC damage.
Challenge York Power Authority (NYPA) imple- Guidelines were developed to provide
Flow-accelerated corrosion (FAC) affects mented a program to find cost-effective additional options for performing piping
the feedwater systems of many power methods of assessing the risk of FAC inspections. An innovative pulsed eddy-
plants and results in loss of pipe wall damage at its IP3 Power Project. current technique by Rontgen
thickness. If the FAC damage goes Response Technische Dienst (RTD) in the
undetected, pipe rupture may occur, FAC damage has been an area of sig- Netherlands to detect corrosion under
with significant consequences for safety nificant EPRI research since a 1986 insulation for the petrochemical indus-

JUNE 2000 13469978 IN-114576


try was identified. EPRI contracted with successful testing at Poletti, through- silicate) or surface preparation. An
RTD to assess and refine the technique insulation testing was performed at IP3 added benefit is that the INCOTEST
for application to inspecting feedwater in September 1998. Results were con- data files are compatible with EPRI's
piping for FAC. The results demon- sistent with previous data taken with ChecWorks Software Program.
strated that the RTD system, called insulation removed and verified that
References
INCOTEST for Insulated Component FAC damage was not occurring.
• Guidelines for Controlling Flow-
Test, could be successfully used for Based on this work, more testing
Accelerated Corrosion in Fossil Plants.
FAC inspection. was conducted at IP3 in August 1999.
EPRI Report TR-108859, 1997.
The INCOTEST system measures Initially the INCOTEST system was
the diffusion of an eddy-current pulse used as a screening tool on systems such • Assessment of the Pulsed Eddy-Current
as it penetrates the pipe wall. When as the feedwater system, which has Technique: Detecting Flow-Accelerated
the eddy current reaches the back wall parallel trains of identical components. Corrosion in Feedwater Piping. EPRI
of the pipe, the signature of the signal The INCOTEST system would allow Report TR-109146, 1997.
suddenly changes. The time of arrival NYPA to economically screen multiple EPRI publications are available from
at the back wall is dependent on mag- components, and if required, perform the EPRI Distribution Center,
netic permeability, conductivity, and confirmatory UT on suspect areas. (925) 934-4212.
material thickness. The INCOTEST system proved
In 1998, RTD licensed INCOTEST extremely economical when used to For further information, contact:
for application to power plant piping measure the thickness of the feedwater EPRI
in the United States. NYPA and EPRI shells. Seven feedwater heaters were P.O. Box 10412
entered into a cofunding agreement selected for inspection, based on recent Palo Alto, CA 94303
to assess the performance of the industry events of feedwater heater shell (800) 313-3774
INCOTEST system at both the fossil failures. An area approximately 8 feet (650) 855-2121 (International)
steam plant Poletti Power Station Unit wide by an arc of approximately 300 Rich Tilley, Manager
1 and the pressurized water reactor IP3 degrees was easily examined without Boiler Life and Availability
Power Project. Following the initial, the removal of insulation (calcium Improvement
Science & Technology Development
(704) 547-6097
rtilley@epri.com
Calculated Value of NYPA's Application Norris Hirota, Target Manager
Estimated Saving ($000)
Steam & Hydro Turbine-Generator and
Investment Fixed Present
Year Saving Charges O&M(1) Total Value(2) Balance of Plant
Science & Technology Development
1998 0 0 0 (650) 855-2084
1999 450.0 450.0 450.0
nhirota@epri.com
2000 0 0 0
2001 482.1 932.1 404.3 Kenji Krzywosz
2002 0 0 0
Program Manager
2003 516.4 1448.5 363.2
NDE Technology & Training
Present value of total estimated saving $1,218,000 Science & Technology Development
Levelized annual saving $241,000 (704) 547-6096
kkrzywos@epri.com
Basis for Benefits No credit is taken for the benefit of Interest Categories
1.O&M saving is based on the cost performing inspections during plant • Boiler life and availability improvement
of conventional pipe inspection, operation. The calculation applies a • Fossil NDE technology and training
including insulation removal and 3.5% escalation factor to O&M program
replacement, scaffolding, and the savings.
handling of lead-containing coated 2.The 1998 present-value calculations
surfaces, less the cost of INCOTEST assume a 5.5% discount rate.
through-insulation pipe inspection.

© 2000 Electric Power Research Institute (EPRI), Inc.


All rights reserved. Electric Power Research Institute
EPRI • 3412 Hillview Avenue, Palo Alto, California 94304-1395 USA and EPRI are registered service marks of the Electric
P.O. Box 10412, Palo Alto, California 94303-0813 USA Power Research Institute, Inc.
800.313.3774 • 650.855.2121 • askepri@epri.com • www.epri.com Printed on recycled paper in the United States of America

13469978

You might also like