N ew Yo r k Powe r A u t h o r i t y S ave s W i t h I N C OT E S T
T h ro u g h - I n s u l a t i o n I n s p e c t i o n f o r F l ow - A c c e l e r a t e d
C o r ro s i o n D a m age
Boiler Life and Availability Improvement Target
Benefits and operations. Conventional inspection pipe failure at a nuclear power plant.
• Using the INCOTEST system to is based on removal of pipe insulation More recent failures and detected
inspect for flow-accelerated corro- to measure pipe wall thickness with ultra- damage in fossil power plants have
sion damage in large-bore piping sonic testing (UT). This requires a also highlighted the need for addi-
and feedwater heater shells with- maintenance outage and involves the tional steps to control the FAC risk at
out removing insulation, New significant cost of removing and replac- fossil plants. Accordingly, in 1997
York Power Authority estimates a ing the pipe insulation along with costs EPRI developed and published guide-
saving of over $450,000 biannu- due to piping surface preparation. lines that recommend a combination
ally at one site. Radiographic testing can be performed of short-term actions based on inspect-
• The through-insulation inspection through insulation, but it requires sig- ing for existing damage and long-term
technique allows greater flexibility nificant personnel safety measures and actions based on maintaining feedwater
in checking piping independent may interfere with normal plant opera- chemistry parameters to reduce the
of planned maintenance outages. tions. Consulting with EPRI, the New susceptibility of piping to FAC damage.
Challenge York Power Authority (NYPA) imple- Guidelines were developed to provide
Flow-accelerated corrosion (FAC) affects mented a program to find cost-effective additional options for performing piping
the feedwater systems of many power methods of assessing the risk of FAC inspections. An innovative pulsed eddy-
plants and results in loss of pipe wall damage at its IP3 Power Project. current technique by Rontgen
thickness. If the FAC damage goes Response Technische Dienst (RTD) in the
undetected, pipe rupture may occur, FAC damage has been an area of sig- Netherlands to detect corrosion under
with significant consequences for safety nificant EPRI research since a 1986 insulation for the petrochemical indus-
13469978